PROYECTO Localidad Distrito Provincia Depart. UND METRADO PRECIO UNITARIO TOTAL METRADO TOTAL METRADO TOTAL METRADO TOTAL % METRADO % 01 OBRAS PRELIMINARES 1,088.67 0.00 01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m glb 1.00 586 586.00 1.00 586.00 0.00 0.00 1.00 586.00 100.00 0.00 0.00 01.02 ALMACEN OFICINA Y SS.HH glb 1.00 502.67 502.67 1.00 502.67 0.00 0.00 1.00 502.67 100.00 0.00 0.00 02 TRABAJOS PRELIMARES 17,876.30 7,470.00 02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO glb 1.00 12000 12,000.00 0.50 6000.00 0.50 6000.00 1.00 12000.00 100.00 0.00 0.00 02.02 ROCE Y DESBROCE m2 10000.00 0.42 4,200.00 6500.00 2730.00 3500.00 1470.00 10000.00 4200.00 100.00 0.00 0.00 02.03 TRAZO Y REPLANTEO km 2.00 838.15 1,676.30 2.00 1676.30 0.00 0.00 2.00 1676.30 100.00 0.00 0.00 03 EXPLANACIONES 222,309.51 76,765.97 03.01 CORTE DE MATERIAL SUELTO RENDIMIENTO=400 m3/día m3 6847.35 7.60 52,039.86 4480.02 34048.15 2367.33 17991.71 6847.35 52039.86 100.00 0.00 0.00 03.02 CORTE ROCA SUELTA (PERFORACION Y DISPARO) m3 1310.00 46.17 60,482.70 858.19 39622.63 451.81 20860.07 1310.00 60482.70 100.00 0.00 0.00 03.03 CORTE ROCA FIJA (PERFORACION Y DISPARO) m3 1115.24 65.17 72,680.19 730.69 47619.07 384.55 25061.12 1115.24 72680.19 100.00 0.00 0.00 03.04 EXCAVACION, DESQUINCHE Y PEINADO DE TALUDES m3 430.06 4.88 2,098.68 279.54 1364.16 150.52 734.52 430.06 2098.69 100.00 0.00 0.00 03.05 RELLENO CON MATERIAL DE PRESTAMO MANUAL m3 2500.00 3.14 7,850.00 1662.88 5221.44 837.12 2628.56 2500.00 7850.00 100.00 0.00 0.00 03.06 ELIMINACION DE MATERIAL EXCEDENTE DE CORTE m3 6772.59 4.01 27,158.09 4406.01 17668.10 2366.58 9489.99 6772.59 27158.09 100.00 0.00 0.00 04 OBRAS DE ARTE Y DRENAJE 28,295.53 28,295.53 04.01 CUNETAS 16,400.00 16,400.00 04.01.01 CONSTRUCCION DE CUNETAS LATERALES EN MATERIAL SUELTO m 1200.00 7.00 8,400.00 0.00 0.00 1200.00 8400.00 1200.00 8400.00 100.00 0.00 0.00 04.01.02 CONSTRUCCION DE CUNETAS LATERALES EN ROCA SUELTA m 800.00 10.00 8,000.00 0.00 0.00 800.00 8000.00 800.00 8000.00 100.00 0.00 0.00 04.02 BADENES 8,158.26 8,158.26 04.02.01 EXCAVACION MANUAL m3 24.08 24.65 593.57 0.00 0.00 24.08 593.57 24.08 593.57 100.00 0.00 0.00 04.02.02 ELIMINACION DE MATERIAL CARGUIO MANUAL m3 36.55 1.96 71.64 0.00 0.00 36.55 71.64 36.55 71.64 100.00 0.00 0.00 04.02.03 ENCOFRADO Y DESENCOFRADO PARA BADENES m2 20.78 73.38 1,524.84 0.00 0.00 20.78 1524.84 20.78 1524.84 100.00 0.00 0.00 04.02.04 CONCRETO f'c=210 kg/cm2 PARA LOSAS DE FONDO m3 5.19 476.21 2,471.53 0.00 0.00 5.19 2471.53 5.19 2471.53 100.00 0.00 0.00 04.02.05 CONCRETO f'c=140 kg/cm2 m3 3.38 423.14 1,430.21 0.00 0.00 3.38 1430.21 3.38 1430.21 100.00 0.00 0.00 04.02.06 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS DE FONDO PISO kg 251.73 8.08 2,033.98 0.00 0.00 251.73 2033.98 251.73 2033.98 100.00 0.00 0.00 04.02.07 JUNTAS ASFALTICAS m 5.19 6.26 32.49 0.00 0.00 5.19 32.49 5.19 32.49 100.00 0.00 0.00 04.03 ALCANTARILLADO 3,737.27 3,737.27 04.03.01 EXCAVACION MANUAL m3 4.82 24.65 118.81 0.00 0.00 4.82 118.81 4.82 118.81 100.00 0.00 0.00 04.03.02 RELLENO ESTRUCTURAL m3 2.36 65.91 155.55 0.00 0.00 2.36 155.55 2.36 155.55 100.00 0.00 0.00 04.03.03 ENCOFRADO Y DESENCOFRADO m2 14.25 48.03 684.43 0.00 0.00 14.25 684.43 14.25 684.43 100.00 0.00 0.00 04.03.04 CONCRETO f'c=140 kg/cm2 m3 2.38 423.14 1,007.07 0.00 0.00 2.38 1007.07 2.38 1007.07 100.00 0.00 0.00 04.03.05 CONCRETO f'c=210 kg/cm2 m3 1.62 496.47 804.28 0.00 0.00 1.62 804.28 1.62 804.28 100.00 0.00 0.00 04.03.06 ACERO fy=4200 kg/cm2 GRADO 60 kg 50.35 8.13 409.35 0.00 0.00 50.35 409.35 50.35 409.35 100.00 0.00 0.00 04.03.07 ALCANTARILLA TMC 0=36" m 2.00 278.89 557.78 0.00 0.00 2.00 557.78 2.00 557.78 100.00 0.00 0.00 V A L O R I Z A C I O N 0 2 M E S D E F E B R E R O ITEM DESCRIPCION PRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO

Upload: carlosguillermoyanacgamarra

Post on 25-Sep-2015

218 views

Category:

Documents


3 download

DESCRIPTION

FORMATO DE VALORIZACIÓN

TRANSCRIPT

  • PROYECTO

    LocalidadDistritoProvinciaDepart.

    UND METRADO PRECIO UNITARIO

    TOTAL METRADO TOTAL METRADO TOTAL METRADO TOTAL % METRADO %

    01 OBRAS PRELIMINARES 1,088.67 0.0001.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m glb 1.00 586 586.00 1.00 586.00 0.00 0.00 1.00 586.00 100.00 0.00 0.0001.02 ALMACEN OFICINA Y SS.HH glb 1.00 502.67 502.67 1.00 502.67 0.00 0.00 1.00 502.67 100.00 0.00 0.00

    02 TRABAJOS PRELIMARES 17,876.30 7,470.0002.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO glb 1.00 12000 12,000.00 0.50 6000.00 0.50 6000.00 1.00 12000.00 100.00 0.00 0.0002.02 ROCE Y DESBROCE m2 10000.00 0.42 4,200.00 6500.00 2730.00 3500.00 1470.00 10000.00 4200.00 100.00 0.00 0.0002.03 TRAZO Y REPLANTEO km 2.00 838.15 1,676.30 2.00 1676.30 0.00 0.00 2.00 1676.30 100.00 0.00 0.00

    03 EXPLANACIONES 222,309.51 76,765.9703.01 CORTE DE MATERIAL SUELTO RENDIMIENTO=400 m3/da m3 6847.35 7.60 52,039.86 4480.02 34048.15 2367.33 17991.71 6847.35 52039.86 100.00 0.00 0.0003.02 CORTE ROCA SUELTA (PERFORACION Y DISPARO) m3 1310.00 46.17 60,482.70 858.19 39622.63 451.81 20860.07 1310.00 60482.70 100.00 0.00 0.0003.03 CORTE ROCA FIJA (PERFORACION Y DISPARO) m3 1115.24 65.17 72,680.19 730.69 47619.07 384.55 25061.12 1115.24 72680.19 100.00 0.00 0.0003.04 EXCAVACION, DESQUINCHE Y PEINADO DE TALUDES m3 430.06 4.88 2,098.68 279.54 1364.16 150.52 734.52 430.06 2098.69 100.00 0.00 0.0003.05 RELLENO CON MATERIAL DE PRESTAMO MANUAL m3 2500.00 3.14 7,850.00 1662.88 5221.44 837.12 2628.56 2500.00 7850.00 100.00 0.00 0.0003.06 ELIMINACION DE MATERIAL EXCEDENTE DE CORTE m3 6772.59 4.01 27,158.09 4406.01 17668.10 2366.58 9489.99 6772.59 27158.09 100.00 0.00 0.00

    04 OBRAS DE ARTE Y DRENAJE 28,295.53 28,295.53

    04.01 CUNETAS 16,400.00 16,400.0004.01.01 CONSTRUCCION DE CUNETAS LATERALES EN MATERIAL SUELTO m 1200.00 7.00 8,400.00 0.00 0.00 1200.00 8400.00 1200.00 8400.00 100.00 0.00 0.0004.01.02 CONSTRUCCION DE CUNETAS LATERALES EN ROCA SUELTA m 800.00 10.00 8,000.00 0.00 0.00 800.00 8000.00 800.00 8000.00 100.00 0.00 0.00

    04.02 BADENES 8,158.26 8,158.2604.02.01 EXCAVACION MANUAL m3 24.08 24.65 593.57 0.00 0.00 24.08 593.57 24.08 593.57 100.00 0.00 0.0004.02.02 ELIMINACION DE MATERIAL CARGUIO MANUAL m3 36.55 1.96 71.64 0.00 0.00 36.55 71.64 36.55 71.64 100.00 0.00 0.0004.02.03 ENCOFRADO Y DESENCOFRADO PARA BADENES m2 20.78 73.38 1,524.84 0.00 0.00 20.78 1524.84 20.78 1524.84 100.00 0.00 0.0004.02.04 CONCRETO f'c=210 kg/cm2 PARA LOSAS DE FONDO m3 5.19 476.21 2,471.53 0.00 0.00 5.19 2471.53 5.19 2471.53 100.00 0.00 0.0004.02.05 CONCRETO f'c=140 kg/cm2 m3 3.38 423.14 1,430.21 0.00 0.00 3.38 1430.21 3.38 1430.21 100.00 0.00 0.0004.02.06 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS DE FONDO PISO kg 251.73 8.08 2,033.98 0.00 0.00 251.73 2033.98 251.73 2033.98 100.00 0.00 0.0004.02.07 JUNTAS ASFALTICAS m 5.19 6.26 32.49 0.00 0.00 5.19 32.49 5.19 32.49 100.00 0.00 0.00

    04.03 ALCANTARILLADO 3,737.27 3,737.2704.03.01 EXCAVACION MANUAL m3 4.82 24.65 118.81 0.00 0.00 4.82 118.81 4.82 118.81 100.00 0.00 0.0004.03.02 RELLENO ESTRUCTURAL m3 2.36 65.91 155.55 0.00 0.00 2.36 155.55 2.36 155.55 100.00 0.00 0.0004.03.03 ENCOFRADO Y DESENCOFRADO m2 14.25 48.03 684.43 0.00 0.00 14.25 684.43 14.25 684.43 100.00 0.00 0.0004.03.04 CONCRETO f'c=140 kg/cm2 m3 2.38 423.14 1,007.07 0.00 0.00 2.38 1007.07 2.38 1007.07 100.00 0.00 0.0004.03.05 CONCRETO f'c=210 kg/cm2 m3 1.62 496.47 804.28 0.00 0.00 1.62 804.28 1.62 804.28 100.00 0.00 0.0004.03.06 ACERO fy=4200 kg/cm2 GRADO 60 kg 50.35 8.13 409.35 0.00 0.00 50.35 409.35 50.35 409.35 100.00 0.00 0.0004.03.07 ALCANTARILLA TMC 0=36" m 2.00 278.89 557.78 0.00 0.00 2.00 557.78 2.00 557.78 100.00 0.00 0.00

    V A L O R I Z A C I O N N 0 2 M E S D E F E B R E R O

    ITEM DESCRIPCIONPRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO

  • PROYECTO

    LocalidadDistritoProvinciaDepart.

    UND METRADO PRECIO UNITARIO

    TOTAL METRADO TOTAL METRADO TOTAL METRADO TOTAL % METRADO %

    V A L O R I Z A C I O N N 0 2 M E S D E F E B R E R O

    ITEM DESCRIPCIONPRESUPUESTO AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO SALDO

    05 FLETE 8,900.00 3,115.0005.01 TRANSPORTE DE PETROLEO Y OTROS glb 1.00 8,900.00 8,900.00 0.65 5785.00 0.35 3115.00 1.00 8900.00 100.00 0.00 0.00

    COSTO DIRECTO S/.278,470.01 S/. 162,823.52 S/.115,646.49 S/. 278,470.01 S/. 0.00GASTOS GENERALES (8.00%) S/.22,277.60 S/.13,025.88 S/.9,251.72 S/.22,277.60 S/. 0.00UTILIDAD (8.00%) S/.22,277.60 S/.13,025.88 S/.9,251.72 S/.22,277.60 S/. 0.00PARCIAL S/.323,025.21 S/.188,875.28 S/.134,149.93 S/.323,025.21 S/. 0.00IGV (19%) S/.61,374.79 S/.35,886.30 S/.25,488.49 S/.61,374.79 S/. 0.00TOTAL PRESUPUESTO S/.384,400.00 S/.224,761.58 S/.159,638.42 S/.384,400.00 S/. 0.00PORCENTAJE DE AVANCE MENSUAL 58.47% 41.53% 100.00% 0.00%PORCENTAJE ACUMULADO 58.47% 41.53% 100.00% 0.00%