graphic cv rodrigo rieiro díaz

36
2 4 5 6 10 14 16 17 18 19 20 24 26 27 28 29 30 31 32 INDEX /workExperience Laboratory and logictics building of the Bispebjerg Hos- pital REVIT modelling, architectural visualisation and construc- tion documents Youth + Family Housing in Copenhagen Architectural visualisation and design Gäddorna Office Building Architectural visualisation and design New sport facilities for the school in Elsinore REVIT modelling, architectural visualisation and construc- tion documents Rosenhøj transformation REVIT modelling, architectural visualisation and construc- tion documents Canopy for the Music Plaza Construction parametric design with Grasshopper and construction documents. Extension of the Tønder City Hall Architectural visualisation “Sustainable Public Housing of the Future” Architectural visualisation Stockholm pavilions “Kalejdoskop” Architectural visualisation Biobío Theater Competition documents Transportation hub in Logroño Construction documents San Pablo CEU High School Working project development and on-site construction management New typology of social housing Competition documents Social housing in El Porvenir Competition documents /personalWork Over-casted summer in La Raya Workshop organisation and management /academicResearch Thermodynamic Prototypological Fields Assisting teaching, exhibition and publications editing coordinator Vakko Fashion Center Landscape Model making, competition documents Public baths Kompass Model making, competition documents Neo-kasbah in the Golden Horn Master’s thesis CPH 2015 GRAPHIC CV RODRIGO RIEIRO DÍAZ M. Architect

Upload: rodrigo-rieiro

Post on 22-Jul-2016

242 views

Category:

Documents


5 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Graphic CV Rodrigo Rieiro Díaz

2

4

5

6

10

14

16

17

18

19

20

24

26

27

28

29

30

31

32

INDEX

/workExperience

Laboratory and logictics building of the Bispebjerg Hos-pitalREVIT modelling, architectural visualisation and construc-tion documents

Youth + Family Housing in CopenhagenArchitectural visualisation and designGäddorna Office BuildingArchitectural visualisation and designNew sport facilities for the school in ElsinoreREVIT modelling, architectural visualisation and construc-tion documentsRosenhøj transformationREVIT modelling, architectural visualisation and construc-tion documentsCanopy for the Music PlazaConstruction parametric design with Grasshopper and construction documents.

Extension of the Tønder City HallArchitectural visualisation“Sustainable Public Housing of the Future”Architectural visualisationStockholm pavilions “Kalejdoskop”Architectural visualisation

Biobío TheaterCompetition documentsTransportation hub in LogroñoConstruction documents

San Pablo CEU High SchoolWorking project development and on-site construction managementNew typology of social housingCompetition documentsSocial housing in El PorvenirCompetition documents

/personalWork

Over-casted summer in La RayaWorkshop organisation and management

/academicResearch

Thermodynamic Prototypological FieldsAssisting teaching, exhibition and publications editing coordinator

Vakko Fashion Center LandscapeModel making, competition documentsPublic baths KompassModel making, competition documents

Neo-kasbah in the Golden HornMaster’s thesis

CPH 2015

GRAPHIC CVRODRIGO RIEIRO DÍAZ

M. Architect

Page 2: Graphic CV Rodrigo Rieiro Díaz

Laboratory and logistics building of the Bispebjerg HospitalMikkelsen Arkitekter Position: M. Arch.REVIT modelling, architectural visualisation and construction documentsCopenhagen 2015Ongoing construction

/wE

2

First building of the compre-hensve development of the New Hospital and Psychiatric of Bispebjerg. This project consists of 9.500 m2 of labora-tories, logistic and storage faci-lities, as well as the research laboratories for the Bispebjerg Hospital. The project brings a very challengung task with great technical and programa-tic demands.

2

Page 3: Graphic CV Rodrigo Rieiro Díaz

3

The new laboratory and logis-tics building for the Bispebjerg Hospital will play a crucial role in the operation and efficiency of the hospiral and psychiatry

which will be already in use in 2017. Along with its own

demands, the building has to contribute to the quality of the surrounding city, as the exis-

ting hospital area does.

21

Page 4: Graphic CV Rodrigo Rieiro Díaz

Youth + Family Housing in CopenhagenMikkelsen ArkitekterPosition: M. Arch.Architectural visualization and designCopenhagen 2015Sketching phase

Sketching design for the develpment of a longitudinal housing

block in a former indus-trial area of Copenha-

gen. It convines a tower of family apartments

and a horizontal block of youth housing (ung-

domsboliger).

Page 5: Graphic CV Rodrigo Rieiro Díaz

Gäddorna Office BuildingDorte Mandrup ArkitelterPosition: M. Arch.Architectural visualization and designMalmø, Sweden 2008Sketching phase

Office building, part of a vast new development in one for-mer harbour area of the Sw-dish city of Malmø. Different studies on window size and materials , facade materials and materials and geometry

for building base and roof were conducted with the help of rendering software tools, in order to make design choices and envision new possibilities during the sketching phase of

the project.

29

Tags materialegylden perforeret med et tilfældigt mønster (nr. 74)

550 GÄDDORNA

Rammes geometri

all frames equal (nr. 78)extra rotated balc. (nr. 70)inverted funnel 4 (nr. 49)

all frames (nr. 77)rotated balc. (nr. 69)inverted funnel 3 (nr. 48)

to all directions (nr.72)flat bal. (nr. 68)inverted funnel 2 (nr. 47)funnel balcony (nr. 45)glas frame (nr. 43)rotated frame (nr. 41)flipflap windows (nr. 27)

sharper balc. (nr. 67)inverted funnel (nr. 46)funnel glas balc. (nr. 44)ext. rotated frame (nr. 42)pop-up wind. (nr. 28)balconies (nr. 26) extra sharper balc. (nr. 71)

550 GÄDDORNA

Rammes geometri

all frames equal (nr. 78)extra rotated balc. (nr. 70)inverted funnel 4 (nr. 49)

all frames (nr. 77)rotated balc. (nr. 69)inverted funnel 3 (nr. 48)

to all directions (nr.72)flat bal. (nr. 68)inverted funnel 2 (nr. 47)funnel balcony (nr. 45)glas frame (nr. 43)rotated frame (nr. 41)flipflap windows (nr. 27)

sharper balc. (nr. 67)inverted funnel (nr. 46)funnel glas balc. (nr. 44)ext. rotated frame (nr. 42)pop-up wind. (nr. 28)balconies (nr. 26) extra sharper balc. (nr. 71)

550 GÄDDORNA

Tags materialegylden perforeret med et tilfældigt mønster (nr. 74)

550 GÄDDORNA

Tags materiale550 GÄDDORNA

pearl cladding (nr. 82)

white ceramic tiles (nr. 76)golden lattice 2 (nr. 64)

golden random lattice (nr. 74)concrete lattice 1 (nr. 63)

golden pixel lattice (nr. 73)golden lattice 1 (nr. 62)

pearl lattice 2 (nr. 65)white ceramic lattice 1 (nr. 61)

Tags materiale550 GÄDDORNA

pearl cladding (nr. 82)

white ceramic tiles (nr. 76)golden lattice 2 (nr. 64)

golden random lattice (nr. 74)concrete lattice 1 (nr. 63)

golden pixel lattice (nr. 73)golden lattice 1 (nr. 62)

pearl lattice 2 (nr. 65)white ceramic lattice 1 (nr. 61)

Page 6: Graphic CV Rodrigo Rieiro Díaz

New Sport facilities for the School in ElsinoreEffekt Arkitekter Position: M. Arch.REVIT modelling, architectural visualisation and construction documentsElsinore 2014Ongoing construction

The city school project com-bines learning facilities with urban development and public space in Elsinore, Denmark, by integrating many smaller projects into one. A playful learning city, that combines indoor and outdoor facilities, school life and city culture.This stage contains new sport facilities and public spaces.

6

Page 7: Graphic CV Rodrigo Rieiro Díaz

7

Page 8: Graphic CV Rodrigo Rieiro Díaz

8

Page 9: Graphic CV Rodrigo Rieiro Díaz

9

Page 10: Graphic CV Rodrigo Rieiro Díaz

Rosenhøj TransformationEffekt Arkitekter Position: M. Arch.REVIT modelling, architectural visualisation and construction documentsÅrhus 2013Ongoing construction

Far-reaching transformation of Rosenhøj - a social housing area of 1100 homes in Viby South, Århus. It is a holistic

plan with comprehensive transformation of urban space, infrastructure, facades, access

routes, new features, and the establishment of Europe’s

largest urban solar park on the roofs of all 27 blocks which would make the area more

than self-sustaining in terms of energy consumption.

10

Page 11: Graphic CV Rodrigo Rieiro Díaz

11

Page 12: Graphic CV Rodrigo Rieiro Díaz

12

Page 13: Graphic CV Rodrigo Rieiro Díaz

13

Page 14: Graphic CV Rodrigo Rieiro Díaz

Canopy for the Music PlazaEffekt Arkitekter Position: M. Arch.Construction parametric design with Grasshopper and construction documents.Copenhagen 2015Ongoing construction

The Music Plaza will beco-me a central setting on

Amager, Copenhagen for music, cultural life, events

and city life in general. The project is based

on existing institutions and activities and has

been developed through dialogues with the users. A roof creates an outdoor

covered event space, and becomes a landmark of

the area..

Page 15: Graphic CV Rodrigo Rieiro Díaz

15

Page 16: Graphic CV Rodrigo Rieiro Díaz

Extension of the Tønder City HallNathan Romero Arkitekter + Ignacio FosPosition: Freelance M. Arch.Architectural visualisationTønder 2013Competition. Awarded

The horizontal play that characterizes Halldor

Gunnløgsson’s building is enhanced and activated

by the cylindrical form, se-lected to harmonize with

the water tower, which is exactly twice as hight. “The jury is enthusiastic

about the poetry and elegance of this proposal.

(...) Building expression indicates a sensitivity both

in relation with the lands-cape and the existing

building.”

16

Page 17: Graphic CV Rodrigo Rieiro Díaz

“Sustainable Public Housing of the Future”Nathan Romero Arkitekter + ACM Arquitectura Position: Freelance M. Arch.Architectural visualisationLinbjerg, Århus 2013Competition

New development in the eight kilometers north of Århus town of Lingbjerg, in close contact with nature and the city. The

complex is divided in four units of twenty to thirty families

sharing common gardens overlooking the hilly landscape

of Egådalen, to meet both the dense city qualities with the advantages of the life in the

village. All private and public spaces are designed to relate to the contiguous ancient city.

17

Page 18: Graphic CV Rodrigo Rieiro Díaz

Stockholm Pavilions “Kalejdoskop”

Nathan Romero ArkitekterPosition: Freelance M. Arch.

Architectural visualisationStockholm 2013

Competition

Like the sky or the sea, the pavilions would never look exactly the same. A pattern of partially polished steel returns a kaleidoscopic image of city and skies. This pattern would cover the whole pavilion, both opaque and glass surfaces, adding ambiguity and richness to the perception: maple leaves on a rain puddle.

18

Page 19: Graphic CV Rodrigo Rieiro Díaz

Biobío TheaterÁbalos+SentkierwiczPosition: M. Arch.Competition documentsConcepción, Chile 2012Competition. Third prize

Landform building that aims to be an ambivalent place.

The challenge of the project is to transform a rather

absorted program into a an opportunity to act as a catalyst for public life and

social interaction, a “place of the experience” linking culture and geographical

frame. An interface that, all in all, intend to transform the

experience into knowledge in the collective experience of space considered to be

the basis of a new thermodinamic beaty.

19

Page 20: Graphic CV Rodrigo Rieiro Díaz

Transportation Hub in LogroñoÁbalos + Sentkiewicz Arquitectos Position: M. Arch.Construction documentsLogroño 2011Completed

The Intermodal station is a bulge on the green belt, that appears as a small hill giving continuity and, at the same time, transforming the linearity of the belt into a great public space. The station is planned as a cave that equips the park and extends it through the inte-riors, starting from a triangular geometry that is adapted both to the topographic configura-tion of the roof and a figurative (cave) answer to functional demands.

20

Page 21: Graphic CV Rodrigo Rieiro Díaz

The project buries under-ground the train lines along their pass through Logroño

as a double opportunity to transform what usually

divides and socially segregates the city into

a green belt linking these districts and permiting the

movement through a public space, walking or by bike,

to experiment the possibility of building a new station area, understanding it as a meeting point between

landscape, architecture and environment.

Page 22: Graphic CV Rodrigo Rieiro Díaz

22

Page 23: Graphic CV Rodrigo Rieiro Díaz

Under the “hill”, the train and bus stations conform a “landform building” that

adjusts through its triangular shape both the external

organic shapes and internal constructive ones, genera-ting two cracled hypostyle

naves around the central dome that extend as caves

the public dimension of the park. The high impact

building, due to its scale and conditions, pretends

on itself to reequilibrate the central areas of the whole

city.

23

Page 24: Graphic CV Rodrigo Rieiro Díaz

San Pablo CEU High SchoolDe Lapuerta + Asensio Arquitectos Position: M. Arch.Working project development and on-site construction managementMadrid 2010Completed

Comprehensive renovation of a semi-abandoned educatio-nal facility into a private high

school in the center of Madrid. Challenging construction

management in terms of size, more than 4.000 m2, number of

workers, peaking up to above one hundred at the same time

some occasions, and especia-lly time, considering the acade-

mic schedule limitations.

24

Page 25: Graphic CV Rodrigo Rieiro Díaz

25

Page 26: Graphic CV Rodrigo Rieiro Díaz

New Typology of Social HousingDe Lapuerta + Asensio ArquitectosPosition: M. Arch.Competition documentsSao Paulo 2010Competition. First prize

Competition held by CDHU Sao Paulo for new

housing typologies in slum clearance projects. This

winning solution answers to the local weather (and its rainy season), is che-

ap, fast to mount thanks to a prefab concrete design,

and also admits future extensions along the

longitudinal axis as well as spontaneous lateral

growings.

26

Page 27: Graphic CV Rodrigo Rieiro Díaz

New Typology of Social HousingDe Lapuerta + Asensio ArquitectosPosition: M. Arch.Competition documentsSao Paulo 2010Competition. First prize

Social Housing in El PorvenirDe Lapuerta + Asensio Arquitectos

Position: M. Arch.Competition documents

Seville 2010Competition

Two hundred social housing units in El Porvenir, Seville. General disposition of the blocks follows natural pedestrian flows. U-shaped towers allow both to keep the urbanistic requirements as well as different levels of privacy in the public spaces of the project. All housing units facing two elevantions, all living rooms in the corners.

PLANTA BAJA PLANTA PRIMERA PLANTA SEGUNDA PLANTA TIPO

27

Page 28: Graphic CV Rodrigo Rieiro Díaz

Over-casted summer in La RayaUnanubeenmihabitación + IFAC

Position: PartnerWorkshop organisation and management

Villarino de los Aires, Spain 2012Completed

Collective exploration. Ephemeral structures. Infla-table construction materials. Intensification of the experien-ce. Estrangement. One of the most ubiquitous and cheap materials: the air. unanubeenmihabitacion orga-nised one of the workshops in the festival of art and construc-tion IFAC (International Festival of Art and Construction), which took place in Villarino de los Ai-res, Spain, 2-11 August, 2012.

/pW

28

Page 29: Graphic CV Rodrigo Rieiro Díaz

Thermodynamic Prototypological Fields ETSAM (Iñaki Ábalos Projects Design Teaching Unit)Position: Assistant teacher Assisting teaching, exhibition and publications editing coordinator. Madrid, 2010-11

‘Thermodynamic Prototypolical Fields:

application in the center of Madrid’ was the topic

of the Project Design Subject in hte Teaching

Unit leaded by Iñaki Ábalos at ETSAM during

the course 2010-11. Spatio-temporal coordi-nates are Madrid-2030.

Students were told firstly to build together a mapping of the area from a thermodynamic paradigm. The seven

thermodynamic fields of actuation (water, earth, air, solar radiation, mo-bility systems, building

stock recycling and urban intendency) are

the areas of opportunity to develop new proto-

typolgies to activate and challenge specific locations in the urban

core of the future city of Madrid.

Rethinking the center of Madrid from the thermody-namic pers-pective aims to modify the rutinary ways of understanding and let the development of strategies to adapt it to emergent uses and values.

/aR

29

Page 30: Graphic CV Rodrigo Rieiro Díaz

Vakko Fashion Center LandscapeSuperpool Studio + REX NYPosition: Creative InternModel making, competition documentsIstabul 2007Consultancy

Landscape design consul-tancy for the headquarters for

a Turkish fashion house—in-cluding offices, showrooms,

conference rooms, auditorium, museum, and dining hall—as well as the television studios,

radio production facilities, and screening rooms of its media

sister-company. Superpool performed as the

local landscape design consul-tancy for the renaown architec-

tural office REX New York.

Page 31: Graphic CV Rodrigo Rieiro Díaz

Public Baths KompassSuperpool StudioPosition: Creative InternModel making, competition documentsHudiksvall, Sweden 2008Competition

Historically, public baths were important public pla-

ces for a variery of experien-ces. The aim of Kompass is

to offer visitors a variety of experienceswith its various

pools, other services and unique opportunity to swim

in the sea. Bath house Kompass would

be a significant new for Hudiksvall town. It is an

opportunity for the munici-pality to offer its residents

a unique, common place to be proud of.

31

Page 32: Graphic CV Rodrigo Rieiro Díaz

A reactivation strategy for the neighborhoods of Fener

and Balat in the Golden Horn, in Istanbul, is propo-

sed following four steps:· renewal of the residential fabric (consisting on both renewal and completion)

· diversification of uses by including green fingers, a network of urban gardens

and workshops...· new commercial uses, to bring workplaces into the

mainly residential areas· renewal of the original little shops of the neighborhoodThe exercices is focused in

detail in the filling of a big residential plot which sepa-

rates Fener and Balat.

Neo-kasbah in the Golden HornETSAMPosition: Master studentFinal thesisIstabul 2009Outstanding

32

Page 33: Graphic CV Rodrigo Rieiro Díaz

For the completion of the residential fabric is considered essential to fill a large void that

separates Fener and Balatr neighborhoods. To this end,

a contemporary interpretation of the Islamic urban principles

that led to the Ottoman laws which in turn generated the

built environment of the area is one starting point of the

proposal. So are recovered certain urban invariants, such as density, privacy, the patios

network and the subtle public-private transitions.

Page 34: Graphic CV Rodrigo Rieiro Díaz

Besides the rich built context of these areas of Istanbul, its no less interesting and cha-llenging human context is con-sidered in the definition of the proposal. The classic Western middle-class housing makes little sense in this context, so it is “exploded” in a network of housing units. This reflects both the flexible contemporary housing need of the public: big extended families with their social network of relationships as their main asset.

Page 35: Graphic CV Rodrigo Rieiro Díaz

The implementation of the new residential fabric is

intended to be flexible and dynamic, growing with the

changing needa iof the users, following the same principles that lead many

people all over the world to leave a bucket protecting the exposed steelbars on

top of infinished reinforced concrete columns in many

growing housing units.35

Page 36: Graphic CV Rodrigo Rieiro Díaz

/cV

CURRICULUM VITAE

Rodrigo Rieiro Díaz

150682-4571Bergthorasgade, 15, 3.5, 2300 KBH S28229015, [email protected]

Academic and professional practice- 2015. Architect. Mikkelsen Arkitekter.- 2014-15. Ph.D. student at Statens Byggeforskningsinstitut, Aalborg Universitet København- 2012-14/2015. Architect. Effekt Arkitekter. - 2013. Freelance architect. Nathan Romero Arkitekter.- 2011-12. Architect. Ábalos+Sentkiewitz Arquitectos.- 2010-11. Assistant teacher. UPM-ETSAM. Project design.- 2010. Architect. De Lapuerta + Asensio Arquitectos.- 2007-08. Intern. Superpool Studio.

Education- 2011. Postgraduate. Master in Advanced Architectural Projects. UPM-ETSAM- 2009. Master of Architecture (M. Arch.). UPM-ETSAM- 2008. Seneca Grant. UPC-ETSAB- 2006. Erasmus Grant. BUTE- 2002. Senior Technician in Image

Language skills- Spanish. Mother tongue.- English. 106 TOEFL.- Danish. 5.modul VUF.- Catalan. B2 UPC.

Technical skillsCompetent with AutoCAD, REVIT, Photoshop, Illustrator, InDesign, Rhinoceros, VRay, Grasshopper, Processing, SketchUp and most common software for architecture.

36