17
ENCOFRADO BUZONES AGUA PARA PRUEBAS 3.1416 D H A(m2) V(M3) D D2 1.2 1.5 5.65 0.031 0.2 0.04 1.5 4 18.85 0.196 0.5 0.25 1.5 4.5 21.21 0.031 0.2 0.04 1.2 1.5 5.65 0.031 0.2 0.04 1.2 1.5 5.65 0.031 0.2 0.04 1.2 1.5 5.65 0.031 0.2 0.04

Upload: jorgemas1

Post on 29-Sep-2015

218 views

Category:

Documents


3 download

DESCRIPTION

Diseño Mezcla Concreto Buzones Al 30-12-14

TRANSCRIPT

ENCOFENCOFRADO BUZONESAGUA PARA PRUEBAS3.1416DHA(m2)V(M3)DD21.21.55.650.0310.20.041.5418.850.1960.50.251.54.521.210.0310.20.041.21.55.650.0310.20.041.21.55.650.0310.20.041.21.55.650.0310.20.04

EQUIVlt/seglt/minm3/horam3/24horaspie3/seggal/minmiles de gal/horamiles de gal/24 horas140084000504012096049.43221901331.41631954318010.82590.11482.853691 Kg/cm214.2234lb/pulg21 lb/pulg20.0703067Kg/cm21m1.422lb/pulg2Kg/cm2lb/pulg2m.c.apies de aguaatmmm de Hg0.001360.019330.135960.004460.0013161114.22341032.80830.967787600.070310.70382.306650.0680451.712lt/segm3/diapie3/segpie3/mingal/minmiles de gal/dia186.40.03532.11815.8522.8BARRAS DE ACERODenominacionDiam (pulg)A (cm2)Permetro (cm)Peso (kg/m)Denominacin actual21/40.3220.25N 8 AWG33/80.7130.5841/21.2941.0255/8251.663/42.8462.2677/83.8773.07815.184.0491 1/86.4595.08101 1/48.1910.16.42111 3/810.0611.27.95Alambre negro recocido #16N16 AWGTUBERIASPulg.mmPulg.mm6160348508200369001025038950123154010001435542105035.561640044110045.721845046115020500481200225505012502460052130054837.226650541350287005614003075058145032800601500

DISEOBuzonC.TerrenoC. de FondoLongSS CalculadoTramodesdehastadesdehastadesdehasta(m)(m/km)(m/km)1-21210.04410.0489.2448.99630.9582-BE12BE110.04810.3418.9968.60959.646.5BE1-BE2BE1BE210.34110.1438.6098.41338.805.05-45410.16610.1199.3668.82177.8574-34310.11910.1888.8218.53751.605.53-BE33BE310.18810.1798.5378.29944.405.45-65610.16610.0999.3668.82177.8576-BE46BE410.09910.0998.8218.61940.505.0BuzonesC.TerrenoH (m)TRAMOLONG.110.0440.801-230.95210.0481.052-BE159.64BE110.3411.07BE1-BE238.8BE210.1431.73BE3-344.4310.1881.653-451.6410.1191.304-577.85BE310.1791.885-677.85510.1660.806-BE440.5610.0991.28BE410.0991.481.270.2830.0068523002DNDmax Buzon (m)10060Hasta DN800 -- Di=1.2015060hasta DN1200 -- Di=1.5020080250-300100>300150

EXCAVProyectoExcavacinAlturaAltura11.201.401.211.411.511.711.611.8121.401.601.221.421.521.721.611.8131.601.801.231.431.531.731.621.8241.802.001.241.441.541.741.631.8352.002.201.251.451.551.751.641.8462.202.401.261.461.561.761.651.8572.402.601.271.471.571.771.661.8682.602.801.281.481.581.781.671.8792.803.001.291.491.591.791.681.88103.003.201.301.501.601.801.691.89113.203.401.311.511.611.811.701.90123.403.601.321.521.621.821.711.91133.603.801.331.531.631.831.721.92143.804.001.341.541.641.841.741.94154.004.201.351.551.651.851.751.95164.204.401.361.561.661.861.761.96174.404.601.371.571.671.871.771.97184.604.801.381.581.681.881.781.98194.805.001.391.591.691.891.791.99205.005.201.401.601.701.901.802.002130.101.711.9137.97221.511.721.922.00231.741.94241.751.95251.761.96261.771.97271.781.98281.791.99291.802.00301.812.01311.822.02321.832.03331.842.04341.852.05351.862.06361.872.07371.882.08381.892.09391.902.10401.912.11411.922.12421.932.13431.942.14441.952.15451.962.16461.972.17471.982.18481.992.19492.002.2086.0295.821.761.96

Hoja2CANTIDAD DE MATERIALES PARA CONSTRUCCION DE BUZONESVOLUMEN DE CONCRETO (M3)CANTIDAD DE MATERIALES3.1416F'c=210 kg/cm2 Prop: 1:2.5: 2.8F'c=280 kg/cm2 Prop: 1:1 1/2: 2 1/2F'c=175 kg/cm2 Prop: 1:2: 40.20Prof. Buzn (m)Di buzn (m)Dprom (m) (Di+2e)Vol.concreto pared (m3)Volumen losa fondo e=0.20m (m3)Volumen total (m3)Cemento (Bls)Arena (m3)Piedra 3/4" (m3)Agua (m3)Cemento (Bls)Arena (m3)Piedra 3/4" (m3)Agua (m3)Cemento (Bls)Arena (m3)Piedra 3/4" (m3)Agua (m3)1.000.801.200.62830.10050.72895.990.400.440.167.660.350.590.126.190.310.830.111.201.201.601.05560.22621.281810.530.710.770.2713.470.611.030.2010.880.541.460.191.501.201.601.31950.22621.545712.690.850.930.3316.250.741.240.2513.120.661.760.221.751.201.601.53940.22621.765614.500.971.060.3818.560.841.420.2814.990.752.020.262.001.201.601.75930.22621.985516.301.091.190.4220.870.951.600.3216.860.842.270.292.251.201.601.97920.22622.205418.111.221.320.4723.181.051.770.3518.720.932.520.322.501.201.602.19910.22622.425319.921.341.450.5225.491.161.950.3920.591.032.770.352.751.201.602.41900.22622.645221.721.461.590.5627.801.272.130.4222.461.123.020.383.001.201.602.63890.22622.865123.531.581.720.6130.121.372.300.4624.321.213.270.423.251.201.602.85890.22623.085125.331.701.850.6632.431.482.480.4926.191.313.520.453.501.201.603.07880.22623.305027.141.821.980.7034.741.582.660.5328.061.403.770.483.751.501.904.00550.35344.359035.792.402.610.9345.822.083.510.7037.001.854.970.634.001.501.904.27260.35344.626037.992.552.780.9948.622.213.720.7439.271.965.280.674.501.501.904.80660.35345.160142.372.853.101.1054.242.474.150.8243.802.195.890.755.001.501.905.34070.35345.694246.763.143.421.2159.852.724.580.9148.342.416.500.835.501.802.206.91150.50897.420560.944.094.451.5878.003.555.971.1962.993.158.471.086.001.802.207.53980.50898.048866.094.444.831.7184.603.856.471.2968.333.419.191.176.501.802.208.16820.50898.677171.254.785.211.8591.204.156.981.3973.663.689.901.267.002.002.409.67610.628310.304484.625.686.182.19108.314.938.291.6587.484.3711.761.497.502.002.4010.36730.628310.995690.296.066.602.34115.575.268.841.7693.344.6612.551.598.002.002.4011.05840.628311.686895.976.447.012.49122.845.599.401.8799.214.9513.341.698.502.002.4011.74960.628312.3779101.646.827.432.64130.105.929.961.98105.085.2514.131.799.002.002.4012.44070.628313.0691107.327.217.842.78137.376.2510.512.09110.945.5414.921.899.502.002.4013.13190.628313.7602113.007.598.252.93144.636.5811.072.20116.815.8315.701.9910.002.002.4013.82300.628314.4514118.677.978.673.08151.906.9111.622.31122.686.1316.492.091.00008.210.550.600.211 bolsa de cemento es igual a 1pie3 =0.0283168466m3Factores de proporcin F'c=210Relacin agregadosFactores de proporcin F'c=175Relacin agregadoscemento52.55441.0cemento59.42391.0arena gruesa1.59421.5arena gruesa1.48372.0Piedra1.60872.5Piedra1.42664.0agua159.88agua144.89Concreto F'c=210 kg/cm21.-Requisitos:Se quiere disear una mezcla de F'c a ser empleado en el vaceado de la zapata ,losa de fondo y cpula del reservorio.2.-Anlisis en Laboratorio:Del estudio hecho por laboratorio de transportes se obtiene los siguientes resultados de los anlisis de agregados de las muestrasN1 y N4 que encajan con las especificaciones para concreto y la N3 y N 2DESCRIPCIONCEMENTOAgregado FinoAgregado GruesoAguaa.-Peso especfico3.152.702.631.00b.-Peso seco compactado (kg/m3)1,250.001,567.001,597.001,000.0026.84c.-Tamao Mximo3/4"d.-Mdulo de fuerza3.00e.-Porcentaje de absorcin1.00%2.00%f.-Contenido de humedad0.00%0.00%3.-Asentamiento.-Segn la tabla N1 y las condiciones de colocacin a ser empleados, permiten recomendar el empleo de un asentamiento de 1" -3"4.-Tamao mximo del agregado grueso.-El agregado grueso es graduado de la malla de 3/4" a la N 4 y es adecuada por lo quese considera para entrar a las tablas un tamao mximo de 3/4"5.- Contenido de aire.-Desde que la estructura a ser localizada no va a estar expuesta a condiciones de intemperismo severoa la probabilidad de ataque por sulfatos, no ser necesario incorporar aire a la mezcla.6.-Contenido de agua.-La tabla N2 nos indica que el volumen aproximado de agua de la mezcla necesario para obtener un asentamientode 1" a 3" con un concreto sin aire incorporado en el cual se va a utilizar un agregado grueso de 3/4" de tamao mximo es de 185 lts/m37.-Contenido de aire.-De acuerdo con la tabla N2 el contenido de aire que probablemente quede atrapado con la mezcla cuando secon un agregado grueso de 3/4" de tamao mximo es de 2%8.-Relacin agua cemento.-La table N3 nos indica que la relacin agua -cemento para obtener una resistencia a los 28 dias conconcreto sin aire incorporado es 0.53.9.-Factor Cemento.-Conociendo el contenido total de agua de la mezcla y la relacin agua-cemento de la misma se puede calcularel factor cemento dividiendo el primero entre el segundo.Factor cemento: 185/0.53 = 349 kg/m310.-Contenido de agregado grueso.-Para un agregadoi fino de mdulo de finura de 3.00 y un agregado grueso de tamao mximo3/4" la tabla N5 indica que puede emplearse para cada metro cbico de concreto 0.64 m3 de agregado grueso seco y compactado.Agregado grueso: 0.60*1,597=958 kg.11.-Contenido de agregado fino.-Conocidas las cantidades de cemento agua y agregado que interviene en la mezcla,el material necesario para completar el m3 consistir en agregado fino y aire atrapado.Volumen slido de cemento = 0.111m3Volumen de agua: 185/1000 = 0.185 m3Volumen de aire atrapado: 2% =0.020 m3Volmen slido de agrgado grueso: (958/(2.63*1000)) = 0.364Volumen Parcial =0.680 m3Volumen slido de agrgado fino: 1-0.68=0.32 m3Peso de agrgado fino seco: 0.320*2,700=864 kg.12.-Correccin por humedad del agregadoLos porcentajes de humedad de los agregados son:0%Los aportes de humedad sern:Agregado fino: 864*0.01=8.6 ltsAgregado grueso: 958*0.02=19.20 kg.Total: 28 lts= 8.60+19.20Agua efectiva: 185+28=213 ltsPesos estimados de materiales ya corregidos por humedad del agregado:Cemento: 349 kg349Agua efectiva: 213 lts213Agregado fino: 864 kg864Agregado grueso: 958 kg958Peso Total: 2,384 kgs./m313.-Proporciones en peso349/349 : 864/349 : 958/349 :213/349 = 1: 2.5 : 2.8: 0.61c: f:g:a14.-Peso por tanda de un saco:Cemento: 1*42.5=42.5 kg/saco42.5Agua efectiva: 0.61*42.5 =26 kg/sacoAgregado fino: 2.5*42.5=106 kg/sacoAgregado grueso: 2.8*42.5=119 kg/saco15.-Conversin a Proporcin por volumenLos pesos unitarios (de los agregados) secos son:P.U.S.F: 1567/35 = 44.77 kg/pie3P.U.S.G: 1597/35 = 45.63 kg/pie31: 2.5: 2.8: 0.61Por tanto:Cemento: 1 bls =1 pie31Agua: 2626Agregado fino: 106/44.77kg/p32.4Agregado grueso: 119/45.63kg/p32.61Nota 1p3=2 latasCemento: 1 bls=1 pie3=1.85 latas2latasAgua:26 lts26ltsArena gruesa: 2.4*2latas =4.44latasPiedra chancada =2.6*2latas =4.81latasTotal9.25latas

BUZONESCANTIDAD DE MATERIALES PARA CONSTRUCCION DE BUZONESVOLUMEN DE CONCRETO (M3)CANTIDAD DE MATERIALES3.1416F'c=210 kg/cm2 Prop: 1:2.5: 2.8F'c=280 kg/cm2 Prop: 1:1 1/2: 2 1/2F'c=175 kg/cm2 Prop: 1:2: 40.20Prof. Buzn (m)Di buzn (m)Dprom (m) (Di+2e)Vol.concreto pared (m3)Volumen losa fondo e=0.20m (m3)Volumen total (m3)Cemento (Bls)Arena (m3)Piedra 3/4" (m3)Agua (m3)Cemento (Bls)Arena (m3)Piedra 3/4" (m3)Agua (m3)Cemento (Bls)Arena (m3)Piedra 3/4" (m3)Agua (m3)1.000.801.200.62830.10050.72897.81360.42090.42860.14087.660.350.590.126.190.310.830.111.001.201.600.87960.22621.105811.85520.63860.65020.213611.620.530.890.189.390.471.260.161.201.201.601.05560.22621.281813.74120.74020.75370.247613.470.611.030.2010.880.541.460.191.501.201.601.31950.22621.545716.57030.89260.90890.298616.250.741.240.2513.120.661.760.221.751.201.601.53940.22621.765618.92791.01961.03820.341118.560.841.420.2814.990.752.020.262.001.201.601.75930.22621.985521.28551.14661.16750.383620.870.951.600.3216.860.842.270.292.251.201.601.97920.22622.205423.64301.27361.29680.426123.181.051.770.3518.720.932.520.322.501.201.602.19910.22622.425326.00061.40061.42610.468625.491.161.950.3920.591.032.770.352.751.201.602.41900.22622.645228.35821.52761.55540.511127.801.272.130.4222.461.123.020.383.001.201.602.63890.22622.865130.71571.65461.68470.553530.121.372.300.4624.321.213.270.423.251.201.602.85890.22623.085133.07331.78161.81400.596032.431.482.480.4926.191.313.520.453.501.201.603.07880.22623.305035.43091.90861.94330.638534.741.582.660.5328.061.403.770.483.751.501.904.00550.35344.359046.73032.51732.56310.842245.822.083.510.7037.001.854.970.634.001.501.904.27260.35344.626049.59312.67152.72010.893748.622.213.720.7439.271.965.280.674.501.501.904.80660.35345.160155.31862.97993.03410.996954.242.474.150.8243.802.195.890.755.001.501.905.34070.35345.694261.04413.28843.34821.100159.852.724.580.9148.342.416.500.835.501.802.206.91150.50897.420579.55104.28534.36321.433678.003.555.971.1962.993.158.471.086.001.802.207.53980.50898.048886.28694.64824.73271.555084.603.856.471.2968.333.419.191.176.501.802.208.16820.50898.677193.02285.01105.10211.676491.204.156.981.3973.663.689.901.267.002.002.409.67610.628310.3044110.46885.95086.05901.9908108.314.938.291.6587.484.3711.761.497.502.002.4010.36730.628310.9956117.87836.35006.46542.1243115.575.268.841.7693.344.6612.551.598.002.002.4011.05840.628311.6868125.28786.74916.87182.2579122.845.599.401.8799.214.9513.341.698.502.002.4011.74960.628312.3779132.69737.14827.27822.3914130.105.929.961.98105.085.2514.131.799.002.002.4012.44070.628313.0691140.10687.54747.68462.5249137.376.2510.512.09110.945.5414.921.899.502.002.4013.13190.628313.7602147.51637.94658.09102.6585144.636.5811.072.20116.815.8315.701.9910.002.002.4013.82300.628314.4514154.92588.34578.49742.7920151.906.9111.622.31122.686.1316.492.091.000010.210.550.560.181 bolsa de cemento es igual a 1pie3 =0.0283168466m3Factores de proporcin F'c=210Relacin agregadosFactores de proporcin F'c=175Relacin agregadoscemento52.55441.0cemento59.42391.0arena gruesa1.59421.5arena gruesa1.48372.0Piedra1.60872.5Piedra1.42664.0agua159.88agua144.89Concreto F'c=210 kg/cm21.-Requisitos:Se quiere disear una mezcla de F'c a ser empleado en el vaceado de la zapata ,losa de fondo y cpula del reservorio.2.-Anlisis en Laboratorio:Del estudio hecho por laboratorio de transportes se obtiene los siguientes resultados de los anlisis de agregados de las muestrasN1 y N4 que encajan con las especificaciones para concreto y la N3 y N 2DESCRIPCIONCEMENTOAgregado FinoAgregado GruesoAguaa.-Peso especfico3.152.702.631.00b.-Peso seco compactado (kg/m3)1,250.001,567.001,597.001,000.00c.-Tamao Mximo3/4"d.-Mdulo de fuerza3.00e.-Porcentaje de absorcin1.00%2.00%f.-Contenido de humedad0.00%0.00%3.-Asentamiento.-Segn la tabla N1 y las condiciones de colocacin a ser empleados, permiten recomendar el empleo de un asentamiento de 1" -3"4.-Tamao mximo del agregado grueso.-El agregado grueso es graduado de la malla de 3/4" a la N 4 y es adecuada por lo quese considera para entrar a las tablas un tamao mximo de 3/4"5.- Contenido de aire.-Desde que la estructura a ser localizada no va a estar expuesta a condiciones de intemperismo severoa la probabilidad de ataque por sulfatos, no ser necesario incorporar aire a la mezcla.6.-Contenido de agua.-La tabla N2 nos indica que el volumen aproximado de agua de la mezcla necesario para obtener un asentamientode 1" a 3" con un concreto sin aire incorporado en el cual se va a utilizar un agregado grueso de 3/4" de tamao mximo es de 185 lts/m37.-Contenido de aire.-De acuerdo con la tabla N2 el contenido de aire que probablemente quede atrapado con la mezcla cuando secon un agregado grueso de 3/4" de tamao mximo es de 2%8.-Relacin agua cemento.-La table N3 nos indica que la relacin agua -cemento para obtener una resistencia a los 28 dias conconcreto sin aire incorporado es 0.53.9.-Factor Cemento.-Conociendo el contenido total de agua de la mezcla y la relacin agua-cemento de la misma se puede calcularel factor cemento dividiendo el primero entre el segundo.Factor cemento: 185/0.53 = 349 kg/m310.-Contenido de agregado grueso.-Para un agregadoi fino de mdulo de finura de 3.00 y un agregado grueso de tamao mximo3/4" la tabla N5 indica que puede emplearse para cada metro cbico de concreto 0.64 m3 de agregado grueso seco y compactado.Agregado grueso: 0.60*1,597=958 kg.11.-Contenido de agregado fino.-Conocidas las cantidades de cemento agua y agregado que interviene en la mezcla,el material necesario para completar el m3 consistir en agregado fino y aire atrapado.Volumen slido de cemento = 0.111m3Volumen de agua: 185/1000 = 0.185 m3Volumen de aire atrapado: 2% =0.020 m3Volmen slido de agregado grueso: (958/(2.63*1000)) = 0.364Volumen Parcial =0.680 m3Volumen slido de agregado fino: 1-0.68=0.32 m3Peso de agrgado fino seco: 0.320*2,700=864 kg.12.-Correccin por humedad del agregadoLos porcentajes de humedad de los agregados son:0%Los aportes de humedad sern:Agregado fino: 864*0.01=8.6 ltsAgregado grueso: 958*0.02=19.20 kg.Total: 28 lts= 8.60+19.20Agua efectiva: 185+28=213 ltsPesos estimados de materiales ya corregidos por humedad del agregado:Cemento: 349 kg433.925Agua efectiva: 213 lts184Agregado fino: 864 kg861.85Agregado grueso: 958 kg894.32Peso Total: 2,384 kgs./m313.-Proporciones en peso349/349 : 864/349 : 958/349 :213/349 = 1: 2.5 : 2.8: 0.61c: f:g:a14.-Peso por tanda de un saco:Cemento: 1*42.5=42.5 kg/saco42.5Agua efectiva: 0.61*42.5 =26 kg/sacoAgregado fino: 2.5*42.5=106 kg/sacoAgregado grueso: 2.8*42.5=119 kg/saco15.-Conversin a Proporcin por volumenLos pesos unitarios (de los agregados) secos son:P.U.S.F: 1567/35 = 44.77 kg/pie3P.U.S.G: 1597/35 = 45.63 kg/pie31: 2.5: 2.8: 0.61Por tanto:Cemento: 1 bls =1 pie31Agua: 2626Agregado fino: 106/44.77kg/p32.4Agregado grueso: 119/45.63kg/p32.61Nota 1p3=2 latasCemento: 1 bls=1 pie3=1.85 latas2latasAgua:26 lts26ltsArena gruesa: 2.4*2latas =4.44latasPiedra chancada =2.6*2latas =4.81latasTotal9.25latasConcreto F'c=280 kg/cm21.-Requisitos:Se quiere disear una mezcla de F'c para la cuba2.-Caracteristicas de los materialesSimilara a las usadas para F'c=210 kg/cm2N1 y N4 que encajan con las especificaciones para concreto y la N3 y N 2DESCRIPCIONCEMENTOAgregado FinoAgregado GruesoAguaa.-Peso especfico3.152.702.631.00b.-Peso seco compactado (kg/m3)1,250.001,567.001,597.001,000.00c.-Tamao Mximo3/4"d.-Mdulo de fuerza3.00e.-Porcentaje de absorcin1.00%2.00%f.-Contenido de humedad0.00%0.00%3.-Asentamiento.-Segn la tabla N1 de 1" -2"4.-Tamao mximo del agregado grueso.-El agregado grueso es graduado de la malla de 3/4" a la N 4 y es adecuada por lo quese considera para entrar a las tablas un tamao mximo de 3/4"5.- Contenido de aire.-No necesita6.-Contenido de agua.-La tabla N2 nos indica que el volumen aproximado de agua de la mezcla necesario para obtener un asentamientode 1" a 3" con un concreto sin aire incorporado en el cual se va a utilizar un agregado grueso de 3/4" de tamao mximo es de 185 lts/m37.-Contenido de aire atrapado.-De acuerdo con la tabla N2 el contenido de aire que probablemente quede atrapado con la mezcla cuando secon un agregado grueso de 3/4" de tamao mximo es de 2%8.-Relacin agua cemento.-La table N3 nos indica que la relacin agua -cemento para obtener una resistencia a los 28 dias conconcreto sin aire incorporado es W/C =0.499.-Factor Cemento.-Conociendo el contenido total de agua de la mezcla y la relacin agua-cemento de la misma se puede calcularel factor cemento dividiendo el primero entre el segundo.Factor cemento: 185/0.49 =378 kg10.-Contenido de agregado grueso.-Para un agregadoi fino de mdulo de finura de 3.00 y un agregado grueso de tamao mximo3/4" la tabla N5 indica que puede emplearse para cada metro cbico de concreto 0.64 m3 de agregado grueso seco y compactado.Agregado grueso: 0.64*1,597=1022 kg.1022.08kg11.-Contenido de agregado fino.-Conocidas las cantidades de cemento agua y agregado que interviene en la mezcla,el material necesario para completar el m3 consistir en agregado fino y aire atrapado.Volumen slido de cemento = 0.120m3=378/3150Volumen de agua: 185/1000 = 0.185 m3Volumen de aire atrapado: 2% =0.020 m3Volmen slido de agrgado grueso: (1022/(2.63*1000)) = 0.389Volumen Parcial =0.714 m32630Volumen slido de agrgado fino: 1-0.714=0.286 m3Peso de agrgado fino seco: 0.286*2,700=772 kg.12.-Correccin por humedad del agregadoLos porcentajes de humedad de los agregados son:0%Los aportes de humedad sern:Agregado fino hmedo: 772 kg/m3Agregado grueso hmedo: 1,032 kg/m3Aportes de Humedad:Agregado fino: 772x0.01=7.70 lts7.72Agregado grueso: 1022x0.02=20.40 lts20.44Sub Tot=28 lts28.16Agua efectiva: 185+28=213 lts13.-Pesos estimados de materiales ya corregidos por humedad del agregado:Cemento: 378 kg378Agua efectiva: 213 lts213Agregado fino: 772 kg772Agregado grueso: 1022 kg1022Peso Total: 2,384 kgs./m3238514.-Proporciones en peso378/378 : 772/378 : 1022/349 :213/378 = 1: 2 : 2.7: 0.5615.-Peso por tanda de un saco:Cemento: 1*42.5=42.5 kg/saco42.5Agua efectiva: 0.56*42.5 =24 kg/sacoAgregado fino: 2.0*42.5=85 kg/sacoAgregado grueso: 2.7*42.5=115 kg/saco16.-Conversin a Proporcin por volumenLos pesos unitarios (de los agregados) secos son:10850P.U.S.F: 11567kg/35p3 = 44.77 kg/pie332550P.U.S.G: 1597/35 = 45.63 kg/pie31: 2.5: 2.8: 0.61Por tanto:Cemento: 1 bls =1 pie31Agua efectiva:24ltsAgregado fino: 85/44.77kg/p31.9p3Agregado grueso: 115/45.63kg/p32.5p3Nota 1p3=2 latasCemento: 1 bls=1 pie3=1.85 latas2latasAgua:26 lts26ltsArena gruesa: 2.4*2latas =4.44latasfalta acondicionarPiedra chancada =2.6*2latas =4.81latasTotal9.25latasConcreto F'c=140 kg/cm21.-Relacin Agua:Tabla N1: Por durabilidad---sin lmiteTabla N2: Para F'c=140 kg/cm2 de resistencia a la compresin por resistencia: 8.5 gls/saco2.-AsentamientoTabla N3Para zapatas 1" - 4" usaremos 4"3.-Requisitos de Agua.-Tabla N5 Piedra 1 1/2" -49 glns agua/m3 de concreto.4.-Factor Cemento.-Dividiendo 49/8.5 = 5.8 sacos/m3 de concreto5.- Relacin Agua- Cemento.-A/C = (49*3.785)/(5.8*42.5) = 0.7526.-Porcentaje de Arena.-La tabla N6 con mdulo de fineza 2.53, y factor cemento 5 sacos/m3El porcentaje de arena necesario es 44%7.-Volumenes absolutos.-Volumen absoluto cemento: (5.8*42.5)/(3.15*1000) = 0.078Volumen absoluto agua: (49*3.785)/(1000) = 0.185 ; 0.185/0.263 = 0.7038.-Pesos de los materiales.-Cemento: 5.8*42.5 =247 kgAgua: 49*3.785 = 185 ltArena: 0.324*2.65*1000 = 859 kgPiedra: 0.413*2.70*1000 =1115 kg9.-Correccin por Humedad.-Peso arena hmeda: 859*1.0033=862 kgPeso piedra hmeda: 1115*1.0025 = 1115kg10.-Mayor Cantidad de Agua.-Porcentaje agua faltante en arena =0.66-0.33 = 0.33%Porcentaje agua faltante en piedra = 1.00-0.25 = 0.75%Agua necesaria en arena: 8.62*0.0033 =3 ltsAgua necesaria en piedra: 1118*0.0075 =9 ltsAgua necesaria en agregados: 3+9 = 12 ltsCantidad real de agua = 185+12 = 197 lts11.-Pesos finales-Cemento = 247 kg247kg6blsAgua = 197 lts197ltsArena = 862 kg862kgPiedra = 1118 kg1118kgTotal2424kg/m3Referencia: Recomendaciones del Comit 613-ACI-54

CANTUNITPARA PRUEBAS HIDRAULICASAGUA POTABLE3.1416DESCRIPCIONDNA(m2)V(m3)/mlTuberia500.00200.0020630.00310.0031750.00440.0044900.00640.00641100.00950.00951600.02010.02012000.03140.03142500.04910.04913150.07790.07793550.09900.09904000.12570.12574500.15900.15905000.19640.19645500.23760.23766000.28270.28277000.38480.38487500.44180.44188000.50270.50279000.63620.636210000.78540.785412001.13101.131013001.32731.3273