Reabilitare rezervor T5(corp C47) de 4508m 3 de benzina: construire fundatii, sistem PSI, legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR Installation Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/ Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018) 16.02.2021 Tanasescu C. Saia L. Data/ Date Intocmit/ Designer Verificat/ Checked Pag/Pag._1_din/from_39_ 04 03 02 01 Aprobat pentru obtinere Aviz Mediu / Approved for environmental agreement 16.02.2021 Tanasescu C. Saia L. 00 Emis pentru verificare / Issued for review 08.02.2021 Tanasescu C. Saia L. Rev/Rev. Denumirea modificarii/Change description Data/Date Intocmit/Designer Verificat/Checked SC POERNER ROMANIA S.R.L. 021985 Bucuresti, Vasile Cristescu , Nr. 8 Telefon: +40(0)21 3264440 100540 Ploiesti, B.P. Hasdeu, Nr. 28 Telefon: +40(0)244 529151 Email: [email protected] 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Nr. proiect / Project no. Nr. desen / Drawing no. Rev/Rev 7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 17 18 19 20 21 22 23 30 31 80 Intreprindere/Client OMV Petrom SA Rafinăria Petrobrazi Cod instalatie/ Plant code Orig. doc. F Instalatia/Plant Parc 230-7 7 8 6 2 9 0 0 0 1 4 Scara/Scale Denumire document/Document name - MTh Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018) / Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018) OMV PETROM S.A. is reserving all the rights over this documentation and will take legal action against any unauthorized person that uses or sends to third parts MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN LEGEA NR. 292/10.12.2018) / PRESENTATION MEMORANDUM (ACC. TO ANNEX NO. 5E OF LAW 292 /10.12.2018) Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundații, sistem PSI, legături conducte, montaj echipamente aferente rezervorului in incinta Rafinăriei Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR InstallationBeneficiar: S.C. OMV PETROM S.A. Proiectant: S.C. Poerner Romania S.R.L. DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Upload: others

Post on 17-Nov-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag._1_din/from_39_

04

03

02

01 Aprobat pentru obtinere Aviz

Mediu / Approved for environmental agreement

16.02.2021 Tanasescu C. Saia L.

00 Emis pentru verificare / Issued

for review 08.02.2021 Tanasescu C. Saia L.

Rev/Rev. Denumirea modificarii/Change

description Data/Date Intocmit/Designer Verificat/Checked

SC POERNER ROMANIA S.R.L. 021985 Bucuresti, Vasile Cristescu , Nr. 8 Telefon: +40(0)21 3264440 100540 Ploiesti, B.P. Hasdeu, Nr. 28 Telefon: +40(0)244 529151 Email: [email protected]

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Nr. proiect / Project no. Nr. desen / Drawing no. Rev/Rev

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1

17 18 19 20 21 22 23 30 31 80

Intreprindere/Client OMV Petrom SA Rafinăria Petrobrazi

Cod instalatie/ Plant code Orig. doc.

F

Instalatia/Plant Parc 230-7 7 8 6 2 9 0 0 0 1 4

Scara/Scale Denumire document/Document name

- MTh – Memoriu de prezentare (conform Anexei nr.

5E din Legea nr. 292/10.12.2018) / Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN LEGEA NR. 292/10.12.2018) / PRESENTATION

MEMORANDUM (ACC. TO ANNEX NO. 5E OF LAW 292 /10.12.2018)

“Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundații, sistem PSI, legături conducte, montaj

echipamente aferente rezervorului in incinta Rafinăriei Petrobrazi (caroul 54) /

Tank T5 Aluminium Dome and IFR Installation”

Beneficiar: S.C. OMV PETROM S.A.

Proiectant: S.C. Poerner Romania S.R.L.

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 2: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__2__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

Contents

1. Denumirea proiectului/ Project name ................................................................................. 4

2. Titular/ Holder ...................................................................................................................... 5

3. Descrierea proiectului/ Project description ....................................................................... 6

3.1. Rezumatul proiectului/ Summary of the project.................................................................... 6

3.2. Justificarea necesitații proiectului/ Justification of this project necessity .............................. 7

3.3. Perioada de implementare propusa/ Proposed implementation period ................................ 7

3.4. Planșe reprezentând limitele amplasamentului proiectului/ Drawings with the project site

boundaries ................................................................................................................................. 7

3.5. Formele fizice ale proiectului/ Physical forms of the project ................................................. 8

4. Descrierea lucrărilor de demolare necesare/ Description of the required demolition works ........................................................................................................................... 16

5. Localizarea Proiectului/ Project location ......................................................................... 16

5.1. Folosințe actuala si planificate ale terenului/ Current and planned use of the land ............ 17

5.2. Politici de zonare și de folosire a terenului / Zoning and land use policies ......................... 17

5.3. Areale sensibile/ Sensitive areas ....................................................................................... 17

5.4. Coordonatele geografice ale amplasamentului proiectului/ Geographic coordinates of the

project site ................................................................................................................................ 17

5.5. Detalii privind orice varianta de amplasament luata in considerare/ Details on any site

alternatives taken into consideration ......................................................................................... 17

6. Descrierea efectelor semnificative posibile asupra mediului/ Description of possible significant environmental effects .............................................................................. 18

6.1. Protecția calității apelor/ Water quality protection .............................................................. 18

6.2. Protecția aerului/ Air protection .......................................................................................... 19

6.3. Protecția împotriva zgomotului si vibrațiilor/ Protection against noise and vibrations ......... 20

6.4. Protecția împotriva radiațiilor/ Protection against radiation ................................................ 23

6.5. Protecția solului si subsolului/ Soil and subsoil protection .................................................. 23

6.6. Protecția ecosistemelor terestre si acvatice/ Protection of terrestrial and aquatic

ecosystems .............................................................................................................................. 24

6.7. Protecția așezărilor umane si a altor obiective de interes public/ Protection of human

settlements and other public interest objectives........................................................................ 25

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 3: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__3__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

6.8. Gospodărirea deșeurilor generate pe amplasament/ Waste management for waste

generated on site ...................................................................................................................... 25

6.9. Gospodărirea substanțelor si preparatelor chimice/ Management of chemical substances

and preparations ...................................................................................................................... 28

7. Caracteristicile impactului potențial/ Characteristics of the potential impact ............... 29

7.1. Impactul asupra populației si sănătății umane/ Impact on the population and on human

health ....................................................................................................................................... 29

7.2. Impactul asupra florei si faunei/ Impact on flora and fauna ................................................ 30

7.3. Impactul asupra solului/ Impact on soil .............................................................................. 30

7.4. Impactul asupra folosințelor si bunurilor materiale/ Impact on facilities and property ......... 31

7.5. Impactul asupra calității si regimului cantitativ al apei/ Impact on water quality and water

levels ........................................................................................................................................ 31

7.6. Impactul asupra calității aerului/ Impact on air quality ........................................................ 32

7.7. Impactul asupra climei/ Impact on climate ......................................................................... 32

7.8. Impactul produs de zgomote si vibrații/ Impact of noise and vibrations .............................. 32

7.9. Impactul asupra peisajului si mediului vizual/ Impact on the landscape and visual

environment ............................................................................................................................. 32

7.10. Impactul asupra patrimoniului istoric si cultural/ Impact on the historical and cultural

heritage .................................................................................................................................... 33

7.11. Impactul asupra interacțiunilor dintre aceste elemente/ Impact on the interaction

between these elements ........................................................................................................... 33

7.12. Natura transfrontiera a impactului/ Cross-border nature of the impact ......................... 34

8. Prevederi pentru monitorizarea mediului/ Provisions for environmental monitoring .. 34

9. Justificarea încadrării proiectului, după caz, in prevederile altor acte normative naționale care transpun legislația comunitara/ Justification of the project classification, as applicable, under the provision of other national regulatory acts that incorporate European Community legislation .......................................... 35

10. Lucrări necesare organizării de șantier/ Works needed for construction site layout ........................................................................................................................... 36

11. Lucrări de refacere a amplasamentului la finalizarea investiției / Land restoration works at the end of the project .................................................................................. 37

12. Anexe/ Annexes .......................................................................................................... 37

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 4: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__4__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

Prezenta lucrare s-a întocmit pe baza informațiilor furnizate de către proiectantul general, proiectanții de specialitate, documentarea in teren si respectând prevederile următoarelor acte normative:

This paper was prepared based on the information supplied by the General Designer, specialized designers, fact-finding in the field and in compliance with provisions in the following regulatory acts:

• Ordonanța de urgenta a Guvernului nr. 195/2005 privind protecția mediului, aprobata cu modificări si completări prin Legea nr. 265/2006, cu modificările si completările ulterioare,

• Ordinul 76/2010 privind aprobarea Metodologiei de aplicare a evaluării impactului asupra mediului pentru proiecte publice si private

• Legea 292/2018, privind evaluarea impactului anumitor proiecte publice si private asupra mediului;

• Legea nr. 107 din 25 septembrie 1996 (Legea apelor) modificata si completata ulterior.

• Government Emergency Ordinance no. 195/2005 on environmental protection, approved, with amendments and supplements, by Law no.265/2006, as amended and supplemented.

• Order 76/2010 to approve the Implementing Rules for the environmental impact assessment of public and private projects.

• Law no. 292/2018 on the environmental impact assessment of certain public and private projects.

• Law no. 107 of 25 September 1996 (the Waters Law) as amended and supplemented.

1. Denumirea proiectului/ Project name

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundații, sistem PSI, legături conducte, montaj echipamente aferente rezervorului in incinta Rafinăriei Petrobrazi (caroul 54)

Tank T5 Aluminium Dome and IFR Installation

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 5: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__5__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

2. Titular/ Holder

Denumirea Titularului: S.C. OMV PETROM S.A. – Punct de lucru Rafinăria Petrobrazi

Adresa titularului: Brazi, jud. Prahova, Str. Trandafirilor, nr.65, cod poștal 107084.

Tel: +40 372854488

Fax: +40 244 541452

Adresa de e-mail: [email protected]

Adresa pagina de internet: www.petrom.com

Numele persoanelor de contact:

Holder's name: S.C. OMV PETROM S.A. – place of business: Petrobrazi Refinery

Holder address: Brazi, Prahova County, 65 Trandafirilor St., postal code 107084.

Phone: +40 372854488

Fax: +40 244 541452

E-mail address: [email protected]

Web page: www.petrom.com

Contact persons:

• Manager Proiect: Pitiga Catalin

• Responsabil pentru protecția mediului: Iulia Ciobanu

• Project Manager: Pitiga Catalin

• Environmental Protection Officer: Iulia Ciobanu

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 6: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__6__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

3. Descrierea proiectului/ Project description

3.1. Rezumatul proiectului/ Summary of the project

Proiectul consta in reabilitarea unui rezervor existent, T5 in caroul 54, in incinta Rafinăriei PETROBRAZI, precum si racordarea la utilitățile rafinăriei. Realizarea obiectivului propus se face in conformitate cu Planul de situație pe suport topografic anexat.

The project consists in the rehabilitation of an existing tank, T5, in Area 54, on the premises of PETROBRAZI Refinery, as well as branching it to the refinery utilities. The proposed objective will be achieved pursuant to the Site Plan based on the enclosed topographic survey.

Reabilitarea va consta în modernizarea rezervorului T5 prin înlocuirea capacului plutitor extern cu un acoperiș tip dom din aluminiu si instalarea unui capac flotat la interior pentru a reduce emisiile de compuși organici volatili în aer.

Rehabilitation will consist in upgrading the floating roof of Tank T5 by replacing the external floating roof with an aluminium dom roof and installing also an internal floating membrane in order to reduce VOC emissions to air from the storage of volatile liquid hydrocarbon compounds

Acest rezervor va fi reabilitat cu scopul de a i se extinde durata de viată cu 15 ani.

This tank will be rehabilitated in order to extend its life by 15 years.

Rezervorul va fi reparat si modernizat in conformitate cu standardele aplicabile. Elementele care vor fi considerate necorespunzătoare ca urmare a calculelor si pe baza evaluării tehnice vor fi înlocuite.

The tank will be repaired and upgraded in accordance with applicable standards. Items that will be considered inadequate as a result of the calculations and based on the technical evaluation will be replaced.

Piese care vor fi instalate / înlocuite: Parts that will be installed/replaced:

• Capac flotant intern nou și dom din aluminiu în locul acoperișului plutitor extern;

• new internal floating membrane and aluminum dom instead of external floating roof;

• racorduri noi • new nozzles

• conducte apa de răcire si spuma • new cooling water and foam pipelines

• opritor de flacăra • new flame arrestor

• conducte noi conectate la conducta de aspirație pompe

• new pipelines connected to the suction line of the pumps

• conducta noua de drenaj • new drainage pipeline

• guri de vizita noi pentru a permite instalarea IFR

• new shell manholes DN 800, for IFR installation;

• Prezoane pentru ancorare rezervor • new anchor bolts.

Componente care vor fi eliminate: Parts that will be removed:

• Capac flotant extern • External floating roof

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 7: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__7__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

• Sistem de supra-plin existent (inclusiv conducta 250-6290032-13)

• Existing overflow system (including the pipeline 250-6290032-13)

• Sistem de drenaj acoperiș • Drainage Roof System for Rain

• serpentina de încălzire acoperiș, inclusiv toate conductele de abur si condens

• Roof Heating Coil including all Steam and Condensate Pipelines.

Rezervorul va fi conectat la sistemul de canalizare existent in zona.

The tank will be connected to the existing sewerage system.

De asemenea, pentru rezervor se va realiza un sistem de protecție la foc si un sistem semifix de stingere cu spuma aeromecanica. Acest sistem va fi alcătuit dintr-o rețea de conducte, unele conectate la sistemul de hidranți din zona si altele dirijate către exteriorul caroului, într-o zona unde mașinile de pompieri pot staționa pentru a alimenta sistemul cu spuma.

Moreover, a fire protection system and a semi-fixed firefighting system with air-mechanical foam will be made for the tank. This system will consist of a pipe network, of which some will be connected to the hydrant system in the area and others will be routed towards outside the block, in an area where fire brigade vehicles can be parked to supply the system with foam.

3.2. Justificarea necesitații proiectului/ Justification of this project necessity

Proiectul propus face parte din politica de dezvoltare si investiții a OMV Petrom in cadrul Rafinăriei Petrobrazi, cu respectarea tuturor cerințelor de protecție a mediului. Proiectul se aliniază cerințelor documentului BREF referitor la emisiile de la depozitarea produselor lichide, gazelor lichefiate si solidelor

The proposed project is part of the development and investment policy of OMV Petrom for the Petrobrazi Refinery, with the observance of all environmental protection requirements. The project is in line with the requirements in the BREF document in relation with emissions from liquid products, liquefied gas and solid gas storage.

3.3. Perioada de implementare propusa/ Proposed implementation period

Perioada de execuție a lucrărilor va fi de cca. 10 luni; aceasta perioada de execuție se poate prelungi in funcție de condițiile concrete din teren si de condițiile atmosferice. Punerea in funcțiune a instalației se va face la sfârșitul anului 2021.

The performance term of the works will be of approx. 10 months; this performance term may extend depending on actual conditions in the field and weather conditions. The system will be commissioned at the end of 2021

3.4. Planșe reprezentând limitele amplasamentului proiectului/ Drawings with the project site boundaries

Se anexează prezentei documentații: Enclosed with this documentation:

• Plan de situație lucrări propuse

• Plan încadrare in PUG

• Site plan for the proposed works

• Positioning in PUG Brazi Plan

Investiția se va realiza pe o suprafața totala de 57745 mp, suprafața inclusa in cei 3706017 mp

The investment will cap a total surface area of 57745 sq m, a surface area included in the

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 8: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__8__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

ocupați de Rafinăria Petrobrazi. 3706017 sq m occupied by the Petrobrazi Refinery.

3.5. Formele fizice ale proiectului/ Physical forms of the project

3.5.1. Profilul si capacitățile de producție/ Profile and production capabilities

Rezervorul T5 are o capacitate de 4508 m3 si este utilizat pentru depozitarea de benzina.

Tank T5 have a storage capacity of 4508 m3 and it is used to store gasoline.

3.5.2. Descrierea instalației si a fluxurilor existente pe amplasament/ Description of the plant and of the existing site flows

Rezervorul care face obiectul proiectului analizat nu face parte dintr-un proces tehnologic; reprezintă un echipament de stocare dotat cu elemente de automatizare, control, siguranța si monitorizare.

Caracteristicile tehnice si constructive ale rezervorului sunt:

The tank that forms the subject matter of the reviewed project is not part of a process flow; it is a storage equipment, provided with automation, control, safety and monitoring elements.

Technical and build characteristics of the tank:

• Capacitate max. 4508 m3

• Diametrul D= 22.763m

• Rezervor cu fund simplu, manta simpla, prevăzut cu capac geodezic de aluminiu si membrana plutitoare. Membrana plutitoare are rolul de a minimiza emisiile de hidrocarburi (COV) in atmosfera conform BAT

• Construit din metal S235J2 (OL37)

• Înălțimea rezervorului pana la capac este de H= 13.6m

• Sunt montate sisteme de răcire cu apa si inele de spuma pentru stingerea incendiilor

• Prevăzut cu scări de acces metalice amplasate circular

• Prevăzut cu 2 guri de vizitare

• Caracteristicile de exploatare ale rezervorului sunt: o densitatea produsului depozitat - ρ=

0,760 g/cmc la t= 15°C o Rata de pompare de intrare = max.

130 m3/h o Rata de pompare de ieșire = max.

150 m3/h

• Max. capacity 4508 m3

• Inner diameter D= 22.763m

• Tank with a single bottom, single wall, provided with a geodesic aluminum dome roof and internal floating roof. The floating roof is meant to minimize hydrocarbon emissions (VOC) in the atmosphere, as per BAT

• Made of metal S235J2 (OL37)

• Tank height up to the roof H= 13.6m

• The firefighting system of the tank is designed with cooling water system and aeromechanical foam.

• Provided with circular access stairs

• Provided with 2 manholes

• Operating characteristics of the tank:

o density of the stored product - ρ= 0.760g/cm3 at t= 15°C

o Input pumping rate = 130 m3/h max.

o Output pumping rate = 150 m3/h max.

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 9: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__9__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

o Temperatura maxima de operare T max= 40°C

o Temperatura minima de stocare este Tmin = 5°C in condițiile unei temperaturi exterioare de Text = -15.4C

o Presiunea maxima de vapori a produsului depozitat Pv = 32 kPa la 40°C;

o Presiunile de calcul la proiectarea rezervorului Pcalcul= Patmosferic.

o Maximum operating temperature T max= 40°C

o The minimum storage temperature is Tmin = 5°C at an outer temperature of Tout = -15.4°C

o Maximum vapour pressure of the stored product Pv = 32 kPa at 40°C;

o Tank designed pressures Pdesign= Patmospheric.

Elemente constructive: Constructive elements:

Fundații

Rezervorul este așezat pe fundații din beton armat. O sa fie executat un inel de fundație in vederea asigurării montajului buloanelor de ancoraj. De asemenea vor fi amplasate fundații pentru susținerea conductelor pentru stingerea incendiilor si fundații pentru scări de acces

Foundations

The tank rest on reinforced concrete foundations. Shall be design a new foundation ring in order to ensure the installation of anchor bolts. There will also be foundations to support the pipes for firefighting and foundation for access bridges.

Execuție reparație rezervor si a echipamentelor montate pe acesta

Elementele care vor fi considerate necorespunzătoare ca urmare a calculelor si pe baza evaluării tehnice vor fi înlocuite. Rezervorul este metalic, cu perete simplu.

Capacul nou va fi capac fix tip dom aluminiu

Execution of the tank repair and of the equipment mounted on it

Items that will be considered inadequate as a result of the calculations and based on the technical evaluation will be replaced. The tank is made of metal, with single wall.

The new roof will be fixed type aluminum dome

Rețeaua de canalizare.

Apele pluviale sau uzate de pe rezervor vor cădea direct pe teren, iar eventualele scurgeri de la robinete se vor colecta in bașa rezervorului si vor fi direcționate către sistemul de canalizare industriala existent in amplasament.

Sewerage system.

Rainwater or wastewater from the tank will fall directly on the ground, and any leaks from the valves will be collected at the bottom of the tank and will be directed to the existing industrial sewer system on site.

Sisteme de măsura si control Measuring and control systems

Sistemul de măsura, control se compune din următoarele elemente:

The measuring and control system consists of the following elements:

• Traductor de nivel radar montat pe • Radar level mounted on the tank roof

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 10: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__10__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

capacul rezervorului

• Traductor de temperatura montat pe capacul rezervorului

• Întreruptoare de nivel maxim si minim instalate pe mantaua interioara a rezervorului

• Traductorul de nivel radar, temperatura sunt legate la sistemul de control GILB

• Temperature sensor mounted on the tank roof

• Maximum and minimum level switches mounted on the inner wall of the tank

• The radar and the temperature sensor are connected to the GILB control system

3.5.3. Descrierea proceselor de producție ale proiectului propus/ Description of the production processes involving the proposed project

Rezervorul T5 este un echipament de depozitare a produselor petroliere si nu este implicat in procesul de producție propriu-zis (prelucrarea materiilor prime in scopul obținerii de produse finite).

The T5 tank is a storage equipment for petroleum products and it is not involved in the actual production process (processing of raw materials to make finished products).

Operațiunile care se vor executa asupra rezervorului sunt umplerea si golirea sa cu benzina.

The operations to be conducted at the tank are filling it with gasoline and emptying it.

Benzina stocată în rezervorul T5 este pompată în unitatea HB120, unde este hidro-tratată.

The gasoline stored in the tank T5 is pumped out to the HB120 Unit, where it is hydrotreated.

Umplerea rezervorului se realizează prin pomparea produsului in rezervor prin partea inferioara, prin racordul S1

The tank will be filled by pumping the product into the lower area of the tank, via nozzle S1

In timpul stocării se monitorizează temperatura din interiorul rezervorului si nivelul produsului prin indicatorul de nivel.

During storage, the temperature, and the level of product inside the tank will be monitored by the level indicator.

Înainte de începerea pompării produsului in rezervor se verifica nivelul în rezervor si poziția robineţilor, pentru a fi deschiși numai aceia care corespund intrării in rezervor.

Before the product is pumped into the tank, the tank level will be checked, as well as the position of the valves, so that only those for the tank inlet are opened.

Golirea rezervorului sau scoaterea parțiala a produsului din rezervor se face tot pe la partea inferioara.

The product will be drained or partially removed from the tank from the lower part of the tank.

Pentru reabilitarea acestui rezervor sunt necesare o serie de lucrări de construcții-montaj, după cum urmează:

The rehabilitation of this tank requires a series of construction and assembly works, as follows:

Construcții civile Civil works

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 11: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__11__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

• Fundație pentru rezervor in vederea asigurării montajului buloanelor de ancoraj

• Foundation for the tank in order to ensure the installation of the anchor bolts

• Fundații si structuri metalice pentru trasee de conducte

• Foundations and metal structures for pipe routes

• Fundații si structuri metalice pentru acces

• Foundations and metal structures for access

• Cămin nou de beton • New concrete pit

Electrice si instrumentație Electric and instrumentation works

• Realizarea traseelor de cabluri • New cable routing

• Instalarea instrumentelor pe rezervor • Mounting of instruments on the tank

• Conectarea rezervorului la sistemul existent de împământare

• Connecting the tank to the existing grounding system

• Realizarea sistemului de protecție la paratrăsnet al rezervorului

• Tank lightning arrester system

• Proiectarea si realizarea unui sistem de iluminat

• Design and installation of a lighting system

• Proiectarea si realizarea unui sistem de însoțire electrica pentru conducta de drenaj

• Design and installation of an electrical tracing system for drainage pipe

Conducte tehnologice Process pipes

• realizarea unui traseu nou de conducta de scurgere a rezervorului T5, însoțita electric si izolata, de cca 1 m, conducta nr. 3’’-629-0030-01CA3Sg-LO

• realizarea unui tronson nou de cca. 0.6 m pe conducta existenta 250-6290028-13

• construction of a new route for the T5 tank drain pipe, insulated and electrical heat traced, of about 1 m, pipe no. 3’’ - 629-0030-01CA3Sg-LO

• construction of a new section of approx. 0.6 m on the existing pipeline 250-6290028-13

Utilaje – Rezervor Tank

• Lucrări reparație corp rezervor

• Instalare capac de tip dom de aluminiu

• instalarea la interior a unui capac flotant

• Racorduri noi

• Guri de vizita noi

• Platforma si scara noua de acces

• Se vor realiza teste si inspecții

• Tank body repair works

• Installing an aluminum dome roof

• installing an internal floating roof

• New nozzles

• New manholes

• New access platform and ladder

• Tests and inspections

P.S.I Firefighting

Se vor realiza trasee noi de conducte pentru sistemul PSI. Acesta va fi un sistem de protecție la foc si un sistem semifix de stingere cu spuma aeromecanica. Acest sistem va fi alcătuit dintr-o

New pipe routes for the FF system. This will be a fire protection system and a semi-fixed firefighting system with aeromechanical foam. This system will consist of a pipe network, of which some will be

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 12: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__12__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

rețea de conducte, unele conectate la sistemul de hidranți din zona si altele dirijate către exteriorul caroului într-o zona unde mașinile de pompieri pot staționa pentru a alimenta sistemul cu spuma.

connected to the hydrant system in the area and others will be routed towards outside the block, in an area where fire brigade vehicles can be parked to supply the system with foam.

3.5.4. Materiile prime, energia si combustibilii utilizați, modul de asigurare a acestora/ Raw materials, energy and fuels used, procurement thereof

Rezervorul de stocare benzina nu face parte dintr-un proces de producție propriu-zis, astfel încât nu exista materii prime. Produsele care vor fi stocate in rezervor sunt caracterizate, conform fiselor cu date de securitate anexate.

The gasoline storage tank is not involved in any actual production process so there are no raw materials involved. Characteristics of the products to be stored in the tank, according to the enclosed safety data sheet.

3.5.5. Modul de asigurare a utilităților/ Utilities Supply

Operațiunile de stocare a produselor in rezervoare implica un necesar de utilități, care este asigurat din cadrul utilităților existente pe platforma industriala a OMV-PETROM Petrobrazi, astfel:

Product storing in tanks involves a requirement of utilities, to be provided from the utilities that exist on the industrial platform of OMV-PETROM Petrobrazi, as follows:

• Energie electrica – alimentarea echipamentelor nou instalate se va realiza din sistemul intern al rafinăriei. Tensiunea de alimentare a sistemului electric este de 230V, 50Hz, iar tipul rețelei este TNC-S (conform normativ I7-2011). Acestea sunt alimentate din tabloul electric N629DE0020 propus pentru execuție, din Caroul 54. La rândul sau, noul tablou electric N629DE0020 se va alimenta din tabloul electric existent N691CA0016, din Caroul 54

• Electric power - the supply of the newly installed equipment will be made from the internal system of the refinery. The supply voltage of the electrical system is 230V, 50Hz, and the type of network is TNC-S (according to normative I7-2011). They are supplied from the electrical panel N629DE0020 proposed for execution, from Area 54. The new electrical panel N629DE0020 will be powered from the existing electrical panel N691CA0016, from Area 54

• Apa pentru stingerea incendiilor - racordarea se face la rețeaua existenta in caroul 54.

• Water for firefighting - connecting to the existing firefighting water system, in Area 54.

• Apele pluviale sau uzate de pe rezervor vor cădea direct pe teren, iar eventualele scurgeri de la robinete se vor colecta in bașa rezervorului si vor fi direcționate către sistemul de canalizare industriala existent in amplasament.

• Rainwater or wastewater from the tank will fall directly on the ground, and any leaks from the valves will be collected at the bottom of the tank and will be directed to the existing industrial sewer system on site.

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 13: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__13__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

Asigurarea energiei electrice pe parcursul lucrărilor se va realiza prin racordarea la energia electrica din rețeaua interna a rafinăriei. Nu este prevăzută si/sau necesara o conexiune la un sistem electric din exteriorul Rafinăriei Petrobrazi.

Electric power will be provided throughout the works by connections to the local power grid of the refinery. A connection to a power grid outside the Petrobrazi Refinery premises is not envisaged and/or required.

3.5.6. Descrierea lucrărilor de refacere a amplasamentului/ Description of land restoration works on site

Destinația terenului stabilita prin Planul Urbanistic General al localității, conform Certificatului de Urbanism, este „zona unități industriale si depozite”. Lucrările de reabilitare a rezervorului se fac fără schimbarea destinației terenului.

The land destination, as set out in the General Urban Plan of the locality, pursuant to the Urban Planning Certificate, is "industrial and warehouse area". The tank rehabilitation works will be performed without a land-use change.

După finalizarea lucrărilor terenul se va aduce la stadiul inițial.

At the completion of works, the land will be restored to its initial condition.

3.5.7. Cai noi de acces sau schimbări ale celor existente/ New access road or changes to existing access road

Investiția se va realiza in cadrul Rafinăriei Petrobrazi situata in comuna Brazi, sat Brazii de Sus, str. Trandafirilor nr. 65, județul Prahova, in caroul 54.

Prin lucrările propuse nu se prevede execuția unui drum provizoriu balastat pe perioada de execuție a lucrărilor deoarece deja exista un drum provizoriu.

The investment will be performed at the Petrobrazi Refinery, located in Brazi Commune, Brazii de Sus Village, 65 Trandafirilor St., Prahova County, in Area 54.

The proposed works is not requested to build a temporary ballast road, during the performance of the works, because already exist a temporary road in the area.

3.5.8. Resurse naturale folosite in construcție si funcționare/ Natural resources used for building and operation

Pentru execuția lucrărilor propuse, singura etapa in care sunt folosite resurse naturale este etapa de realizare a fundațiilor, pentru care se utilizează nisip si apa pentru prepararea betonului armat, alături de ciment, armaturi metalice, etc.

Pentru utilizarea in condiții de siguranța a rezervorului, acesta va fi prevăzut cu sistem PSI care utilizează apa de răcire din instalația de apa de răcire existenta in cadrul rafinăriei.

For the performance of the proposed works, the only stage that will use natural resources is the foundation building stage, which will use sand and water to make the reinforced concrete, together with cement, metal reinforcement bars etc.

For a safe use of the tank, it will be provided with a FF system that will use cooling water taken from the existing cooling water plant on site.

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 14: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__14__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

3.5.9. Metode folosite in construcție/ Building methods

Singurele lucrări de construcție din cadrul proiectului sunt lucrările de execuție a fundațiilor pentru rezervor, a susținerilor conductelor de apa pentru incendiu. Restul lucrărilor sunt lucrări de construcții metalice, de montaj si legături.

Metoda folosita este turnarea betonului armat, care se face cu respectarea prevederilor normativelor NE 012/1-2007 si NP112-04. având caracteristicile si calitatea prevăzute in proiect.

Metodele folosite pentru realizarea structurilor metalice destinate susținerii echipamentelor la înălțime, conductelor supraterane, platformele de lucru si de acces, sunt sudura si îmbinările demontabile.

The only construction works in the project are those to make the tank foundations and the supports for firefighting water pipes. The rest of the works are metal structures, mounting and connections.

The method used is reinforced concrete casting, made with the observance of provisions in regulations NE 012/1-2007 and NP112-04, with the characteristics and quality set out in the design.

The methods used to make the metal structures that will support the equipment at height, overground pipes, work platforms and access platforms are welding and knock-down joints.

3.5.10. Planul de execuție, punerea in funcțiune, exploatare si folosire ulterioara/ Detail design engineering, commissioning, operation and reuse

Perioada de execuție a lucrărilor va fi de cca. 10 luni; aceasta perioada de execuție se poate prelungi in funcție de condițiile concrete din teren si de condițiile atmosferice. Punerea in funcțiune a instalației se va face la sfârșitul anului 2021.

The performance term of the works will be of approx. 10 months; this performance term may extend depending on actual conditions in the field and weather conditions. The system will be commissioned at the end of 2021

Programul de execuție si recepție a lucrărilor va fi prezentat de antreprenorul lucrării. Acest program va fi in funcție de volumul de lucrări prezentat de proiectant si de nivelul de dotare si puterea de mobilizare a antreprenorului.

The time schedule for work performance and work acceptance will be submitted by the contractor. This schedule will depend on the volume of works submitted by the designer and the capabilities of the contractor in terms of endowments and mobilization.

3.5.11. Relația cu alte proiecte existente sau planificate / Relationship with other existing or planned projects

Scopul proiectului este reabilitarea rezervorului T5, care va fi echipat cu cele mai moderne sisteme de control, siguranța si reducere a emisiilor.

The purpose of the project is to erect a new tank, provided with state-of-the-art control, safety and emission reduction systems.

In caroul 54, Parc 230-7 mai este propus pentru reabilitare si rezervorul T20.

In Area 54, Parc 230-7 it is proposed for rehabilitation also tank T20.

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 15: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__15__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

Rezervorul T5 se afla într-o incinta industriala care asigura toate facilitățile necesare desfășurării activității si o buna relaționare cu obiectivele existente in vecinătate.

Tank T5 is located on industrial premises, which can ensure all the facilities required to conduct the activities and good-neighbourly relations with objectives that exist close-by.

3.5.12. Detalii privind alternativele luate in considerare/ Details on alternatives taken into consideration

Decizia de reabilitare a rezervorului T5 reprezintă o necesitate pentru respectarea cerințelor de protecție a mediului, respectiv reducerea emisiilor de compuși organici volatili.

The decision to rehabilitate tank T5 represent a necessity to ensure the environmental protection requirement, that is to reduce the emission of volatile organic compounds.

3.5.13. Alte activități care pot apare ca urmare a proiectului/ Other activities that may appear due to the project

In perioada de execuție, realizarea obiectivului propus implica doar lucrări de construcții-montaj. In perioada de funcționare, rezervorul este un obiectiv care nu produce/furnizează materii prime pentru alte instalații, deci nu exista posibilitatea apariției altor activități/procese tehnologice.

During the performance term of the works, the proposed projects involves only construction and assembly works. During operation, the tank will not produce/supply raw materials for other plants, so there is no possibility of creating other processing activities/flows.

3.5.14. Alte autorizații cerute prin proiect/ Other mandatory authorizations

Prin Certificatul de Urbanism nr. 37/11.05.2020, au fost solicitate următoarele:

With Urban Planning Certificate no. 37/11.05.2020, the following were requested:

• Avizul administratorului rețelelor din incinta Rafinăriei Petrobrazi;

• Aviz Autoritatea Aeronautica Civila Romana

• Approval of the grid operator for the grids located on the premises of Petrobrazi Refinery.

• Approval from the Romanian Civil Aviation Authority.

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 16: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__16__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

4. Descrierea lucrărilor de demolare necesare/ Description of the required

demolition works

Nu este cazul, pentru realizarea proiectului propus nu sunt necesare lucrări de demolare.

Not applicable since the erection of the proposed project does not require demolition.

5. Localizarea Proiectului/ Project location

Investiția se va realiza in cadrul Rafinăriei Petrobrazi situata in comuna Brazi, sat Brazii de Sus, str. Trandafirilor nr. 65, județul Prahova. Terenul este proprietate a societății OMV Petrom conform Certificatului de atestare a dreptului de proprietate asupra terenurilor seria Mo3 nr. 3293/19.11.1996 emis de Ministerul Industriilor.

Amplasamentul lucrării este in caroul 54 conform Plan de situație pe suport topografic anexat. Raportat la nordul geografic, vecinătățile noilor construcții sunt:

The investment will be erected at the Petrobrazi Refinery, located in Brazi Commune, Brazii de Sus Village, 65 Trandafirilor St., Prahova County. The land is the property of the OMV Petrom Company, according to the Land Ownership Certificate series Mo3 no. 3293/19.11.1996 issued by the Industry Ministry.

The site is located in Area 54 according to the Site Plan based on the enclosed topographic survey. In the north, the neighbourhood of the new constructions will be:

• Nord – Caroul 54A (nr. cad. 20423) si Drumul 17 (nr cad. 24492)

• Sud – Caroul 60A (nr. cad. 20715) si Drumul 15 (nr. cad. 24492)

• Est – Caroul 65 (nr. cad. 22267), Caroul 58 (nr. cad. 20544) si Drumul 3 (nr. cad. 24492)

• Vest – Proprietate privata (nr. Cad. 20143), Proprietate privata (nr. Cad. 20142), Proprietate privata (nr. cad. 20141), Caroul 34 (nr. cad 20704), Caroul 15 (nr. cad 20719) si Drumul 10 (nr. cad. 24492)

• North – Area 54A (Land Reg. no. 20423) and Road 17 (Land Reg. no. 24492)

• South – Area 60A (Land Reg. no. 20715) and Road 15 (Land Reg. no. 24492)

• East – Area 65 (Land Reg. no. 22267), Area 58 (Land Reg. no. 20544) and Road 3 (Land Reg. no. 24492)

• West – Private property (Land Reg. no. 20143), Private property (Land Reg. no. 20142), Private property (Land Reg. no. 20141), Area 34 (Land Reg. no. 20704), Area 15 (Land Reg. no. 20719) and Road 10 (Land Reg. no. 24492)

Accesul in Caroul 54, zona in care se va executa reabilitarea rezervorului T5, se va face din rețeaua rutiera existenta in rafinăria Petrobrazi din drumurile 17, 3, 10, 15 prin poarta numărul 4.

Access to Area 54, the area where the rehabilitation of the tank T5, will be made from the existing road grid on the premises of the Petrobrazi Refinery, from roads 17, 3, 10, 15 through gate 4.

Suprafața de teren totala ocupata de scopul Total land surface occupied for the works = 57745

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 17: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__17__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

lucrării = 57745 mp sqm.

Regim de înălțime: Înălțimea maxima (fata de CTA) = +22.35 m.

Height: Maximum height (as to the DLGL) = +22.35 m

5.1. Folosințe actuala si planificate ale terenului/ Current and planned use of the land

Modul de încadrare in planul de urbanism si de amenajare in teritoriu pentru obiectivul propus este reglementat prin Certificatul de Urbanism 37/11.05.2020, eliberat de către Primăria Comunei Brazi.

The positioning of the proposed objective in the town planning and land management layouts is regulated in the Urban Planning Certificate no. 37/11.05.2020 issued by the Brazi Commune Hall.

5.2. Politici de zonare și de folosire a terenului / Zoning and land use policies

Actuala folosința a terenului este „curți-construcții”, iar destinația terenului stabilita prin Planul Urbanistic General al localității, conform Certificatului de Urbanism, este „zona unități industriale si depozite - subzona industrie poluanta”. Pentru realizarea investiției propuse, destinația terenului stabilita prin PUG nu se va schimba.

The current use of the land is "constructions yards" and the land destination set in the General Urban Plan of the locality, according to the Urban Certificate, is "industrial and warehouse area – polluting industry subzone". For the realization of the proposed investment, the destination of the land established by the PUG will not change.

5.3. Areale sensibile/ Sensitive areas

Nu este cazul, amplasamentul nu are in vecinătate arii protejate sau alte areale sensibile

Not applicable; the site is not adjacent to protected areas or other sensitive areas

5.4. Coordonatele geografice ale amplasamentului proiectului/ Geographic coordinates of the project site

Coordonate amplasare rezervor: Tank location coordinates:

• Y: 580469.7926

• X: 375819.6511

• Y: 580469.7926

• X: 375819.6511

5.5. Detalii privind orice varianta de amplasament luata in considerare/ Details on any site alternatives taken into consideration

Nu este cazul, rezervorul este existent Not applicable; it is an existing tank

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 18: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__18__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

6. Descrierea efectelor semnificative posibile asupra mediului/ Description of

possible significant environmental effects

Surse de poluanți si instalații pentru reținerea, evacuarea si dispersia poluanților in mediu

Sources of pollutants and systems for the retention, evacuation, and dispersion of pollutants in the environment

6.1. Protecția calității apelor/ Water quality protection

Surse de poluanți pentru ape, locul de evacuare sau emisarul

In perioada de execuție a proiectului propus nu se generează ape uzate pe amplasament, in afara apelor uzate menajere rezultate din activitatea igienico-sanitara a personalului executant. Aceasta activitate va fi deservita de grupurile sanitare existente in zona.

Apa va avea o utilizare limitata, deoarece lucrările propuse nu necesita prepararea de betoane decât in scopul executării fundațiilor echipamentelor si a fundațiilor pentru estacade. Apa utilizata pentru prepararea unor materiale de construcție la fata locului va fi înglobata in acestea, astfel ca din aceasta activitate nu vor rezulta ape uzate, cu excepția apei pentru testul hidraulic. Aceasta va fi furnizata de rețeaua existente de PSI si va fi deversata la canalizarea industriala din amplasament.

Sursele posibile de poluare pentru apa in aceasta perioada sunt scurgeri accidentale de carburanți/lubrifianți de la utilaje/echipamente/autovehicule utilizate, care sa fie preluate de apele din precipitații. In aceasta situație, apele potențial impurificate sunt colectate de rigolele perimetrale din incinta si sunt evacuate in canalizarea industriala a rafinăriei, după care ajung in stația de epurare a rafinăriei.

Apele rezultate din activitățile igienico – sanitare ale personalului angajat pentru executarea lucrărilor vor fi dirijate in canalizarea existenta a

Sources of pollutants for waters, evacuation site or emissary

During the execution of the proposed project there will be no waste water generated on site, except for domestic sewage, as resulted from the hygiene and sanitary activities of the operating staff. This will be serviced by the toilets that exist in the area.

Water will be of limited use since the proposed works require preparing concrete only for the foundations of the equipment and scaffold bridges. Water used to prepare some construction materials on site will be included in them so this activity will not generate waste water, except for the water for hydraulic tests. This will be supplied from the existing FPFF water grid and it will be discharged into the industrial sewerage system on site.

Possible sources for water pollution at this time would be accidental leaks of fuels/lubricants from the employed machinery/equipment/motor vehicles, which would be carried over into water coursed due to rainfalls. In such a situation, potentially impure water will be collected by the perimeter drainage gutters on site and then discharged into the industrial sewerage system of the refinery, then it will reach the refinery's wastewater treatment plant.

Water resulted from hygiene and sanitary activities of the personnel employed to execute the works will be routed to the existing sewerage

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 19: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__19__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

rafinăriei.

In condiții normale de exploatare a rezervorului nu exista surse suplimentare de poluanți pentru apele de suprafață sau freatice.

Scurgeri de produs (benzina) pot avea loc în special în timpul operațiunilor de transvazare. Cauzele care pot provoca astfel de evenimente sunt neetanșeități, defecte la echipamentele de umplere, manevre greșite sau acționarea echipamentelor de persoane neautorizate.

Astfel de evenimente pot fi evitate printr-un control strict al echipamentelor înainte și în timpul operației de transvazare.

Scurgeri accidentale de lubrifianți la pompele centrifuge pot avea loc datorita: defecte la presetupe, deteriorarea garniturilor, armături defecte, fisuri datorită vibrațiilor, acțiunea unor persoane neautorizate soldate cu deschideri de trasee și scurgerea în exterior.

Probabilitatea de producere a acestor fenomene este medie, aceste fenomene sunt însă evitate prin efectuarea unui program de revizie și reparații riguros. In situația in care se produc, acestea sunt strict localizate si limitate prin amplasarea pompelor in cuve betonate sub cota terenului.

Masuri de protecție

Pentru asigurarea protecției calității apelor se va folosi rețeaua existenta de canalizare, racordata la canalizarea industriala a rafinăriei.

system of the refinery.

Under normal operating conditions of the tank, there are no additional sources of pollutants for surface water or underground water.

Product leaks (gasoline) may occur especially during transfer operations. Causes that could lead to such events are leaks, faulty tank filling equipment, wrong maneuvering or actuation of the equipment by unauthorized persons.

Such events can be avoided by a strict inspection of the equipment prior and during transfer operations.

Accidental lubricant leaks from centrifugal pumps may occur due to stuffing box defects, seal deterioration, faulty fittings, cracking from vibrations, actions of unauthorized persons leading to the opening of routes and leaks to the outside.

The likelihood of such phenomena is average, but they are eluded by a rigorous overhaul and repairs schedule. If they do occur, they will be strictly localized and limited by placing pumps in concrete cast trays below ground level.

Protection measures

To ensure water quality protection, the existing sewerage system will be used, connected to the industrial sewerage system of the refinery.

6.2. Protecția aerului/ Air protection

Surse de poluare

Sursele de poluare pentru aer in perioada de execuție sunt constituite din surse mobile, de scurta durata:

Sources of pollution

The sources of air pollution during the execution phase are short-term mobile sources:

• emisiile de gaze arse provenite de la eșapamentele motoarelor utilajelor angrenate in activitățile de construcții-montaj echipamente;

• scăpări de acetilena la efectuarea

• emissions of exhaust gas coming from the engines of the machinery employed in the equipment construction and assembly works.

• acetylene leaks when performing cuts by

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 20: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__20__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

operațiilor de taiere prin sudura;

• pulberi in suspensie si pulberi sedimentabile de la lucrările de excavare/ săpătura/ nivelare si de la activitatea de transport desfășurata in zona amplasamentului.

welding.

• air-borne powders and settling powders coming from excavation/digging/ levelling works and from the transport activity conducted on site.

Referitor la emisiile de poluanți de la motoarele utilajelor angrenate in lucrările de execuție, acestea sunt utilaje moderne, omologate, cu emisii reduse de poluanți, care trebuie sa respecte normele de mediu aprobate. Poluarea atmosferica pe zona amplasamentului si in vecinătatea acestuia pe perioada desfășurării lucrărilor de execuție este redusa.

Lucrările de construcții-montaj constau in principal in execuția de fundații si asamblarea de elemente metalice (virole, conducte, elemente de legătura, îmbinări, racorduri, flanșe, etc). Aceste lucrări nu sunt generatoare de pulberi, ci doar de cantități moderate de gaze si pulberi metalice din tăierea cu aparatul autogen.

Lucrările care implica excavare/săpătura/nivelare au pondere redusa si se desfășoară pe suprafețe reduse.

In perioada de exploatare a rezervorului, potențiala sursa de poluare o constituie emisiile difuze de compuși organici volatili generate de:

In relation to pollutant emissions from the engines of the machinery employed in the works, these pieces of equipment are modern, approved machinery, with low pollutant emissions, which must observe the approved environmental regulations. Air pollution on site and in its vicinity during the performance of the execution works is low.

Construction and assembly works consist mainly in making foundations and assembling metal elements (aprons, pipes, connecting elements, joints, connections, flanges etc.) These works do not generate powders, but only moderate quantities of gas and metal powders coming from oxyacetylene cutting.

The works that involve excavation/digging/levelling are reduced in numbers and surface area covered.

During the tank operating period, a potential source of pollution will be the diffuse emissions of volatile organic compounds generated by:

• respirația rezervorului;

• umplerea rezervorului

• extragerea produsului din rezervor;

• pierderi prin neetanșeități, fitinguri, etc.

• tank breathing.

• tank filling.

• product drawing from the tank.

• losses due to leaks, poor fittings etc.

Masuri de protecție

Rezervorul va fi cu capac fix si membrana plutitoare, tip de rezervor care este recomandat de tehnicile BAT pentru a fi utilizat la stocarea produselor generatoare de emisii COV.

Protection measures

The tank will have a fixed cover and a floating membrane, which tank type is recommended in the BAT techniques for use in storing VOC emitting products.

6.3. Protecția împotriva zgomotului si vibrațiilor/ Protection against noise and vibrations

Surse de zgomot si vibrații

Principalele surse de zgomot in perioada de

Sources of noise and vibrations

The main noise sources during the erection

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 21: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__21__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

execuție sunt reprezentate de motoarele utilajelor folosite pentru executarea lucrărilor de construcții si montaj echipamente si de traficul aferent al autovehiculelor in zona amplasamentului si, eventual, de testele de funcționare.

Nivelul de zgomot variază in funcție de tipul si intensitatea operațiilor, tipul utilajelor in funcțiune, regim de lucru, suprapunerea numărului de surse si dispunerea pe orizontala/verticala, de prezenta obstacolelor naturale cu rol de ecranare.

In condiții normale de funcționare a echipamentelor si utilajelor, nivelele de zgomot in șantier variază intre 72-102 dB. De asemenea, de fiecare data când se dublează distanta fata de sursa punctiforma de zgomot, nivelul de presiune acustica scade cu 6 dB.

Referitor la vibrații, acestea sunt generate de echipamentele de mare tonaj, care in aceasta situație sunt utilizate pe un segment redus de lucrări.

Lucrările de construcții, debitare, amplasare construcții ușoare si montaj si racordare echipamente se constituie in surse provizorii de zgomot si vibrații de scurta durata, care nu vor depăși nivelul de zgomot prevăzut prin legislația in vigoare într-o incinta industriala.

Menționam ca amplasamentul obiectivului propus se afla in incinta industriala a Rafinăriei Petrobrazi si nu are in vecinătate zona rezidențiale. In același timp, activitățile se vor desfășura in intervalul orar 08:00-18:00, cu respectarea programului de sfârșit de săptămâna si a sărbătorilor legale.

In perioada funcționarii obiectivului, zgomotul este produs la încărcarea si golirea rezervorului, nu este constant si este specific industrial. Conform specificațiilor tehnice ale echipamentelor, nivelul de zgomot total (cu toate echipamentele in funcțiune) la 1m distanta este de 85 dB(A).

stage are given by the engines of the machinery used to perform the construction and assembly works, the equipment and the traffic of motor vehicles on site and, possibly, noise coming from functional tests.

The noise level will vary depending on the type and intensity of the operations, the type of operating machinery, working conditions, overlapping of the number of sources and their horizontal/vertical layering, on the presence of natural obstacles that could act like screen against noise propagation.

Under normal operating conditions, the equipment and the machinery on site will generate a noise level of 72-102 dB. Moreover, each time the distance from a spot noise source doubles, the sound pressure level will drop by 6 dB.

As regards vibrations, these are generated by high tonnage equipment, which, in this situation, is used on a small segment of works.

Works of construction, cutting, positioning of light-weight constructions and assembly and equipment connections will be temporary short-term sources of noise and vibrations, which will not exceed the noise levels set forth in the laws in force that apply to industrial premises.

Mention must be made that the site of the proposed objective is located inside the industrial premises of the Petrobrazi Refinery and it has no residential areas close by. At the same time, the activities will be conducted during 08:00-18:00, with the observance of the working hours for weekends and national holidays.

During operation, the noise generated when loading and unloading the tank will not be continuous and it will be the noise usually generated in industrial areas. According to the technical specifications of the equipment, the overall noise level (with all the equipment in operation), at a distance of 1m, will be of 85

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 22: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__22__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

In oricare din etapele exploatării pompelor se va respecta:

dB(A).

In all stages of pump operation, the following will be observed:

• nivelul de zgomot echivalent continuu la limita incintelor industriale: max. 65 dB(A), conform STAS 10009/1988;

• nivelul limita de 55 dB in apropierea locuințelor, conform STAS 10009/1988;

• nivelul limita de 87 dB(A) in interiorul unităților funcționale, conform Normelor generale de protecția muncii-2002.

• equivalent continuous noise level at the boundary of industrial premises: 65 dB(A) max., as per STAS 10009/1988.

• the 55 dB limit noise level close to dwellings, as per STAS 10009/1988.

• the 87 dB(A) limit noise level within functional units, as per the General Regulations on labor protection - 2002.

Masuri de protecție

Masuri de reducere a zgomotului in perioada de construcție:

Protection measures

Measures for noise abatement during construction works:

• execuția lucrărilor se va realiza cu utilaje si echipamente moderne, prevăzute cu sisteme de atenuare a zgomotului;

• activitățile se vor desfășura in intervalul orar 08:00 – 18:00, cu respectarea programului de sfârșit de săptămâna si a sărbătorilor legale;

• se va reduce viteza autovehiculelor grele in zona (viteza scăzută poate reduce nivelul de zgomot cu pana la 5dB);

• se va adopta o conducerea preventiva a autovehiculelor grele (conducerea calma creează mai puțin zgomot decât frecventele schimbări de accelerație si frâna).

• echipamentele si utilajele vor fi verificate periodic, întreținerea lor si reviziile realizându-se cu societăți specializate.

Masuri de reducere a zgomotului in perioada de operare:

• operarea rezervorului trebuie sa se facă conform masurilor de buna practica pentru controlul zgomotului; aceasta include o mentenanța adecvata a echipamentelor, a căror deteriorare poate conduce la creșterea zgomotului.

• limitarea vitezei autovehiculelor in incinta

• the works will be performed with modern pieces of machinery and equipment, provided with noise abatement systems.

• the activities will be conducted during 08:00-18:00, with the observance of the working hours for weekends and national holidays.

• heavy motor vehicle will reduce their speed in the area (a reduction of speed can reduce noise level by up to 5dB).

• a preventative driving of heavy motor vehicles will be adopted (calm driving creates less noise than sudden changes in acceleration and braking).

• the equipment and the machinery will be checked regularly, they will be maintained and overhauled by specialized companies.

Measures for noise abatement during operation:

• the tank must be operated according to good practice measures for noise control; this includes a proper maintenance of the equipment, the deterioration of which can lead to an increase in noise emission.

• speed limitation for motor vehicles on the

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 23: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__23__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

rafinăriei. premises of the refinery.

Menționam ca amplasamentul propus este in zona cu specific industrial, ca si drumurile de acces, deci in afara de masurile specifice de protecție împotriva zgomotului industrial, nu sunt necesare alte masuri suplimentare.

Mention must be made that the proposed site and the access roads are located in an industrial area; therefore, besides the specific measures for protection against industrial noise, no other additional measures will be necessary.

6.4. Protecția împotriva radiațiilor/ Protection against radiation

Nu este cazul, nici in etapa de construcție si nici in cea de funcționare a obiectivului nu se utilizează si nu se produc substanțe/preparate cu potențial radioactiv.

Activitatea de construcții-montaj nu generează radiații electromagnetice, radiații ionizante si nici poluare biologica.

Not applicable; neither during the construction stage, nor during the operating stage, since in both stages no radioactive substances/preparations will be used and produced.

The construction and assembly activity will not generate electromagnetic radiation, ionizing radiation, or biological pollution.

6.5. Protecția solului si subsolului/ Soil and subsoil protection

Surse de poluare

In perioada de construire exista următoarele surse potențiale de poluarea a solului in zona amplasamentului:

Sources of pollution

During the construction stage, the following potential sources of soil pollution will exist on site:

• scurgeri accidentale de combustibili, lubrifianți de la autocamioane si echipamentele mobile rutiere si ne-rutiere folosite in construcția obiectivului;

• depozitare necorespunzătoare a deșeurilor din construcții.

• accidental leaks of fuels, lubricants from lorries and on-road and off-road mobile equipment used to build the objective.

• improper storage of construction debris and waste.

In perioada de exploatare a rezervorului nu există surse de poluanți pentru sol, deoarece prin proiect au fost prevăzute masuri de protecție in acest sens. Rezervorul este amplasat in interiorul unui dig de retenție.

Masuri de protecție

Masurile de protecție a solului si subsolului ce vor fi luate în etapa de execuție sunt:

During the tank operating period, there are no soil polluting sources since it was provided with protection measures in this respect by design. The tank is positioned inside a retention wall.

Protection measures

Soil and subsoil protection measures to be taken during the work performance stage:

• verificarea zilnica a stării tehnice a • daily inspection of the technical condition

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 24: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__24__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

utilajelor si echipamentelor utilizate in execuția lucrărilor;

• alimentarea cu carburanți a mijloacelor de transport in stații de distribuție si nu pe amplasament;

• schimbarea uleiului utilajelor in unități specializate si nu pe amplasamentul instalației;

• utilizarea de vehicule corespunzătoare din punct de vedere tehnic, de către furnizorii de echipamente si materiale;

• depozitarea temporara a deșeurilor de construcție pe platforme protejate, special amenajate in cadrul instalației si eliminarea prin operatori autorizați;

• depozitarea deșeurilor de tip menajer in zonele special destinate din cadrul platformei.

• in cazul scăpărilor accidentale de ulei si combustibili de la utilajele folosite, se va interveni imediat cu materiale absorbante.

of the machinery and equipment used in the performance of the works.

• fueling means of transport at petrol stations, not on site.

• changing the oil of machinery in specialized units, not on site.

• using vehicles that are technically

conforming by suppliers of equipment and supplies.

• temporary storage of construction waste on protected platforms, specially arranged at the plant and disposal thereof through licensed companies.

• storage of household waste in special dedicated areas arranged on the platform.

• immediate intervention with absorbent materials if accidental oil and fuel leaks from the employed machinery occur.

In vederea asigurării protecției solului în timpul funcționarii rezervorului, prin proiect s-au prevăzut următoarele lucrări care reduc posibilitatea si sursele potențiale de poluare:

To ensure oil protection during the tank operation, the following works are provided by design to reduce the likelihood and potential sources of pollution:

• colectarea tuturor surselor de ape potențial poluate si dirijarea la rețeaua de canalizare industriala existenta a rafinăriei si de aici la Stația de epurare ape uzate a rafinăriei.

• collection of all potentially polluting sources of water and routing them towards the existing industrial sewerage system of the refinery and, from there, to the wastewater treatment plant of the refinery.

In condiții normale de operare a rezervorului nu exista pericolul poluării solului si subsolului

Under normal operating conditions, the tank poses no threat of soil and subsoil pollution

6.6. Protecția ecosistemelor terestre si acvatice/ Protection of terrestrial and aquatic ecosystems

Nu este cazul, amplasamentul nu se afla in zona de protecție naturala si nu are in vecinătate areale protejate.

Not applicable; the site is not in a natural protected area and there are no protected areas close by.

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 25: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__25__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

6.7. Protecția așezărilor umane si a altor obiective de interes public/ Protection of human settlements and other public interest objectives

In zona amplasamentului nu au fost identificate obiective de interes public, zona are caracter industrial si face parte din Platforma Industriala Petrobrazi.

Nu se impun lucrări suplimentare sau dotări pentru protecția așezărilor umane.

No public interest objectives have been identified in the area of the site; it is an industrial area and it is part of the Petrobrazi Industrial Platform.

No additional works or endowments are necessary to protect human settlements.

6.8. Gospodărirea deșeurilor generate pe amplasament/ Waste management for waste generated on site

In perioada de execuție a lucrărilor propuse, deșeurile generate sunt:

During the execution period of the proposed works, the generated waste will be:

• deșeuri de ambalaje rezultate din folosirea diferitelor materiale auxiliare (vopsele, uleiuri) utilizate in lucrările de construcții-montaj, care se colectează si se predau la unități specializate in colectarea acestor tipuri de deșeuri – cod deșeu 15 01 10*;

• deșeuri metalice provenite din materialele de construcție ca urmare a activității de construcții-montaj, care vor fi colectate si predate către unități specializate in colectarea acestor tipuri de deșeuri – cod deșeu 17 04 07;

• eventuale elemente din beton armat, moloz rezultate din lucrările de preparare si turnare betoane, care vor fi evacuate prin intermediul firmelor specializate – cod deșeu 17 01 01;

• deșeuri menajere si asimilabil menajere, rezultate din activitățile igienica – sanitare ale personalului, care sunt colectate si predate conform contractului de salubrizare existent al rafinăriei – cod deșeu 20 03 01.

• packing materials resulted from using varied auxiliary materials (paint, oil) for the construction and assembly works, to be collected and handed over to companies specialized in this type of waste - waste code 15 01 10*.

• metal resulted from construction materials used for the construction and assembly activities, to be collected and handed over to companies specialized in this type of waste - waste code 17 04 07;.

• possibly, reinforced concrete elements, debris resulted from concrete preparation and concrete casting works, to be removed through specialized companies - waste code 17 01 01.

• household waste and associated waste, resulted from the hygiene and sanitary activities of the personnel, to be collected and handed over according to the existing sanitation contract entered by the refinery - waste code 20 03 01.

Exploatarea rezervorului nu necesita masuri de gestionare a deșeurilor, pentru ca activitatea

The tank operation will not require measures for waste management since the specific activity

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 26: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__26__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

specifica nu este producătoare de deșeuri. Activitatea de întreținere echipamente/utilaje presupune înlocuirea uleiului uzat de la pompe, ceea ce înseamnă depozitare temporara in recipiente de la furnizor, in interiorul stației de pompe si eliminarea/valorificarea prin societăți specializate.

Prin modul de gestionare a deșeurilor in conformitate cu legislația naționala si cu procedurile specifice Sistemului de Management de Mediu certificat si implementat la nivel de rafinărie se urmărește reducerea riscurilor pentru mediu si populație si limitarea cantităților de deșeuri eliminate prin evacuare la depozitele de deșeuri.

Responsabilitatea gestionarii deșeurilor (eliminare/valorificare) rezultate in etapa de execuție revine antreprenorului general al lucrărilor.

Programul de prevenire si reducere a cantităților de deșeuri generate

Strategia naționala privind gestionarea deșeurilor pune un accent deosebit pe prevenirea, reutilizarea si reciclarea deșeurilor, in scopul eliminării poluării si conservării resurselor naturale. Daca evitarea producerii de deșeuri nu este întotdeauna posibila, atunci trebuie minimizata cantitatea de deșeuri generata prin reutilizare, reciclare si valorificare energetica.

Astfel, sortarea selectiva a deșeurilor in vederea valorificării acestora contribuie la reducerea cantității de deșeuri ce sunt eliminate prin depozitare. Sortarea la sursa asigura un grad ridicat de reciclare, costuri reduse pentru reciclare, venituri din recuperarea si reutilizarea anumitor materiale, șantiere mai curate.

Reutilizarea deșeurilor generate se aplica in situația in care, acestea își găsesc utilizarea in cadrul altor activități, in afara amplasamentului, fără a duce modificări in procesele tehnologice existente sau a deșeurilor reutilizabile.

Reciclarea și valorificarea reprezintă o prioritate înaintea eliminării prin depozitare si sunt

does not generate waste. Equipment/machinery maintenance will involve used oil replacement for pumps, which will entail a temporary storage of the containers received from the supplier at the pumping station and the removal/recovery thereof through specialized companies.

Waste management pursuant to the national legislation and to the specific procedures in the implemented and certified Environmental Management System of the refinery will aim at risk reduction for the environment and for the population and a limitation of the amount of waste removed and taken to landfill sites.

The responsibility for waste management (removal/recovery) as regards the waste generated during the performance of the works will lie with the general contractor.

Generated waste prevention and reduction program

The national strategy on waste management places a great emphasis on the prevention, reuse, and recycling of waste in order to eliminate pollution and preserve natural resources. If the avoidance of generating waste is not always possible, then the amount of generated waste must be minimized by reuse, recycling, and waste-to-energy recovery.

Thus, a selective sorting of waste for recovery will contribute to reducing the amount of generated waste disposed of by removal to a landfill site. Waste sorting at the source will ensure a high level of recycling possibilities, reduced costs for recycling, revenues from the recovery and reuse of certain materials, cleaner construction sites.

Reuse of generated waste applies when they can be used in other activities, outside the site, without changes to the existing process flows or to reusable waste.

Recycling and recovery will be prioritized over removal to landfill sites and they are operations

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 27: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__27__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

operațiuni care se pot realiza atât pe amplasament, cât și în afară amplasamentului.

Eliminarea deșeurilor trebuie aplicata numai după ce au fost folosite la maxim toate celelalte mijloace, in mod responsabil, astfel încât sa nu producă efecte negative asupra mediului.

Deșeurile din construcții si demolări reprezintă deșeurile rezultate in urma activităților de construire a noilor structuri sau de renovare sau dezafectare/demolare a unor structuri existente, si pot include următoarele tipuri de materiale:

that can be performed both on site and outside the site.

Waste disposal should be applied only after all other means have been responsibly employed to the maximum so as not to cause negative environmental effects.

Construction and demolition waste is waste resulted from building new structures or renovating existing ones or decommissioning/demolishing existing buildings and it may include the following types of materials:

• materiale rezultate din construcții si demolări clădiri: beton, ciment, cărămizi, țigle, ceramica, roci, ipsos, plastic, metal, fonta, lemn, sticla, resturi de tâmplărie, etc.;

• materiale rezultate din construcția si întreținerea cailor de acces si a structurilor aferente: nisip, pietriș, bitum, lianți bituminoși sau hidraulici;

• materiale excavate in timpul activităților de construire, dezafectare: sol, pietriș, argila, nisip, roci, resturi vegetale.

• materials resulted from erecting and demolishing buildings: concrete, cement, bricks, roof tiles, ceramics, rock, plaster, plastic, metal, cast iron, wood, glass, carpentry residues etc.

• materials resulted from building and maintaining access ways and related structures: sand, gravel, bitumen, bitumen, or hydraulic binders.

• materials dug out during construction and decommissioning works: soil, gravel, clay, sand, rocks, vegetation.

Masuri specifice deșeurilor generate Generated waste specific measures

• Beton - poate fi folosit ca strat suport pentru drumuri si terasamente, după concasarea prealabila, pentru viitoare amenajări in incinta.

• Metal - va fi debitat la dimensiuni transportabile si va fi valorificat prin societăți autorizate.

• Ambalaje contaminate – vor fi eliminate prin societăți autorizate.

• Deșeurile menajere – vor fi eliminate de societatea de salubritate.

• Concrete - it can be used as a supporting layer for roads and earthwork, after prior crushing, for future works on the premises.

• Metal - it will be cut to transportable sizes and then recovered via authorized companies.

• Contaminated packaging - it will be disposed of through authorized companies.

• Household waste - it will be disposed of by the sanitation company.

Planul de gestionare a deșeurilor

Cantitățile de deșeuri generate sunt cele calculate in faza DTAD a proiectului.

Pe amplasament vor fi identificate si marcate corespunzător spatiile destinate depozitarii

Waste management plan

The amount of generated waste is as calculated in the DTAD stage of the project.

Storage spaces dedicated for waste storage on site will be properly identified and marked during

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 28: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__28__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

deșeurilor, in cadrul organizării de șantier. Deșeurile vor fi depozitate vrac, separat.

Pentru reținerea si îndepărtarea rapida a eventualelor scurgeri accidentale de carburanți sau uleiuri, organizarea de șantier va fi dotata cu materiale absorbante de tipul: nisip, rumeguș, etc. Acestea vor fi gestionate, după utilizare, ca deșeuri periculoase.

Politica antreprenorului general privind gestionarea acestor deșeuri are drept ținta următoarele aspecte:

the construction site layout stage. Waste will be stored in bulk, separately.

For a fast retention and removal of possible accidental leaks of fuels or oils, the construction site layout will provide absorbent materials such as: sand, sawdust etc. They will be handled as hazardous waste after use.

The general contractor's policy on the management of this waste will aim:

• minimizarea cantităților de deșeuri rezultate;

• colectarea si depozitarea selectiva a deșeurilor, identificarea tipurilor cu potențial de reciclare/reutilizare;

• inventarierea tipurilor si cantităților de deșeuri generate;

• reducerea la minimum a riscurilor de mediu și de sănătate a populației;

• eliminarea deșeurilor si reciclările prin firme autorizate vor fi documentate și înregistrările vor fi menținute într-un fișier special creat si actualizat de responsabilul de mediu.

• to minimize the amount of resulted waste.

• to collect and store waste selectively, to identify the types that can be recycled/reused.

• to draw up an inventory of the type and quantities of generated waste.

• to minimize risks that threaten the environment and population health.

• waste disposal and waste recycling through authorized companies will be documented and the records will be kept in a special file, to be updated by the environmental protection officer.

6.9. Gospodărirea substanțelor si preparatelor chimice/ Management of chemical substances and preparations

In perioada de realizare a lucrărilor de reabilitare a rezervorului propuse nu sunt utilizate substanțe toxice si periculoase.

Utilajele si echipamentele vor fi aduse in cadrul amplasamentului cu autovehicule in stare buna de funcționare, cu toate reviziile necesare si cu schimburile de ulei efectuate in unități specializate. In cazul operațiilor de întreținere a bateriilor de acumulatori se va urma aceeași procedura.

In rezervor se va depozita benzina pentru care se vor asigura fisele cu date de securitate. Frazele de pericol ale celor doua produse sunt:

No toxic or hazardous substances will be used during the performance of the proposed works to rehabilitate the tank.

The machinery and the equipment will be brought on site by motor vehicles that are in a good operating condition, with all the necessary overhauls and oil replacements already made at specialized companies. The same procedure will be followed for battery packs.

Tank will store gasoline, for which safety data sheets will be provided. The hazard statements of the two products are:

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 29: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__29__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

Benzina: Gasoline:

• H224 Lichid și vapori foarte inflamabili.

• H304 Poate fi mortal în caz de înghițire și de pătrundere în căile respiratorii.

• H315 Provoacă iritarea pielii.

• H336 Poate provoca somnolență sau amețeală

• H340 Poate provoca anomalii genetice.

• H350 Poate provoca cancer.

• H361d Susceptibil de a dăuna fătului

• H411 Toxic pentru viața acvatică având efecte de lungă durată.

• H224 Highly flammable liquid and vapors.

• H304 May be fatal if swallowed and enters airways.

• H315 Causes skin irritation.

• H336 May cause drowsiness or dizziness

• H340 May cause genetic defects.

• H350 May cause cancer.

• H361d Suspected of damaging fetus

• H411 Toxic to aquatic life with long lasting effects.

7. Caracteristicile impactului potențial/ Characteristics of the potential impact

Impactul potențial este evaluat pe baza analizării activităților de construire, de exploatare si de închidere a obiectivului.

The potential impact is assessed based on analyzing the construction, operation and close down activities.

7.1. Impactul asupra populației si sănătății umane/ Impact on the population and on human health

Amplasamentul investiției, se afla in incinta Rafinăriei Petrobrazi, situata aproape de comuna Brazi si in același timp într-o zona industriala.

Lucrările de construcții-montaj si punerea in funcțiune a rezervorului nu presupun un impact major asupra populației, deoarece lucrările se derulează pe o perioada scurta de timp, iar zona locuita este la distanta mare.

In perioada de execuție a lucrărilor propuse zgomotul este produs de organizarea de șantier, funcționarea utilajelor si mijloacelor de transport, dar se produce local si temporar si nu are caracter continuu.

Ținând cont ca activitatea de execuție a obiectivului propus are un caracter temporar si intermitent, precum si de perioadele foarte scurte de manifestare a zgomotului in zona obiectivului in timpul funcționarii, se poate aprecia ca acesta nu creează disconfort fonic

The project site is located on the premises of the Petrobrazi Refinery, located close to the Brazi Commune, in an industrial area.

Construction and assembly works and the commissioning of the tank do not involve a major impact on the population, since works will be conducted over a short period of time and the inhabited area is very remote.

During the performance of the proposed works, noise will be generated from the construction site layout, the operation of the machinery and of the means of transport, but the noise will be local and temporary, not of a permanent nature.

Taking into consideration the activity to erect the proposed objective is temporary and intermittent, as well as the very short time intervals when noise will be generated on site during operation, it can be appraised that it will not create a sound nuisance for the population in the area and the

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 30: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__30__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

pentru populația din zona, iar impactul produs este nesemnificativ.

generated impact will be insignificant.

7.2. Impactul asupra florei si faunei/ Impact on flora and fauna

Lucrările propuse se vor realiza pe o platforma tehnologica aflata într-o zona cu caracter industrial, fără specii reprezentative de flora si fauna, puternic modificata de factorul antropic. Toate aceste aspecte conduc la concluzia ca impactul va fi practic inexistent.

The proposed works will be conducted on a technological platform located in an industrial area, without representative species of flora and fauna, subjected to large man-made alterations. All these aspects lead to the conclusion that there will practically be no impact.

7.3. Impactul asupra solului/ Impact on soil

Lucrările de construcții-montaj presupun executarea de fundații, construcții metalice, estacade.

Ocuparea temporara a solului cu echipamentele si utilajele necesare nu va avea un impact negativ asupra solului. Apele din precipitații care ar putea spală scurgeri accidentale de produse petroliere sunt colectate de rigolele de apa pluviala care mărginesc platforma si sunt evacuate in canalizarea industriala a obiectivului.

In condiții cu totul accidentale, in perioada de execuție pot apare situații ce țin de circulația vehiculelor si funcționarea echipamentelor si utilajelor cu motoare cu ardere interna, pot apare scurgeri de combustibili.

In perioada desfășurării lucrărilor de construcție-montaj nu se vor folosi materiale, substanțe si tehnologii care sa fie periculoase si nocive pentru sol, subsol si ape freatice.

In perioada de exploatare nu vor exista generări de substanțe periculoase si poluanți pentru sol, subsol si ape freatice.

Incinta in care va funcționa rezervorul de benzina este prevăzută cu toate dotările si amenajările necesare protecției solului: platforme si cai de acces betonate, rigole

Construction and assembly works involve the execution of foundations, metal structures, scaffold bridges.

A temporary occupation of the soil with the necessary equipment and machinery will not have a negative impact on the soil. Rain water that could wash away accidental leaks of oil products will be collected by the surface run-off gutters that are placed on the perimeter of the platform and then evacuated in the industrial sewerage system on site.

Under totally accidental conditions, some situations may occur during the performance term that are related to the traffic of vehicles and the operation of the equipment and machinery with internal combustion engines - that is fuel leaks.

During the construction and assembly works no materials, substances and technologies will be used that might be dangerous and toxic for the soil, subsoil and underground water.

During operation, there will be no generation of hazardous substances and pollutants for the soil, subsoil and underground water.

The enclosure where the tank for gasoline will be operated is provided with all the endowments and arrangements needed to protect the soil: concrete platforms and access ways, road gutters to collect

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 31: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__31__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

carosabile pentru colectarea apelor pluviale, rețea de canalizare industriala.

In aceste situații impactul asupra solului si a apelor (de suprafața si subterane) este unul negativ, dar temporar. Probabilitatea scăzută de producere a acestor situații accidentale si posibilitatea de intervenție imediata pentru îndepărtarea si remedierea lor fac ca acest impact sa fie nesemnificativ.

Se poate aprecia astfel ca impactul realizării lucrărilor propuse asupra solului din zona amplasamentului este nesemnificativ.

surface run-off, an industrial sewerage system.

In such situations, the impact on soil and water (surface water and underground water) is negative, but temporary. The low likelihood of these accidental situations to occur and the possibility of an immediate intervention to remove and remedy them make this impact insignificant.

It can be thus appreciated that the impact of performing the proposed works on the soil in the site area is insignificant.

7.4. Impactul asupra folosințelor si bunurilor materiale/ Impact on facilities and property

Vecinătățile amplasamentului studiat sunt instalații tehnologice, deci nu se impune studierea impactului asupra folosințelor si a bunurilor materiale, atât pentru perioada de construire cat si pentru perioada de funcționare.

The studied site is surrounded by technological installations, so there is no need to study the impact on facilities and property, both during the construction works and during operation.

7.5. Impactul asupra calității si regimului cantitativ al apei/ Impact on water quality and water levels

Evacuarea apelor uzate menajere generate pe amplasamentul organizării de șantier se va face prin intermediul grupurilor sanitare existente in zona de realizare a proiectului, in rețeaua de canalizare menajera.

Apele pluviale care pot antrena scurgerile accidentale de produse petroliere si combustibili pe căile de acces sunt colectate de rețeaua de ape meteorice a rafinăriei.

In aceasta situație se poate aprecia ca impactul direct, pe termen mediu si lung al activității analizate asupra calității apei este nesemnificativ.

Domestic waste water generated at the construction site layout will be disposed of through the existing toilets in the area of the project, directly into the sewerage system.

Surface run-off that could wash away accidental leaks of oil products and fuels on access routes will be collected by the surface run-off sewerage system of the refinery.

In this situation, it can be appreciated that the long-term and medium-term direct impact of the analyzed activity on water quality is insignificant.

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 32: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__32__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

7.6. Impactul asupra calității aerului/ Impact on air quality

Pe durata execuției, activitățile propuse nu vor avea un impact semnificativ.

In perioada de funcționare a rezervorului, impactul asupra aerului este nesemnificativ, emisiile de COV fiind reduse prin utilizarea tipului de rezervor cu membrana interioara flotanta.

During the performance of the works, the proposed activities will have no significant impact.

During the tank operation, the impact on air will be insignificant, VOC emissions will be reduced by using a floating inner membrane type of tank.

7.7. Impactul asupra climei/ Impact on climate

Nu este cazul, activitatea nu generează gaze cu efect de sera, radiații ionizante sau efluenți cu temperaturi ridicate.

Not applicable; the activity does not generate greenhouse gases, ionizing radiation, or effluents at high temperatures.

7.8. Impactul produs de zgomote si vibrații/ Impact of noise and vibrations

In faza de construcții-montaj, ca sursa de zgomot se constituie funcționarea motoarelor utilajelor angrenate in activitate. Aceasta constituie surse temporare de zgomot si vibrații, fiind de scurta durata si nu vor depăși nivelul de zgomot prevăzut prin legislația in vigoare.

Exploatarea ulterioara a rezervorului nu creste nivelul de zgomot general al platformei tehnologice, pentru ca echipamentele dinamice (pompe) au prevăzute prin proiect protecții fonice care sa limiteze nivelul de zgomot la 85 dB(A).

Astfel, nivelul de zgomot nu va depăși limita de 85 dB (A) pentru incinte industriale, in conformitate cu H.G. 493/2006, iar impactul va fi nesemnificativ.

During the construction and assembly stage, the source of noise will be the operation of the engines of the machinery employed to conduct the activities. These will be temporary short-term sources of noise and vibrations, which will not exceed the noise levels set forth in the laws in force.

Later on, the operation of the tank will not increase the overall noise level generated by the technological platform, since the dynamic equipment (the pumps) are provided by design with noise protections that will limit the noise level to 85 dB(A).

Thus, the noise level will not exceed 85 dB (A) for industrial sites, pursuant to G.R. 493/2006, and the impact will be insignificant.

7.9. Impactul asupra peisajului si mediului vizual/ Impact on the landscape and visual environment

Este nesemnificativ, amplasarea obiectivului It is insignificant since the objective is located in

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 33: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__33__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

într-o zona cu specific industrial nu influențează peisajul deja modificat.

and industrial area and it will not alter the already altered landscape.

7.10. Impactul asupra patrimoniului istoric si cultural/ Impact on the historical and cultural heritage

Nu se manifesta un asemenea impact, nu exista obiective culturale sau cu caracter istoric in zona.

There is no such impact; there are no cultural objectives or historical objectives in the area.

7.11. Impactul asupra interacțiunilor dintre aceste elemente/ Impact on the interaction between these elements

In perioada de execuție a lucrărilor propuse poate fi considerat nesemnificativ, temporar, pe termen scurt si secundar, pe baza următoarelor criterii:

During the performance term of the proposed works, it can be considered insignificant, temporary, short-term and secondary, based on the following criteria:

• extinderea impactului – nu poate fi luata in considerare;

• magnitudinea si complexitatea impactului – minima;

• probabilitatea impactului – minima;

• durata, frecventa si reversibilitatea impactului – termen scurt, frecventa redusa, reversibil.

• impact expansion - it cannot be taken into consideration.

• impact magnitude and complexity - minimal.

• impact likelihood - minimal.

• impact duration, regularity, and reversibility - short-term, low regularity, reversible.

Masuri de evitare, reducere sau ameliorare a impactului asupra mediului:

Measures to avoid, reduce or mitigate environmental impact:

• respectarea proiectului tehnic de execuție si a tuturor masurilor si recomandărilor făcute in acesta si celelalte studii de specialitate;

• verificarea periodica a stării tehnice a autovehiculelor implicate in execuția proiectului;

• utilizarea autovehiculelor cu emisii de noxe reduse;

• exploatarea echipamentelor conform cărților tehnice si tehnologiei din proiect;

• gestionarea deșeurilor in conformitate cu legislația in vigoare.

• observance of the detailed engineering design and of all measures and recommendations therein and in other specialty studies.

• regular inspection of the technical condition of the motor vehicles involved in the performance of the project.

• use of motor vehicles with low nitrogen oxides emissions.

• operation of the equipment pursuant to technical books and the technology in the project.

• waste management pursuant to laws in force.

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 34: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__34__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

7.12. Natura transfrontiera a impactului/ Cross-border nature of the impact

Nu este cazul, datorita distantei mari fata de granițe, nici una din activitățile din lista anexata Convenției privind evaluarea impactului asupra mediului in context trans frontiera, adoptata la Espoo la 25 februarie 1991, ratificata prin Legea 22/2001 nu se intersectează cu lucrările prevăzute in proiectul propus pentru avizare.

Not applicable, due to remoteness from boundaries; no activity in the list attached to the Convention on Environmental Impact Assessment in a Transboundary Context, adopted at Espoo on 25 February 1991, ratified by Law no. 22/2001, converges with the works proposed in the project submitted for approval.

8. Prevederi pentru monitorizarea mediului/ Provisions for environmental

monitoring

Calitatea factorilor de mediu se urmărește in cadrul Programului de Monitorizare la nivel de Rafinărie. După realizarea lucrărilor prevăzute in prezentul proiect, in timpul funcționarii rezervorului nu sunt necesare masuri suplimentare de monitorizare a calității factorilor de mediu fata de cele existente in prezent conform Autorizației Integrate de Mediu nr. 7 /2015, revizuita in data de 22.10.2019.

Se monitorizează intern calitatea materiilor prime, materiilor auxiliare si a produselor finite in concordanta cu Programul de inspecție a calității existent in rafinărie, care rămâne nemodificat in urma realizării proiectului propus.

The quality of environmental factors will be monitored through the Refinery Monitoring Program. After the completion of the works set out in this project, no additional measures for environmental monitoring, in addition to the existing ones, will be necessary, according to the Integrated Environmental Permit no 7/2015, revised on 22.10.2019.

The quality of raw materials, auxiliary matters and finished products are monitored in-house, pursuant to the Quality Inspection Program put in place at the refinery, which will remain unchanged after the completion of the proposed project.

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 35: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__35__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

9. Justificarea încadrării proiectului, după caz, in prevederile altor acte

normative naționale care transpun legislația comunitara/ Justification of

the project classification, as applicable, under the provision of other

national regulatory acts that incorporate European Community legislation

Rezervorul T5 de 4508 m3 este parte componenta a Rafinăriei Petrobrazi care prin specific, mărime si activitățile desfășurate intra sub incidenta actelor normative naționale cu privire la protecția factorilor de mediu (Legea 278/2013 cu modificările si completările ulterioare, Legea 59/2016 etc.) care transpun legislația comunitara aferenta (Directivele europene IPPC, SEVESO, etc.).

Proiectul implementat nu modifica încadrarea instalației. Atât la nivel de proiectare, cat si la nivel de execuție si exploatare ulterioara se respecta prevederile legislației naționale care transpun legislația europeana privind protecția calității factorilor de mediu, respectiv actele normative Comunității Europene.

Tank T5 with a capacity of 4508 m3 is a component of the Petrobrazi Refinery, which, due to its specifics, size and activities conducted, falls within the scope of national regulatory acts on the protection of environmental factors (Law no. 278/2013, as amended and supplemented, Law no. 59/2016 etc.), which incorporate the related European Community legislation (European Directives IPPC, SEVESO etc.).

The implemented project will not change the classification of the plant. Both at design and execution level, as well as during the subsequent operation, the project observes provisions in the national legislation that incorporate the European legislation on the protection of the quality of environmental factors, that is the regulatory acts of the European Community.

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 36: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__36__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

10. Lucrări necesare organizării de șantier/ Works needed for construction site

layout

Organizarea de șantier se va amenaja în incinta rafinăriei.

Activitățile de recepție si depozitare echipamente, utilaje, materiale se desfășoară in incinta rafinăriei Petrobrazi si nu au un impact semnificativ asupra mediului.

Pe durata lucrărilor de execuție, constructorul va lua masurile necesare pentru eliminarea factorilor de disconfort (praf, zgomot etc.) si încadrarea lucrărilor în standardele si legislația privind protecția mediului.

Deșeurile rezultate din activitatea de construcții-montaj vor fi colectate separat, transportate si depozitate temporar in spatiile special destinate existente in cadrul rafinăriei, după care vor fi eliminate pe baza de contract cu societăți autorizate.

The construction site layout will be on the premises of the refinery.

The equipment, the machinery and the materials will be received and stored on the premises of the Petrobrazi Refinery and they will have no significant impact on the environment.

During the performance of the works, the builder will take the necessary measures to remove nuisance factors (dust, noise etc.) and to make the works abide by the standards and legislation on environmental protection.

Waste resulted from construction and assembly works will be collected separately, then transported and temporarily stored in special dedicated areas on the refinery premises, and then it will be removed based on contracts entered with authorized companies.

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 37: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__37__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

11. Lucrări de refacere a amplasamentului la finalizarea investiției / Land

restoration works at the end of the project

Singurele lucrări de refacere necesare vor viza eventualele platforme de lucru cu caracter provizoriu in interiorul caroului.

Rafinăria Petrobrazi are implementat un Sistem de Management Integrat Calitate–Mediu Sănătate si Securitate Ocupaționala fiind elaborate proceduri operaționale si de sistem specifice. Acesta se concretizează in planuri de prevenire in situații potențiale, planuri de intervenție in situații efective (accidente) având consecințe majore, instrucțiuni de lucru – atenționări pentru situațiile cu consecințe minore.

Pot exista poluări accidentale numai în situații de erori de operare grave sau o întreținere defectuoasă a echipamentelor. În această situație, sistemele de control si detecție vor iniția procedura de oprire automată si se va interveni imediat cu mijloacele din dotare.

The only restoration works required will be related to the any temporary work platforms made within the Plot boundaries.

The Petrobrazi Refinery has an Integrated Management System for Quality, the Environment, Occupational Health and Safety and there are operating procedures and system-specific procedures in place. This will materialize in prevention plans for potential situations, response plans for actual situations (accidents) with major consequences, work instructions - warnings for situations with minor consequences.

Accidental pollution may only occur due to severe operating errors or an improper maintenance of the equipment. In such a situation, the control and detection systems will initiate the automatic shutdown procedure, followed by an immediate intervention with the provided means.

12. Anexe/ Annexes

• Fise cu date de securitate benzina

• Schema flux de proces H10-F510

• Plan de situație lucrări propuse X00-G001

• Plan de încadrare in PUG Brazi X00-G002

• Safety data sheets for gasoline

• Process flow chart H10-F510

• Site plan for the proposed works X00-G001

• Positioning in the PUG Brazi Plan X00-G002

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 38: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__38__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

Proiectul propus nu intra sub incidenta prevederilor art. 28 din Ordonanța de urgență a Guvernului nr. 57/2007 privind regimul ariilor naturale protejate, conservarea habitatelor naturale, a florei și faunei sălbatice, aprobată cu modificări și completări prin Legea nr. 49/2011, cu modificările și completările ulterioare.

Proiectul propus nu se realizează pe ape si nu are legătura cu apele.

The proposed project does not fall within the scope of provisions in art. 28 in Government Emergency Ordinance no. 57/2007 on protected natural areas, conservation of natural habitats, wild flora and fauna, as approved, as amended and supplemented, by Law no. 49/2011m as amended and supplemented.

The proposed project is not to be built on waters and it has no connection with waters.

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4

Page 39: MEMORIU DE PREZENTARE (CONFORM ANEXEI NR. 5E DIN …

Reabilitare rezervor T5(corp C47) de 4508m3 de benzina: construire fundatii, sistem PSI,

legaturi conducte,montaj echipamente aferente rezervorului in incinta Rafinariei

Petrobrazi (caroul 54) / Tank T5 Aluminium Dome and IFR

Installation

Memoriu de prezentare (conform Anexei nr. 5E din Legea nr. 292/10.12.2018)/

Presentation Memorandum (acc. to Annex no. 5E of Law 292 /10.12.2018)

16.02.2021 Tanasescu C. Saia L.

Data/ Date

Intocmit/ Designer

Verificat/ Checked

Pag/Pag.__39__din/from__39__

Proiect nr/Project no. Nr. document/Document no. Rev/Rev. Cod instalatie/Plant code Orig.doc.

7 3 8 9 0 1 X 0 0 - C 0 0 5 0 1 7 8 6 2 9 0 0 0 1

OM

V P

ET

RO

M S

.A. is

reserv

ing a

ll th

e r

ights

over

this

docum

enta

tion

and w

ill take le

gal actio

n a

gain

st

any u

nauth

orized p

ers

on t

hat uses o

r sends t

o t

hird p

art

s

Proiectant de specialitate: SC POERNER ROMANIA SRL

Beneficiar: S.C. OMV PETROM S.A. – Rafinăria Petrobrazi

Proiect Manager: Lucian Saia

Director of Petrobrazi Site management: Nicolaescu Adrian

HSSE Manager: Poenaru Iulian

Head of Department Project Management: Rabitsch Roland

Proiect Manager: Catalin Pitiga

Expert Autority: Iulia Ciobanu

DocuSign Envelope ID: FE22E752-5F94-4ED8-877E-712E4F673EE4