04.01.00 - alcantarillas d=36

29
METRADO DE ALCANTARILLAS PROGRESIVA: 0+280.00 DIAMETRO: 36" UNIDAD PARTIDA UNIDAD LARGO ANCHO ALTURA PARCIAL TOTAL (m.) (m.) (m.) 4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 31.78 DATOS ALCANTARILLA TMC L -(Ecua 1) Lc1 (Hc+a)/2 L = 9.30 8.22 1.60 1.30 17.10 La = 1.60 CAJA DE TOMA Lc + 0.60 2.00 a La1 = 1.72 1.95 2.00 1.30 5.07 La2 = 1.92 CABEZAL DE SALIDA (Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 2.47 1.57 1.30 5.03 Lc = 1.35 CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 CIMIENTO 5 (Lc1+Lc4)/2 C2 P Lc2 = 2.93 1.39 0.78 0.40 0.43 Lc3 = 3.33 CIMIENTO 6 Lc1 V P Lc4 = 1.18 1.60 0.07 0.40 0.04 Le = 2.10 CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES) (La2+La3)/2 C1 P Ls = 4.40 1.72 0.70 0.40 0.96 a = 1.30 LOSA CABEZAL SALIDA (Lc2+Lc4)/2 H P1 b = 1.00 2.06 0.87 0.15 0.27 B = 0.30 VIGA DE BORDE CABEZAL SALIDA (Lc2+Lc3)/2 e P C = 0.85 3.13 0.20 0.40 0.25 C1 = 0.70 LOSA CAJA TOMA 2.10 Lc + 0.60 0.40 C2 = 0.78 2.10 1.95 0.40 1.64 D = 0.90 VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES) 1.20+Lc 0.50 0.30 H = 0.87 2.55 0.50 0.30 0.77 Hc = 1.30 VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES) 1.20 0.30 0.30 P = 0.40 1.20 0.30 0.30 0.22 P1 = 0.15 4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 11.87 Tc = 0.15 RELLENO CON MATERIAL PROPIO SELECCIONADO L -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 8.22 1.60 1.30 17.10 p = 3.14 AREA CIRCULAR (-) L -(Ecua 1) Ha = 0.60 8.22 -0.64 -5.23 e = 0.20 4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 23.23 Ecua 1 = 1.08 4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V PARAPETO EN SALIDA 1 PARAPETO 1 (Lc+Lc1)/2 B Hc 1.48 0.30 1.30 0.58 PARAPETO 2 Tc Hc Lc1 0.15 1.30 0.80 0.16 PARAPETO 3 (AREA CIRCULAR) (-) ((4Tc/3)+2B)/2 -0.64 0.40 -0.25 ALETAS DE SALIDA (2 UNIDADES) (La1+La)/2 B (Ha+Hc)/2 1.66 0.30 0.95 0.95 CIMIENTO PARAPETO EN SALIDA CIMIENTO 5 (Lc1+Lc4)/2 C2 P 1.39 0.78 0.40 0.43 CIMIENTO 6 Lc1 V P 1.60 0.07 0.40 0.04 CIMIENTO ALA (2 UNIDADES) (La2+La3)/2 C1 P 1.72 0.70 0.40 0.96 LOSA CABEZAL SALIDA (Lc2+Lc4)/2 H P1 2.06 0.87 0.15 0.27 VIGA DE BORDE SALIDA (Lc2+Lc3)/2 e P 3.13 0.20 0.40 0.25 MUROS PARALELOS A VIA MURO 10 (2 UNIDADES) a + 0.40 0.40 Lc+0.60 1.70 0.40 1.95 2.65 AREA CIRCULAR (-) (11) 0.40 -0.64 0.40 -0.25 MUROS PERPENDICULAR A VIA MURO 12 (02 UNIDADES) b + 0.70 0.30 1.20 1.70 0.30 1.20 1.22 AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES) -0.20 0.30 -0.20 0.30 -0.12 LOSA CAJA INGRESO 1.20 Lc 0.40 1.20 1.35 0.40 0.65 VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES) 1.20+Lc 0.50 0.30 2.55 0.50 0.30 0.77 VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES) 1.20 0.30 0.30 1.20 0.30 0.30 0.22 4.01.05 EMBOQUILLADO DE PIEDRA 18.75 EMBOQUILLADO ENTRADA Le Lc + 0.60 2.10 1.95 4.10 EMBOQUILLADO SALIDA Le1 Lc3 4.40 3.33 14.65 4.01.06 ENCOFRADO Y DESENCOFRADO 26.80 PARAPETO EN CABEZAL SALIDA PARAPETO 1 (02 UNIDADES) Lc Hc 1.35 1.30 3.51 TAPA LATERAL TRIANGULAR (02 UNIDADES) Tc Hc 0.15 1.30 0.20 AREA CIRCULAR (-) -0.64 -0.64 ALETAS DE SALIDA TAPAS MUROS ALAS INTERNOS (02 UNIDADES) (Hc+Ha)/2 La 0.95 1.60 3.04 TAPAS MUROS ALAS EXTERNOS (02 UNIDADES) (Hc+Ha)/2 La1 0.95 1.72 3.27 TAPAS LATERALES (02 UNIDADES) B Ha 0.30 0.60 0.36 MUROS PERPENDICULAR VIA CAJA TOMA 6.40 a 6.40 1.30 8.32 MURO PERPENDICULAR VIA CAJA TOMA 1.20+4Lc a 6.60 1.30 8.58 AREA CIRCULAR (-) -0.64 -0.64 AREA CUNETA (-) (04 UNIDADES) 0.20 0.20 0.80 4.01.07 TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO m 9.30 ALCANTARILLA TMC 36" m L 9.30 9.30 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 m 3 (p x D²)/4 m 3 m 3 m 3 (p x D²)/4 m 3 m 3 m 3 m 3 m 3 m 3 (p x D²)/4 m 3 m 3 m 3 m 3 m 3 (p x D²)/4 m 3 (p x D²)/4

Upload: edwin-urbano-estrada

Post on 16-Jan-2016

237 views

Category:

Documents


0 download

DESCRIPTION

METRADO ALCANTARILLA TMC 36"

TRANSCRIPT

Page 1: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 0+280.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 31.78 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 9.30 m

8.22 1.60 1.30 17.10 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 2.10 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 4.40 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 11.87 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

8.22 1.60 1.30 17.10 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

8.22 -0.64 -5.23 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 23.23 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 18.75

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

2.10 1.95 4.10

EMBOQUILLADO SALIDA m²Le1 Lc3

4.40 3.33 14.65

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 9.30

ALCANTARILLA TMC 36" mL

9.30 9.30

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 2: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 2+280.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 29.07 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.00 m

6.92 1.60 1.30 14.39 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 0.00 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 4.50 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.99 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

6.92 1.60 1.30 14.39 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

6.92 -0.64 -4.40 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.45 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 14.99

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

0.00 1.95 0.00

EMBOQUILLADO SALIDA m²Le1 Lc3

4.50 3.33 14.99

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 8.00

ALCANTARILLA TMC 36" mL

8.00 8.00

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 3: 04.01.00 - ALCANTARILLAS D=36

NO TIENE CABEZAL DE SALIDAMETRADO DE ALCANTARILLAS

PROGRESIVA: 2+440.00DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 22.08 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.00 m

6.92 1.60 1.30 14.39 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

0.00 0.00 0.00 0.00 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

0.00 0.00 0.00 0.00 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

0.00 0.00 0.00 0.00 Le = 0.00 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.50 m

0.00 0.00 0.00 0.00 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

0.00 0.00 0.00 0.00 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

0.00 0.00 0.00 0.00 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.99 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

6.92 1.60 1.30 14.39 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

6.92 -0.64 -4.40 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 13.72 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 5.13 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

0.00 0.00 0.00 0.00

PARAPETO 2Tc Hc Lc1

0.00 0.00 0.00 0.00

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

0.00 0.00 0.00

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

0.00 0.00 0.00 0.00

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

0.00 0.00 0.00 0.00

CIMIENTO 6Lc1 V P

0.00 0.00 0.00 0.00

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

0.00 0.00 0.00 0.00

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

0.00 0.00 0.00 0.00

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

0.00 0.00 0.00 0.00

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 8.33

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

0.00 1.95 0.00

EMBOQUILLADO SALIDA m²Le1 Lc3

2.50 3.33 8.33

4.01.06 ENCOFRADO Y DESENCOFRADO m² 17.06

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

0.00 0.00 0.00

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.00 0.00 0.00

AREA CIRCULAR (-)0.00 0.00

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.00 0.00 0.00

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.00 0.00 0.00

TAPAS LATERALES (02 UNIDADES)B Ha

0.00 0.00 0.00

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 8.00

ALCANTARILLA TMC 36" mL

8.00 8.00

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 4: 04.01.00 - ALCANTARILLAS D=36

NO TIENE CAJA DE TOMATIENE 02 CABEZAL DE SALIDA

METRADO DE ALCANTARILLASPROGRESIVA: 4+221.99

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 27.96 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.80 m

6.72 1.60 1.30 13.98 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

0.00 0.00 0.00 0.00 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 10.06 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.87 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.09 Le = 4.70 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.50 m

1.72 0.70 0.40 1.93 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.54 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.50 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

0.00 0.00 0.00 0.00 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

0.00 0.00 0.00 0.00 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

0.00 0.00 0.00 0.00 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.70 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

6.72 1.60 1.30 13.98 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

6.72 -0.64 -4.28 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 21.46 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 6.77 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

0.00 0.00 0.00 0.00

AREA CIRCULAR (-) (11)0.40

0.00 0.00 0.00

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

0.00 0.00 0.00 0.00

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

0.00 0.00 0.00

LOSA CAJA INGRESO1.20 Lc 0.40

0.00 0.00 0.00 0.00

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

0.00 0.00 0.00 0.00

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

0.00 0.00 0.00 0.00

4.01.05 EMBOQUILLADO DE PIEDRA m² 20.82

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

4.70 1.95 9.17

EMBOQUILLADO SALIDA m²Le1 Lc3

3.50 3.33 11.66

4.01.06 ENCOFRADO Y DESENCOFRADO m² 19.47

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

0.00 0.00 0.00

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

0.00 0.00 0.00

AREA CIRCULAR (-) m²0.00 0.00

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.00 0.00

4.01.07 m 7.80

ALCANTARILLA TMC 36" mL

7.80 7.80

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 5: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 7+660.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 28.87 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.90 m

6.82 1.60 1.30 14.19 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 4.10 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.50 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.85 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

6.82 1.60 1.30 14.19 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

6.82 -0.64 -4.34 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.40 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 16.32

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

4.10 1.95 8.00

EMBOQUILLADO SALIDA m²Le1 Lc3

2.50 3.33 8.33

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 7.90

ALCANTARILLA TMC 36" mL

7.90 7.90

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 6: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 8+010.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 28.24 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.60 m

6.52 1.60 1.30 13.56 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 5.40 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.50 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.41 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

6.52 1.60 1.30 13.56 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

6.52 -0.64 -4.15 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.22 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 18.86

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

5.40 1.95 10.53

EMBOQUILLADO SALIDA m²Le1 Lc3

2.50 3.33 8.33

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 7.60

ALCANTARILLA TMC 36" mL

7.60 7.60

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 7: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 8+310.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 29.49 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.20 m

7.12 1.60 1.30 14.81 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 5.50 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 0.60 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.28 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

7.12 1.60 1.30 14.81 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

7.12 -0.64 -4.53 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.57 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 12.72

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

5.50 1.95 10.73

EMBOQUILLADO SALIDA m²Le1 Lc3

0.60 3.33 2.00

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 8.20

ALCANTARILLA TMC 36" mL

8.20 8.20

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 8: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 8+610.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 30.11 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.50 m

7.42 1.60 1.30 15.43 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 4.00 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.90 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.71 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

7.42 1.60 1.30 15.43 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

7.42 -0.64 -4.72 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.75 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 17.46

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

4.00 1.95 7.80

EMBOQUILLADO SALIDA m²Le1 Lc3

2.90 3.33 9.66

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 8.50

ALCANTARILLA TMC 36" mL

8.50 8.50

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 9: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 9+610.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 28.03 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.50 m

6.42 1.60 1.30 13.35 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 2.95 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.90 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.27 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

6.42 1.60 1.30 13.35 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

6.42 -0.64 -4.08 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.16 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 15.41

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

2.95 1.95 5.75

EMBOQUILLADO SALIDA m²Le1 Lc3

2.90 3.33 9.66

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 7.50

ALCANTARILLA TMC 36" mL

7.50 7.50

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 10: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 11+903.72

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 29.07 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.00 m

6.92 1.60 1.30 14.39 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 5.35 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 1.35 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.99 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

6.92 1.60 1.30 14.39 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

6.92 -0.64 -4.40 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.45 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 14.93

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

5.35 1.95 10.43

EMBOQUILLADO SALIDA m²Le1 Lc3

1.35 3.33 4.50

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 8.00

ALCANTARILLA TMC 36" mL

8.00 8.00

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 11: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 12+615.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 32.19 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 9.50 m

8.42 1.60 1.30 17.51 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 0.00 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.50 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 12.16 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

8.42 1.60 1.30 17.51 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

8.42 -0.64 -5.36 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 23.34 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 8.33

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

0.00 1.95 0.00

EMBOQUILLADO SALIDA m²Le1 Lc3

2.50 3.33 8.33

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 9.50

ALCANTARILLA TMC 36" mL

9.50 9.50

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 12: 04.01.00 - ALCANTARILLAS D=36

NO TIENE CABEZAL DE SALIDAMETRADO DE ALCANTARILLAS

PROGRESIVA: 13+700.00DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 26.03 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 9.90 m

8.82 1.60 1.30 18.35 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

0.00 0.00 0.00 0.00 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

0.00 0.00 0.00 0.00 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

0.00 0.00 0.00 0.00 Le = 0.00 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.55 m

0.00 0.00 0.00 0.00 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

0.00 0.00 0.00 0.00 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

0.00 0.00 0.00 0.00 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 12.73 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

8.82 1.60 1.30 18.35 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

8.82 -0.64 -5.61 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 14.84 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 5.13 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

0.00 0.00 0.00 0.00

PARAPETO 2Tc Hc Lc1

0.00 0.00 0.00 0.00

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

0.00 0.00 0.00

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

0.00 0.00 0.00 0.00

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

0.00 0.00 0.00 0.00

CIMIENTO 6Lc1 V P

0.00 0.00 0.00 0.00

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

0.00 0.00 0.00 0.00

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

0.00 0.00 0.00 0.00

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

0.00 0.00 0.00 0.00

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 11.82

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

0.00 0.00 0.00

EMBOQUILLADO SALIDA m²Le1 Lc3

3.55 3.33 11.82

4.01.06 ENCOFRADO Y DESENCOFRADO m² 17.06

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

0.00 0.00 0.00

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.00 0.00 0.00

AREA CIRCULAR (-)0.00 0.00

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.00 0.00 0.00

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.00 0.00 0.00

TAPAS LATERALES (02 UNIDADES)B Ha

0.00 0.00 0.00

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 9.90

ALCANTARILLA TMC 36" mL

9.90 9.90

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 13: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 13+776.70

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 29.70 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.30 m

7.22 1.60 1.30 15.02 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 4.35 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.05 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.42 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

7.22 1.60 1.30 15.02 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

7.22 -0.64 -4.59 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.63 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 18.64

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

4.35 1.95 8.48

EMBOQUILLADO SALIDA m²Le1 Lc3

3.05 3.33 10.16

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 8.30

ALCANTARILLA TMC 36" mL

8.30 8.30

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 14: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 13+924.17

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 30.11 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.50 m

7.42 1.60 1.30 15.43 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 0.00 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 5.15 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.71 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

7.42 1.60 1.30 15.43 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

7.42 -0.64 -4.72 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.75 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 17.15

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

0.00 1.95 0.00

EMBOQUILLADO SALIDA m²Le1 Lc3

5.15 3.33 17.15

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 8.50

ALCANTARILLA TMC 36" mL

8.50 8.50

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 15: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 14+840.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 30.95 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.90 m

7.82 1.60 1.30 16.27 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 0.00 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.65 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 11.29 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

7.82 1.60 1.30 16.27 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

7.82 -0.64 -4.97 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.99 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 8.82

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

0.00 1.95 0.00

EMBOQUILLADO SALIDA m²Le1 Lc3

2.65 3.33 8.82

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 8.90

ALCANTARILLA TMC 36" mL

8.90 8.90

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 16: 04.01.00 - ALCANTARILLAS D=36

NO TIENE CABEZAL DE SALIDA

METRADO DE ALCANTARILLASPROGRESIVA: 16+510.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 25.83 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 9.80 m

8.72 1.60 1.30 18.14 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

0.00 0.00 0.00 0.00 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

0.00 0.00 0.00 0.00 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

0.00 0.00 0.00 0.00 Le = 0.00 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.50 m

0.00 0.00 0.00 0.00 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

0.00 0.00 0.00 0.00 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

0.00 0.00 0.00 0.00 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 12.59 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

8.72 1.60 1.30 18.14 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

8.72 -0.64 -5.55 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 14.78 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 5.29 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

0.00 0.00 0.00 0.00

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

0.00 0.00 0.00

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

0.00 0.00 0.00 0.00

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

0.00 0.00 0.00 0.00

CIMIENTO 6Lc1 V P

0.00 0.00 0.00 0.00

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

0.00 0.00 0.00 0.00

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

0.00 0.00 0.00 0.00

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

0.00 0.00 0.00 0.00

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 8.33

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

0.00 0.00 0.00

EMBOQUILLADO SALIDA m²Le1 Lc3

2.50 3.33 8.33

4.01.06 ENCOFRADO Y DESENCOFRADO m² 17.06

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

0.00 0.00 0.00

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.00 0.00 0.00

AREA CIRCULAR (-)0.00 0.00

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.00 0.00 0.00

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.00 0.00 0.00

TAPAS LATERALES (02 UNIDADES)B Ha

0.00 0.00 0.00

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 9.80

ALCANTARILLA TMC 36" mL

9.80 9.80

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 17: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 17+930.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 31.15 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 9.00 m

7.92 1.60 1.30 16.47 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 0.00 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.75 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 11.44 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

7.92 1.60 1.30 16.47 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

7.92 -0.64 -5.04 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 23.05 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 12.49

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

0.00 1.95 0.00

EMBOQUILLADO SALIDA m²Le1 Lc3

3.75 3.33 12.49

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 9.00

ALCANTARILLA TMC 36" mL

9.00 9.00

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 18: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 18+093.89

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 30.43 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.65 m

7.57 1.60 1.30 15.75 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 0.00 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.50 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.93 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

7.57 1.60 1.30 15.75 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

7.57 -0.64 -4.82 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.84 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 8.33

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

0.00 1.95 0.00

EMBOQUILLADO SALIDA m²Le1 Lc3

2.50 3.33 8.33

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 8.65

ALCANTARILLA TMC 36" mL

8.65 8.65

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 19: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 20+030.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 29.49 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.20 m

7.12 1.60 1.30 14.81 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 1.40 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.20 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.28 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

7.12 1.60 1.30 14.81 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

7.12 -0.64 -4.53 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.57 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 13.39

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

1.40 1.95 2.73

EMBOQUILLADO SALIDA m²Le1 Lc3

3.20 3.33 10.66

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 8.20

ALCANTARILLA TMC 36" mL

8.20 8.20

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 20: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 20+233.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 28.03 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.50 m

6.42 1.60 1.30 13.35 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 2.75 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.20 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.27 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

6.42 1.60 1.30 13.35 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

6.42 -0.64 -4.08 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.16 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 16.02

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

2.75 1.95 5.36

EMBOQUILLADO SALIDA m²Le1 Lc3

3.20 3.33 10.66

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 7.50

ALCANTARILLA TMC 36" mL

7.50 7.50

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 21: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 20+415.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 29.49 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.20 m

7.12 1.60 1.30 14.81 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 0.00 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.60 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.28 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

7.12 1.60 1.30 14.81 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

7.12 -0.64 -4.53 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.57 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 8.66

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

0.00 1.95 0.00

EMBOQUILLADO SALIDA m²Le1 Lc3

2.60 3.33 8.66

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 8.20

ALCANTARILLA TMC 36" mL

8.20 8.20

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 22: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 20+600.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 28.87 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.90 m

6.82 1.60 1.30 14.19 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 2.50 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.65 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.85 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

6.82 1.60 1.30 14.19 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

6.82 -0.64 -4.34 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.40 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 13.70

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

2.50 1.95 4.88

EMBOQUILLADO SALIDA m²Le1 Lc3

2.65 3.33 8.82

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 7.90

ALCANTARILLA TMC 36" mL

7.90 7.90

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 23: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 20+810.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 30.32 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.60 m

7.52 1.60 1.30 15.64 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 0.00 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.85 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.86 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

7.52 1.60 1.30 15.64 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

7.52 -0.64 -4.78 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.81 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 12.82

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

0.00 1.95 0.00

EMBOQUILLADO SALIDA m²Le1 Lc3

3.85 3.33 12.82

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 8.60

ALCANTARILLA TMC 36" mL

8.60 8.60

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 24: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 21+200.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 28.87 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.90 m

6.82 1.60 1.30 14.19 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 2.75 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 6.35 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.85 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

6.82 1.60 1.30 14.19 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

6.82 -0.64 -4.34 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.40 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 26.51

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

2.75 1.95 5.36

EMBOQUILLADO SALIDA m²Le1 Lc3

6.35 3.33 21.15

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 7.90

ALCANTARILLA TMC 36" mL

7.90 7.90

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 25: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 21+340.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 28.87 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 7.90 m

6.82 1.60 1.30 14.19 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 2.75 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.20 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 9.85 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

6.82 1.60 1.30 14.19 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

6.82 -0.64 -4.34 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.40 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 12.69

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

2.75 1.95 5.36

EMBOQUILLADO SALIDA m²Le1 Lc3

2.20 3.33 7.33

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 7.90

ALCANTARILLA TMC 36" mL

7.90 7.90

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 26: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 21+840.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 31.05 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.95 m

7.87 1.60 1.30 16.37 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 2.90 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 2.60 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 11.36 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

7.87 1.60 1.30 16.37 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

7.87 -0.64 -5.01 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 23.02 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 14.31

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

2.90 1.95 5.66

EMBOQUILLADO SALIDA m²Le1 Lc3

2.60 3.33 8.66

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 8.95

ALCANTARILLA TMC 36" mL

8.95 8.95

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 27: 04.01.00 - ALCANTARILLAS D=36

METRADO DE ALCANTARILLASPROGRESIVA: 22+150.00

DIAMETRO: 36"

UNIDAD PARTIDA UNIDADLARGO ANCHO ALTURA

PARCIAL TOTAL(m.) (m.) (m.)

4.01.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 29.91 DATOS

ALCANTARILLA TMCL -(Ecua 1) Lc1 (Hc+a)/2 L = 8.40 m

7.32 1.60 1.30 15.23 La = 1.60 m

CAJA DE TOMALc + 0.60 2.00 a La1 = 1.72 m

1.95 2.00 1.30 5.07 La2 = 1.92 m

CABEZAL DE SALIDA(Lc1+Lc3)/2 H+B+2e Hc La3 = 1.52 m

2.47 1.57 1.30 5.03 Lc = 1.35 m

CIMIENTO PARAPETO EN CABEZAL SALIDA Lc1 = 1.60 m

CIMIENTO 5(Lc1+Lc4)/2 C2 P Lc2 = 2.93 m

1.39 0.78 0.40 0.43 Lc3 = 3.33 m

CIMIENTO 6Lc1 V P Lc4 = 1.18 m

1.60 0.07 0.40 0.04 Le = 2.65 m

CIMIENTO ALA CABEZAL SALIDA (2 UNIDADES)(La2+La3)/2 C1 P Ls = 3.75 m

1.72 0.70 0.40 0.96 a = 1.30 m

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1 b = 1.00 m

2.06 0.87 0.15 0.27 B = 0.30 m

VIGA DE BORDE CABEZAL SALIDA(Lc2+Lc3)/2 e P C = 0.85 m

3.13 0.20 0.40 0.25 C1 = 0.70 m

LOSA CAJA TOMA2.10 Lc + 0.60 0.40 C2 = 0.78 m

2.10 1.95 0.40 1.64 D = 0.90 m

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30 H = 0.87 m

2.55 0.50 0.30 0.77 Hc = 1.30 m

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30 P = 0.40 m

1.20 0.30 0.30 0.22 P1 = 0.15 m

4.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS 10.57 Tc = 0.15 m

RELLENO CON MATERIAL PROPIO SELECCIONADOL -(Ecua 1) Lc1 (Hc+a)/2 V = 0.07 m

7.32 1.60 1.30 15.23 p = 3.14

AREA CIRCULAR (-)L -(Ecua 1) Ha = 0.60 m

7.32 -0.64 -4.66 e = 0.20 m

4.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL 22.69 Ecua 1 = 1.08 m

4.01.04 CONCRETO f'c = 175 kg/cm² 8.51 Ecua 1 = B+Tc+(e-V)+0.50

PARAPETO EN SALIDA 1

PARAPETO 1(Lc+Lc1)/2 B Hc

1.48 0.30 1.30 0.58

PARAPETO 2Tc Hc Lc1

0.15 1.30 0.80 0.16

PARAPETO 3 (AREA CIRCULAR) (-)((4Tc/3)+2B)/2

-0.64 0.40 -0.25

ALETAS DE SALIDA (2 UNIDADES)(La1+La)/2 B (Ha+Hc)/2

1.66 0.30 0.95 0.95

CIMIENTO PARAPETO EN SALIDA

CIMIENTO 5(Lc1+Lc4)/2 C2 P

1.39 0.78 0.40 0.43

CIMIENTO 6Lc1 V P

1.60 0.07 0.40 0.04

CIMIENTO ALA (2 UNIDADES)(La2+La3)/2 C1 P

1.72 0.70 0.40 0.96

LOSA CABEZAL SALIDA(Lc2+Lc4)/2 H P1

2.06 0.87 0.15 0.27

VIGA DE BORDE SALIDA(Lc2+Lc3)/2 e P

3.13 0.20 0.40 0.25

MUROS PARALELOS A VIA

MURO 10 (2 UNIDADES)a + 0.40 0.40 Lc+0.60

1.70 0.40 1.95 2.65

AREA CIRCULAR (-) (11)0.40

-0.64 0.40 -0.25

MUROS PERPENDICULAR A VIA

MURO 12 (02 UNIDADES)b + 0.70 0.30 1.20

1.70 0.30 1.20 1.22

AREA TRIANGULAR (CUNETA) (-) (02 UNIDADES)-0.20 0.30

-0.20 0.30 -0.12

LOSA CAJA INGRESO1.20 Lc 0.40

1.20 1.35 0.40 0.65

VIGA DE BORDE INGRESO PARALELA A VIA (02 UNIDADES)1.20+Lc 0.50 0.30

2.55 0.50 0.30 0.77

VIGA DE BORDE INGRESO PERPENDICULAR VIA (02 UNIDADES)1.20 0.30 0.30

1.20 0.30 0.30 0.22

4.01.05 EMBOQUILLADO DE PIEDRA m² 17.66

EMBOQUILLADO ENTRADA m²Le Lc + 0.60

2.65 1.95 5.17

EMBOQUILLADO SALIDA m²Le1 Lc3

3.75 3.33 12.49

4.01.06 ENCOFRADO Y DESENCOFRADO m² 26.80

PARAPETO EN CABEZAL SALIDA

PARAPETO 1 (02 UNIDADES)Lc Hc

1.35 1.30 3.51

TAPA LATERAL TRIANGULAR (02 UNIDADES)Tc Hc

0.15 1.30 0.20

AREA CIRCULAR (-)-0.64 -0.64

ALETAS DE SALIDA

TAPAS MUROS ALAS INTERNOS (02 UNIDADES)(Hc+Ha)/2 La

0.95 1.60 3.04

TAPAS MUROS ALAS EXTERNOS (02 UNIDADES)(Hc+Ha)/2 La1

0.95 1.72 3.27

TAPAS LATERALES (02 UNIDADES)B Ha

0.30 0.60 0.36

MUROS PERPENDICULAR VIA CAJA TOMA m²6.40 a

6.40 1.30 8.32

MURO PERPENDICULAR VIA CAJA TOMA m²1.20+4Lc a

6.60 1.30 8.58

AREA CIRCULAR (-) m²-0.64 -0.64

AREA CUNETA (-) (04 UNIDADES) m²0.20

0.20 0.80

4.01.07 m 8.40

ALCANTARILLA TMC 36" mL

8.40 8.40

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3(p x D²)/4

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

m3

(p x D²)/4

m3

m3

m3

m3

m3

(p x D²)/4

m3

(p x D²)/4

TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO

Page 28: 04.01.00 - ALCANTARILLAS D=36

RESUMEN DE METRADOS

RUBRO 04.00.00 OBRAS DE ARTE Y DRENAJE

RUBRO 04.01.00 ALCANTARILLAS D = 36''

PARTIDA DESCRIPCION UNIDAD CANTIDAD

04.01.01 EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS m³ 786.00

04.01.02 RELLENO COMPACTADO CON MAT. PROPIO PARA ESTRUCTURAS m³ 285.50

04.01.03 ELIMINACIÓN DE MATERIAL EXCEDENTE MANUAL m³ 585.65

04.01.04 m³ 218.13

04.01.05 EMBOQUILLADO DE PIEDRA 388.21

04.01.06 ENCOFRADO Y DESENCOFRADO 687.08

04.01.07 TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE 36'' DE DIAMETRO m 226.90

CONCRETO f'c = 175 Kg/cm2

m2

m2