Summer Presentation3rd Term Co-op
Desmond LarkinPaint Department Line 1
![Page 2: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/2.jpg)
Order of Events Introduction Personal Aspirations Training and Classes Department Projects Volunteer Day Lessons Learned Thank’s Q & A
![Page 3: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/3.jpg)
About Me Warner Robins, Ga
Tuskegee University› Mechanical Engineering
› Graduating Date: Spring 2016
Student Government Association
Pre-Alumni Council Hobbies:
› Anything with Nature› Traveling› Laughter
![Page 4: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/4.jpg)
Goal Returning Back to Honda
Take principles and theories that I have learn in previous department to advance my skills
Enhance my engineering skills› Experience in the Automotive Industry› Experience in Corporate America
Improve my communication skills in working with others to perform various task
Obtain knowledge, substance and reasoning of courses I’ve studied at Tuskegee University.
![Page 5: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/5.jpg)
Classes & Training
Project Leadership› Investment Plan Group› Project Safety
Fire Safety and Fire watch Lock Out Tag Out Fork- Lifting E-Learning Courses
› Quality-Back to the Basics › SQM 5 Principles for Problem Solving› Machine Shop Safety for Quality
Associates
![Page 6: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/6.jpg)
PA Monitor Projector Holder Problem:
› Process Assistants unable to monitor Inline Measure Gauge while assisting parts
Task:› Create an 3rd level
projection holder to help visual view production of the Inline Measure Gauge
MC-1st Term
![Page 7: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/7.jpg)
Safety Hand Guard Plate Issue: Associate jammed her finger between the
handles of the car and the cable beam for a control panel
Solution: Design Weld Disk in 3 places (approximately 120° apart) › Weld parts on carts and paint after cooled› Minimum of 25 carts per day› Diameter of 4.7”› Thickness of 1/8“
MC-1st Term
![Page 8: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/8.jpg)
Quotes for Project Outside Companies Impact
› Machining Cart Handle End Guard Request Quote
Helix Atlas Brannon Machine Haynes Machine
Submit REQ Plan and Set a day
Quotes For Project Prices TaskBrannon Machine and Die 1,560.00 Material Haynes Machine Company 1,083.78 Material Helix Industrial Automation 4,542.00 Material , Paint, WeldAtlas Industrial Contractors 7,095.00 Material , Paint, Weld
MC-1st Term
![Page 9: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/9.jpg)
Part Carts MC -1st Term
Before After Before After
![Page 10: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/10.jpg)
Human Machine Interface Stand Vin Move required equipment stand
design› EGA planned a major project for WE-1 that consist of moving the VIN
Process Machine 45° to accommodate a new robot Purpose: Hold HMI, Robot Controller and Process Pc
on one bracket to give associates more room for parts carts.
Existing condition – 3 components in 3 locations
EGA-L -2nd Term
![Page 11: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/11.jpg)
HMI Stand
CATIA 2D Model
CATIA 3D Design
HMI Final Product
EGA-L-2nd Term
![Page 12: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/12.jpg)
TypeCapacity
WeightCenter of Gravity
End Of Arm Tooling
EGA-L-2nd TermMaterial Handler
Capacity at WE-2
Plan : Review Robots in HMA Line 2 Weld department for “Over Capacity” Condition.
Do : List all Robots and their End Of Arm Tooling (EOAT).
Check : After all Data gathered, Check Weight & CG of EOAT with respect to Robot Capacity.
Act : Identify At risk Robots and Make visual confirmation of condition at line 2.
![Page 13: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/13.jpg)
Main Targets Check: Sort through all MH and
Identify all machines that End of Tooling Arm exceeded over 100%
EGA-L 2nd Term
![Page 14: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/14.jpg)
Tool Arm attached on right side
Attached is another Clamp Unit on the top of the Main Centering Bar
Compare Line Side Model to Original Drawings
EGA-L 2nd Term
![Page 15: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/15.jpg)
Pre-Treat/ E-coat
Sealer
Inspection
Paint Off
Bumper
Surfacer
Clear Coat
Base Coat
Repair
Paint On
Top Coat Oven
![Page 16: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/16.jpg)
Shut-Down Work Assisted Paint Maintenance
with preventative maintenance on replacing Air House Filter upstairs near Facilities
Air house filter to before replaced
Air house filter after replaced
PA1- 3rd Term
![Page 17: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/17.jpg)
Problem Paint having to replace damage parts Before: installed parts unto an scrap
body to be sent through paint booth › 1 Bonnet› 1 Tailgate› 4 Doors **(All Same Color)
Idea: Design Multi- Parts Carrier to be hold different parts to paint at one time› Up to 6 parts**(All Same Color) › Bonnet, Tailgate, Front Doors , Slide Doors
PA1- 3rd Term
![Page 18: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/18.jpg)
Brain Storming PA1- 3rd Term
![Page 19: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/19.jpg)
Solution: › Save time by designing multifunctional carrier › Ability to run units during production› Quicker tact time for final production› Help keep final repair parts low inventory› Supports New Model and Current Model
PA1- 3rd Term
![Page 20: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/20.jpg)
Call-Out Parts
PA1- 3rd Term
![Page 21: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/21.jpg)
Front Door ApplicationPA1- 3rd Term
![Page 22: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/22.jpg)
Bonnet Alignment PA1- 3rd Term
![Page 23: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/23.jpg)
Application PA1- 3rd Term
![Page 24: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/24.jpg)
Quotes
Labor Material Totals
McMaster-Carr *Aluminum
- $ 3,061.82
Helix Construction
$ 2,212.00 $ 1,219.00 $ 3,431.00
F & S Industrials $ 1,057.50 $ 705.00 $ 1,762.50
PA1- 3rd Term
![Page 25: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/25.jpg)
![Page 26: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/26.jpg)
What I Have Learned How different concepts of engineering and how it corresponds
with a manufacturing and production environment With the correct planning one can accomplish excellent
expectations› CATIAV5 helps individuals see design on a Parts, Drawing,
Assembly View
Several different prototypes before the final product is completed
Enhance Problem Solving Skills Strengthen communication and teamwork skills by working
with contractors, maintenance ,and outside suppliers to get task complete.
Learn daily survival skills and characteristics that I can apply in everyday life.
![Page 27: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/27.jpg)
Thanks to.. Paint Department
› Greg Taylor› Maurice Dates› Eric Terry› Perry Perkins› Santiago Marin› Sheryl Bishop› Ron Roberson
HMA Staffing› Freddie Thomas› Charleen Butler
EGA-L Department Machining Department Co-op’s HMA Associates
![Page 28: Desmond Larkin's 3rd Presentation](https://reader036.vdocumento.com/reader036/viewer/2022081505/58ed99651a28abdc118b45bd/html5/thumbnails/28.jpg)
Questions??