cronograma.xls

4
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA OBRA "Construccion de Local Multiuso CC.PP. Villa Virginia del Distrito de Rio Negro-Satipo-Junin" PERIODO DE EJECUCION : 75 DIAS FECHA : ABRIL DEL 2013 90 DIAS 1° SEM 2° SEM 3° SEM 4° SEM 5° SEM 6° SEM 7° SEM 8° SEM 9° SEM 01.00.00 OBRAS PROVISIONALES 450.00 450.00 02.00.00 TRABAJOS PRELIMINARES 224.94 224.94 03.00.00 MOVIMIENTO DE TIERRAS 628.55 314.28 314.28 04.00.00 OBRAS DE CONCRETO SIMPLE 3,758.44 1,252.81 1,252.81 1,252.81 05.00.00 OBRAS DE CONCRETO ARMADO 23,097.09 5,774.27 5,774.27 5,774.27 5,774.27 06.00.00 ESTRUCTURA DE MADERA PARA COBERTURA 15,076.56 5,025.52 5,025.52 5,025.52 07.00.00 COBERTURA LIVIANA 7,431.55 3,715.78 3,715.78 08.00.00 MUROS Y TABIQUES DE ALBAÑILERIA 3,647.28 1,823.64 1,823.64 09.00.00 REVOQUES ENLUCIDOS Y MOLDURAS 4,359.91 4,359.91 10.00.00 CIELORRASOS 2,652.29 2,652.29 11.00.00 PISOS Y PAVIMENTOS 5,376.60 5,376.60 12.00.00 VEREDAS DE CONCRETO PULIDO Y BRUNADO 1,274.46 1,274.46 13.00.00 CONTRAZOCALOS 390.86 390.86 14.00.00 CARPINTERIA METALICA 11,209.00 5,604.50 15.00.00 PINTURA 5,423.14 2,711.57 16.00.00 INSTALACIONES ELECTRICAS 3,070.49 1,535.25 1,535.25 17.00.00 VARIOS 852.69 170.54 170.54 170.54 170.54 COSTO DIRECTO 88,923.85 989.215 1567.08833 8850.72583 13876.2458 10799.7925 15330.2405 9653.773 6696.018 12674.143 AVANCE MENSUAL (%) PROGRAMADO 1.11% 1.76% 9.95% 15.60% 12.14% 17.24% 10.86% 7.53% 14.25% EJECUTADO 1.11% 1.76% 9.95% 15.60% 12.14% 17.24% 10.86% 7.53% 14.25% PARTIDA DESCRIPCION PRESUPUES TO

Upload: miguel-d-sanchez-espinoza

Post on 15-Sep-2015

39 views

Category:

Documents


10 download

TRANSCRIPT

Hoja1CRONOGRAMA VALORIZADO DE EJECUCION DE OBRAOBRA"Construccion de Local Multiuso CC.PP. Villa Virginia del Distrito de Rio Negro-Satipo-Junin"PERIODO DE EJECUCION: 75 DIASFECHA: ABRIL DEL 2013PARTIDADESCRIPCIONPRESUPUESTO90 DIAS1 SEM2 SEM3 SEM4 SEM5 SEM6 SEM7 SEM8 SEM9 SEM10 SEM01.00.00OBRAS PROVISIONALES450.00450.0002.00.00TRABAJOS PRELIMINARES224.94224.9403.00.00MOVIMIENTO DE TIERRAS628.55314.28314.2804.00.00OBRAS DE CONCRETO SIMPLE3,758.441,252.811,252.811,252.8105.00.00OBRAS DE CONCRETO ARMADO23,097.095,774.275,774.275,774.275,774.2706.00.00ESTRUCTURA DE MADERA PARA COBERTURA15,076.565,025.525,025.525,025.5207.00.00COBERTURA LIVIANA7,431.553,715.783,715.7808.00.00MUROS Y TABIQUES DE ALBAILERIA3,647.281,823.641,823.6409.00.00REVOQUES ENLUCIDOS Y MOLDURAS4,359.914,359.9110.00.00CIELORRASOS2,652.292,652.2911.00.00PISOS Y PAVIMENTOS5,376.605,376.6012.00.00VEREDAS DE CONCRETO PULIDO Y BRUNADO1,274.461,274.4613.00.00CONTRAZOCALOS390.86390.8614.00.00CARPINTERIA METALICA11,209.005,604.505,604.5015.00.00PINTURA5,423.142,711.572,711.5716.00.00INSTALACIONES ELECTRICAS3,070.491,535.251,535.2517.00.00VARIOS852.69170.54170.54170.54170.54170.54COSTO DIRECTO88,923.85989.2151567.08833333338850.725833333313876.245833333310799.792515330.24059653.7736696.01812674.1438486.608AVANCE MENSUAL (%)PROGRAMADO1.11%1.76%9.95%15.60%12.14%17.24%10.86%7.53%14.25%9.54%EJECUTADO1.11%1.76%9.95%15.60%12.14%17.24%10.86%7.53%14.25%9.54%AVANCE ACUMULADO (%)PROGRAMADO1.11%1.76%9.95%15.60%12.14%17.24%10.86%7.53%14.25%9.54%EJECUTADO1.11%2.87%12.83%28.43%40.58%57.82%68.67%76.20%90.46%100.00%

Hoja2

Hoja3