    High Speed Rail: How Fast, How

    Soon?

    Chuck Wochele

    May 24, 2010

  • 8/2/2019 Wochele Rail Presentation

    2/34

    - - P 2

    Two main activities

    Equipment & services forpower generation anddistribution

    Equipment & servicesfor rail transport

    Power Sector Transport Sector

  • 8/2/2019 Wochele Rail Presentation

    3/34

    - - P 3

    Metro

    Regional

    Locomotives

    Very High Speed

    DISTANCE

    SPEED

    Tram

    Train

    Tram

    High Speed

    Interurban

    An extensive range of products and services

  • 8/2/2019 Wochele Rail Presentation

    4/34

    - - P 4

    SignallingInfrastructureServicesand maintenance

    An extensive range of products and services

  • 8/2/2019 Wochele Rail Presentation

    5/34

    HS Miles & Kilometers

  • 8/2/2019 Wochele Rail Presentation

    6/34

    - - P 6

    The Success of the Paris Lyon TGV Line 30 years ago

    240MLS

  • 8/2/2019 Wochele Rail Presentation

    7/34- - P 7

    Construction Schedule For TGV Sud Est

    5 YEARS WERE REQUIRED TO DO DESIGN AND APPROVAL BETWEEN 1970 AND 1975

    DUP = DECLARATION OF PUBLIC INTEREST

    1976 1977 1978 1979 1980 1981 1982 1983

    1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76 79 82 85 88 91 94

    PRE-CONSTRUCTION PHASE

    DUP

    CONSTRUCTION PHASE

    SOUTH SECTION 275 KM

    NORTH SECTION 115 KM

    COMBS LA

    VILLE

    SAINT

    FLORENTIIN

    SATHONAY

    (FRANCE - 242 Miles/ 390 km)

  • 8/2/2019 Wochele Rail Presentation

    8/34- - P 8

    European High Speed Lines in 2001

    New lines Adapted lines

  • 8/2/2019 Wochele Rail Presentation

    9/34- - P 9

    European High Speed Lines in 2010

    New lines Adapted lines

  • 8/2/2019 Wochele Rail Presentation

    10/34- - P 10

    European High Speed Lines in 2020

    2006: 1900 Miles 2020: 5600 Miles

  • 8/2/2019 Wochele Rail Presentation

    11/34- - P 11

    Mainline trends

    +100 % over the last 10years

    Source UIC

    .. And growth will speed upIn the years to come

  • 8/2/2019 Wochele Rail Presentation

    12/34

    - - P 12

    The US Opportunities for VHSR are Good

    Orlando

    Tampa

    Miami

    FLORIDAPopulation: 18M

    Pop. Density: 338/sq Ml.

    Lille

    Paris

    Lyon

    FRANCEPopulation: 65M

    Pop. Density: 297/sq Ml.

    Not only these 2 Corridors should be VHS (>200MPH)

    We need to keep a focus on VHS Corridors Our economy, environment and future depends on

    efficient transportation systems.

    Bay Area

    Sacramento

    Los Angeles

    San Diego

    CALIFORNIAPopulation: 37M

    Pop. Density: 234/sq Ml.

  • 8/2/2019 Wochele Rail Presentation

    13/34

    - - P 13

    The US Opportunities for VHSR are Good

    VHS (>200MPH) Backbone Corridors would benefit all these Densely Populated Regions

  • 8/2/2019 Wochele Rail Presentation

    14/34

    HS .Why?

  • 8/2/2019 Wochele Rail Presentation

    15/34

    - - P 15Source SNCF I

    VHST an Economic and Ecological alternative to air transportation

    Why a High Speed Train ?

  • 8/2/2019 Wochele Rail Presentation

    16/34

    - - P 16

    VHST saves Energy Costs and

    reduces Greenhouse Gases

    0 10 20 30 40 50 60"Petroleum equivalent gramme" per passenger-kilometre

    TGV

    Classic Train

    Bus

    Private Car

    Plane 51.1

    29.9

    18.3

    17.6

    12.1

    Source : SNCF-I

    Why a High Speed Train ?

  • 8/2/2019 Wochele Rail Presentation

    17/34

    - - P 17

    Land requirement are Smaller

    Source : SNCF-I

    Why a High Speed Train ?

    A rail-line can carry more passengers as a eight lane highway.

    The capital cost to adding another 4 lanes to a highway or a HSR line are comparable.

  • 8/2/2019 Wochele Rail Presentation

    18/34

    - - P 18

    0 5 10 15 20

    Number of people killed per billion passenger-kilometre

    TGV

    ClassicTrain

    Road

    Airplane 0.27

    17

    0.18

    0

    Source : SNCF-I

    Why a High Speed Train ?

    VHST is SAFERHow many lives are lost each winter inAlberta on the road between Calgary andEdmonton? As travel demand increasesso will the death toll.

  • 8/2/2019 Wochele Rail Presentation

    19/34

    - - P 19

    Airport Connections and Economic Growth (TOD)

  • 8/2/2019 Wochele Rail Presentation

    20/34

    - - P 20

    What will HSR Look Like in my Back Yard?

  • 8/2/2019 Wochele Rail Presentation

    21/34

    HS technology snapshot

  • 8/2/2019 Wochele Rail Presentation

    22/34

    - - P 22

    Alstom experience in Very High Speed

    670 VHS trains sold to-date, operating daily at 187-200 mph

    EUROSTARFrance, England

    THALYSBelgium, France, Holland & Germany

    TGV DuplexFrance

    KTXKorea

    TGV EastFrance, Germany, Luxembourg,

    Switzerland

    AVESpain

  • 8/2/2019 Wochele Rail Presentation

    23/34

    - - P 23

    Daily operating speed: 190-220 mph - start of operation in 2011

    25 AGV sold to NTV (+ 10 options)

  • 8/2/2019 Wochele Rail Presentation

    24/34

    - - P 24

    US Electrified Track vs. US Diesel Train

    Incremental Speed is Part of VHS Success

    VHS (>150MPH to 220MPH) must be electrified and should form the main feedercorridors

    HS (100MPH to 125 MPH) can be done with diesel power, and obviously would havecheaper infrastructure.

    Global technology can be transferred to USA for VHS application.

    Incremental HS solutions are available in the USA.

  • 8/2/2019 Wochele Rail Presentation

    25/34

    - - P 25

    American Style 100-125MPH Trains,Non-Tilting

    European Style Tilting Trains EMU Style

    Tilting vs. Non-Tilting:

    Intermediate High Speed Technology

    Many US locations will not benefit from TiltingTechnology.

    Speed of Locomotive hauled trains are often limitedby the locomotive dynamics.

    Track design and maintenance must be aligned totilting.

    VHSR does not use tilting technology...

    Coradia

    PL42 (similar to NJT) adapted to 125MPH locomotive

  • 8/2/2019 Wochele Rail Presentation

    26/34

    - - P 26

    Double Deck increases line capacity:

    SNCFs success with VHS led to increased capacitydemands on many lines.

    Today SNCF purchase only Duplex trains.

    Future demand increase to be considered

    US Style 100-125MPH Duplex Intercity Trains

    French TGVDuplex

    Intermediate HS and VHS Technology

  • 8/2/2019 Wochele Rail Presentation

    27/34

    - - P 27

    Passenger Safety is Paramount:

    High Speed Rail : the safest mode of transportation

    Trainsets to be designed and tested to ensure:.

    - Car Shell Design Integrity

    - Proven articulated cars with trucks between cars

    (enhanced rigidity) for VHS.- Crash Resistance / Impact Resistance

    - Safety design of Passenger Compartment Interiors

    Automatic Train Control [PTC] is imperative.

    Intermediate HS and VHS Technology

    http://../Desktop/020_REI_AGV_MEGA807.m1v
  • 8/2/2019 Wochele Rail Presentation

    28/34

    - - P 28

    Comfort

    Flexible Interior design

  • 8/2/2019 Wochele Rail Presentation

    29/34

    - - P 29

    Flexible Interior design

    ModularityFlexibilitySpace

  • 8/2/2019 Wochele Rail Presentation

    30/34

    - - P 30

    Open forNew Concepts

    Flexible Interior design

  • 8/2/2019 Wochele Rail Presentation

    31/34

    - - P 31

    Lounge Car

  • 8/2/2019 Wochele Rail Presentation

    32/34

    - - P 32

    Capacity

    Flexible Interior design

  • 8/2/2019 Wochele Rail Presentation

    33/34

    Thank You

  • 8/2/2019 Wochele Rail Presentation

    34/34

    AGV The first articulated train with distributed power

    From single deck TGV (660 ft)TGV : 13 bogies

    9600 kW 200 mph430 tons loaded

    377 passengers (TGV-R)

    To AGV (660 ft)

    AGV 11 : 12 bogies9000 kW 220 mph410 tons Loaded

    420 to 460 passengers

    More capacity ( at same train length)Optimized operation costs (power, maintenance)Very high availability

    Common block

    Transformer

    Traction block