  • 7/31/2019 FTM - TPM Presentation

    1/13

    1

    Total Productive Maintenanceand

    FTM From Werardt

    A presentation by Werardt Systemss P Ltd

  • 7/31/2019 FTM - TPM Presentation

    2/13

    2

    Increases Productivity

    Labor productivity, and Break down reduction

    Improves Quality by

    Reducing the Defects in processes Reducing Defects in products Reducing Customer complaints

    Why TPM?

  • 7/31/2019 FTM - TPM Presentation

    3/13

    3

    Reduces Cost

    Reduction in man power Maintenance cost reduction Energy Conservation

    Delivery

    Stock reduction Inventory turnover increase

    Safety Environment

    Improvement Ideas increase Small Group meetings increase

    Why TPM?

  • 7/31/2019 FTM - TPM Presentation

    4/13

    4

    Financial Return on Investment (ROI)

    after 2 to 3 years

    Break even on initial TPM

    project Less than one year

    Reduction in absenteeism, aswork place is enriched

    Why TPM?

  • 7/31/2019 FTM - TPM Presentation

    5/13

    5

    Zero unplanned Downtime

    Zero Defects

    Zero failure

    Zero variability Reduced Idle time on machines

    Zero Accidents

    Maximized P.M. Compliance

    Thus Maximizing OEE

    TPM Goals

    FTM puts you on the road to achieve these Goalsin a Simple, Better and Faster way !

  • 7/31/2019 FTM - TPM Presentation

    6/13

    6

    The Pillars of TPM

    TPM is a cultural change and FTMsupplements it in Information management

    1 Kobetsu Kaizen - Individual Improvements

    2 Jishu-Hozen - Autonomous Maintenance

    3 Planned Maintenance

    4 Quality Maintenance5 Education and Training

    6 Safety and Environment

    7 Office TPM

    8 Development Management

  • 7/31/2019 FTM - TPM Presentation

    7/13

    7

    Some Facts about TPM & Maintenance

    Maintenance can generally account fora major portion of todaysmanufacturing costs

    Hence when it comes to TPM

    implementation the Maintenancedepartment generally takes the lead

    Generally upto 25% of maintenancecost is wasted or not known

    Emergency repair jobs are at least

    three times more expensive than thesame repair done a pre-planned basis.

    Hence TPM & Maintenance go hand-in-hand

  • 7/31/2019 FTM - TPM Presentation

    8/13

    8

    RCFA - Root Cause Failure Analysis

    Making P.M. effective and dynamic

    Condition & Time Based Maintenance

    Doing Why-Why Analysis and maintaining 6W2H

    Improving the Reliability of work

    Reducing Idle time on repairs

    Condition Monitoring and Inspection

    Autonomous Maintenance activities

    How to achieve Zero Breakdowns?

    FTM is very strong in this area !

  • 7/31/2019 FTM - TPM Presentation

    9/13

    9

    Awareness : Understanding your activities, IdentifyingCritical, Essential and Desirable requirements

    Business Process Optimization : What processes do youfollow to achieve your objectives? Who is doing what? Arethey trained for the Job? Are required skills available?

    Quantification : How many and which type of Jobs do youdo? To focus on the type of work being done, how much isreactive and how much is proactive?

    Benchmarking : FTM helps in devising and defining your Key

    measuring parameters or KPIs that help in Improvements

    Performance Review : And most importantly devising a postimplementation review mechanism to monitor progress

    The FTM Steps to Success

  • 7/31/2019 FTM - TPM Presentation

    10/13

    10

    Facilitating autonomous maintenance or Jishu Hozen, throughActivity based PM, and feedback on machine behavior

    Applying Kaizen activities to monitor Improvements

    Increasing the ease of operation, make it easy from

    information and work point of view Improving skills through need based training programs and

    easy availability of history

    Improving maintainability through condition monitoring andreliable operations

    Improving safety through awareness

    Maintenance Prevention Design

    Applying FTM feedback !

  • 7/31/2019 FTM - TPM Presentation

    11/13

    11

    Key Result Areas

    1. Improving human resources

    Operators ability to perform Jishu-Hozen

    Maintenance employees ability to perform quality & reliable

    maintenance Production engineers ability to execute maintenance free

    equipment plan

    2. Improving Plant & Machinery

    Maximizing Uptime

    Increased Plant value

    Achieving TPR - Total Plant Reliability

  • 7/31/2019 FTM - TPM Presentation

    12/13

    12

    3. Improving the corporate culture

    From authoritarian to participative management

    Involving everyone in CIP

    4. Reducing losses

    Down time losses

    Speed losses

    Defect lossesFTM directly and indirectly helps you in

    achieving the above

    Key Result Areas

  • 7/31/2019 FTM - TPM Presentation

    13/13

    13

    Contact Information

    Werardt Systemss Pvt Ltd

    Pune, India

    Phone : 91-20-25285256, 25285257

    Website : http://www.werardt.com

    email: [email protected]