GOBIERNO AUTONOMO MUNICIPAL DE COROICO PLANILLA CONTRATO MODIFICATORIO No1 PROYECTO : CONSTRUCCION DE CUBIERTA METALICA U.E. NUCLEO SAN PABLO CÓDIGO SISIN Nº. COMUNIDAD : SAN PABLO CONTRATISTA : INGENIERIA & CONSTRUCCION JADIEL INVITACIÓN : GAMC ANPE OBRAS 09/2013 PAGINA No.1 ÍTEM DESCRIPCIÓN UNIDAD CANTIDADES Y MONTOS DE CONTRATO CANTIDADES Y MONTOS DE VARIACIÓN CANTIDADES Y MONTOS REQUERIDOS CANTIDAD P.U. TOTAL CANTIDAD P.U. TOTAL CANTIDAD P.U. TOTAL TINGLADO 1 INSTALACION DE FAENAS glb. 1 890.54 890.54 0.00 890.54 0.00 1.00 890.54 890.54 2 LETRERO DE OBRA DE ESTRUCTURA Y PARANTE METAL pza 1 915.25 915.25 0.00 915.25 0.00 1.00 915.25 915.25 3 REPLANTEO Y TRAZADO glb. 1 631.59 631.59 0.00 631.59 0.00 1.00 631.59 631.59 4 LIMPIEZA GENERAL DE LA OBRA glb. 53.55 54.05 2,894.38 -52.55 54.05 -2,840.33 1.00 54.05 54.05 5 PLAQUETA CONMEMORATIVA DE 0,6*0,40 pza. 6.3 316.06 1,991.18 -5.30 316.06 -1,675.12 1.00 316.06 316.06 6 EXCAVACION COMUN P/ESTRUCTURAS m3 9.45 2539.8 24,001.11 62.24 2,539.80 158,064.45 71.69 2,539.80 182,078.26 7 RELLENO Y COMPACTADO DE TIERRA (MANUAL) m3 22.8 3353.61 76,462.31 34.14 3,353.61 114,492.25 56.94 3,353.61 190,954.55 8 CARPETA DE HORMIGON POBRE m2 5.12 3375.48 17,282.46 17.38 3,375.48 58,665.84 22.50 3,375.48 75,948.30 9 ZAPATAS DE H°A° m3 33.77 51.09 1,725.31 -25.67 51.09 -1,311.48 8.10 51.09 413.83 10 COLUMNAS DE H° A° m3 7 9120.46 63,843.21 2.00 9,120.46 18,240.92 9.00 9,120.46 82,084.13 11 EMPEDRADO PARA REPARACION DE GRADERIA m2 825 44.42 36,646.50 -782.60 44.42 -34,763.09 42.40 44.42 1,883.41 12 ANCLAJE DE EMPALME EN COLUMNAS DE HoAo pza. 898.59 77.59 69,721.60 -886.59 77.59 -68,790.52 12.00 77.59 931.08 13 CERCHA CON PERFIL METALICO pza. 33.2 59.51 1,975.73 -26.20 59.51 -1,559.16 7.00 59.51 416.57 14 SISTEMA DE TENSORES 16 MM (PROV. COL) ml 12 616.17 7,394.04 163.80 616.17 100,928.65 175.80 616.17 108,322.69 15 CUB. TRAPEZOIDAL ZING/ALUM N°28 m2 66 107.95 7,124.70 620.96 107.95 67,032.63 686.96 107.95 74,157.33 16 CORREAS CON PERFIL METALICO ml. 35.52 188.34 6,689.84 573.88 188.34 108,084.56 609.40 188.34 114,774.40 17 CUMBRERA CALAMINA PLANA N° 28 ml. 6 1903.22 11,419.32 21.70 1,903.22 41,299.87 27.70 1,903.22 52,719.19 18 CANALETA DE CALAMINA N°28 ml. 1 255.5 255.50 54.40 255.50 13,899.20 55.40 255.50 14,154.70 19 BAJANTE DE TUBERIA PVC 4" ml. 1 227.8 227.80 23.18 227.80 5,280.40 24.18 227.80 5,508.20 NUEVOS ITEMS 20 RETIRO DE ESCOMBROS EN CARRETILLA <100M glb 0 120.33 0.00 1.00 120.33 120.33 1.00 120.33 120.33 21 EXCAVACION ZANJAS m3 0 40.79 0.00 7.86 40.79 320.61 7.86 40.79 320.61 22 PROV. Y TENDIDO TUB. DESAGUE PVC D=4" ml 0 319.62 0.00 52.40 319.62 16,748.09 52.40 319.62 16,748.09 23 CAMARA DE REGISTRO 0.40X0.40 pza 0 180.04 0.00 6.00 180.04 1,080.24 6.00 180.04 1,080.24 24 TABLERO PARA UN TERMICO BIPOLAR pza 0 915.99 0.00 1.00 915.99 915.99 1.00 915.99 915.99 25 REFLECTORES ALURO METALICO 400 BATIOS pza 0 98.27 0.00 4.00 98.27 393.08 4.00 98.27 393.08 26 REFLECTORES ALURO METALICO 400 BATIOS pza 0 101.98 0.00 4.00 101.98 407.92 4.00 101.98 407.92 TOTAL 332,092.37 595,035.33 927,140.39 AJUSTE POR REDONDEO 0.00 0.00 0.00 TOTAL AUTORIZADO 332,092.37 595,035.33 927,140.39 MONTO DEL CONTRATO MODIFICATORIO 927,140.39 SON : Trescientos Treinta y Un Mil Novecientos Veintitres con 61/100 Bolivianos EL MONTO AUTORIZADO CON CONTRATO MODIFICATORIO ASCIENDE A : Bs. 927,140.39 CON ESTE CONTRATO MODIFICATORIO, EL MONTO DE CONTRATO ORIGINAL ASCIENDE EN : 179.18 % SUPERVISOR DE OBRA EMPRESA FISCAL DE OBRAS Vo Bo ALCALDE

Upload: remberto-choque-arroyo

Post on 12-Dec-2015

11 views

Category:

Documents


0 download

DESCRIPTION

com. metric

TRANSCRIPT

Page 1: COMPUTOS METRICOS  MUNAYPATA

GOBIERNO AUTONOMO MUNICIPAL DE COROICO

PLANILLA CONTRATO MODIFICATORIO No1

PROYECTO : CONSTRUCCION DE CUBIERTA METALICA U.E. NUCLEO SAN PABLO CÓDIGO SISIN Nº.

COMUNIDAD : SAN PABLO

CONTRATISTA : INGENIERIA & CONSTRUCCION JADIEL INVITACIÓN : GAMC ANPE OBRAS 09/2013

PAGINA No.1

ÍTEM DESCRIPCIÓN UNIDADCANTIDADES Y MONTOS DE CONTRATO CANTIDADES Y MONTOS DE VARIACIÓN CANTIDADES Y MONTOS REQUERIDOS

CANTIDAD P.U. TOTAL CANTIDAD P.U. TOTAL CANTIDAD P.U. TOTAL

TINGLADO

1 INSTALACION DE FAENAS glb. 1 890.54 890.54 0.00 890.54 0.00 1.00 890.54 890.54

2 LETRERO DE OBRA DE ESTRUCTURA Y PARANTE pza 1 915.25 915.25 0.00 915.25 0.00 1.00 915.25 915.25

3 REPLANTEO Y TRAZADO glb. 1 631.59 631.59 0.00 631.59 0.00 1.00 631.59 631.59

4 LIMPIEZA GENERAL DE LA OBRA glb. 53.55 54.05 2,894.38 -52.55 54.05 -2,840.33 1.00 54.05 54.05

5 PLAQUETA CONMEMORATIVA DE 0,6*0,40 pza. 6.3 316.06 1,991.18 -5.30 316.06 -1,675.12 1.00 316.06 316.06

6 EXCAVACION COMUN P/ESTRUCTURAS m3 9.45 2539.8 24,001.11 62.24 2,539.80 158,064.45 71.69 2,539.80 182,078.26

7 RELLENO Y COMPACTADO DE TIERRA (MANUAL) m3 22.8 3353.61 76,462.31 34.14 3,353.61 114,492.25 56.94 3,353.61 190,954.55

8 CARPETA DE HORMIGON POBRE m2 5.12 3375.48 17,282.46 17.38 3,375.48 58,665.84 22.50 3,375.48 75,948.30

9 ZAPATAS DE H°A° m3 33.77 51.09 1,725.31 -25.67 51.09 -1,311.48 8.10 51.09 413.83

10 COLUMNAS DE H° A° m3 7 9120.46 63,843.21 2.00 9,120.46 18,240.92 9.00 9,120.46 82,084.13

11 EMPEDRADO PARA REPARACION DE GRADERIA m2 825 44.42 36,646.50 -782.60 44.42 -34,763.09 42.40 44.42 1,883.41

12 ANCLAJE DE EMPALME EN COLUMNAS DE HoAo pza. 898.59 77.59 69,721.60 -886.59 77.59 -68,790.52 12.00 77.59 931.08

13 CERCHA CON PERFIL METALICO pza. 33.2 59.51 1,975.73 -26.20 59.51 -1,559.16 7.00 59.51 416.57

14 SISTEMA DE TENSORES 16 MM (PROV. COL) ml 12 616.17 7,394.04 163.80 616.17 100,928.65 175.80 616.17 108,322.69

15 CUB. TRAPEZOIDAL ZING/ALUM N°28 m2 66 107.95 7,124.70 620.96 107.95 67,032.63 686.96 107.95 74,157.33

16 CORREAS CON PERFIL METALICO ml. 35.52 188.34 6,689.84 573.88 188.34 108,084.56 609.40 188.34 114,774.40

17 CUMBRERA CALAMINA PLANA N° 28 ml. 6 1903.22 11,419.32 21.70 1,903.22 41,299.87 27.70 1,903.22 52,719.19

18 CANALETA DE CALAMINA N°28 ml. 1 255.5 255.50 54.40 255.50 13,899.20 55.40 255.50 14,154.70

19 BAJANTE DE TUBERIA PVC 4" ml. 1 227.8 227.80 23.18 227.80 5,280.40 24.18 227.80 5,508.20

NUEVOS ITEMS

20 RETIRO DE ESCOMBROS EN CARRETILLA <100M glb 0 120.33 0.00 1.00 120.33 120.33 1.00 120.33 120.33

21 EXCAVACION ZANJAS m3 0 40.79 0.00 7.86 40.79 320.61 7.86 40.79 320.61

22 PROV. Y TENDIDO TUB. DESAGUE PVC D=4" ml 0 319.62 0.00 52.40 319.62 16,748.09 52.40 319.62 16,748.09

23 CAMARA DE REGISTRO 0.40X0.40 pza 0 180.04 0.00 6.00 180.04 1,080.24 6.00 180.04 1,080.24

24 TABLERO PARA UN TERMICO BIPOLAR pza 0 915.99 0.00 1.00 915.99 915.99 1.00 915.99 915.99

25 REFLECTORES ALURO METALICO 400 BATIOS pza 0 98.27 0.00 4.00 98.27 393.08 4.00 98.27 393.08

26 REFLECTORES ALURO METALICO 400 BATIOS pza 0 101.98 0.00 4.00 101.98 407.92 4.00 101.98 407.92

TOTAL 332,092.37 595,035.33 927,140.39

AJUSTE POR REDONDEO 0.00 0.00 0.00

TOTAL AUTORIZADO 332,092.37 595,035.33 927,140.39

MONTO DEL CONTRATO MODIFICATORIO 927,140.39 SON : Trescientos Treinta y Un Mil Novecientos Veintitres con 61/100 Bolivianos

EL MONTO AUTORIZADO CON CONTRATO MODIFICATORIO ASCIENDE A : Bs. 927,140.39

CON ESTE CONTRATO MODIFICATORIO, EL MONTO DE CONTRATO ORIGINAL ASCIENDE EN : 179.18 %

SUPERVISOR DE OBRA EMPRESA FISCAL DE OBRAS Vo Bo ALCALDE

Page 2: COMPUTOS METRICOS  MUNAYPATA

GOBIERNO AUTONOMO MUNICIPAL DE COROICO

PLANILLA CONTRATO MODIFICATORIO No1

RESUMEN DE LA PROPUESTA - CONTRATO MODIFICATORIO N° 1

PROYECTO : CONSTRUCCION DE CUBIERTA METALICA U.E. NUCLEO SAN PABLO

COMUNIDAD : SAN PABLO

CONTRATISTA : INGENIERIA & CONSTRUCCION JADIEL

DETALLE UNIDAD

ESTIMACIÓN DE PRESUPUESTO

MONTO CONTRATO CONTRATO MODIFICATORIO Nº.1 MONTO REQUERIDO

CONSTRUCCION DE CUBIERTA METALICA U.E. NUCLEO SAN PABLO GLB 332,092.37 595,035.33 927,140.39

SUPERVISOR DE OBRA EMPRESA FISCAL DE OBRAS Vo Bo ALCALDE

Page 3: COMPUTOS METRICOS  MUNAYPATA

NUEVOS COMPUTOS METRICOS

Proyecto: CONSTRUCCION TINGLADO Y POLIFUNCIONAL U.E. MUNAYPATA (COROICO)

Ubicación: COROICO COMUNID MUNAYPATA

No DESCRIPCION Unid. EJE Cant.

DIMENSIONES [m]AREA VOLUMEN

PARCIAL TOTALancho largo altura

A B C D=AxB V=AxBxC

MOD. OBRAS COMPLEMENTARIAS1 INSTALACION DE FAENAS glb. TOTAL : 1.00

1 1.00 1.00

2 pza TOTAL : 1.00

1 1.00 1.00

3 REPLANTEO Y TRAZADO glb. TOTAL : 1.00

1 1.00 1.00

4 glb. TOTAL : 1.00

1 1.00

5 pza. TOTAL : 1.00

1 1.00

MOD. TINGLADO

6 m3 TOTAL : 71.69

ZAPATAS eje 1 A,B,C,D,E,F 6 1.50 1.50 2.60 5.85 35.10

eje 2 A,B,C,D,E,F 6 1.50 1.50 2.71 6.10 36.59

7 m3 TOTAL : 56.94

ZAPATAS AREA TOTAL 1 1.00 1.00 1.00 71.69 1.00 71.69

Descuento carpeta de H° eje 1 y 2 A,B,C,D,E,F 1 1.13 -1.13

Descuento Zapata eje 1 y 2 A,B,C,D,E,F 1 8.10 -8.10

Descuento columnas eje 1= A,B,C,D,E,F -12 3.72 -3.72

Descuento columnas eje 2= A,B,C,D,E,F -12 1.80 -1.80

8 m2 TOTAL : 22.50

ZAPATAS eje 1=A,B,C,D,E,F 6 1.50 1.50 2.25 13.50

eje= 2 A,B,C,D,E,F 6 1.50 1.00 1.50 9.00

9 ZAPATAS DE H°A° m3 TOTAL : 8.10Volumen Prisma Rectangular eje 1= A,B,C,D,E,F 6 1.50 1.50 0.30 0.67 4.05

volumen Priramide Truncada Eje 2= A,B,C,D,E,F 6 1.50 1.50 0.30 0.67 4.05

10 COLUMNAS DE H° A° m3 TOTAL : 9.00

ZAPATAS eje 1= A,B,C,D,E,F 6 0.30 0.50 4.20 0.63 3.78

eje 2= A,B,C,D,E,F 6 0.30 0.50 5.80 0.87 5.22

11 VIGA DE H° A° m3 TOTAL : 4.04

Viga Tipo 20x30 cm eje 1 5 0.20 4.49 0.30 0.27 1.35

Viga Tipo 20x30 cm eje 2 5 0.20 4.49 0.30 0.27 1.35

Viga Tipo 20x30 cm eje 2 (viga de cimentacion) 5 0.20 4.49 0.30 0.27 1.35

12 pza. TOTAL : 12.00

12 12.00

13 pza. TOTAL : 7.00

7 7.00

LETRERO DE OBRA DE ESTRUCTURA Y PARANTE METALICO

LIMPIEZA GENERAL DE LA OBRA

PLAQUETA CONMEMORATIVA DE 0,6*0,40

EXCAVACION COMUN P/ESTRUCTURAS

RELLENO Y COMPACTADO DE TIERRA (MANUAL)

CARPETA DE HORMIGON POBRE

ANCLAJE DE EMPALME EN COLUMNAS DE HoAo

CERCHA CON PERFIL METALICO

Page 4: COMPUTOS METRICOS  MUNAYPATA

14 ml TOTAL : 175.80

6 29.30 29.30 175.80

15 m2 TOTAL : 686.96

1 12.40 27.70 343.48 343.48

1 12.40 27.70 343.48 343.48

16 ml. TOTAL : 609.40

22 27.70 609.40

17 ml. TOTAL : 27.70

1 27.70 27.70

18 CANALETA DE CALAMINA N°28 ml. TOTAL : 55.40

2 27.70 55.40

19 BAJANTE DE TUBERIA PVC 4" ml. TOTAL : 24.18

eje 1 3 2.34 7.02

eje 2 3 5.72 17.16

20 glb TOTAL : 1.00

1 1.00 1.00 1.00 1.00 1.00 1.00

MOD. INSTALACION PLUVIAL

21 EXCAVACION ZANJAS m3 TOTAL : 7.86

, eje 2 1 0.30 26.20 0.50 3.93 3.93

eje 1 1 0.30 26.20 0.50 3.93 3.93

22 ml TOTAL : 52.40

eje 1 1 26.20 26.20

eje 2 1 26.20 26.20

23 pza TOTAL : 6.00

6 6.00

MOD. INSTALACION ELECTRICA

24 pza TOTAL : 1.00

1 1.00

25 pza TOTAL : 4.00

4 4.00

SISTEMA DE TENSORES 16 MM (PROV. COL)

CUB. TRAPEZOIDAL ZING/ALUM N°28

CORREAS CON PERFIL METALICO

CUMBRERA CALAMINA PLANA N° 28

RETIRO DE ESCOMBROS EN CARRETILLA <100M

PROV. Y TENDIDO TUB. DESAGUE PVC D=4"

CAMARA DE REGISTRO 0.40X0.40

TABLERO PARA UN TERMICO BIPOLAR

REFLECTORES ALURO METALICO 400 BATIOS