trabajo walycyto topografia

Upload: walycyto-paredes-alva

Post on 05-Jul-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/16/2019 Trabajo Walycyto Topografia

    1/2

    DATOSS: 875.9mts

    Tº: 30ºC

    T: 10kg

    L: 30mts

    LR: 29.93mtsW: 0.68kg

    P: 4.5kg

     A: 3mm² LR:?

    0PERACIÓ

    ERROR POR LONGITUDINCORRECTA (CL):

    CL= L´ − L

    CL=29.93m−30m

    CL=−0 .07m

     

    30m−0.07m   875. 92mX 

     X =875.92∗−0.07

    30

     X =

    −61.3144

    30

     X =−2 .044m

     LR=875.92−2.044

    CL=873. 88m

    ERROR POR TEMPERATURA (Cx):

    Cx= K (T −¿ ) L

    Cx=0.0000117 (30−20 )30

    Cx=0 .00351m

    30m0.00351 873. 88mX 

     X =0 .102   Cx=873.88+0.102

    Cx=873.982

    ERROR POR CATENARIA (Cc):

    Cc=¿W 

    2 L

    24 p2

    10¿¿

    24 ¿

    Cc=−(0.68)230

    ¿

    Cc=−0,00578 m

    30m−0 .00578   873 .982mX 

     X =−0,168m

    Cc=873.88−0,168

    Cc=873.712 m

    ERROR POR TENSIÓN (C p):

    Cp= ( P− Po ) L AE

    Cp=( 10−4,5 )30

    3∗21000

    Cp=0 .00261m

    30m0.00261 m   873.88mX 

  • 8/16/2019 Trabajo Walycyto Topografia

    2/2

     X =0.076m

    Cp=873.88+0.076