costos parametricos m2 de construccion (1) (1)

2
Volver atrás Costos por m² de Construcción Costo por m2 BIMSA-CMIC 2014 COSTOS POR M² DE CONSTRUCCION DE ENERO A JUNIO DE 2014 GÉNERO CALIDAD ENE $/M2 FEB $/M2 MAR $/M2 ABR $/M2 MAY $/M2 JUN $/M2 % (a) Vivienda Unifamiliar Baja 6,054 6,126 6,139 6,152 6,139 6,113 -0.42% Media 7,693 7,765 7,807 8,050 7,991 7,947 -0.55% Alta 8,871 8,917 8,945 9,067 9,028 8,999 -0.32% Vivienda Multifamiliar Baja 5,098 5,268 5,285 5,314 5,278 5,276 -0.04% Media 7,366 7,483 7,503 7,968 7,908 7,897 -0.14% Alta 10,703 10,863 10,934 11,050 10,989 10,994 0.05% Oficinas Baja 6,182 6,250 6,288 6,341 6,305 6,307 0.03% Media 7,820 7,956 8,036 8,110 8,093 8,104 0.14% Alta 9,164 9,232 9,278 9,357 9,321 9,322 0.01% Estacionamientos Baja 3,780 3,807 3,851 3,862 3,876 3,879 0.08% Media 3,076 3,125 3,128 3,191 3,136 3,140 0.13% Alta 5,202 5,278 5,423 5,322 5,455 5,464 0.16% Hotel Baja 6,847 6,956 6,994 7,097 7,053 7,020 -0.47% Media 9,711 9,965 9,984 10,251 10,178 10,159 -0.19% Alta 16,072 16,114 16,152 16,381 16,301 16,316 0.09% Escuela Baja 4,083 4,110 4,135 4,189 4,152 4,120 -0.77% Media 6,381 6,423 6,463 6,548 6,490 6,439 -0.79% Alta 10,145 10,213 10,276 10,410 10,318 10,238 -0.78% Naves Industriales Baja 3,590 3,685 3,750 3,737 3,724 3,734 0.27% Media 5,108 5,278 5,455 5,466 5,422 5,391 -0.57% Alta 10,221 10,548 10,765 10,826 10,760 10,701 -0.55% NOTA : LOS COSTOS POR m² INCLUYEN LOS SIGUIENTES PARAMETROS: Se encuentran actualizados al mes inmediato anterior a la Edición correspondiente y reflejan la investigación validada hasta el día 20 de cada mes Todos incluyen Costo Directo, Indirecto, Utilidad, Licencias y Costo del proyecto aproximado En el caso de Vivienda incluyen el IVA correspondiente a los materiales Los valores son promedio directo de diversos modelos específicos, analizados con base a la investigación de precios que realiza Bimsa a fechas determinadas El porcentaje se refiere al comportamiento de los dos últimos meses %(a) Para mayor detalle consulte la información Valuador de Bimsa Reports Fuente : BIMSA REPORTS, S.A DE C.V. Última Actualización: Julio de 2014. Próxima Actualización: Noviembre de 2014. Los datos aquí contenidos se presentan exclusivamente como información, por lo que no podrán ser utilizados como sustento de avalúos o estudios. Aclaraciones al teléfono (0155) 2581-2160, dichos datos son reproducidos exclusivamente en Boletínes y en las Paginas de Internet CMIC, con la autorización de BIMSA REPORTS, S.A. DE C.V. Estamos a sus órdenes para mayor información: Ing. Rafael López Torres 01 (55) 5424-7417 Ing. Sofia Espinosa Maldonado 01 (55) 5424-7400 Ext. 7207 O cualquier comentario o sugerencia favor de completar el siguiente formulario: Page 1 of 2 CMIC - Costos por m2 de Construcción 27/08/2014 http://www.cmic.org/comisiones/Tematicas/costosyp/Costom2/Bimsa/costom2.htm

Upload: jc-mosqueda

Post on 21-Nov-2015

342 views

Category:

Documents


8 download

DESCRIPTION

Costos parametricos CMIC 2014

TRANSCRIPT

  • Volver atrs Costos por m de Construccin

    Costo por m2 BIMSA-CMIC 2014

    COSTOS POR M DE CONSTRUCCION DE ENERO A JUNIO DE 2014

    GNERO CALIDAD ENE $/M2 FEB $/M2 MAR $/M2 ABR $/M2 MAY $/M2 JUN $/M2 % (a)

    Vivienda Unifamiliar

    Baja 6,054 6,126 6,139 6,152 6,139 6,113 -0.42%

    Media 7,693 7,765 7,807 8,050 7,991 7,947 -0.55%

    Alta 8,871 8,917 8,945 9,067 9,028 8,999 -0.32%

    Vivienda Multifamiliar

    Baja 5,098 5,268 5,285 5,314 5,278 5,276 -0.04%

    Media 7,366 7,483 7,503 7,968 7,908 7,897 -0.14%

    Alta 10,703 10,863 10,934 11,050 10,989 10,994 0.05%

    OficinasBaja 6,182 6,250 6,288 6,341 6,305 6,307 0.03%

    Media 7,820 7,956 8,036 8,110 8,093 8,104 0.14%

    Alta 9,164 9,232 9,278 9,357 9,321 9,322 0.01%

    EstacionamientosBaja 3,780 3,807 3,851 3,862 3,876 3,879 0.08%

    Media 3,076 3,125 3,128 3,191 3,136 3,140 0.13%

    Alta 5,202 5,278 5,423 5,322 5,455 5,464 0.16%

    HotelBaja 6,847 6,956 6,994 7,097 7,053 7,020 -0.47%

    Media 9,711 9,965 9,984 10,251 10,178 10,159 -0.19%

    Alta 16,072 16,114 16,152 16,381 16,301 16,316 0.09%

    EscuelaBaja 4,083 4,110 4,135 4,189 4,152 4,120 -0.77%

    Media 6,381 6,423 6,463 6,548 6,490 6,439 -0.79%

    Alta 10,145 10,213 10,276 10,410 10,318 10,238 -0.78%

    Naves Industriales

    Baja 3,590 3,685 3,750 3,737 3,724 3,734 0.27%

    Media 5,108 5,278 5,455 5,466 5,422 5,391 -0.57%

    Alta 10,221 10,548 10,765 10,826 10,760 10,701 -0.55%

    NOTA : LOS COSTOS POR m INCLUYEN LOS SIGUIENTES PARAMETROS:

    Se encuentran actualizados al mes inmediato anterior a la Edicin correspondiente y reflejan la investigacin validada hasta el da 20 de cada mes

    Todos incluyen Costo Directo, Indirecto, Utilidad, Licencias y Costo del proyecto aproximado

    En el caso de Vivienda incluyen el IVA correspondiente a los materiales

    Los valores son promedio directo de diversos modelos especficos, analizados con base a la investigacin de precios que realiza Bimsa a fechas determinadas

    El porcentaje se refiere al comportamiento de los dos ltimos meses %(a)

    Para mayor detalle consulte la informacin Valuador de Bimsa Reports

    Fuente : BIMSA REPORTS, S.A DE C.V.

    ltima Actualizacin: Julio de 2014. Prxima Actualizacin: Noviembre de 2014.

    Los datos aqu contenidos se presentan exclusivamente como informacin, por lo que no podrn ser utilizados como sustento de avalos o estudios. Aclaraciones al telfono (0155) 2581-2160, dichos datos son reproducidos exclusivamente en Boletnes y en las Paginas de Internet CMIC, con la autorizacin de BIMSA REPORTS, S.A. DE C.V.

    Estamos a sus rdenes para mayor informacin:Ing. Rafael Lpez Torres 01 (55) 5424-7417Ing. Sofia Espinosa Maldonado 01 (55) 5424-7400 Ext. 7207

    O cualquier comentario o sugerencia favorde completar el siguiente formulario:

    Page 1 of 2CMIC - Costos por m2 de Construccin

    27/08/2014http://www.cmic.org/comisiones/Tematicas/costosyp/Costom2/Bimsa/costom2.htm

  • Cmara Mexicana de la Industria de la Construccin - Todos los derechos reservados 2014.

    Page 2 of 2CMIC - Costos por m2 de Construccin

    27/08/2014http://www.cmic.org/comisiones/Tematicas/costosyp/Costom2/Bimsa/costom2.htm