    Obra

    Cliente MUNICIPALIDAD DISTRITAL DE YUNGA

    Item Descripcin Und. Metrado Precio S/. Parcial

    01.00.00 OBRAS PROVISIONALES

    01.01.00 CONSTRUCCIONES PROVISIONALES

    01.01.01 OFICINAS GLB 1.00 750.00 750.0001.01.02 VESTUARIO GLB 1.00 750.00 750.00

    01.01.03 CERCO PERIMETRICO GLB 1.00 1,000.00 1,000.00

    01.01.04 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M UND 1.00 700.00 700.0001.02.00 INSTALACIONES PROVISIONALES01.02.01 AGUA PARA LA OBRA GLB 1.00 500.00 500.00

    01.02.02 DESAGUE PARA LA CONSTRUCCION GLB 1.00 750.00 750.0001.02.03 ENERGIA ELECTRICA GLB 1.00 2,500.00 2,500.0001.02.04 TRANSPORTE DE MATERIALES AQP - YUNGA GBL 1.00 25,000.00 25,000.0002.00.00 TRABAJOS PRELIMINARES02.01.00 LIMPIEZA DE TERRENO02.01.02 ELEMENTOS DE BASURA Y ELEMENTOS SUELTOS LIVIANOS M3 110.00 13.22 1,454.2002.02.00 TRAZOS, NIVELES Y REPLANTEOS02.02.01 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO M2 2,200.00 0.52 1,144.00

    03.00.00 MOVIMIENTO DE TIERRAS

    03.01.00 NIVELACION DE TERRENO03.01.01 NIVELACION DE TERRENO M2 2,200.00 0.77 1,694.0003.01.02 NIVELACION INTERIOR APISONADO MANUAL M2 2,200.00 0.40 880.0003.02.00 EXCAVACIONES03.02.01 EXCAVACION ZAPATAS M3 448.24 1.00 448.2403.02.02 EXCAVACION DE ZANJAS M3 192.24 9.80 1,883.95

    03.03.00 CORTES03.03.01 CORTE DE MATERIAL RENDIMIENTO=750 M3/DIA M3 1,797.98 0.69 1,240.6103.04.00 RELLENOS03.04.01 EXTRACCION Y APILAMIENTO RENDIMIENTO=370 M3/DIA M3 1,491.67 2.05 3,057.9203.04.02 CARGUIO Y TRANSPORTE DE RELLENO A OBRA M3 947.49 8.94 8,470.5603.04.03 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 474.05 4.16 1,972.0503.05.00 ELIMINACION DE MATERIAL EXCEDENTE03.05.01 ELIMINACION MATERIAL EXCEDENTE M3 2,118.50 8.94 18,939.3903.06.00 NIVELACION INTERIOR Y APISONADO03.06.01 NIVELACION RELLENO CON MATERIAL PROPIO M3 430.65 5.52 2,377.1904.00.00 OBRAS DE CONCRETO SIMPLE04.01.00 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA M3 24.93 117.38 2,926.2804.02.00 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS M3 10.80 135.38 1,462.1004.03.00 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MT M2 110.81 21.47 2,379.0904.04.00 SOLADO PARA ZAPATAS E=4" MEZCLA 1:12 M2 224.12 12.81 2,870.98

    05.00.00 OBRAS DE CONCRETO ARMADO05.01.00 ZAPATAS05.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 M3 104.17 254.42 26,502.9305.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS KG 3,021.98 3.40 10,274.7305.02.00 CIMIENTOS REFORZADOS O VIGAS DE CIMENTACION05.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 M3 74.95 280.31 21,009.2305.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACION M2 324.27 25.63 8,311.0405.02.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CIMENTACION KG 5,376.46 3.40 18,279.9605.03.00 COLUMNAS05.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 183.95 287.52 52,889.3005.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 961.84 26.22 25,219.4405.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS KG 17,884.89 3.40 60,808.6305.04.00 VIGAS05.04.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 90.28 290.86 26,258.8405.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 753.80 31.10 23,443.18

    05.04.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELES KG 8,525.85 3.40 28,987.8905.05.00 LOSAS ALIGERADAS05.05.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 M3 11.33 266.46 3,018.9905.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS M2 136.45 21.39 2,918.6705.05.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS KG 1,943.94 3.40 6,609.4005.05.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO UND 1,365.00 1.31 1,788.1505.06.00 GRADERIOS APOYADO SOBRE TERRENO COMPACTADO05.06.01 CONCRETO FC=140 KG/CM2. EN GRADERIOS M3 100.10 164.07 16,423.4105.06.02 ENCOFRADO Y DESENCOFRADO EN GRADERIOS M2 335.03 21.91 7,340.5105.06.03 ACERO ESTRUCTURAL TRABAJADO PARA GRADERIOS KG 2,238.71 3.40 7,611.6105.07.00 GRADERIOS05.07.01 CONCRETO EN GRADERIOS FC=210 KG/CM2 M3 72.02 290.55 20,925.4105.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIOS M2 608.33 21.91 13,328.5105.07.03 ACERO ESTRUCTURAL EN GRADERIOS KG 9,908.52 3.40 33,688.9705.08.00 MURO DE CONTENCION ARMADO

    CONSTRUCCION DE COLISEO MUNICIPAL DE USOS MULTIPLES -YUNGA

    Presupuesto

  • 7/22/2019 Control Avance 2

    2/16

    Obra

    Cliente MUNICIPALIDAD DISTRITAL DE YUNGA

    Item Descripcin Und. Metrado Precio S/. Parcial

    CONSTRUCCION DE COLISEO MUNICIPAL DE USOS MULTIPLES -YUNGA

    Presupuesto

    05.08.01 CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2 M3 34.16 278.00 9,496.4805.08.02 ENCOFRADO Y DESENCOF MUROS REFORZADOS M2 273.24 17.28 4,721.5905.08.03 ACERO ESTRUCTURAL TRABAJADO PARA MUROS KG 2,659.94 3.40 9,043.8005.09.00 TANQUE ELEVADO05.09.01 CONCRETO EN TANQUE ELEVADO F'C=210 KG/CM2 M3 5.48 315.59 1,729.4305.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN TANQUE ELEVADO M2 56.26 19.54 1,099.3205.09.03 ACERO GRADO 60 EN TANQUE ELEVADO KG 247.74 3.40 842.3205.10.00 TANQUE CISTERNA05.10.01 CONCRETO EN TANQUE CISTERNA M3 10.35 294.95 3,052.73

    05.10.02 ENCOFRADO Y DESENCOFRADO NORMAL EN T. CISTER. M2 66.82 19.51 1,303.6605.10.03 ACERO GRADO 60 EN TANQUE CISTERNA KG 415.21 3.40 1,411.7105.11.00 ESCALERAS05.11.01 CONCRETO FC=210 KG/CM2 EN ESCALERAS M3 2.75 250.30 688.3305.11.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS M2 12.21 16.24 198.2905.11.03 ACERO GRADO 60 EN ESCALERAS KG 185.28 3.49 646.6306.06.01 APOYO DE ARMADURAS PRINCIPALES UND 12.00 992.53 11,910.3607.00.00 MUROS Y TABIQUES DE ALBA ILERIA07.01.00 MUROS DE LADRILLO KING KONG DE ARCILLA07.01.01 MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM. M2 1,148.68 37.84 43,466.0507.01.02 MURO DE CABEZA LADRILLO KK CON CEM-ARENA 1:4 X 1.5 CM M2 616.18 59.94 36,933.8308.00.00 REVOQUES, ENLUCIDOS Y MOLDURAS08.01.00 EN MUROS08.01.01 TARRAJEO PRIMARIO RAYADO M2 328.86 5.40 1,775.8408.01.02 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA M2 2,846.45 5.69 16,196.30

    08.01.03 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA M2 1,314.46 7.72 10,147.6308.02.00 EN COLUMNAS08.02.01 TARRAJEO DE SUPERFICIE COLUMNA M2 890.10 11.15 9,924.6208.02.02 TARRAJEO DE ARISTAS EN COLUMNAS M 1,259.60 1.50 1,889.4008.03.00 EN VIGAS08.03.01 TARRAJEO DE SUPERFICIE VIGAS M2 548.89 12.84 7,047.7508.03.02 VESTIDURA DE ARISTAS EN VIGAS M 1,089.82 2.78 3,029.7008.04.00 VESTIDURA DE DERRAMES08.04.01 VESTIDURA DE DERRAMES EN PUERTAS M 189.40 2.63 498.1208.04.02 VESTIDURA DE DERRAMES EN VENTANAS M 206.80 2.92 603.8608.05.00 TANQUE ELEVADO08.05.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA M2 36.54 7.97 291.2208.05.02 TARRAJEO INTERIOR CON CEMENTO-ARENA + IMPERMEABILIZANTE M2 32.18 9.19 295.7308.06.00 TANQUE CISTERNA08.06.01 TARRAJEO DE MUROS INTERIORES M2 33.99 13.60 462.26

    09.00.00 CIELORRASOS09.01.00 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA M2 136.45 16.73 2,282.8109.02.00 VESTIDURA DE SUPERFICIE FONDO DE ESCALERA C/MOR.1:4 X 1.5 CM M2 8.21 10.82 88.8310.00.00 PISOS Y PAVIMENTOS10.01.00 FALSO PISO DE 4" DE CONCRETO 1:10 M2 2,144.18 14.53 31,154.9410.02.00 CONTRAPISO DE 48 MM. M2 2,355.32 12.06 28,405.1610.03.00 PISO DE CEMENTO PULIDO CON OCRE E=2.5 CM M2 1,228.99 10.73 13,187.0610.04.00 PISO DE CERAMICO DE COLOR 30 X 30 CM M2 208.30 38.57 8,034.1310.05.00 PISO DE PARQUET HUAYACAN 6 X 30 CM VETEADO M2 838.06 37.17 31,150.6911.00.00 CONTRAZOCALOS11.01.00 CONTRAZOCALO DE CEDRO 3/4" X 2" RODON DE 3/4" M 95.75 9.13 874.2012.00.00 ZOCALOS12.01.00 ZOCALO DE MAYOLICA DE COLOR 20 X 30 CM M2 328.86 47.04 15,469.5713.00.00 REVESTIMIENTO DE GRADAS Y ESCALERAS13.01.00 REVESTIMIENTOS DE GRADERIOS M2 1,041.54 9.24 9,623.83

    14.00.00 CARPINTERIA METALICA14.01.00 PUERTAS Y VENTANAS DE FIERRO14.01.01 PUERTA TIPO P-01 UND 2.00 555.91 1,111.8214.01.02 PUERTAS TIPO P-02 UND 2.00 307.95 615.9014.01.03 PUERTAS TIPO P-04 UND 12.00 147.95 1,775.4014.01.04 PUERTAS TIPO P-06 UND 4.00 505.91 2,023.6414.01.05 VENTANA TIPO V-05 UND 8.00 472.36 3,778.8814.02.00 DIVISION DE FIERRO PARA SERVICIOS HIGIENICOS14.02.01 DIVISION CON PANELES METALICOS EN SS HH M2 38.50 85.64 3,297.1414.03.00 ELEMENTOS ESPECIALES14.03.01 TAPA METALICA DE 0.60 X 0.60 M UND 1.00 57.03 57.0315.00.00 CARPINTERIA DE MADERA15.01.00 PUERTAS DE MADERA15.01.01 PUERTAS TIPO P-03 UND 12.00 472.36 5,668.3215.01.03 PUERTAS TIPO P-06 UND 6.00 477.95 2,867.70

    16.00.00 CERRAJERIA

  • 7/22/2019 Control Avance 2

    3/16

    Obra

    Cliente MUNICIPALIDAD DISTRITAL DE YUNGA

    Item Descripcin Und. Metrado Precio S/. Parcial

    CONSTRUCCION DE COLISEO MUNICIPAL DE USOS MULTIPLES -YUNGA

    Presupuesto

    16.01.00 BISAGRAS16.01.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" PZA 184.00 7.01 1,289.8416.02.00 CERRADURAS16.02.01 CERRADURA EN PUERTA METALICA DE INGRESO 3 GOLPES UND 32.00 69.02 2,208.6416.02.02 CERRADURA PTA.BA O TIPO CILINDRO PZA 6.00 37.02 222.1216.02.03 CERRADURA PARA PUERTA PRINCIPAL PESADA PZA 32.00 69.02 2,208.6417.00.00 VIDRIOS, CRISTALES Y SIMILARES17.01.00 VIDRIO SISTEMA MODUGLASS E=8 mm INC INST Y ACC P2 1,802.65 10.16 18,314.9217.02.00 VIDRIO SISTEMA MODUGLASS E=6 mm INC INST Y ACC P2 611.40 8.27 5,056.28

    17.03.00 ESPEJOS 50 X 60 cm UND 20.00 14.99 299.8018.00.00 PINTURA18.01.00 PINTURA LATEX EN CIELO RASO 2 MANOS M2 119.95 3.63 435.4218.02.00 PINTURA EXTERIORES CON LATEX 2 MANOS M2 1,314.46 5.44 7,150.6618.03.00 PINTURA EN INTERIORES AL OLEO 2 MANOS M2 4,479.49 5.31 23,786.0918.04.00 PINTURA EN COLUMNAS M2 961.84 5.39 5,184.3218.05.00 PINTURA EN VIGAS M2 470.09 5.04 2,369.2518.06.00 PINTURA DE CONTRAZOCALO C/BARNIZ M 95.75 1.14 109.1618.07.00 PINTURA EN PUERTA METALICA M2 49.98 5.17 258.4018.08.00 PINTURA EN ESTRUCTURA METALICAS DE COBERTURA M 1,250.00 10.85 13,562.5018.09.00 PINTURA EN ESTRUCTURA METALICA DE ILUMINACION M 310.00 3.84 1,190.4018.10.00 PINTURA EN CORREAS METALICAS M 756.00 9.87 7,461.7219.00.00 VARIOS, LIMPIEZA19.01.00 LIMPIEZA PERMANENTE DE OBRA GLB 1.00 4,791.60 4,791.6019.02.00 LIMPIEZA FINAL DE OBRA GLB 1.00 2,359.02 2,359.02

    20.00.00 APARATOS Y ACCESORIOS SANITARIOS20.01.00 INODORO TANQUE BAJO BLANCO PZA 42.00 180.00 7,560.0020.02.00 LAVATORIO DE PARED BLANCO 1 LLAVE PZA 20.00 120.00 2,400.0020.04.00 DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS UND 6.00 30.00 180.0020.05.00 COLOCACION DE APARATOS CORRIENTES PZA 40.00 23.96 958.4020.06.00 COLOCACION DE ACCESORIOS SANITARIOS PZA 40.00 11.98 479.2021.00.00 INSTALACIONES SANITARIAS21.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP PTO 40.00 18.57 742.8021.02.01 TUBERIA DE PVC DE 1/2" CLASE 10 M 75.00 6.41 480.7521.02.02 TUBERIA DE PVC 3/4" CLASE 10 M 45.00 7.25 326.2521.02.03 TUBERIA DE PVC DE 1" CLASE 10 M 35.00 7.67 268.4521.02.04 TUBERIA DE PVC DE 1 1/4" CLASE 10 M 95.00 10.16 965.2021.02.05 TUBERIA DE PVC DE 1 1/2" CLASE 10 M 25.00 9.24 231.0021.02.06 TUBERIA DE PVC DE 2" CLASE 10 M 26.00 10.16 264.1621.03.01 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2" UND 2.00 42.78 85.56

    21.03.02 VALVULA COMPUERTA 3/4" DE BRONCE UND 3.00 53.78 161.3421.03.03 VALVULA DE COMPUERTA 1" DE BRONCE UND 2.00 64.28 128.5621.03.04 VALVULA DE COMPUERTA DE 2" BRONCE UND 2.00 65.28 130.5621.04.01 PRUEBA HIDRAULICA EN TUBERIA DE AGUA GLB 2.00 214.93 429.8623.00.00 DESAGUE INTERIOR23.01.01 SALIDAS DE PVC SAL PARA DESAGUE DE 4" PTO 30.00 40.50 1,215.0023.01.02 PUNTO DE DESAGUE CON TUB. PVC SAL 2" PTO 30.00 40.50 1,215.0023.02.01 TUBERIA PVC SAL 6" M 125.00 40.24 5,030.0023.02.02 TUBERIA DE PVC SAL 4" M 114.00 7.59 865.2623.02.03 TUBERIA DE PVC SAL 2" M 75.00 6.50 487.5023.03..01 SUMIDEROS DE 2" PZA 44.00 31.34 1,378.9623.04.01 REGISTRO DE BRONCE 2", PROVISION Y COLOCACION UND 10.00 21.81 218.1023.04.02 REGISTROS DE BRONCE DE 4" PZA 38.00 27.53 1,046.1423.05.01 PRUEBA HIDRAULICA+ESCORRENTIA DE TUBERIA DESAGUE M 1.00 163.04 163.0424.00.00 SISTEMA DE AGUA DE LLUVIA

    24.01.01 TUBERIA PVC SAP 2" M 125.00 9.68 1,210.0024.01.02 CONCRETO F'C=140 KG/CM2 PARA ANCLAJES Y/O DADOS M3 1.00 208.56 208.5625.00.00 TANQUE ELEVADO25.01.00 SISTEMA DE REBOSE Y SISTEMA CONTRA INCENDIO UND 2.00 120.75 241.5025.02.00 VENTILACION EN TANQUE ELEVADO UND 2.00 38.17 76.3425.03.00 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDA OS DE 3/4" M 2.00 56.49 112.9826.00.00 REDES EXTERIORES DE DESAGUE26.01.01 TRAZO Y REPLANTEO M 113.72 0.28 31.8426.01.02 EXCAVACION DE ZANJAS (TERRENO NORMAL) M3 314.00 11.54 3,623.5626.01.03 RELLENO Y COMP.MAT.PROPIO EN ZANJAS M3 34.12 5.13 175.0426.02.01 TUBERIA DE PVC SAL 4" M 91.32 11.58 1,057.4926.02.02 TUBERIA PVC SAL 6" M 20.40 40.24 820.9026.03.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" PZA 10.00 47.58 475.8027.00.00 SISTEMA DE BOMBEO27.01.00 TUBERIA FIE.GALVANIZADO PESADO C-40 1" I/ELEM.UNION+ 2%DESP. M 40.00 12.78 511.20

    27.02.00 ELECTROBOMBA DE AGUA POTABLE P=1 HP UND 2.00 491.50 983.00

  • 7/22/2019 Control Avance 2

    4/16

    Obra

    Cliente MUNICIPALIDAD DISTRITAL DE YUNGA

    Item Descripcin Und. Metrado Precio S/. Parcial

    CONSTRUCCION DE COLISEO MUNICIPAL DE USOS MULTIPLES -YUNGA

    Presupuesto

    28.00.00 EMPALME A REDES28.01.00 EMPALME A BUZON DE RED EXISTENTE GLB 1.00 500.00 500.0028.02.00 EMPALME A RED DE AGUA GLB 1.00 500.00 500.0029.00.00 SALIDAS PARA ELECTRICIDAD Y FUERZAS29.01.01 SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR SIMPLE PTO 58.00 102.45 5,942.1029.01.02 SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR DE COMMUTACION PTO 12.00 101.61 1,219.3229.01.04 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC PTO 44.00 76.10 3,348.4029.01.05 SALIDA PARA FUERZA PTO 2.00 14.79 29.5829.02.01 FLUORESCENTE RECTO ISPE 1 X 40 W INCLUYENDO EQUIPO Y PANTALL UND 70.00 54.47 3,812.90

    29.02.02 REFLECTOR MEDIANO INC ACC EQUIPOS UND 20.00 545.47 10,909.4029.03.01 CABLE ELECTRICO NYY 3 X 16 MM2. M 30.00 5.25 157.5029.04.01 TABLERO GENERAL PRINCIPAL PZA 1.00 484.09 484.0929.04.02 TABLERO ELECTRICO GAB.METALICO P/DISTRIBUCION DE 3 CIRCUITOS UND 3.00 600.05 1,800.1530.00.00 CONEXION A LA RED EXTERNA Y MEDIDORES30.01.01 POZO - CONEXION A PUESTA A TIERRA UND 1.00 284.22 284.2230.01.02 POZO DE TIERRA PARA PARARRAYO UND 1.00 287.67 287.6731.00.00 EQUIPOS ELECTRO-MECANICOS ESPECIALES31.01.01 ELECTROBOMBA DE AGUA POTABLE P=1 HP UND 1.00 491.50 491.50

    COSTO DIRECTOGASTOS GENERALES 6.36 %GASTOS DE SUPERVISION 1.31 %TOTAL DE PRESUPUESTO

  • 7/22/2019 Control Avance 2

    5/16

    MUNICIPALIDAD DISTRITAL DE YUNGA

    OBRA : CONSTRUCCION DE COLISEO MUNICIPAL DE USOS MULTIPLES - YUNGA

    PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YUNGA

    FECHA : MAYO DEL 2008

    ITEM PARTIDA UND. METRADO P.U. PARCIAL METRADO PARCIAL

    01.00.00 OBRAS PROVISIONALES

    01.01.00 CONSTRUCCIONES PROVISIONALES

    01.01.01 OFICINAS GLB 1.00 750.00 750.00 0.

    01.01.02 VESTUARIO GLB 1.00 750.00 750.00 0.01.01.03 CERCO PERIMETRICO GLB 1.00 1000.00 1000.00 0.

    01.01.04 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M UND 1.00 700.00 700.00 0.

    01.02.00 INSTALACIONES PROVISIONALES

    01.02.01 AGUA PARA LA OBRA GLB 1.00 500.00 500.00 0.

    01.02.02 DESAGUE PARA LA CONSTRUCCION GLB 1.00 750.00 750.00 0.

    01.02.03 ENERGIA ELECTRICA GLB 1.00 2500.00 2500.00 0.

    01.02.04 TRANSPORTE DE MATERIALES AQP - YUNGA GBL 1.00 25000.00 25000.00 0.

    02.00.00 TRABAJOS PRELIMINARES

    02.01.00 LIMPIEZA DE TERRENO

    02.01.02 ELEMENTOS DE BASURA Y ELEMENTOS SUELTOS LIVIANOS M3 110.00 13.22 1454.20 0.

    02.02.00 TRAZOS, NIVELES Y REPLANTEOS

    02.02.01 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO M2 2200.00 0.52 1144.00 0.

    03.00.00 MOVIMIENTO DE TIERRAS

    03.01.00 NIVELACION DE TERRENO

    03.01.01 NIVELACION DE TERRENO M2 2200.00 0.77 1694.00 0.

    03.01.02 NIVELACION INTERIOR APISONADO MANUAL M2 2200.00 0.40 880.00 0.

    03.02.00 EXCAVACIONES

    03.02.01 EXCAVACION ZAPATAS M3 448.24 1.00 448.24 0.

    03.02.02 EXCAVACION DE ZANJAS M3 192.24 9.80 1883.95 0.

    03 .03 .00 CORTES

    03.03.01 CORTE DE MATERIAL RENDIMIENTO=750 M3/DIA M3 1797.98 0.69 1240.61 0.

    03.04 .00 RELLENOS

    03.04.01 EXTRACCION Y APILAMIENTO RENDIMIENTO=370 M3/DIA M3 1491.67 2.05 3057.92 0.

    03.04.02 CARGUIO Y TRANSPORTE DE RELLENO A OBRA M3 947.49 8.94 8470.56 0.

    03.04.03 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 474.05 4.16 1972.05 0.

    03.05.00 ELIMINACION DE MATERIAL EXCEDENTE

    03.05.01 ELIMINACION MATERIAL EXCEDENTE M3 2118.50 8.94 18939.39 0.

    03.06.00 NIVELACION INTERIOR Y APISONADO

    03.06.01 NIVELACION RELLENO CON MATERIAL PROPIO M3 430.65 5.52 2377.19 0.

    04.00.00 OBRAS DE CONCRETO SIMPLE

    04.01.00 CIMIENTOS CORRIDOS MEZCLA 1 :10 CEMENTO-HORMIGON 30% PIEDRA M3 24.93 117.38 2926.28 0.

    04.02.00 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS M3 10.80 135.38 1462.10 0.

    04.03.00 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MT M2 110.81 21.47 2379.09 0.

    04.04.00 SOLADO PARA ZAPATAS E=4" MEZCLA 1:12 M2 224.12 12.81 2870.98 0.

    05.00.00 OBRAS DE CONCRETO ARMADO05.01.00 ZAPATAS

    05.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 M3 104.17 254.42 26502.93 0.

    05.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS KG 3021.98 3.40 10274.73 0.

    05.02.00 CIMIENTOS REFORZADOS O VIGAS DE CIMENTACION

    05.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 M3 74.95 280.31 21009.23 0.

    05.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACION M2 324.27 25.63 8311.04 0.

    05.02.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CIMENTACION KG 5376.46 3.40 18279.96 0.

    05.03 .00 COLUMNAS

    05.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 183.95 287.52 52889.30 0.

    05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 961.84 26.22 25219.44 0.

    05.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS KG 17884.89 3.40 60808.63 0.

    05 .04 .00 VIGAS

    05.04.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 90.28 290.86 26258.84 0.

    05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 753.80 31.10 23443.18 0.

    05.04.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELES KG 8525.85 3.40 28987.89 0.

    05.05.00 LOSAS ALIGERADAS

    VALORIZACION CORRESPONDIENTE A MAYO 2008

    PRESUPUESTO BASE AVANCE ANTE

  • 7/22/2019 Control Avance 2

    6/16

    MUNICIPALIDAD DISTRITAL DE YUNGA

    OBRA : CONSTRUCCION DE COLISEO MUNICIPAL DE USOS MULTIPLES - YUNGA

    PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YUNGA

    FECHA : MAYO DEL 2008

    ITEM PARTIDA UND. METRADO P.U. PARCIAL METRADO PARCIAL

    VALORIZACION CORRESPONDIENTE A MAYO 2008

    PRESUPUESTO BASE AVANCE ANTE

    05.05.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 M3 11.33 266.46 3018.99 0

    05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS M2 136.45 21.39 2918.67 0

    05.05.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS KG 1943.94 3.40 6609.40 0

    05.05.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO UND 1365.00 1.31 1788.15 005.06.00 GRADERIOS APOYADO SOBRE TERRENO COMPACTADO

    05.06.01 CONCRETO FC=140 KG/CM2. EN GRADERIOS M3 100.10 164.07 16423.41 0

    05.06.02 ENCOFRADO Y DESENCOFRADO EN GRADERIOS M2 335.03 21.91 7340.51 0

    05.06.03 ACERO ESTRUCTURAL TRABAJADO PARA GRADERIOS KG 2238.71 3.40 7611.61 0

    05.07.00 GRADERIOS

    05.07.01 CONCRETO EN GRADERIOS FC=210 KG/CM2 M3 72.02 290.55 20925.41 0

    05.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIOS M2 608.33 21.91 13328.51 0

    05.07.03 ACERO ESTRUCTURAL EN GRADERIOS KG 9908.52 3.40 33688.97 0

    05.08.00 MURO DE CONTENCION ARMADO

    05.08.01 CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2 M3 34.16 278.00 9496.48 0

    05.08.02 ENCOFRADO Y DESENCOF MUROS REFORZADOS M2 273.24 17.28 4721.59 0

    05.08.03 ACERO ESTRUCTURAL TRABAJADO PARA MUROS KG 2659.94 3.40 9043.80 0

    05.09.00 TANQUE ELEVADO

    05.09.01 CONCRETO EN TANQUE ELEVADO F'C=210 KG/CM2 M3 5.48 315.59 1729.43 0

    05.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN TANQUE ELEVADO M2 56.26 19.54 1099.32 0

    05.09.03 ACERO GRADO 60 EN TANQUE ELEVADO KG 247.74 3.40 842.32 0

    05.10.00 TANQUE CISTERNA

    05.10.01 CONCRETO EN TANQUE CISTERNA M3 10.35 294.95 3052.73 0

    05.10.02 ENCOFRADO Y DESENCOFRADO NORMAL EN T. CISTER. M2 66.82 19.51 1303.66 0

    05.10.03 ACERO GRADO 60 EN TANQUE CISTERNA KG 415.21 3.40 1411.71 0

    05.11.00 ESCALERAS

    05.11.01 CONCRETO FC=210 KG/CM2 EN ESCALERAS M3 2.75 250.30 688.33 0

    05.11.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS M2 12.21 16.24 198.29 005.11.03 ACERO GRADO 60 EN ESCALERAS KG 185.28 3.49 646.63 0

    06.06.01 APOYO DE ARMADURAS PRINCIPALES UND 12.00 992.53 11910.36 0

    07.00.00 MUROS Y TABIQUES DE ALBAILERIA

    07.01.00 MUROS DE LADRILLO KING KONG DE ARCILLA

    07.01.01 MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM. M2 1148.68 37.84 43466.05 0

    07.01.02 MURO DE CABEZA LADRILLO KK CON CEM-ARENA 1:4 X 1.5 CM M2 616.18 59.94 36933.83 0

    08.00.00 REVOQUES, ENLUCIDOS Y MOLDURAS

    08.01.00 EN MUROS

    08.01.01 TARRAJEO PRIMARIO RAYADO M2 328.86 5.40 1775.84 0

    08.01.02 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA M2 2846.45 5.69 16196.30 0

    08.01.03 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA M2 1314.46 7.72 10147.63 0

    08.02.00 EN COLUMNAS

    08.02.01 TARRAJEO DE SUPERFICIE COLUMNA M2 890.10 11.15 9924.62 0

    08.02.02 TARRAJEO DE ARISTAS EN COLUMNAS M 1259.60 1.50 1889.40 0

    08.03.00 EN VIGAS

    08.03.01 TARRAJEO DE SUPERFICIE VIGAS M2 548.89 12.84 7047.75 0

    08.03.02 VESTIDURA DE ARISTAS EN VIGAS M 1089.82 2.78 3029.70 0

    08.04.00 VESTIDURA DE DERRAMES

    08.04.01 VESTIDURA DE DERRAMES EN PUERTAS M 189.40 2.63 498.12 0

    08.04.02 VESTIDURA DE DERRAMES EN VENTANAS M 206.80 2.92 603.86 0

    08.05.00 TANQUE ELEVADO

    08.05.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA M2 36.54 7.97 291.22 0

    08.05.02 TARRAJEO INTERIOR CON CEMENTO-ARENA + IMPERMEABILIZANTE M2 32.18 9.19 295.73 008.06.00 TANQUE CISTERNA

    08.06.01 TARRAJEO DE MUROS INTERIORES M2 33.99 13.60 462.26 0

    09.00.00 CIELORRASOS

    09.01.00 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA M2 136.45 16.73 2282.81 0

    09.02.00 VESTIDURA DE SUPERFICIE FONDO DE ESCALERA C/MOR.1:4 X 1.5 CM M2 8.21 10.82 88.83 0

  • 7/22/2019 Control Avance 2

    7/16

    MUNICIPALIDAD DISTRITAL DE YUNGA

    OBRA : CONSTRUCCION DE COLISEO MUNICIPAL DE USOS MULTIPLES - YUNGA

    PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YUNGA

    FECHA : MAYO DEL 2008

    ITEM PARTIDA UND. METRADO P.U. PARCIAL METRADO PARCIAL

    VALORIZACION CORRESPONDIENTE A MAYO 2008

    PRESUPUESTO BASE AVANCE ANTE

    10.00.00 PISOS Y PAVIMENTOS

    10.01.00 FALSO PISO DE 4" DE CONCRETO 1:10 M2 2144.18 14.53 31154.94 0.

    10.02.00 CONTRAPISO DE 48 MM. M2 2355.32 12.06 28405.16 0.

    10.03.00 PISO DE CEMENTO PULIDO CON OCRE E=2.5 CM M2 1228.99 10.73 13187.06 0.10.04.00 PISO DE CERAMICO DE COLOR 30 X 30 CM M2 208.30 38.57 8034.13 0.

    10.05.00 PISO DE PARQUET HUAYACAN 6 X 30 CM VETEADO M2 838.06 37.17 31150.69 0.

    11.00.00 CONTRAZOCALOS

    11.01.00 CONTRAZOCALO DE CEDRO 3/4" X 2" RODON DE 3/4" M 95.75 9.13 874.20 0.

    12.00 .00 ZOCALOS

    12.01.00 ZOCALO DE MAYOLICA DE COLOR 20 X 30 CM M2 328.86 47.04 15469.57 0.

    13.00.00 REVESTIMIENTO DE GRADAS Y ESCALERAS

    13.01.00 REVESTIMIENTOS DE GRADERIOS M2 1041.54 9.24 9623.83 0.

    14.00.00 CARPINTERIA METALICA

    14.01.00 PUERTAS Y VENTANAS DE FIERRO

    14.01.01 PUERTA TIPO P-01 UND 2.00 555.91 1111.82 0.

    14.01.02 PUERTAS TIPO P-02 UND 2.00 307.95 615.90 0.

    14.01.03 PUERTAS TIPO P-04 UND 12.00 147.95 1775.40 0.

    14.01.04 PUERTAS TIPO P-06 UND 4.00 505.91 2023.64 0.

    14.01.05 VENTANA TIPO V-05 UND 8.00 472.36 3778.88 0.

    14.02.00 DIVISION DE FIERRO PARA SERVICIOS HIGIENICOS

    14.02.01 DIVISION CON PANELES METALICOS EN SS HH M2 38.50 85.64 3297.14 0.

    14.03.00 ELEMENTOS ESPECIALES

    14.03.01 TAPA METALICA DE 0.60 X 0.60 M UND 1.00 57.03 57.03 0.

    15.00.00 CARPINTERIA DE MADERA

    15.01.00 PUERTAS DE MADERA

    15.01.01 PUERTAS TIPO P-03 UND 12.00 472.36 5668.32 0.

    15.01.03 PUERTAS TIPO P-06 UND 6.00 477.95 2867.70 0.

    16.00.00 CERRAJERIA

    16.01 .00 BISAGRAS

    16.01.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" PZA 184.00 7.01 1289.84 0.

    16.02.00 CERRADURAS

    16.02.01 CERRADURA EN PUERTA METALICA DE INGRESO 3 GOLPES UND 32.00 69.02 2208.64 0.

    16.02.02 CERRADURA PTA.BAO TIPO CILINDRO PZA 6.00 37.02 222.12 0.

    16.02.03 CERRADURA PARA PUERTA PRINCIPAL PESADA PZA 32.00 69.02 2208.64 0.

    17.00.00 VIDRIOS, CRISTALES Y SIMILARES

    17.01.00 VIDRIO SISTEMA MODUGLASS E=8 mm INC INST Y ACC P2 1802.65 10.16 18314.92 0.

    17.02.00 VIDRIO SISTEMA MODUGLASS E=6 mm INC INST Y ACC P2 611.40 8.27 5056.28 0.

    17.03.00 ESPEJOS 50 X 60 cm UND 20.00 14.99 299.80 0.

    18.00 .00 PINTURA18.01.00 PINTURA LATEX EN CIELO RASO 2 MANOS M2 119.95 3.63 435.42 0.

    18.02.00 PINTURA EXTERIORES CON LATEX 2 MANOS M2 1314.46 5.44 7150.66 0.

    18.03.00 PINTURA EN INTERIORES AL OLEO 2 MANOS M2 4479.49 5.31 23786.09 0.

    18.04.00 PINTURA EN COLUMNAS M2 961.84 5.39 5184.32 0.

    18.05.00 PINTURA EN VIGAS M2 470.09 5.04 2369.25 0.

    18.06.00 PINTURA DE CONTRAZOCALO C/BARNIZ M 95.75 1.14 109.16 0.

    18.07.00 PINTURA EN PUERTA METALICA M2 49.98 5.17 258.40 0.

    18.08.00 PINTURA EN ESTRUCTURA METALICAS DE COBERTURA M 1250.00 10.85 13562.50 0.

    18.09.00 PINTURA EN ESTRUCTURA METALICA DE ILUMINACION M 310.00 3.84 1190.40 0.

    18.10.00 PINTURA EN CORREAS METALICAS M 756.00 9.87 7461.72 0.

    19.00.00 VARIOS, LIMPIEZA

    19.01.00 LIMPIEZA PERMANENTE DE OBRA GLB 1.00 4791.60 4791.60 0.

    19.02.00 LIMPIEZA FINAL DE OBRA GLB 1.00 2359.02 2359.02 0.

    20.00.00 APARATOS Y ACCESORIOS SANITARIOS

    20.01.00 INODORO TANQUE BAJO BLANCO PZA 42.00 180.00 7560.00 0.

    20.02.00 LAVATORIO DE PARED BLANCO 1 LLAVE PZA 20.00 120.00 2400.00 0.

  • 7/22/2019 Control Avance 2

    8/16

    MUNICIPALIDAD DISTRITAL DE YUNGA

    OBRA : CONSTRUCCION DE COLISEO MUNICIPAL DE USOS MULTIPLES - YUNGA

    PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YUNGA

    FECHA : MAYO DEL 2008

    ITEM PARTIDA UND. METRADO P.U. PARCIAL METRADO PARCIAL

    VALORIZACION CORRESPONDIENTE A MAYO 2008

    PRESUPUESTO BASE AVANCE ANTE

    20.04.00 DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS UND 6.00 30.00 180.00 0

    20.05.00 COLOCACION DE APARATOS CORRIENTES PZA 40.00 23.96 958.40 0

    20.06.00 COLOCACION DE ACCESORIOS SANITARIOS PZA 40.00 11.98 479.20 0

    21.00.00 INSTALACIONES SANITARIAS21.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP PTO 40.00 18.57 742.80 0

    21.02.01 TUBERIA DE PVC DE 1/2" CLASE 10 M 75.00 6.41 480.75 0

    21.02.02 TUBERIA DE PVC 3/4" CLASE 10 M 45.00 7.25 326.25 0

    21.02.03 TUBERIA DE PVC DE 1" CLASE 10 M 35.00 7.67 268.45 0

    21.02.04 TUBERIA DE PVC DE 1 1/4" CLASE 10 M 95.00 10.16 965.20 0

    21.02.05 TUBERIA DE PVC DE 1 1/2" CLASE 10 M 25.00 9.24 231.00 0

    21.02.06 TUBERIA DE PVC DE 2" CLASE 10 M 26.00 10.16 264.16 0

    21.03.01 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2" UND 2.00 42.78 85.56 0

    21.03.02 VALVULA COMPUERTA 3/4" DE BRONCE UND 3.00 53.78 161.34 0

    21.03.03 VALVULA DE COMPUERTA 1" DE BRONCE UND 2.00 64.28 128.56 0

    21.03.04 VALVULA DE COMPUERTA DE 2" BRONCE UND 2.00 65.28 130.56 0

    21.04.01 PRUEBA HIDRAULICA EN TUBERIA DE AGUA GLB 2.00 214.93 429.86 0

    23.00.00 DESAGUE INTERIOR

    23.01.01 SALIDAS DE PVC SAL PARA DESAGUE DE 4" PTO 30.00 40.50 1215.00 0

    23.01.02 PUNTO DE DESAGUE CON TUB. PVC SAL 2" PTO 30.00 40.50 1215.00 0

    23.02.01 TUBERIA PVC SAL 6" M 125.00 40.24 5030.00 0

    23.02.02 TUBERIA DE PVC SAL 4" M 114.00 7.59 865.26 0

    23.02.03 TUBERIA DE PVC SAL 2" M 75.00 6.50 487.50 0

    23.03..01 SUMIDEROS DE 2" PZA 44.00 31.34 1378.96 0

    23.04.01 REGISTRO DE BRONCE 2", PROVISION Y COLOCACION UND 10.00 21.81 218.10 0

    23.04.02 REGISTROS DE BRONCE DE 4" PZA 38.00 27.53 1046.14 0

    23.05.01 PRUEBA HIDRAULICA+ESCORRENTIA DE TUBERIA DESAGUE M 1.00 163.04 163.04 0

    24.00.00 SISTEMA DE AGUA DE LLUVIA24.01.01 TUBERIA PVC SAP 2" M 125.00 9.68 1210.00 0

    24.01.02 CONCRETO F'C=140 KG/CM2 PARA ANCLAJES Y/O DADOS M3 1.00 208.56 208.56 0

    25.00.00 TANQUE ELEVADO

    25.01.00 SISTEMA DE REBOSE Y SISTEMA CONTRA INCENDIO UND 2.00 120.75 241.50 0

    25.02.00 VENTILACION EN TANQUE ELEVADO UND 2.00 38.17 76.34 0

    25.03.00 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAOS DE 3/4" M 2.00 56.49 112.98 0

    26.00.00 REDES EXTERIORES DE DESAGUE

    26.01.01 TRAZO Y REPLANTEO M 113.72 0.28 31.84 0

    26.01.02 EXCAVACION DE ZANJAS (TERRENO NORMAL) M3 314.00 11.54 3623.56 0

    26.01.03 RELLENO Y COMP.MAT.PROPIO EN ZANJAS M3 34.12 5.13 175.04 0

    26.02.01 TUBERIA DE PVC SAL 4" M 91.32 11.58 1057.49 0

    26.02.02 TUBERIA PVC SAL 6" M 20.40 40.24 820.90 0

    26.03.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" PZA 10.00 47.58 475.80 0

    27.00.00 SISTEMA DE BOMBEO

    27.01.00 TUBERIA FIE.GALVANIZADO PESADO C-40 1" I/ELEM.UNION+ 2%DESP. M 40.00 12.78 511.20 0

    27.02.00 ELECTROBOMBA DE AGUA POTABLE P=1 HP UND 2.00 491.50 983.00 0

    28.00.00 EMPALME A REDES

    28.01.00 EMPALME A BUZON DE RED EXISTENTE GLB 1.00 500.00 500.00 0

    28.02.00 EMPALME A RED DE AGUA GLB 1.00 500.00 500.00 0

    29.00.00 SALIDAS PARA ELECTRICIDAD Y FUERZAS

    29.01.01 SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR SIMPLE PTO 58.00 102.45 5942.10 0

    29.01.02 SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR DE COMMUTACION PTO 12.00 101.61 1219.32 0

    29.01.04 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC PTO 44.00 76.10 3348.40 0

    29.01.05 SALIDA PARA FUERZA PTO 2.00 14.79 29.58 0

    29.02.01 FLUORESCENTE RECTO ISPE 1 X 40 W INCLUYENDO EQUIPO Y PANTALL UND 70.00 54.47 3812.90 0

    29.02.02 REFLECTOR MEDIANO INC ACC EQUIPOS UND 20.00 545.47 10909.40 0

    29.03.01 CABLE ELECTRICO NYY 3 X 16 MM2. M 30.00 5.25 157.50 0

    29.04.01 TABLERO GENERAL PRINCIPAL PZA 1.00 484.09 484.09 0

  • 7/22/2019 Control Avance 2

    9/16

    MUNICIPALIDAD DISTRITAL DE YUNGA

    OBRA : CONSTRUCCION DE COLISEO MUNICIPAL DE USOS MULTIPLES - YUNGA

    PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YUNGA

    FECHA : MAYO DEL 2008

    ITEM PARTIDA UND. METRADO P.U. PARCIAL METRADO PARCIAL %

    VALORIZACION CORRESPONDIENTE A MAYO 2008

    PRESUPUESTO BASE AVANCE ANTERIOR

    29.04.02 TABLERO ELECTRICO GAB.METALICO P/DISTRIBUCION DE 3 CIRCUITOS UND 3.00 600.05 1800.15 0.00 0%

    30.00.00 CONEXION A LA RED EXTERNA Y MEDIDORES

    30.01.01 POZO - CONEXION A PUESTA A TIERRA UND 1.00 284.22 284.22 0.00 0%

    30.01.02 POZO DE TIERRA PARA PARARRAYO UND 1.00 287.67 287.67 0.00 0%

    31.00.00 EQUIPOS ELECTRO-MECANICOS ESPECIALES

    31.01.01 ELECTROBOMBA DE AGUA POTABLE P=1 HP UND 1.00 491.50 491.50 0.00 0%

    SUBTOTAL S/. : 1000964.52

    COSTO DIRECTO S/. : 1000964.52

    G.GENERALES: 6.36% 63655.58

    GASTOS SUPERVISION : 1.31% 13150.00

    TOTAL VALOR S/. : 1077770.10

    0.808529453 PORCENTAJE AVANCE :

  • 7/22/2019 Control Avance 2

    10/16

    MUNICIPALIDAD DISTRITAL DE YUNGA

    OBRA : CONSTRUCCION DE COLISEO MUNICIPAL DE USOS MULTIPLES - YUNGA

    PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YUNGA

    FECHA : JUNIO DEL 2008

    ITEM PARTIDA UND. METRADO P.U. PARCIAL METRADO PARCIAL

    01.00.00 OBRAS PROVISIONALES

    01.01.00 CONSTRUCCIONES PROVISIONALES

    01.01.01 OFICINAS GLB 1.00 750.00 750.00 1.00 750.

    01.01.02 VESTUARIO GLB 1.00 750.00 750.00 1.00 750.

    01.01.03 CERCO PERIMETRICO GLB 1.00 1000.00 1000.00 1.00 1000.

    01.01.04 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M UND 1.00 700.00 700.00 1.00 700.

    01.02.00 INSTALACIONES PROVISIONALES

    01.02.01 AGUA PARA LA OBRA GLB 1.00 500.00 500.00 1.00 500.

    01.02.02 DESAGUE PARA LA CONSTRUCCION GLB 1.00 750.00 750.00 0.

    01.02.03 ENERGIA ELECTRICA GLB 1.00 2500.00 2500.00 0.

    01.02.04 TRANSPORTE DE MATERIALES AQP - YUNGA GBL 1.00 25000.00 25000.00 0.40 10000.

    02.00.00 TRABAJOS PRELIMINARES

    02.01.00 LIMPIEZA DE TERRENO

    02.01.02 ELEMENTOS DE BASURA Y ELEMENTOS SUELTOS LIVIANOS M3 110.00 13.22 1454.20 110.00 1454.

    02.02.00 TRAZOS, NIVELES Y REPLANTEOS

    02.02.01 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO M2 2200.00 0.52 1144.00 2000.00 1040.

    03.00.00 MOVIMIENTO DE TIERRAS

    03.01.00 NIVELACION DE TERRENO

    03.01.01 NIVELACION DE TERRENO M2 2200.00 0.77 1694.00 0.

    03.01.02 NIVELACION INTERIOR APISONADO MANUAL M2 2200.00 0.40 880.00 0.

    03.02.00 EXCAVACIONES

    03.02.01 EXCAVACION ZAPATAS M3 448.24 1.00 448.24 448.24 448.

    03.02.02 EXCAVACION DE ZANJAS M3 192.24 9.80 1883.95 20.00 196.

    03 .0 3.0 0 CORTES

    03.03.01 CORTE DE MATERIAL RENDIMIENTO=750 M3/DIA M3 1797.98 0.69 1240.61 1000.00 690.

    03.04.00 RELLENOS

    03.04.01 EXTRACCION Y APILAMIENTO RENDIMIENTO=370 M3/DIA M3 1491.67 2.05 3057.92 0.

    03.04.02 CARGUIO Y TRANSPORTE DE RELLENO A OBRA M3 947.49 8.94 8470.56 0.

    03.04.03 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 474.05 4.16 1972.05 0.

    03.05.00 ELIMINACION DE MATERIAL EXCEDENTE

    03.05.01 ELIMINACION MATERIAL EXCEDENTE M3 2118.50 8.94 18939.39 1250.00 11175.

    03.06.00 NIVELACION INTERIOR Y APISONADO

    03.06.01 NIVELACION RELLENO CON MATERIAL PROPIO M3 430.65 5.52 2377.19 0.

    04.00.00 OBRAS DE CONCRETO SIMPLE

    04.01.00 CIMIENTOS CORRIDOS MEZCLA 1 :10 CEMENTO-HORMIGON 30% PIEDRA M3 24.93 117.38 2926.28 0.

    04.02.00 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS M3 10.80 135.38 1462.10 0.

    04.03.00 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MT M2 110.81 21.47 2379.09 0.

    04.04.00 SOLADO PARA ZAPATAS E=4" MEZCLA 1:12 M2 224.12 12.81 2870.98 100.00 1281.

    05.00.00 OBRAS DE CONCRETO ARMADO05.01.00 ZAPATAS

    05.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 M3 104.17 254.42 26502.93 50.00 12721.

    05.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS KG 3021.98 3.40 10274.73 1500.00 5100.

    05.02.00 CIMIENTOS REFORZADOS O VIGAS DE CIMENTACION

    05.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 M3 74.95 280.31 21009.23 10.00 2803.

    05.02.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACION M2 324.27 25.63 8311.04 20.00 512.

    05.02.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CIMENTACION KG 5376.46 3.40 18279.96 1612.80 5483.

    05.03.00 COLUMNAS

    05.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 183.95 287.52 52889.30 0.

    05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 961.84 26.22 25219.44 0.

    05.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS KG 17884.89 3.40 60808.63 7153.96 24323.

    05 .0 4.0 0 VIGAS

    05.04.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 90.28 290.86 26258.84 0.

    05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 753.80 31.10 23443.18 0.

    05.04.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELES KG 8525.85 3.40 28987.89 0.

    05.05.00 LOSAS ALIGERADAS

    VALORIZACION CORRESPONDIENTE A JUNIO 2008

    PRESUPUESTO BASE AVANCE ANTE

  • 7/22/2019 Control Avance 2

    11/16

    MUNICIPALIDAD DISTRITAL DE YUNGA

    OBRA : CONSTRUCCION DE COLISEO MUNICIPAL DE USOS MULTIPLES - YUNGA

    PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YUNGA

    FECHA : JUNIO DEL 2008

    ITEM PARTIDA UND. METRADO P.U. PARCIAL METRADO PARCIAL

    VALORIZACION CORRESPONDIENTE A JUNIO 2008

    PRESUPUESTO BASE AVANCE ANTE

    05.05.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 M3 11.33 266.46 3018.99 0

    05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS M2 136.45 21.39 2918.67 0

    05.05.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS KG 1943.94 3.40 6609.40 0

    05.05.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO UND 1365.00 1.31 1788.15 005.06.00 GRADERIOS APOYADO SOBRE TERRENO COMPACTADO

    05.06.01 CONCRETO FC=140 KG/CM2. EN GRADERIOS M3 100.10 164.07 16423.41 0

    05.06.02 ENCOFRADO Y DESENCOFRADO EN GRADERIOS M2 335.03 21.91 7340.51 0

    05.06.03 ACERO ESTRUCTURAL TRABAJADO PARA GRADERIOS KG 2238.71 3.40 7611.61 0

    05.07.00 GRADERIOS

    05.07.01 CONCRETO EN GRADERIOS FC=210 KG/CM2 M3 72.02 290.55 20925.41 0

    05.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIOS M2 608.33 21.91 13328.51 0

    05.07.03 ACERO ESTRUCTURAL EN GRADERIOS KG 9908.52 3.40 33688.97 0

    05.08.00 MURO DE CONTENCION ARMADO

    05.08.01 CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2 M3 34.16 278.00 9496.48 0

    05.08.02 ENCOFRADO Y DESENCOF MUROS REFORZADOS M2 273.24 17.28 4721.59 0

    05.08.03 ACERO ESTRUCTURAL TRABAJADO PARA MUROS KG 2659.94 3.40 9043.80 0

    05.09.00 TANQUE ELEVADO

    05.09.01 CONCRETO EN TANQUE ELEVADO F'C=210 KG/CM2 M3 5.48 315.59 1729.43 0

    05.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN TANQUE ELEVADO M2 56.26 19.54 1099.32 0

    05.09.03 ACERO GRADO 60 EN TANQUE ELEVADO KG 247.74 3.40 842.32 0

    05.10.00 TANQUE CISTERNA

    05.10.01 CONCRETO EN TANQUE CISTERNA M3 10.35 294.95 3052.73 0

    05.10.02 ENCOFRADO Y DESENCOFRADO NORMAL EN T. CISTER. M2 66.82 19.51 1303.66 0

    05.10.03 ACERO GRADO 60 EN TANQUE CISTERNA KG 415.21 3.40 1411.71 0

    05.11.00 ESCALERAS

    05.11.01 CONCRETO FC=210 KG/CM2 EN ESCALERAS M3 2.75 250.30 688.33 0

    05.11.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS M2 12.21 16.24 198.29 005.11.03 ACERO GRADO 60 EN ESCALERAS KG 185.28 3.49 646.63 0

    06.06.01 APOYO DE ARMADURAS PRINCIPALES UND 12.00 992.53 11910.36 0

    07.00.00 MUROS Y TABIQUES DE ALBAILERIA

    07.01.00 MUROS DE LADRILLO KING KONG DE ARCILLA

    07.01.01 MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM. M2 1148.68 37.84 43466.05 0

    07.01.02 MURO DE CABEZA LADRILLO KK CON CEM-ARENA 1:4 X 1.5 CM M2 616.18 59.94 36933.83 0

    08.00.00 REVOQUES, ENLUCIDOS Y MOLDURAS

    08.01.00 EN MUROS

    08.01.01 TARRAJEO PRIMARIO RAYADO M2 328.86 5.40 1775.84 0

    08.01.02 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA M2 2846.45 5.69 16196.30 0

    08.01.03 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA M2 1314.46 7.72 10147.63 0

    08.02.00 EN COLUMNAS

    08.02.01 TARRAJEO DE SUPERFICIE COLUMNA M2 890.10 11.15 9924.62 0

    08.02.02 TARRAJEO DE ARISTAS EN COLUMNAS M 1259.60 1.50 1889.40 0

    08.03.00 EN VIGAS

    08.03.01 TARRAJEO DE SUPERFICIE VIGAS M2 548.89 12.84 7047.75 0

    08.03.02 VESTIDURA DE ARISTAS EN VIGAS M 1089.82 2.78 3029.70 0

    08.04.00 VESTIDURA DE DERRAMES

    08.04.01 VESTIDURA DE DERRAMES EN PUERTAS M 189.40 2.63 498.12 0

    08.04.02 VESTIDURA DE DERRAMES EN VENTANAS M 206.80 2.92 603.86 0

    08.05.00 TANQUE ELEVADO

    08.05.01 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA M2 36.54 7.97 291.22 0

    08.05.02 TARRAJEO INTERIOR CON CEMENTO-ARENA + IMPERMEABILIZANTE M2 32.18 9.19 295.73 008.06.00 TANQUE CISTERNA

    08.06.01 TARRAJEO DE MUROS INTERIORES M2 33.99 13.60 462.26 0

    09.00.00 CIELORRASOS

    09.01.00 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA M2 136.45 16.73 2282.81 0

    09.02.00 VESTIDURA DE SUPERFICIE FONDO DE ESCALERA C/MOR.1:4 X 1.5 CM M2 8.21 10.82 88.83 0

  • 7/22/2019 Control Avance 2

    12/16

    MUNICIPALIDAD DISTRITAL DE YUNGA

    OBRA : CONSTRUCCION DE COLISEO MUNICIPAL DE USOS MULTIPLES - YUNGA

    PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YUNGA

    FECHA : JUNIO DEL 2008

    ITEM PARTIDA UND. METRADO P.U. PARCIAL METRADO PARCIAL

    VALORIZACION CORRESPONDIENTE A JUNIO 2008

    PRESUPUESTO BASE AVANCE ANTE

    10.00.00 PISOS Y PAVIMENTOS

    10.01.00 FALSO PISO DE 4" DE CONCRETO 1:10 M2 2144.18 14.53 31154.94 0.

    10.02.00 CONTRAPISO DE 48 MM. M2 2355.32 12.06 28405.16 0.

    10.03.00 PISO DE CEMENTO PULIDO CON OCRE E=2.5 CM M2 1228.99 10.73 13187.06 0.10.04.00 PISO DE CERAMICO DE COLOR 30 X 30 CM M2 208.30 38.57 8034.13 0.

    10.05.00 PISO DE PARQUET HUAYACAN 6 X 30 CM VETEADO M2 838.06 37.17 31150.69 0.

    11.00.00 CONTRAZOCALOS

    11.01.00 CONTRAZOCALO DE CEDRO 3/4" X 2" RODON DE 3/4" M 95.75 9.13 874.20 0.

    12.00 .00 ZOCALOS

    12.01.00 ZOCALO DE MAYOLICA DE COLOR 20 X 30 CM M2 328.86 47.04 15469.57 0.

    13.00.00 REVESTIMIENTO DE GRADAS Y ESCALERAS

    13.01.00 REVESTIMIENTOS DE GRADERIOS M2 1041.54 9.24 9623.83 0.

    14.00.00 CARPINTERIA METALICA

    14.01.00 PUERTAS Y VENTANAS DE FIERRO

    14.01.01 PUERTA TIPO P-01 UND 2.00 555.91 1111.82 0.

    14.01.02 PUERTAS TIPO P-02 UND 2.00 307.95 615.90 0.

    14.01.03 PUERTAS TIPO P-04 UND 12.00 147.95 1775.40 0.

    14.01.04 PUERTAS TIPO P-06 UND 4.00 505.91 2023.64 0.

    14.01.05 VENTANA TIPO V-05 UND 8.00 472.36 3778.88 0.

    14.02.00 DIVISION DE FIERRO PARA SERVICIOS HIGIENICOS

    14.02.01 DIVISION CON PANELES METALICOS EN SS HH M2 38.50 85.64 3297.14 0.

    14.03.00 ELEMENTOS ESPECIALES

    14.03.01 TAPA METALICA DE 0.60 X 0.60 M UND 1.00 57.03 57.03 0.

    15.00.00 CARPINTERIA DE MADERA

    15.01.00 PUERTAS DE MADERA

    15.01.01 PUERTAS TIPO P-03 UND 12.00 472.36 5668.32 0.

    15.01.03 PUERTAS TIPO P-06 UND 6.00 477.95 2867.70 0.

    16.00.00 CERRAJERIA

    16.01 .00 BISAGRAS

    16.01.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" PZA 184.00 7.01 1289.84 0.

    16.02.00 CERRADURAS

    16.02.01 CERRADURA EN PUERTA METALICA DE INGRESO 3 GOLPES UND 32.00 69.02 2208.64 0.

    16.02.02 CERRADURA PTA.BAO TIPO CILINDRO PZA 6.00 37.02 222.12 0.

    16.02.03 CERRADURA PARA PUERTA PRINCIPAL PESADA PZA 32.00 69.02 2208.64 0.

    17.00.00 VIDRIOS, CRISTALES Y SIMILARES

    17.01.00 VIDRIO SISTEMA MODUGLASS E=8 mm INC INST Y ACC P2 1802.65 10.16 18314.92 0.

    17.02.00 VIDRIO SISTEMA MODUGLASS E=6 mm INC INST Y ACC P2 611.40 8.27 5056.28 0.

    17.03.00 ESPEJOS 50 X 60 cm UND 20.00 14.99 299.80 0.

    18.00 .00 PINTURA18.01.00 PINTURA LATEX EN CIELO RASO 2 MANOS M2 119.95 3.63 435.42 0.

    18.02.00 PINTURA EXTERIORES CON LATEX 2 MANOS M2 1314.46 5.44 7150.66 0.

    18.03.00 PINTURA EN INTERIORES AL OLEO 2 MANOS M2 4479.49 5.31 23786.09 0.

    18.04.00 PINTURA EN COLUMNAS M2 961.84 5.39 5184.32 0.

    18.05.00 PINTURA EN VIGAS M2 470.09 5.04 2369.25 0.

    18.06.00 PINTURA DE CONTRAZOCALO C/BARNIZ M 95.75 1.14 109.16 0.

    18.07.00 PINTURA EN PUERTA METALICA M2 49.98 5.17 258.40 0.

    18.08.00 PINTURA EN ESTRUCTURA METALICAS DE COBERTURA M 1250.00 10.85 13562.50 0.

    18.09.00 PINTURA EN ESTRUCTURA METALICA DE ILUMINACION M 310.00 3.84 1190.40 0.

    18.10.00 PINTURA EN CORREAS METALICAS M 756.00 9.87 7461.72 0.

    19.00.00 VARIOS, LIMPIEZA

    19.01.00 LIMPIEZA PERMANENTE DE OBRA GLB 1.00 4791.60 4791.60 0.

    19.02.00 LIMPIEZA FINAL DE OBRA GLB 1.00 2359.02 2359.02 0.

    20.00.00 APARATOS Y ACCESORIOS SANITARIOS

    20.01.00 INODORO TANQUE BAJO BLANCO PZA 42.00 180.00 7560.00 0.

    20.02.00 LAVATORIO DE PARED BLANCO 1 LLAVE PZA 20.00 120.00 2400.00 0.

  • 7/22/2019 Control Avance 2

    13/16

    MUNICIPALIDAD DISTRITAL DE YUNGA

    OBRA : CONSTRUCCION DE COLISEO MUNICIPAL DE USOS MULTIPLES - YUNGA

    PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YUNGA

    FECHA : JUNIO DEL 2008

    ITEM PARTIDA UND. METRADO P.U. PARCIAL METRADO PARCIAL

    VALORIZACION CORRESPONDIENTE A JUNIO 2008

    PRESUPUESTO BASE AVANCE ANTE

    20.04.00 DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS UND 6.00 30.00 180.00 0

    20.05.00 COLOCACION DE APARATOS CORRIENTES PZA 40.00 23.96 958.40 0

    20.06.00 COLOCACION DE ACCESORIOS SANITARIOS PZA 40.00 11.98 479.20 0

    21.00.00 INSTALACIONES SANITARIAS21.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP PTO 40.00 18.57 742.80 0

    21.02.01 TUBERIA DE PVC DE 1/2" CLASE 10 M 75.00 6.41 480.75 0

    21.02.02 TUBERIA DE PVC 3/4" CLASE 10 M 45.00 7.25 326.25 0

    21.02.03 TUBERIA DE PVC DE 1" CLASE 10 M 35.00 7.67 268.45 0

    21.02.04 TUBERIA DE PVC DE 1 1/4" CLASE 10 M 95.00 10.16 965.20 0

    21.02.05 TUBERIA DE PVC DE 1 1/2" CLASE 10 M 25.00 9.24 231.00 0

    21.02.06 TUBERIA DE PVC DE 2" CLASE 10 M 26.00 10.16 264.16 0

    21.03.01 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2" UND 2.00 42.78 85.56 0

    21.03.02 VALVULA COMPUERTA 3/4" DE BRONCE UND 3.00 53.78 161.34 0

    21.03.03 VALVULA DE COMPUERTA 1" DE BRONCE UND 2.00 64.28 128.56 0

    21.03.04 VALVULA DE COMPUERTA DE 2" BRONCE UND 2.00 65.28 130.56 0

    21.04.01 PRUEBA HIDRAULICA EN TUBERIA DE AGUA GLB 2.00 214.93 429.86 0

    23.00.00 DESAGUE INTERIOR

    23.01.01 SALIDAS DE PVC SAL PARA DESAGUE DE 4" PTO 30.00 40.50 1215.00 0

    23.01.02 PUNTO DE DESAGUE CON TUB. PVC SAL 2" PTO 30.00 40.50 1215.00 0

    23.02.01 TUBERIA PVC SAL 6" M 125.00 40.24 5030.00 0

    23.02.02 TUBERIA DE PVC SAL 4" M 114.00 7.59 865.26 0

    23.02.03 TUBERIA DE PVC SAL 2" M 75.00 6.50 487.50 0

    23.03..01 SUMIDEROS DE 2" PZA 44.00 31.34 1378.96 0

    23.04.01 REGISTRO DE BRONCE 2", PROVISION Y COLOCACION UND 10.00 21.81 218.10 0

    23.04.02 REGISTROS DE BRONCE DE 4" PZA 38.00 27.53 1046.14 0

    23.05.01 PRUEBA HIDRAULICA+ESCORRENTIA DE TUBERIA DESAGUE M 1.00 163.04 163.04 0

    24.00.00 SISTEMA DE AGUA DE LLUVIA24.01.01 TUBERIA PVC SAP 2" M 125.00 9.68 1210.00 0

    24.01.02 CONCRETO F'C=140 KG/CM2 PARA ANCLAJES Y/O DADOS M3 1.00 208.56 208.56 0

    25.00.00 TANQUE ELEVADO

    25.01.00 SISTEMA DE REBOSE Y SISTEMA CONTRA INCENDIO UND 2.00 120.75 241.50 0

    25.02.00 VENTILACION EN TANQUE ELEVADO UND 2.00 38.17 76.34 0

    25.03.00 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAOS DE 3/4" M 2.00 56.49 112.98 0

    26.00.00 REDES EXTERIORES DE DESAGUE

    26.01.01 TRAZO Y REPLANTEO M 113.72 0.28 31.84 0

    26.01.02 EXCAVACION DE ZANJAS (TERRENO NORMAL) M3 314.00 11.54 3623.56 0

    26.01.03 RELLENO Y COMP.MAT.PROPIO EN ZANJAS M3 34.12 5.13 175.04 0

    26.02.01 TUBERIA DE PVC SAL 4" M 91.32 11.58 1057.49 0

    26.02.02 TUBERIA PVC SAL 6" M 20.40 40.24 820.90 0

    26.03.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" PZA 10.00 47.58 475.80 0

    27.00.00 SISTEMA DE BOMBEO

    27 .01 .00 TUBERIA F IE.GALVANIZADO PESADO C-40 1" I/EL EM.UNION+ 2%DESP. M 40.00 12.78 511.20 0

    27.02.00 ELECTROBOMBA DE AGUA POTABLE P=1 HP UND 2.00 491.50 983.00 0

    28.00.00 EMPALME A REDES

    28.01.00 EMPALME A BUZON DE RED EXISTENTE GLB 1.00 500.00 500.00 0

    28.02.00 EMPALME A RED DE AGUA GLB 1.00 500.00 500.00 0

    29.00.00 SALIDAS PARA ELECTRICIDAD Y FUERZAS

    29.01.01 SALIDA PARA CENTROS DE LUZ C/INTERRUPTOR SIMPLE PTO 58.00 102.45 5942.10 0

    29 .01 .02 SALIDA PARA CENTROS DE L UZ C/INTERRUPTOR DE COMMUTACION PTO 12.00 101.61 1219.32 0

    29.01.04 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC PTO 44.00 76.10 3348.40 0

    29.01.05 SALIDA PARA FUERZA PTO 2.00 14.79 29.58 0

    29.02 .01 FLUORESCENTE RECTO ISPE 1 X 40 W INCLUYENDO EQUIPO Y PANTALL UND 70.00 54.47 3812.90 0

    29.02.02 REFLECTOR MEDIANO INC ACC EQUIPOS UND 20.00 545.47 10909.40 0

    29.03.01 CABLE ELECTRICO NYY 3 X 16 MM2. M 30.00 5.25 157.50 0

    29.04.01 TABLERO GENERAL PRINCIPAL PZA 1.00 484.09 484.09 0

  • 7/22/2019 Control Avance 2

    14/16

    MUNICIPALIDAD DISTRITAL DE YUNGA

    OBRA : CONSTRUCCION DE COLISEO MUNICIPAL DE USOS MULTIPLES - YUNGA

    PROPIETARIO : MUNICIPALIDAD DISTRITAL DE YUNGA

    FECHA : JUNIO DEL 2008

    ITEM PARTIDA UND. METRADO P.U. PARCIAL METRADO PARCIAL %

    VALORIZACION CORRESPONDIENTE A JUNIO 2008

    PRESUPUESTO BASE AVANCE ANTERIOR

    29.04.02 TABLERO ELECTRICO GAB.METALICO P/DISTRIBUCION DE 3 CIRCUITOS UND 3.00 600.05 1800.15 0.00 0%

    30.00.00 CONEXION A LA RED EXTERNA Y MEDIDORES

    30.01.01 POZO - CONEXION A PUESTA A TIERRA UND 1.00 284.22 284.22 0.00 0%

    30.01.02 POZO DE TIERRA PARA PARARRAYO UND 1.00 287.67 287.67 0.00 0%

    31.00.00 EQUIPOS ELECTRO-MECANICOS ESPECIALES

    31.01.01 ELECTROBOMBA DE AGUA POTABLE P=1 HP UND 1.00 491.50 491.50 0.00 0%

    SUBTOTAL S/. : 1000964.52

    COSTO DIRECTO S/. : 1000964.52

    G.GENERALES: 6.36% 63655.58

    GASTOS SUPERVISION : 1.31% 13150.00

    TOTAL VALOR S/. : 1077770.10

    PORCENTAJE AVANCE :

  • 7/22/2019 Control Avance 2

    15/16

    YSAAC LEONARDO MENDOZA FERNANDEZ

    RESIDENTE DE OBRA

    Proyecto:

    Zona:

    Fecha: 11/1/2011 Provincia: Arequipa

    Regin: Arequipa Distrito: SABANDIA

    Dpto: Arequipa

    INICIO DE OBRA 9/26/2011

    FINAL DE OBRA 11/24/2011

    PLAZO : 60 DIAS

    VALORIZACION CORRESPONDIENTE AL MES DE SETIEMBRE 2011

    MES SETIEMBRE OCTUBRE NOVIEMBRE

    PORCENTAJE PROGRAMADO 11.71 42.74 45.55

    ACUMULADO PROGRAMADO 0 11.71 54.45 100.00

    PORCENTAJE EJECUTADO 7.99 28.15

    ACUMULADO EJECUTADO 0 7.99 36.14

    AMPLIACION SLA ISLA Y LAS ROCAS

    CONEXIONES DOMICILIARIAS DE DESAGUE A LA RED MATRIZ EN ANEXOS DEAMPLIACIN LA ISLA Y LAS ROCAS SABANDIA- AREQUIPA

    CONTROL DE AVANCE DE OBRA 2

    0

    10

    20

    30

    40

    50

    60

    SETIEMBRE OCTUBRE

    PORCENTAJE

    MESES

    CONTROL DE AVANCE

    PROGRAMADO

    EJECUTADO

  • 7/22/2019 Control Avance 2

    16/16

    YSAAC LEONARDO MENDOZA FERNANDEZ

    RESIDENTE DE OBRA