hosni mubarak abdel latif fahmy -...

5
Ayman Kamal Mohammed Khedr Tel.: +201144238633 / +201006261948/+201284079110 E-mail:[email protected] Objective: Obtain a challenging position in the area of computer software engineering and electric power engineering. Education: Bachelor of Engineering: University : Zagazig Faculty : Faculty of Engineering. Department : Electric power and machine. Graduation year : 2003. Graduation Grade : Pass. Project Grade : Power quality & harmonic filtering &power factor improvement (Excellent). Experience: From Apr 2006 till now: Company: Egyptian Maintenance Company (E.M.C) Position: Electrical & control Engineer Location: Power station of Belayim Petroleum Company (PETROBEL) at Abu Rudeis fields as a representative of EMC. Responsibilities: Operation and Maintenance at the station with different kind of turbines : Nuovo Pignone Gas turbines (MS 3002J, Frame 3) o Speedtronic TM Mark II, Mark VI (Control System) General Electric Gas turbines (GE 10) o Speedtronic TM Mark VI (Control System) Sulzer Gas turbines (Type 1)

Upload: others

Post on 12-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hosni Mubarak Abdel Latif Fahmy - Rp-egypt.comrp-egypt.com/candidates/cv/9c7bce0913c9905bd69a0395b42b... · Web viewMark VI (a turbine control system by GE), capable of tracing control

Ayman Kamal Mohammed KhedrTel.: +201144238633 / +201006261948/+201284079110E-mail:[email protected]

Objective:Obtain a challenging position in the area of computer software engineering and electric power engineering.

Education: Bachelor of Engineering:

• University : Zagazig• Faculty : Faculty of Engineering.• Department : Electric power and machine.• Graduation year : 2003.• Graduation Grade : Pass.• Project Grade : Power quality & harmonic filtering &power factor improvement

(Excellent).

Experience:From Apr 2006 till now:Company: Egyptian Maintenance Company (E.M.C)Position: Electrical & control Engineer Location: Power station of Belayim Petroleum Company (PETROBEL) at Abu Rudeis fields as

a representative of EMC.Responsibilities:

• Operation and Maintenance at the station with different kind of turbines : Nuovo Pignone Gas turbines (MS 3002J, Frame 3)

o SpeedtronicTM Mark II, Mark VI (Control System)

General Electric Gas turbines (GE 10)

o SpeedtronicTM Mark VI (Control System)

Sulzer Gas turbines (Type 1)

o ManTurbo (Siemens "SIMATIC" PLC) (Control System)

• I am an experienced user of Mark VI (a turbine control system by GE), capable of tracing

control logic, making a trend, analyzing a trend…etc. I attended the Retrofit of 5 unit of

“ANSALDO” Generator driven by “Nuovo Pignone” Gas turbine (MS 3002J, Frame 3)

“Retrofit consists of: Turbine major inspection, complete replacement of Control System from

SpeedtronicTM (Mark II) to (Mark VI)” also I attended commissioning, testing & re-start up of

Page 2: Hosni Mubarak Abdel Latif Fahmy - Rp-egypt.comrp-egypt.com/candidates/cv/9c7bce0913c9905bd69a0395b42b... · Web viewMark VI (a turbine control system by GE), capable of tracing control

the upgraded (Turbo-Gen.) at (PETROBEL) co.

• I am familiar with various Synchronous Generators (ANSALDO, GENERAL ELECTRIC &

BBC) of different electric connections, protective (schemes & devices) & Excitation Systems

(Static Excitation “ANSALDO & ABB” & Digital Excitation “Basler Electric &

ANSALDO”)

• I participated in many Generator tests (Open & Short circuit, Polarization index, Megger,…etc),

also for instrument transformers “V.T’s & C.T’s” I performed (Polarity test for C.T’s, C.T’s &

V.T’s ratio,…etc.).

• I dealt different types of relays (electro-mechanical, static and microprocessor based relays [e.g. SEPAM protective relay by SCHNEIDER ELECTRIC, G60 "Gen. Management Relay by GENERAL ELECTRIC"]), motors, bearings, switch gears(siemens & Schneider), MCC's, power flow in a network, reading manuals & control drawings, supervisor system (Load Shedding and Sharing System).

• I attended the testing of a group of Siemens protective relays (static type) [Distance relay (21), Directional earth fault relay (67N), Differential relay (87T), Over current relay (51), Short Circuit relay (50)....].

• I attended the maintenance of Siemens vacuum circuit breakers with medium (10.5, 20 kV) & low voltage air circuit breakers (0.4 kv) .

• Participated in the installation of pms (power management system) for load shearing &load shedding system.

• I attended a training course in PMS (14 hours) at GS AUTOMATION Company.• I attended training for (10 hours) in “ronex MV switchgear & sepam protection relay

workshop “at Schneider electric Egypt, I have a certification for this training.From February to May 2012 : Position: electrical field Engineer (part time). Location: south Dabaa petroleum Co. (Dapetco) fieldResponsibility:

• Electrical maintenance engineer in the field which including that varieties: ᶶ 3Solar Gas Turbine Centaur-40 based on Allen Bradley PLC-5.

ᶶ ABB switchgear (3.3kv), 11kv Schneider ring power distribution network, MCC . ᶶ Step up & step down transformers, ESP & Sucker Rod wells switchboards. ᶶ 11 MV/LV SUBSTATIONS includes Medium voltage RMU, distribution transformer, low voltage Distribution panel. ᶶ Stand by diesel generators, DIESEL FIRE PUMPs system (VMFP MODEL ENGINES).

At March and April 200 9:

Page 3: Hosni Mubarak Abdel Latif Fahmy - Rp-egypt.comrp-egypt.com/candidates/cv/9c7bce0913c9905bd69a0395b42b... · Web viewMark VI (a turbine control system by GE), capable of tracing control

Company: Egyptian Maintenance Co. (EMC)Position: Project Engineer (part time). Location: Rashid petroleum Co. (RASHPETCO) fieldResponsibility:

• Carry out control panel retrofit for Solar Gas Turbine Centaur-40 from Allen Bradley PLC-5 with TT2000 Viewer to new Allen Bradley RsLogix 5000, 55L61 Processor Family, With TT4000 HMI Turbine Viewer for part time.

At December 2009:Company: Egyptian Maintenance Co. (EMC)Position: Project Engineer (part time). Location: Qarun Petroleum Company (QPC)) karama fieldResponsibility:

• Participating in construction, commissioning and start up for Solar Gas Turbine Centaur-40 new Allen Bradley RsLogix 5000, 55L61 Processor Family, With TT4000 HMI Turbine Viewer for part time.

From Oct 2003 till Apr 2006 : Company: UTILTY Company for power and control systems.Position: Electrical Engineer. Location: The tenth of Ramadan city.Responsibility:

• Design and execution for power and control panel.• Sales department.• I attended a project for electrical installation at CECIL hotel at Alexandria as a sub-contractor

of ALKAN network Company.

Computer Skills: • Microsoft word.• Microsoft excel.• Microsoft power point.• Internet.

Languages:• Arabic : Native Language.• English : Reading & Speaking & Listening (Excellent) • French : Fair.

Personal Data:

Gender : Male.Date of birth : 08.04.1979Place of birth : Alsharkia - Egypt.Nationality : Egyptian.Religion : MuslimMilitary status : ExemptedMarital Status : Married.

Address : 33,mohammed ibraheem st Hadayk Helwan .

Page 4: Hosni Mubarak Abdel Latif Fahmy - Rp-egypt.comrp-egypt.com/candidates/cv/9c7bce0913c9905bd69a0395b42b... · Web viewMark VI (a turbine control system by GE), capable of tracing control

References: References and transcripts will be supplied upon request.

(For more details see faculty courses details).