EXTRACCION DE MATERIAL DE ACARREO EN CAUCE DE RIO CONDEBAMBA SECTOR SAN LUIS

01.00 EXCAVACION DE MATERIAL

CÓDIGO DESCRIPCIÓN PROGRESIVA

DIMENSIONESPARCIAL TOTAL

m2 m m3 m3

RIO CONDEBAMBA (SECTOR SAN LUIS) Prog. 0+300 a 560

0+160 5.89

0+180 5.84 20.00 117.30

0+200 5.79 20.00 116.30

0+220 5.68 20.00 114.70

0+240 5.57 20.00 112.50

0+260 5.67 20.00 112.40

0+280 5.71 20.00 113.80

0+300 5.41 20.00 111.20

0+320 5.13 20.00 105.40

0+340 5.12 20.00 102.50

0+360 5.01 20.00 101.30

0+380 5.61 20.00 106.20

0+400 5.21 20.00 108.20

0+420 5.16 20.00 103.70

0+440 5.41 20.00 105.70

0+460 5.53 20.00 109.40

0+480 5.21 20.00 107.40

0+500 5.21 20.00 104.20

0+520 5.41 20.00 106.20

0+540 5.55 20.00 109.60

0+560 5.61 20.00 111.60

0+580 5.12 20.00 107.30

0+600 5.18 20.00 103.00

0+620 5.15 20.00 103.30

640 0+640 5.16 20.00 103.10

0+660 5.20 20.00 103.60

Área Transversal

Longitud del Tramo

EXTRACCION DE MATERIAL DE ACARREO EN CAUCE DE RIO CONDEBAMBA SECTOR SAN LUIS

01.00 EXCAVACION DE MATERIAL

CÓDIGO DESCRIPCIÓN PROGRESIVA

DIMENSIONESPARCIAL TOTAL

m2 m m3 m3

Área Transversal

Longitud del Tramo

TOTAL (m3) 2,814.80