¤ Item Descripción Und. Metrado OPERARIO I.U. 47 1 01 OBRAS PRELIMINARES 1,585.40 0 01.01 CARTEL DE OBRA und 1.00 685.40 685.40 180.00 0 01.02 ALQUILER PARA OFICINA Y ALMACEN DE OBRA GLB 1.00 900.00 900.00 2 02 CAPTACION (03 UNID) 12,327.04 0 02.01 TRABAJOS PRELIMINARES 214.20 0 02.01.01 LIMPIEZA DE TERRENO MANUAL m2 90.00 1.05 94.50 0 02.01.02 TRAZO Y REPLANTEO m2 90.00 1.33 119.70 0 02.02 MOVIMIENTO DE TIERRAS 317.18 0 02.02.01 EXCAVACION PARA ESTRUCTURAS EN TERRENO NORMAL m3 8.71 28.25 246.06 0 02.02.02 RELLENO CON MATERIAL PROPIO m3 5.18 13.73 71.12 0 02.03 OBRAS DE CONCRETO SIMPLE 1,419.22 0 02.03.01 CONCRETO SIMPLE FC=140 KG/CM2 m3 1.16 407.47 472.67 23.20 0 02.03.02 CONCRETO CON MAMPOSTERIA DE PIEDRA FC=175 KG/CM +30%PM m3 7.72 122.61 946.55 24.70 0 02.04 OBRAS DE CONCRETO ARMADO 3,968.45 0 02.04.01 CONCRETO FC=175 KG/CM2 m3 3.74 336.52 1,258.58 16.61 0 02.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 30.79 20.98 645.97 40.95 0 02.04.03 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 474.46 4.35 2,063.90 189.78 0 02.05 REVOQUES ENLUCIDOS Y MOLDURAS 698.82 0 02.05.01 TARRAJEO (MORTERO 1:3 e=1.5cm) m2 39.37 17.75 698.82 262.60 0 02.06 INSTALACIONES DE ACCESORIOS 1,414.23 0 02.06.01 INSTALACIONES DE ACCESORIOS GLB 3.00 471.41 1,414.23 48.00 0 02.07 CARPINTERIA METALICA 649.98 0 02.07.01 INSTALACION DE TAPA METALICA 60X60cm und 3.00 108.33 324.99 60.00 0 02.07.02 INSTALACION DE TAPA METALICA 40X40cm und 3.00 108.33 324.99 60.00 Precio (S/.) Parcial (S/.)

Upload: marisol-manch-hmn

Post on 12-Jan-2016

5 views

Category:

Documents


0 download

DESCRIPTION

contruccione

TRANSCRIPT

Page 1: Trabajo Digregado 1

INSTALACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO EN EL CENTRO DEL POBLADODE UYRUMPI,DISTRITO DE ACORIA,PROVINCIA Y REGION DE HUANCAVELICA

¤ Item Descripción Und. Metrado Precio (S/.) Parcial (S/.)

MANO DE OBRA

OPERARIO OFICIAL

I.U. 47 47

1 01 OBRAS PRELIMINARES 1,585.40

0 01.01 CARTEL DE OBRA und 1.00 685.40 685.40 180.00

0 01.02 ALQUILER PARA OFICINA Y ALMACEN DE OBRA GLB 1.00 900.00 900.00

2 02 CAPTACION (03 UNID) 12,327.04

0 02.01 TRABAJOS PRELIMINARES 214.20

0 02.01.01 LIMPIEZA DE TERRENO MANUAL m2 90.00 1.05 94.50

0 02.01.02 TRAZO Y REPLANTEO m2 90.00 1.33 119.70

0 02.02 MOVIMIENTO DE TIERRAS 317.18

0 02.02.01 EXCAVACION PARA ESTRUCTURAS EN TERRENO NORMAL m3 8.71 28.25 246.06 89.63

0 02.02.02 RELLENO CON MATERIAL PROPIO m3 5.18 13.73 71.12

0 02.03 OBRAS DE CONCRETO SIMPLE 1,419.22

0 02.03.01 CONCRETO SIMPLE FC=140 KG/CM2 m3 1.16 407.47 472.67 23.20 20.88

0 02.03.02 CONCRETO CON MAMPOSTERIA DE PIEDRA FC=175 KG/CM +30%PM m3 7.72 122.61 946.55 24.70 22.23

0 02.04 OBRAS DE CONCRETO ARMADO 3,968.45

0 02.04.01 CONCRETO FC=175 KG/CM2 m3 3.74 336.52 1,258.58 16.61 29.92

0 02.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 30.79 20.98 645.97 40.95

0 02.04.03 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 474.46 4.35 2,063.90 189.78 170.81

0 02.05 REVOQUES ENLUCIDOS Y MOLDURAS 698.82

0 02.05.01 TARRAJEO (MORTERO 1:3 e=1.5cm) m2 39.37 17.75 698.82 262.60 236.22

0 02.06 INSTALACIONES DE ACCESORIOS 1,414.23

0 02.06.01 INSTALACIONES DE ACCESORIOS GLB 3.00 471.41 1,414.23 48.00 43.20

0 02.07 CARPINTERIA METALICA 649.98

0 02.07.01 INSTALACION DE TAPA METALICA 60X60cm und 3.00 108.33 324.99 60.00

0 02.07.02 INSTALACION DE TAPA METALICA 40X40cm und 3.00 108.33 324.99 60.00

Page 2: Trabajo Digregado 1

0 02.08 CERCO PERIMETRICO DE SEGURIDAD 3,644.96

0 02.08.01 TRABAJOS PRELIMINARES 43.89

0 02.08.01.01 TRAZO Y REPLANTEO m2 33.00 1.33 43.89

0 02.08.02 MOVIMIENTO DE TIERRAS 86.23

0 02.08.02.01 EXCAVACION MANUAL TERRENO NORMAL m3 1.62 28.25 45.77 16.67

0 02.08.02.02 ELIMINACION DE MATERIAL EXCEDENTE HASTA D=50M m3 2.03 19.93 40.46

0 02.08.03 CONCRETO SIMPLE 660.10

0 02.08.03.01 CONCRETO FC=140 KG/CM2 m3 1.62 407.47 660.10 32.40 29.16

0 02.08.04 COLOCACION DE CERCO PERIMETRICO 2,854.74

0 02.08.04.01 COLOCADO DE CUARTON DE EUCALIPTO DE 3"x3" x2.50 und 36.00 44.13 1,588.68 320.04 288.00

0 02.08.04.02 ALAMBRE DE PUAS Nº 12 m 330.00 1.51 498.30

0 02.08.04.03 COLOCADO DE PUERTA CON MARCO DE MADERA und 3.00 255.92 767.76 72.00

3 03 RESERVORIO NOCTURNO 216 M3 (01 UND) 62,406.92

0 03.01 TRABAJOS PRELIMINARES 132.30

0 03.01.01 LIMPIEZA DE TERRENO MANUAL m2 126.00 1.05 132.30

0 03.02 MOVIMIENTO DE TIERRAS 10,739.45

0 03.02.01 EXCAVACION PARA ESTRUCTURAS EN TERRENO NORMAL m3 189.00 28.25 5,339.25 1944.81

0 03.02.02 REFINE, NIVELACION Y COMPACTACION m2 126.00 5.49 691.74

0 03.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA D=50M m3 236.25 19.93 4,708.46

0 03.03 CONCRETO SIMPLE 3,313.93

0 03.03.01 SOLADO DE CONCRETO C:H 1:10 E=0.10M m3 12.60 263.01 3,313.93 100.80 90.72

0 03.04 CONCRETO ARMADO 35,474.02

0 03.04.01 CONCRETO FC=210 KG/CM2 m3 64.56 430.28 27,778.88 1032.96 929.66

0 03.04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 179.76 26.28 4,724.09 1026.43 923.97

0 03.04.03 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 683.00 4.35 2,971.05 273.20 245.88

0 03.05 REVESTIMIENTO Y JUNTAS 7,163.68

0 03.05.01 TARRAJEO CON IMPERMEABILIZANTE MURO INTERIOR DE CONCRETO m2 88.20 34.30 3,025.26 503.62

0 03.05.02 TARRAJEO CON IMPERMEABILIZANTE FONDO DE LOSA m2 104.00 34.30 3,567.20 593.84

0 03.05.03 WATER STOP DE 9" PROVISION Y COLOCADO DE JUNTA m 12.60 5.08 64.01 21.04

0 03.05.04 BRUÑA DE DILATACION CON ASFALTO E=1" m 87.00 5.83 507.21 125.28

0 03.06 OTRAS PARTIDAS 861.80

0 03.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIOS GLB 1.00 422.10 422.10 80.00 72.00

0 03.06.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN CAJA DE VALVULAS GLB 1.00 439.70 439.70 80.00

0 03.07 CERCO PERIMETRICO DE SEGURIDAD 4,721.74

0 03.07.01 TRABAJOS PRELIMINARES 62.19

0 03.07.01.01 TRAZO Y REPLANTEO m2 46.76 1.33 62.19

0 03.07.02 MOVIMIENTO DE TIERRAS 163.61

0 03.07.02.01 EXCAVACION PARA ZAPATAS EN TERRENO NORMAL m3 4.12 18.00 74.16

0 03.07.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.42 13.73 19.50

Page 3: Trabajo Digregado 1

0 03.07.02.03 ELIMINACION DE MATERIAL DE EXCAVACION D>50m m3 3.51 19.93 69.95

0 03.07.03 OBRAS DE CONCRETO ARMADO 1,764.86

0 03.07.03.01 CONCRETO FC=175 KG/CM2 m3 4.63 336.52 1,558.09 20.56 37.04

0 03.07.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.52 20.98 52.87 3.35

0 03.07.03.03 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 35.38 4.35 153.90 14.15 12.74

0 03.07.04 INSTALACION DE ACCESORIOS DE CERCO PERIMETRICO 2,731.08

0 03.07.04.01 INSTALACION DE ACCESORIOS DE CERCO PERIMETRICO GLB 1.00 2,731.08 2,731.08 20.00 36.00

4 04 LINEA DE CONDUCCION TUB. PVC L = 534.00 ML 11,948.55

0 04.01 TRABAJOS PRELIMINARES 710.22

0 04.01.01 TRAZO Y REPLANTEO m2 534.00 1.33 710.22

0 04.02 MOVIMIENTO DE TIERRAS 6,820.89

0 04.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 170.88 17.65 3,016.03

0 04.02.02 REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m. m 534.00 0.62 331.08

0 04.02.03 CAMA DE APOYO CON MATERIAL SELECCIONADO (E=10 cm) m 534.00 2.74 1,463.16 192.24

0 04.02.04 RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO m3 21.36 11.75 250.98 24.35

0 04.02.05 RELLENO COMPACTADO CON MATERIAL PROPIO m3 128.16 13.73 1,759.64

0 04.03 INSTALACION DE TUBERIAS PVC 4,330.74

0 04.03.01 INSTALACION DE TUBERIA 3" PVC C-7.5 m 534.00 7.02 3,748.68 192.24

0 04.03.02 DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC m 534.00 1.09 582.06 170.88

0 04.04 INSTALACION DE ACCESORIOS 86.70

0 04.04.01 INSTALACION DE ACCESORIOS EN LINEA DE CONDUCCION GLB 1.00 86.70 86.70 4.00

5 05 LINEA DE DISTRIBUCION Y ADUCCION TUB. PVC (L = 2331 ML) 77,676.60

0 05.01 TRABAJOS PRELIMINARES 3,100.23

0 05.01.01 TRAZO Y REPLANTEO m2 2,331.00 1.33 3,100.23

0 05.02 MOVIMIENTO DE TIERRAS 55,701.58

0 05.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 745.92 17.65 13,165.49

0 05.02.02 REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m. m 2,331.00 0.62 1,445.22

0 05.02.03 CAMA DE APOYO CON MATERIAL SELECCIONADO (E=10 cm) m 2,331.00 2.74 6,386.94 839.16

0 05.02.04 RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO m3 93.24 11.75 1,095.57 106.29

0 05.02.05 RELLENO CON MATERIAL PROPIO m3 1,398.60 24.03 33,608.36 13986.00

0 05.03 INSTALACION DE TUBERIAS PVC 18,551.19

0 05.03.01 INSTALACION DE TUBERIA 3" PVC C-7.5 m 1,490.00 7.02 10,459.80 536.40

0 05.03.02 INSTALACION DE TUBERIA 2" PVC C-7.5 m 841.00 6.60 5,550.60 302.76

0 05.03.03 DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC m 2,331.00 1.09 2,540.79 745.92

0 05.04 INSTALACION DE ACCESORIOS 323.60

0 05.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN LINEA DE DISTRIBUCION GLB 1.00 323.60 323.60 80.00 72.00

6 06 LINEA DE RIEGO FIJO TUB. PVC (L = 3638 ML) 124,604.13

0 06.01 TRABAJOS PRELIMINARES 4,838.54

0 06.01.01 TRAZO Y REPLANTEO m2 3,638.00 1.33 4,838.54

Page 4: Trabajo Digregado 1

0 06.02 MOVIMIENTO DE TIERRAS 92,759.90

0 06.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 1,164.16 17.65 20,547.42

0 06.02.02 REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m. m 3,638.00 0.62 2,255.56

0 06.02.03 CAMA DE APOYO CON MATERIAL SELECCIONADO (E=5 cm) m 3,638.00 3.14 11,423.32 1637.10

0 06.02.04 RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO m3 145.52 11.75 1,709.86 165.89

0 06.02.05 RELLENO CON MATERIAL PROPIO m3 2,364.70 24.03 56,823.74 23647.00

0 06.03 INSTALACION DE TUBERIAS PVC 26,884.82

0 06.03.01 INSTALACION DE TUBERIA 1.5" PVC C-7.5 m 3,638.00 6.30 22,919.40 1309.68

0 06.03.02 DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC m 3,638.00 1.09 3,965.42 1164.16

0 06.04 INSTALACION DE ACCESORIOS 120.87

0 06.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN LINEA DE RIEGO FIJO GLB 1.00 120.87 120.87 26.67

7 07 LINEAS PORTATILES DE RIEGO POR ASPERSION (77 UND) 62,493.20

0 07.01 SUMINISTRO E INSTALACION DE LINEA MOVIL DE 50 m. CON 4 ASPERSORES SILVER und 77.00 811.60 62,493.20 616.00

8 08 CABECERA DE RIEGO ( 3 UND) 25,184.01

0 08.01 TRABAJOS PRELIMINARES 11.37

0 08.01.01 TRAZO Y REPLANTEO m2 8.55 1.33 11.37

0 08.02 MOVIMIENTO DE TIERRAS 20,547.42

0 08.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 1,164.16 17.65 20,547.42

0 08.03 OBRAS DE CONCRETO ARMADO 3,274.88

0 08.03.01 CONCRETO FC=175 KG/CM2 m3 5.73 336.52 1,928.26 25.44 45.84

0 08.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 24.48 20.98 513.59 32.56

0 08.03.03 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 191.50 4.35 833.03 76.60 68.94

0 08.04 ACABADOS 649.81

0 08.04.01 TARRAJEO (MEZCLA 1:3 e=1.5cm) m2 25.92 25.07 649.81 172.89 155.52

0 08.05 INSTALACIONES DE ACCESORIOS 700.53

0 08.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CABECERA DE RIEGO GLB 3.00 120.85 362.55 39.99 36.00

0 08.05.02 INSTALACION DE TAPA METALICA 0.60x1.10m e=1/8" und 3.00 112.66 337.98 48.00

9 09 HIDRANTES ( 77 UND) 20,657.77

0 09.01 TRABAJOS PRELIMINARES 25.60

0 09.01.01 TRAZO Y REPLANTEO m2 19.25 1.33 25.60

0 09.02 MOVIMIENTO DE TIERRAS 203.86

0 09.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 11.55 17.65 203.86

0 09.03 OBRAS DE CONCRETO SIMPLE 3,650.01

0 09.03.01 CONCRETO FC=175 KG/CM2 m3 7.39 336.52 2,486.88 32.81 59.12

0 09.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 55.44 20.98 1,163.13 73.74

0 09.04 ACABADOS 492.03

0 09.04.01 TARRAJEO (MORTERO 1:3 e=1.5cm) m2 27.72 17.75 492.03 184.89 166.32

0 09.05 INSTALACION DE ACCESORIOS 16,286.27

0 09.05.01 SUMIN. E INSTAL DE ACCES EN HIDRANTES C/CONEXION A TUB DE 1 1/2" und 77.00 108.85 8,381.45 1026.41 924.00

Page 5: Trabajo Digregado 1

0 09.05.02 INSTALACION DE TAPA METALICA 0.45mx0.45m e=1/8" und 77.00 102.66 7,904.82 1232.00

10 10 VALVULAS DE CONTRO (12 UND) 10,894.89

0 10.01 TRABAJOS PRELIMINARES 10.21

0 10.01.01 TRAZO Y REPLANTEO m2 7.68 1.33 10.21

0 10.02 MOVIMIENTO DE TIERRAS 108.37

0 10.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 6.14 17.65 108.37

0 10.03 OBRAS DE CONCRETO ARMADO 6,039.55

0 10.03.01 CONCRETO FC=175 KG/CM2 m3 12.55 336.52 4,223.33 55.72 100.40

0 10.03.02 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 287.88 4.35 1,252.28 115.15 103.64

0 10.03.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 26.88 20.98 563.94 35.75

0 10.04 ACABADOS 536.76

0 10.04.01 TARRAJEO (MORTERO 1:3 e=1.5cm) m2 30.24 17.75 536.76 201.70 181.44

0 10.05 INSTALACION DE ACCESORIOS 4,200.00

0 10.05.01 SUM E INSTAL DE ACCESORIOS EN VALVULA CONTROL D=2" und 12.00 247.09 2,965.08 159.96 144.00

0 10.05.02 INSTALACION DE TAPA METALICA 0.80mx0.80m e=1/8" und 12.00 102.91 1,234.92 19.20

11 11 VALVULAS DE PURGA (11 UND) 5,389.82

0 11.01 TRABAJOS PRELIMINARES 10.24

0 11.01.01 TRAZO Y REPLANTEO m2 7.70 1.33 10.24

0 11.02 MOVIMIENTO DE TIERRAS 108.72

0 11.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 6.16 17.65 108.72

0 11.03 OBRAS DE CONCRETO ARMADO 2,472.62

0 11.03.01 CONCRETO FC=175 KG/CM2 m3 3.08 336.52 1,036.48 13.68 24.64

0 11.03.02 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 233.59 4.35 1,016.12 93.44 84.09

0 11.03.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 20.02 20.98 420.02 26.63

0 11.04 ACABADOS 355.36

0 11.04.01 TARRAJEO (MORTERO 1:3 e=1.5cm) m2 20.02 17.75 355.36 133.53 120.12

0 11.05 INSTALACION DE ACCESORIOS 2,442.88

0 11.05.01 SUM E INSTAL DE ACCESORIOS EN VALVULA DE PURGA D=1 1/2" und 11.00 115.67 1,272.37 146.63 132.00

0 11.05.02 INSTALACION DE TAPA METALICA 0.50mx0.80m e=1/8" und 11.00 106.41 1,170.51 22.00

12 12 CAMARA DE ROMPE PRESION ( 05 UND) 9,562.26

0 12.01 TRABAJOS PRELIMINARES 35.70

0 12.01.01 LIMPIEZA DE TERRENO MANUAL m2 15.00 1.05 15.75

0 12.01.02 TRAZO Y REPLANTEO m2 15.00 1.33 19.95

0 12.02 MOVIMIENTO DE TIERRAS 219.57

0 12.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 12.44 17.65 219.57

0 12.03 OBRAS DE CONCRETO ARMADO 6,824.24

0 12.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 70.65 20.98 1,482.24 93.96

0 12.03.02 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 548.50 4.35 2,385.98 219.40 197.46

0 12.03.03 CONCRETO FC=210 KG/CM2 m3 6.87 430.28 2,956.02 109.92 98.93

Page 6: Trabajo Digregado 1

0 12.04 REVOQUES ENLUCIDOS Y MOLDURAS 1,114.75

0 12.04.01 TARRAJEO IMPERMEABILIZADO DE MUROS (MEZCLA 1:3 E=1.5 CM) m2 32.50 34.30 1,114.75 185.58

0 12.05 INSTALACION DE ACCESORIOS 1,368.00

0 12.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA ROMPE PRESION GLB 5.00 164.10 820.50 66.65

0 12.05.02 INSTALACION DE TAPA METALICA 0.50x0.50 e=1/8" und 5.00 109.50 547.50 100.00

13 13 CAMARA DE REUNION (01 UND) 1,892.78

0 13.01 TRABAJOS PRELIMINARES 7.14

0 13.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.00 1.05 3.15

0 13.01.02 TRAZO Y REPLANTEO m2 3.00 1.33 3.99

0 13.02 MOVIMIENTO DE TIERRAS 43.95

0 13.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 2.49 17.65 43.95

0 13.03 OBRAS DE CONCRETO ARMADO 1,363.13

0 13.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.13 20.98 296.45 18.79

0 13.03.02 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 109.70 4.35 477.20 43.88 39.49

0 13.03.03 CONCRETO FC=210 KG/CM2 m3 1.37 430.28 589.48 21.92 19.73

0 13.04 REVOQUES ENLUCIDOS Y MOLDURAS 222.95

0 13.04.01 TARRAJEO IMPERMEABILIZADO DE MUROS (MEZCLA 1:3 E=1.5 CM) m2 6.50 34.30 222.95 37.12

0 13.05 INSTALACION DE ACCESORIOS 255.61

0 13.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA DE REUNION GLB 1.00 146.11 146.11 13.33 12.00

0 13.05.02 INSTALACION DE TAPA METALICA 0.40x0.60 e=1/8" und 1.00 109.50 109.50 20.00

14 14 MITIGACION DE IMPACTO AMBIENTAL 8,368.80

0 14.01 CONTROL Y MITIGACION DE IMPACTO AMBIENTAL GLB 1.00 4,500.00 4,500.00

0 14.02 CONFORMACION DE BOTADERO m2 240.00 16.12 3,868.80 64.80

15 15 FLETE 31,500.00

0 15.01 FLETE TERRESTRE GLB 1.00 23,000.00 23,000.00

0 15.02 FLETE RURAL GLB 1.00 8,500.00 8,500.00

16 16 CAPACITACION EN EL MANEJO DE CULTIVO DE RIEGO 4,200.00

0 16.01 CAPTACION Y ASISTENCIA TECNICA EN TECNOLOGIA PRODUCTIVA Y GESTION EMPRESARGLB 1.00 3,500.00 3,500.00

0 16.02 CAPACITACION EN MANEJO DE RIEGO GLB 1.00 700.00 700.00

17 17 FORTALECIMIENTO EN GESTION DE RIEGO 3,400.00

0 17.01 CONSTITUCION, ORGANIZACIÓN Y O&M DEL SISTEMA DE RIEGO GLB 1.00 3,400.00 3,400.00

DESCRIPCION VARIABLE 53070.542 10890.989

COSTO DIRECTO NDIRECTO 474,092.17

GASTOS GENERALES 7% GG 33,186.45 0.09995 0.02051

UTILIDAD 5% UTI 23,704.61

SUB-TOTAL ST 530,983.23 Suma de I.U. semejantes 0.36066

IGV 18% IGV 95,576.98 la suma debe ser al 100% 1.00000

TOTAL PRESUPUESTO 626,560.21

COEFICIENTE DE INCIDENCIA (insumos)

Page 7: Trabajo Digregado 1

CONFORMACIÓN DE MONOMIOS

MONOMIOS I.U.

1 MANO DE OBRA 47 0.501052 MAQUINARIA Y EQUIPO NACIONAL 48 0.086053 BRONCE 30 0.145364 CEMENTO 21 0.083125 TUBERIA 72 0.077286 GG+UTI 39 0.10714

1.00000

LEYENDACOSTO TOTALES DE CADA PARTIDAS DEL PRESUPUESTO

COSTO TOTALES DE CADA UNO DE LOS ELEMENTODISGREGADO

COEFICIENTE DE INCIDENCIA DE CADA UNO DE LOS ELEMENTO

COEFICIENTE DE INCIDENCIA

Page 8: Trabajo Digregado 1

INSTALACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO EN EL CENTRO DEL POBLADODE UYRUMPI,DISTRITO DE ACORIA,PROVINCIA Y REGION DE HUANCAVELICA

MANO DE OBRA equipo MATERIALES

PEON TOPOGRAFO CARRETILLA TEODOLITO

47 37 37 48 49 48 49 37 48 30 65

5.40 500.00

90.00 4.50

36.00 24.30 1.80 15.30 34.20

149.29 7.14

38.85 1.19 31.08

87.00 3.93 52.20

37.06 2.55 111.17

62.35 3.25 41.55 74.80

153.95 5.85

9.49

24.80

2.73

22.50 2.49

22.50 2.49

HERRAMIENTAS MANUALES

MEZCLADORA DE CONCRETO

DE 9-11p3

VIBRADOR DE CONCRETOo 4p

240"

MEZCLADORA DE CONCRETO TROMPO 8p 9p3

COMPACTACION Y VIBRADOR TIPO PLANCHA

4hp

MIRA Y JALONES

BOMBA ANUAL PARA PRUEBA DE TUBERIA

CARTELES DE OBRA IMPREA LAMINA FIBRA

SEGÚN DISEÑO

Page 9: Trabajo Digregado 1

13.20 8.91 0.66 5.61 12.54

27.77 1.33

12.18 0.37 27.91

121.50 5.49 72.90

479.88 32.76

99.00 3.30

120.00 5.76

126.00 6.30

3239.46 154.98

378.00 11.34 302.40

1417.50 42.53 3248.44

302.40 14.87 453.60

3873.60 291.81 1549.44

154.59 62.92

13.66

188.75 21.17

222.56 24.96

15.75 0.76

208.80 10.44

60.00 10.60

60.00 7.00

18.70 12.63 0.94 7.95 17.77

70.62 3.54

10.65 0.33 8.52

Page 10: Trabajo Digregado 1

21.06 0.63 48.26

77.18 4.03 92.60 51.44

12.60 0.48

0.71

30.00 2.58

213.60 144.18 10.68 90.78 202.92

2928.88 87.15

320.40 10.68

320.40 16.02

183.06 6.19

961.20 29.48 768.96

293.70 26.70

192.24 16.02 202.92

6.00 0.30

932.40 629.37 46.62 396.27 885.78

12785.07 380.42

1398.60 46.62

1398.60 69.93

799.07 27.04

10489.50 741.26 8391.60

819.50 74.50

462.55 42.05

839.16 69.93 885.78

60.00 10.60

1455.20 982.26 72.76 618.46 1382.44

Page 11: Trabajo Digregado 1

19953.70 593.72

2182.80 72.76

6839.44 436.56 2510.22

1247.11 42.20

17735.25 1253.29 14188.20

2000.90 181.90

1309.68 109.14 1382.44

20.00 1.40

924.00 46.20

3.42 2.31 0.17 1.45 3.25

19953.70 593.72

95.52 4.99 114.60 63.66

122.40 4.65

3.83

129.60 22.81

30.00 5.31

18.00 1.98

7.70 5.20 0.39 3.27 7.32

197.97 5.89

123.19 6.43 147.80 82.10

277.20 10.53

17.46

770.00 136.29

Page 12: Trabajo Digregado 1

462.00 50.82

3.07 2.07 0.15 1.31 2.92

105.24 3.13

209.21 10.92 139.43 251.00

5.76

134.40 5.11

19.05

9.12

144.00 4.92

3.08 2.08 0.15 1.31 2.93

105.58 3.14

51.34 2.68 34.22 61.60

4.67

100.10 3.80

12.61

8.36

165.00 5.61

15.00 0.75

6.00 4.05 0.30 2.55 5.70

213.22 6.34

353.25 13.42

10.97

412.20 31.05 164.88

Page 13: Trabajo Digregado 1

69.55 7.80

50.00 5.85

3.00

3.00 0.15

1.20 0.81 0.06 0.51 1.14

42.68 1.27

70.65 2.68

2.19

82.20 6.19 32.88

13.91 1.56

0.76

0.60

48.00 2.40

125725.83 1818.1638 6397.7858 5834.8325 1086.4194 445.6518 2059.8 23690.76 1144.7698 2471.14 2558.8972 500

0.23678 0.00342 0.01205 0.01099 0.00205 0.00084 0.00388 0.04462 0.00216 0.00465 0.00482 0.00094

0.36066 0.08605 0.55329

1.00000

Page 14: Trabajo Digregado 1

𝐾𝑎𝑞=0.08312∗𝐶𝑟/𝐶𝑜+0.50105∗(𝑀𝑂𝐵 𝑟)/(𝑀𝑂𝐵 𝑜)+0.08605∗(𝑀𝐴𝑄 𝑟)/(𝑀𝐴𝑄 𝑜)+0.07728∗𝑇𝑟/𝑇𝑜+0.14536∗(𝐴 𝑟)/(𝐴 𝑜)+0.10714∗(𝐺𝑈 𝑟)/(𝐺𝑢 𝑜) FÓRMULA POLINÓMICA

Page 15: Trabajo Digregado 1

INSTALACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO EN EL CENTRO DEL POBLADODE UYRUMPI,DISTRITO DE ACORIA,PROVINCIA Y REGION DE HUANCAVELICA

MATERIALES

65 65 65 65 65 65 65 77 72 72 72

54.00 450.00 57.60 61.20 90.00 130.50

240.00

240.00

TAPA METALICA 0.45x0.45

e=1/8"(incluido marco)

TAPA METALICAa

0.40x0.40 e=1/8 incluido

marco

TAPA METALICA 0.80x0.80n

e=1/8"

TAPA METALICA 0.50x0.80m

e=1/8"

TAPA METALICA 0.60x1.1n

e=1/8" incluio marco

TAPA METALICA 0.40x0.60

e=1/8 incluio marco

TAPA METALICA 0.60x0.60

e=1/8 incluio marco

CONO DE REBOE PVC

6"x4"

VALVULA COMPUERTA

BB4"

TEE PVC SAL 3"x3"

UNION NIPLE PVC SAP 3"

CODO DE FIERRO de 1

1/2"x90

CODO PVC SAP 4"x90"

NIPLE PVC SAP 4" 1.00

Page 16: Trabajo Digregado 1

34.00

Page 17: Trabajo Digregado 1

38.40

Page 18: Trabajo Digregado 1

270.00

Page 19: Trabajo Digregado 1

6160.00

1066.80

110.00

977.90

Page 20: Trabajo Digregado 1

444.50

88.90

6160 240 1066.8 1422.4 270 88.9 240 54 450 130 61.2 110 90 130.5

0.01160 0.00045 0.00201 0.00268 0.00051 0.00017 0.00045 0.00010 0.00085 0.00024 0.00012 0.00021 0.00017 0.00025

0.55329

Page 21: Trabajo Digregado 1

𝐾𝑎𝑞=0.08312∗𝐶𝑟/𝐶𝑜+0.50105∗(𝑀𝑂𝐵 𝑟)/(𝑀𝑂𝐵 𝑜)+0.08605∗(𝑀𝐴𝑄 𝑟)/(𝑀𝐴𝑄 𝑜)+0.07728∗𝑇𝑟/𝑇𝑜+0.14536∗(𝐴 𝑟)/(𝐴 𝑜)+0.10714∗(𝐺𝑈 𝑟)/(𝐺𝑢 𝑜)

Page 22: Trabajo Digregado 1

INSTALACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO EN EL CENTRO DEL POBLADODE UYRUMPI,DISTRITO DE ACORIA,PROVINCIA Y REGION DE HUANCAVELICA

MATERIALES

65 65 65 65 2 3 43 2 2 2 2 2 5

77.20

385.80 37.87 21.55

1575.21 118.62

3.15

150.00 105.00 222.00

NIPLE DE f° GALVANIZADO DE 1 1/2"x1

1/2"

NIPLE e fo DE 3"x9"

CANASTILLA 3"

UNION UNIVERSAL

DE fo GALVANIZADO DE 1 1/2"

UNION UNIVERSAL DE fo GALV

3"

CLAVO PARA MADERA c/c

2"

ACERO DE REFUERZO

fy=4200 GRADO 60

MADERA TORNILLO

inc/corte p/encofrado

ALAMBRE NEGRO

RECOCIDO NEGRO #8

OALAMBRE NEGRO #8

ALAMBRE NEGRO #16

ALAMBRE RECOCIDO

#8

CLAVO PARA MADERA c/c

3"

PIEDRA GRANDE DE

8"

Page 23: Trabajo Digregado 1

125.83 2252.39 52.13 125.83

2267.56 170.75

Page 24: Trabajo Digregado 1

31.58 3.10 1.76

117.46 8.85

Page 25: Trabajo Digregado 1

306.73 30.11 17.14

635.78 47.88

694.66 68.19 38.81

2.22

Page 26: Trabajo Digregado 1

955.76 71.97

336.81 33.06 18.82

2.42

288.00 1152.00

775.52 58.40

250.85 24.62 14.01

1.60

885.24 86.90 49.46

1821.02 137.13

Page 27: Trabajo Digregado 1

177.05 17.38 9.89

364.20 27.43

288 150 105 1152 222 135.22 6244.9532 7588.6751 128.904 52.1304 641.0025 172.3353 297.269 77.2

0.00054 0.00028 0.00020 0.00217 0.00042 0.00025 0.01176 0.01429 0.00024 0.00010 0.00121 0.00032 0.00056 0.00015

0.55329

Page 28: Trabajo Digregado 1

INSTALACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO EN EL CENTRO DEL POBLADODE UYRUMPI,DISTRITO DE ACORIA,PROVINCIA Y REGION DE HUANCAVELICA

MATERIALES

YEO DE 28 HORMIGONAGUA

30 43 21 4 38 39 45 2 26 30 30 30 13 30

5.40 2.70

173.78 111.36 0.31

671.64

665.23 362.78 2.09

99.61 72.44

ESTACA DE MADERA

CEMENTO PORTALND TIPO I

ARENA FINA

CUARTON EUCALIPTO 3"x3"x2.5

ALAMBRE DE PUAS #16

CANDADO INCLUIDO ALDABA

PUERTA DE CALAMINA DE 1.85x1

IMPERMEABILIZANTE

ADITIVO EPOXICO SIKA 32

JUNTA INTER WATER TOP NEOPRENE 9"

ASFALTO LIQUIDO rc-250

PEGAMENTO PARA PVC

CANASTILLA DE SALIDA DE 3"

CINTA TEFLON

CONO DE REBOSE DE PVC 3"

Page 29: Trabajo Digregado 1

1.98 0.99

242.69 155.52 0.44

468.00

396.00

75.00 495.00

770.99 1575.00 5.54

13281.93 6778.80 40.67

1126.31 243.43 2.65 370.44 568.89

1328.08 287.04 3.12 436.80 670.80

26.46

20.01 142.68

0.70 70.00 6.00 72.80

0.70 6.00

2.81 1.40

Page 30: Trabajo Digregado 1

823.54 449.11 2.59

25.00 165.00

32.04 16.02

373.80

139.86 69.93

1043.00

588.70

218.28 109.14

Page 31: Trabajo Digregado 1

2546.60

346.50

0.51 0.26

1019.20 555.81 3.21

109.38 59.62

11.25

1.16 0.58

1314.46 716.83 4.14

70.13 51.00

288.75

Page 32: Trabajo Digregado 1

0.46 0.23

2232.27 1217.35 7.03

76.51 55.64

84.00 108.00

0.46 0.23

547.84 298.76 1.72

50.65 36.84

66.00

0.90 0.45

1413.37 721.35 4.33

Page 33: Trabajo Digregado 1

415.03 89.70 0.98 136.50 209.63

7.00 350.00 91.00

0.18 0.09

281.85 143.85 0.86

83.01 17.94 0.20 27.30 41.93

0.02

404.0364 202.0182 26125.846 933.662 13758.16 79.8818 468 396 100 660 971.04 1491.24 26.46 142.68 4644.5 420 832.52 163.8

0.00076 0.00038 0.04920 0.00176 0.02591 0.00015 0.00088 0.00075 0.00019 0.00124 0.00183 0.00281 0.00005 0.00027 0.00875 0.00079 0.00157 0.00031

0.55329

Page 34: Trabajo Digregado 1

INSTALACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO EN EL CENTRO DEL POBLADODE UYRUMPI,DISTRITO DE ACORIA,PROVINCIA Y REGION DE HUANCAVELICA

MATERIALES

GRAPA

77 41 30 4 72 72 72 72 72 72 72 72 72

ADAPATADOR PARA PVC SAP 1 1/2"

aADAPATADOR PARA PVC SAP 3"

CONO DE 90 PVC SAP 3"

VALVULA DE COMPUERTA DE BRONCE DE 1 1/2"

VALVULA DE COMPUERTA DE BRONCE DE 3"

ROLLIZO DE EUCALIPTO DE 5"

MALLA COCADA 2" DE ALAMBRE GALVANIZADO 8bw=2.0

TIERRA CERNIDA

TUBERIA PVC AP PRESION 3"CLASE 7.5

TUBERIA PVC AP PRESION 1.5" CLASE 7.5

REDUCCION PVC 1.1/2"x1"

REDUCCION PVC SAP 3"

REDUCCION PVC SAP 3"a2"

CODO PVC SAP(aua)con roca 3"x90"

TEE PVC CON REDUCCION 3"-2"

TEE PVC CON REDUCCION 3"-1 1/2"

TEE PVC CON REDUCCION 3"-2"

Page 35: Trabajo Digregado 1

50.00

50.00 32.00 170.00

Page 36: Trabajo Digregado 1

192.50 1260.00 1000.00

934.50

37.38

2862.24

10.00 28.00

4079.25

163.17

7986.40

4154.54

13.00 6.00 6.50

Page 37: Trabajo Digregado 1

254.66

16880.32

60.00 180.00

616.00 4620.00

Page 38: Trabajo Digregado 1

96.00 660.00

88.00 605.88 38.50

Page 39: Trabajo Digregado 1

250.00

20.00 60.00 9.00

800 430 32 5885.88 410 192.5 1260 1000 5468.96 15003.18 16880.32 38.5 9 10 28 13 6 6.5

0.00151 0.00081 0.00006 0.01108 0.00077 0.00036 0.00237 0.00188 0.01030 0.02826 0.03179 0.00007 0.00002 0.00002 0.00005 0.00002 0.00001 0.00001

0.55329

Page 40: Trabajo Digregado 1

INSTALACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO EN EL CENTRO DEL POBLADODE UYRUMPI,DISTRITO DE ACORIA,PROVINCIA Y REGION DE HUANCAVELICA

MATERIALES

72 72 72 72 65 72 72 72 30 30 49 72 72 72

YEE PVC c/reuccion 3"-2"

YEE PVC c/reuccion 2"-1 1/2"

YEE PVC c/reuccion 3"-1 1/2"

TEE PVC 3"

CODO DE FIERRO DE 3"x90

CODO DE PVC SAP 1 1/2x90

CODO DE PVC SAP 45° 1 1/2

CODO DE PVC SAP 22° 1 1/2

ASPEROR BRONCE SECTORAL 3/4" SILVER BOQUILLA 4MM

QUEBRACHORRO DE BRONCE DE 3/4"

ELEVADOR f° ° e 3/4"X80m conexión de marco

TRIPODE ANGOTABLE DE 3/4"

LLAVE TIPO TEE DE 1/2"

LLAVE PVC TIPO BAYONETA DE 3/4"

CODO p.e. 32mmx3/4"

TEE p.e. 32mmx3/4"

MANGUERA PLASTICA DE 3/4"

TAPON PVC DE 3/4"

Page 41: Trabajo Digregado 1
Page 42: Trabajo Digregado 1

7.00 48.00 14.00 6.50

Page 43: Trabajo Digregado 1

20.80 15.60 36.40

24640.00 1540.00 7700.00 15400.00 1270.50 770.00 770.00 8470.00

Page 44: Trabajo Digregado 1

264.00

38.50

Page 45: Trabajo Digregado 1

10.00 14.00

7 48 14 6.5 10 20.8 15.6 36.4 24640 1540 7700 15400 264 1270.5 770 770 8470 52.5

0.00001 0.00009 0.00003 0.00001 0.00002 0.00004 0.00003 0.00007 0.04640 0.00290 0.01450 0.02900 0.00050 0.00239 0.00145 0.00145 0.01595 0.00010

0.55329

Page 46: Trabajo Digregado 1

INSTALACION DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO TECNIFICADO EN EL CENTRO DEL POBLADODE UYRUMPI,DISTRITO DE ACORIA,PROVINCIA Y REGION DE HUANCAVELICA

MATERIALES

GG+UTI SUB TOTAL

72 72 4 39

685.40 0.0012908

900.00 900.00 0.001695

94.50 0.000178

119.70 0.0002254

246.06 0.0004634

71.12 0.0001339

472.67 0.0008902

946.55 0.0017826

1258.58 0.0023703

645.97 0.0012166

2063.90 0.0038869

698.82 0.0013161

1414.23 0.0026634

324.99 0.0006121

324.99 0.0006121

TEE PVC SAP ROSCADO 1 1/2"

TEE PVC AP DE 3" c/r para agua

TIERRA DE CHACRA O VEGETAL

BOTADERO

RENDIMIENTO

Page 47: Trabajo Digregado 1

43.89 8.266E-05

45.77 8.619E-05

40.4579 7.619E-05

660.10 0.0012432

1588.68 0.002992

498.30 0.0009384

767.76 0.0014459

132.30 0.0002492

5339.25 0.0100554

691.74 0.0013028

4708.46 0.0088674

3313.93 0.0062411

27778.88 0.0523159

4724.09 0.0088969

2971.05 0.0055954

3025.26 0.0056975

3567.20 0.0067181

64.01 0.0001205

507.21 0.0009552

422.10 0.0007949

439.70 0.0008281

62.19 0.0001171

74.16 0.0001397

19.50 3.672E-05

Page 48: Trabajo Digregado 1

69.95 0.0001317

1558.09 0.0029343

52.87 9.957E-05

153.90 0.0002898

2731.08 0.0051434

710.22 0.0013376

3016.03 0.0056801

331.08 0.0006235

1463.16 0.0027556

250.98 0.0004727

1759.64 0.0033139

3748.68 0.0070599

582.06 0.0010962

86.70 0.0001633

3100.23 0.0058387

13165.49 0.0247945

1445.22 0.0027218

6386.94 0.0120285

1095.57 0.0020633

33608.36 0.0632946

10459.80 0.0196989

5550.60 0.0104534

2540.79 0.0047851

323.60 0.0006094

4838.54 0.0091124

Page 49: Trabajo Digregado 1

20547.42 0.0386969

2255.56 0.0042479

11423.32 0.0215135

1709.86 0.0032202

56823.74 0.1070161

22919.40 0.0431641

3965.42 0.0074681

120.87 0.0002276

62493.20 0.1176934

11.37 2.142E-05

20547.42 0.0386969

1928.26 0.0036315

513.59 0.0009672

833.03 0.0015688

649.81 0.0012238

362.55 0.0006828

337.98 0.0006365

25.60 4.822E-05

203.86 0.0003839

2486.88 0.0046835

1163.13 0.0021905

492.03 0.0009266

8381.45 0.0157848

Page 50: Trabajo Digregado 1

7904.82 0.0148871

10.21 1.924E-05

108.37 0.0002041

4223.33 0.0079538

1252.28 0.0023584

563.94 0.0010621

536.76 0.0010109

2965.08 0.0055841

1234.92 0.0023257

10.24 1.929E-05

108.72 0.0002048

1036.48 0.001952

1016.12 0.0019137

420.02 0.000791

355.36 0.0006692

38.50 1272.37 0.0023963

1170.51 0.0022044

15.75 2.966E-05

19.95 3.757E-05

219.57 0.0004135

1482.24 0.0027915

2385.98 0.0044935

2956.02 0.0055671

Page 51: Trabajo Digregado 1

1114.75 0.0020994

820.50 0.0015452

547.50 0.0010311

3.15 5.932E-06

3.99 7.514E-06

43.95 8.277E-05

296.45 0.0005583

477.20 0.0008987

589.48 0.0011102

222.95 0.0004199

7.00 146.11 0.00028

109.50 0.00021

4500.00 4500.00 0.00847

153.60 3600.00 3868.80 0.00729

23000.00 23000.00 0.04332

8500.00 8500.00 0.01601

3500.00 3500.00 0.00659

700.00 700.00 0.00132

3400.00 3400.00 0.00640

38.5 7 153.6 3600 44500.00 56,891.06 530983.22 1.00000

0.00007 0.00001 0.00029 0.00678 0.08381 0.10714 1.00000

0.55329

Page 52: Trabajo Digregado 1

¤ Item Descripción Und. Metrado

0 01 OBRAS PRELIMINARES

0 01.01 CARTEL DE OBRA und 1.00

0 01.02 ALQUILER PARA OFICINA Y ALMACEN DE OBRA GLB 1.00

0 02 CAPTACION (03 UNID)

0 02.01 TRABAJOS PRELIMINARES

0 02.01.01 LIMPIEZA DE TERRENO MANUAL m2 90.00

0 02.01.02 TRAZO Y REPLANTEO m2 90.00

0 02.02 MOVIMIENTO DE TIERRAS

0 02.02.01 EXCAVACION PARA ESTRUCTURAS EN TERRENO NORMAL m3 8.71

0 02.02.02 RELLENO CON MATERIAL PROPIO m3 5.18

0 02.03 OBRAS DE CONCRETO SIMPLE

0 02.03.01 CONCRETO SIMPLE FC=140 KG/CM2 m3 1.16

0 02.03.02 CONCRETO CON MAMPOSTERIA DE PIEDRA FC=175 KG/CM +30%PM m3 7.72

0 02.04 OBRAS DE CONCRETO ARMADO

0 02.04.01 CONCRETO FC=175 KG/CM2 m3 3.74

0 02.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 30.79

0 02.04.03 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 474.46

0 02.05 REVOQUES ENLUCIDOS Y MOLDURAS

0 02.05.01 TARRAJEO (MORTERO 1:3 e=1.5cm) m2 39.37

0 02.06 INSTALACIONES DE ACCESORIOS

0 02.06.01 INSTALACIONES DE ACCESORIOS GLB 3.00

0 02.07 CARPINTERIA METALICA

0 02.07.01 INSTALACION DE TAPA METALICA 60X60cm und 3.00

0 02.07.02 INSTALACION DE TAPA METALICA 40X40cm und 3.00

0 02.08 CERCO PERIMETRICO DE SEGURIDAD

0 02.08.01 TRABAJOS PRELIMINARES

0 02.08.01.01 TRAZO Y REPLANTEO m2 33.00

0 02.08.02 MOVIMIENTO DE TIERRAS

0 02.08.02.01 EXCAVACION MANUAL TERRENO NORMAL m3 1.62

0 02.08.02.02 ELIMINACION DE MATERIAL EXCEDENTE HASTA D=50M m3 2.03

0 02.08.03 CONCRETO SIMPLE

0 02.08.03.01 CONCRETO FC=140 KG/CM2 m3 1.62

0 02.08.04 COLOCACION DE CERCO PERIMETRICO

0 02.08.04.01 COLOCADO DE CUARTON DE EUCALIPTO DE 3"x3" x2.50 und 36.00

0 02.08.04.02 ALAMBRE DE PUAS Nº 12 m 330.00

0 02.08.04.03 COLOCADO DE PUERTA CON MARCO DE MADERA und 3.00

0 03 RESERVORIO NOCTURNO 216 M3 (01 UND)

0 03.01 TRABAJOS PRELIMINARES

0 03.01.01 LIMPIEZA DE TERRENO MANUAL m2 126.00

0 03.02 MOVIMIENTO DE TIERRAS

0 03.02.01 EXCAVACION PARA ESTRUCTURAS EN TERRENO NORMAL m3 189.00

0 03.02.02 REFINE, NIVELACION Y COMPACTACION m2 126.00

0 03.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA D=50M m3 236.25

0 03.03 CONCRETO SIMPLE

0 03.03.01 SOLADO DE CONCRETO C:H 1:10 E=0.10M m3 12.60

0 03.04 CONCRETO ARMADO

0 03.04.01 CONCRETO FC=210 KG/CM2 m3 64.56

0 03.04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2 179.76

0 03.04.03 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 683.00

0 03.05 REVESTIMIENTO Y JUNTAS

0 03.05.01 TARRAJEO CON IMPERMEABILIZANTE MURO INTERIOR DE CONCRETO m2 88.20

0 03.05.02 TARRAJEO CON IMPERMEABILIZANTE FONDO DE LOSA m2 104.00

0 03.05.03 WATER STOP DE 9" PROVISION Y COLOCADO DE JUNTA m 12.60

0 03.05.04 BRUÑA DE DILATACION CON ASFALTO E=1" m 87.00

0 03.06 OTRAS PARTIDAS

0 03.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIOS GLB 1.00

0 03.06.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN CAJA DE VALVULAS GLB 1.00

0 03.07 CERCO PERIMETRICO DE SEGURIDAD

0 03.07.01 TRABAJOS PRELIMINARES

Page 53: Trabajo Digregado 1

0 03.07.01.01 TRAZO Y REPLANTEO m2 46.76

0 03.07.02 MOVIMIENTO DE TIERRAS

0 03.07.02.01 EXCAVACION PARA ZAPATAS EN TERRENO NORMAL m3 4.12

0 03.07.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.42

0 03.07.02.03 ELIMINACION DE MATERIAL DE EXCAVACION D>50m m3 3.51

0 03.07.03 OBRAS DE CONCRETO ARMADO

0 03.07.03.01 CONCRETO FC=175 KG/CM2 m3 4.63

0 03.07.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.52

0 03.07.03.03 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 35.38

0 03.07.04 INSTALACION DE ACCESORIOS DE CERCO PERIMETRICO

0 03.07.04.01 INSTALACION DE ACCESORIOS DE CERCO PERIMETRICO GLB 1.00

0 04 LINEA DE CONDUCCION TUB. PVC L = 534.00 ML

0 04.01 TRABAJOS PRELIMINARES

0 04.01.01 TRAZO Y REPLANTEO m2 534.00

0 04.02 MOVIMIENTO DE TIERRAS

0 04.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 170.88

0 04.02.02 REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m. m 534.00

0 04.02.03 CAMA DE APOYO CON MATERIAL SELECCIONADO (E=10 cm) m 534.00

0 04.02.04 RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO m3 21.36

0 04.02.05 RELLENO COMPACTADO CON MATERIAL PROPIO m3 128.16

0 04.03 INSTALACION DE TUBERIAS PVC

0 04.03.01 INSTALACION DE TUBERIA 3" PVC C-7.5 m 534.00

0 04.03.02 DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC m 534.00

0 04.04 INSTALACION DE ACCESORIOS

0 04.04.01 INSTALACION DE ACCESORIOS EN LINEA DE CONDUCCION GLB 1.00

0 05 LINEA DE DISTRIBUCION Y ADUCCION TUB. PVC (L = 2331 ML)

0 05.01 TRABAJOS PRELIMINARES

0 05.01.01 TRAZO Y REPLANTEO m2 2,331.00

0 05.02 MOVIMIENTO DE TIERRAS

0 05.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 745.92

0 05.02.02 REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m. m 2,331.00

0 05.02.03 CAMA DE APOYO CON MATERIAL SELECCIONADO (E=10 cm) m 2,331.00

0 05.02.04 RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO m3 93.24

0 05.02.05 RELLENO CON MATERIAL PROPIO m3 1,398.60

0 05.03 INSTALACION DE TUBERIAS PVC

0 05.03.01 INSTALACION DE TUBERIA 3" PVC C-7.5 m 1,490.00

0 05.03.02 INSTALACION DE TUBERIA 2" PVC C-7.5 m 841.00

0 05.03.03 DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC m 2,331.00

0 05.04 INSTALACION DE ACCESORIOS

0 05.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN LINEA DE DISTRIBUCION GLB 1.00

0 06 LINEA DE RIEGO FIJO TUB. PVC (L = 3638 ML)

0 06.01 TRABAJOS PRELIMINARES

0 06.01.01 TRAZO Y REPLANTEO m2 3,638.00

0 06.02 MOVIMIENTO DE TIERRAS

0 06.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 1,164.16

0 06.02.02 REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m. m 3,638.00

0 06.02.03 CAMA DE APOYO CON MATERIAL SELECCIONADO (E=5 cm) m 3,638.00

0 06.02.04 RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO m3 145.52

0 06.02.05 RELLENO CON MATERIAL PROPIO m3 2,364.70

0 06.03 INSTALACION DE TUBERIAS PVC

0 06.03.01 INSTALACION DE TUBERIA 1.5" PVC C-7.5 m 3,638.00

0 06.03.02 DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC m 3,638.00

0 06.04 INSTALACION DE ACCESORIOS

0 06.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN LINEA DE RIEGO FIJO GLB 1.00

0 07 LINEAS PORTATILES DE RIEGO POR ASPERSION (77 UND)

0 07.01 SUMINISTRO E INSTALACION DE LINEA MOVIL DE 50 m. CON 4 ASPERSORES SILVERund 77.00

0 08 CABECERA DE RIEGO ( 3 UND)

0 08.01 TRABAJOS PRELIMINARES

0 08.01.01 TRAZO Y REPLANTEO m2 8.55

0 08.02 MOVIMIENTO DE TIERRAS

0 08.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 1,164.16

0 08.03 OBRAS DE CONCRETO ARMADO

0 08.03.01 CONCRETO FC=175 KG/CM2 m3 5.73

0 08.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 24.48

0 08.03.03 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 191.50

Page 54: Trabajo Digregado 1

0 08.04 ACABADOS

0 08.04.01 TARRAJEO (MEZCLA 1:3 e=1.5cm) m2 25.92

0 08.05 INSTALACIONES DE ACCESORIOS

0 08.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CABECERA DE RIEGO GLB 3.00

0 08.05.02 INSTALACION DE TAPA METALICA 0.60x1.10m e=1/8" und 3.00

0 09 HIDRANTES ( 77 UND)

0 09.01 TRABAJOS PRELIMINARES

0 09.01.01 TRAZO Y REPLANTEO m2 19.25

0 09.02 MOVIMIENTO DE TIERRAS

0 09.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 11.55

0 09.03 OBRAS DE CONCRETO SIMPLE

0 09.03.01 CONCRETO FC=175 KG/CM2 m3 7.39

0 09.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 55.44

0 09.04 ACABADOS

0 09.04.01 TARRAJEO (MORTERO 1:3 e=1.5cm) m2 27.72

0 09.05 INSTALACION DE ACCESORIOS

0 09.05.01 SUMIN. E INSTAL DE ACCES EN HIDRANTES C/CONEXION A TUB DE 1 1/2" und 77.00

0 09.05.02 INSTALACION DE TAPA METALICA 0.45mx0.45m e=1/8" und 77.00

0 10 VALVULAS DE CONTRO (12 UND)

0 10.01 TRABAJOS PRELIMINARES

0 10.01.01 TRAZO Y REPLANTEO m2 7.68

0 10.02 MOVIMIENTO DE TIERRAS

0 10.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 6.14

0 10.03 OBRAS DE CONCRETO ARMADO

0 10.03.01 CONCRETO FC=175 KG/CM2 m3 12.55

0 10.03.02 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 287.88

0 10.03.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 26.88

0 10.04 ACABADOS

0 10.04.01 TARRAJEO (MORTERO 1:3 e=1.5cm) m2 30.24

0 10.05 INSTALACION DE ACCESORIOS

0 10.05.01 SUM E INSTAL DE ACCESORIOS EN VALVULA CONTROL D=2" und 12.00

0 10.05.02 INSTALACION DE TAPA METALICA 0.80mx0.80m e=1/8" und 12.00

0 11 VALVULAS DE PURGA (11 UND)

0 11.01 TRABAJOS PRELIMINARES

0 11.01.01 TRAZO Y REPLANTEO m2 7.70

0 11.02 MOVIMIENTO DE TIERRAS

0 11.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 6.16

0 11.03 OBRAS DE CONCRETO ARMADO

0 11.03.01 CONCRETO FC=175 KG/CM2 m3 3.08

0 11.03.02 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 233.59

0 11.03.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 20.02

0 11.04 ACABADOS

0 11.04.01 TARRAJEO (MORTERO 1:3 e=1.5cm) m2 20.02

0 11.05 INSTALACION DE ACCESORIOS

0 11.05.01 SUM E INSTAL DE ACCESORIOS EN VALVULA DE PURGA D=1 1/2" und 11.00

0 11.05.02 INSTALACION DE TAPA METALICA 0.50mx0.80m e=1/8" und 11.00

0 12 CAMARA DE ROMPE PRESION ( 05 UND)

0 12.01 TRABAJOS PRELIMINARES

0 12.01.01 LIMPIEZA DE TERRENO MANUAL m2 15.00

0 12.01.02 TRAZO Y REPLANTEO m2 15.00

0 12.02 MOVIMIENTO DE TIERRAS

0 12.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 12.44

0 12.03 OBRAS DE CONCRETO ARMADO

0 12.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 70.65

0 12.03.02 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 548.50

0 12.03.03 CONCRETO FC=210 KG/CM2 m3 6.87

0 12.04 REVOQUES ENLUCIDOS Y MOLDURAS

0 12.04.01 TARRAJEO IMPERMEABILIZADO DE MUROS (MEZCLA 1:3 E=1.5 CM) m2 32.50

0 12.05 INSTALACION DE ACCESORIOS

0 12.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA ROMPE PRESION GLB 5.00

0 12.05.02 INSTALACION DE TAPA METALICA 0.50x0.50 e=1/8" und 5.00

0 13 CAMARA DE REUNION (01 UND)

0 13.01 TRABAJOS PRELIMINARES

0 13.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.00

0 13.01.02 TRAZO Y REPLANTEO m2 3.00

Page 55: Trabajo Digregado 1

0 13.02 MOVIMIENTO DE TIERRAS

0 13.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 2.49

0 13.03 OBRAS DE CONCRETO ARMADO

0 13.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.13

0 13.03.02 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg 109.70

0 13.03.03 CONCRETO FC=210 KG/CM2 m3 1.37

0 13.04 REVOQUES ENLUCIDOS Y MOLDURAS

0 13.04.01 TARRAJEO IMPERMEABILIZADO DE MUROS (MEZCLA 1:3 E=1.5 CM) m2 6.50

0 13.05 INSTALACION DE ACCESORIOS

0 13.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA DE REUNION GLB 1.00

0 13.05.02 INSTALACION DE TAPA METALICA 0.40x0.60 e=1/8" und 1.00

0 14 MITIGACION DE IMPACTO AMBIENTAL

0 14.01 CONTROL Y MITIGACION DE IMPACTO AMBIENTAL GLB 1.00

0 14.02 CONFORMACION DE BOTADERO m2 240.00

0 15 FLETE

0 15.01 FLETE TERRESTRE GLB 1.00

0 15.02 FLETE RURAL GLB 1.00

0 16 CAPACITACION EN EL MANEJO DE CULTIVO DE RIEGO

0 16.01 CAPTACION Y ASISTENCIA TECNICA EN TECNOLOGIA PRODUCTIVA Y GESTION EM GLB 1.00

0 16.02 CAPACITACION EN MANEJO DE RIEGO GLB 1.00

0 17 FORTALECIMIENTO EN GESTION DE RIEGO

0 17.01 CONSTITUCION, ORGANIZACIÓN Y O&M DEL SISTEMA DE RIEGO GLB 1.00

Page 56: Trabajo Digregado 1

Precio (S/.) Parcial (S/.)PORQUE por

1,585.40

685.40 685.40

900.00 900.00

12,327.04

214.20

1.05 94.50

1.33 119.70

317.18

28.25 246.06

13.73 71.12

1,419.22

407.47 472.67

122.61 946.55

3,968.45

336.52 1,258.58

20.98 645.97

4.35 2,063.90

698.82

17.75 698.82

1,414.23

471.41 1,414.23

649.98

108.33 324.99

108.33 324.99

3,644.96

43.89

1.33 43.89

86.23

28.25 45.77

19.93 40.46

660.10

407.47 660.10

2,854.74

44.13 1,588.68

1.51 498.30

255.92 767.76

62,406.92

132.30

1.05 132.30

10,739.45

28.25 5,339.25

5.49 691.74

19.93 4,708.46

3,313.93

263.01 3,313.93

35,474.02

430.28 27,778.88

26.28 4,724.09

4.35 2,971.05

7,163.68

34.30 3,025.26

34.30 3,567.20

5.08 64.01

5.83 507.21

861.80

422.10 422.10

439.70 439.70

4,721.74

62.19

Page 57: Trabajo Digregado 1

1.33 62.19

163.61

18.00 74.16

13.73 19.50

19.93 69.95

1,764.86

336.52 1,558.09

20.98 52.87

4.35 153.90

2,731.08

2,731.08 2,731.08

11,948.55

710.22

1.33 710.22

6,820.89

17.65 3,016.03

0.62 331.08

2.74 1,463.16

11.75 250.98

13.73 1,759.64

4,330.74

7.02 3,748.68

1.09 582.06

86.70

86.70 86.70

77,676.60

3,100.23

1.33 3,100.23

55,701.58

17.65 13,165.49

0.62 1,445.22

2.74 6,386.94

11.75 1,095.57

24.03 33,608.36

18,551.19

7.02 10,459.80

6.60 5,550.60

1.09 2,540.79

323.60

323.60 323.60

124,604.13

4,838.54

1.33 4,838.54

92,759.90

17.65 20,547.42

0.62 2,255.56

3.14 11,423.32

11.75 1,709.86

24.03 56,823.74

26,884.82

6.30 22,919.40

1.09 3,965.42

120.87

120.87 120.87

62,493.20

811.60 62,493.20

25,184.01

11.37

1.33 11.37

20,547.42

17.65 20,547.42

3,274.88

336.52 1,928.26

20.98 513.59

4.35 833.03

Page 58: Trabajo Digregado 1

649.81

25.07 649.81

700.53

120.85 362.55

112.66 337.98

20,657.77

25.60

1.33 25.60

203.86

17.65 203.86

3,650.01

336.52 2,486.88

20.98 1,163.13

492.03

17.75 492.03

16,286.27

108.85 8,381.45

102.66 7,904.82

10,894.89

10.21

1.33 10.21

108.37

17.65 108.37

6,039.55

336.52 4,223.33

4.35 1,252.28

20.98 563.94

536.76

17.75 536.76

4,200.00

247.09 2,965.08

102.91 1,234.92

5,389.82

10.24

1.33 10.24

108.72

17.65 108.72

2,472.62

336.52 1,036.48

4.35 1,016.12

20.98 420.02

355.36

17.75 355.36

2,442.88

115.67 1,272.37

106.41 1,170.51

9,562.26

35.70

1.05 15.75

1.33 19.95

219.57

17.65 219.57

6,824.24

20.98 1,482.24

4.35 2,385.98

430.28 2,956.02

1,114.75

34.30 1,114.75

1,368.00

164.10 820.50

109.50 547.50

1,892.78

7.14

1.05 3.15

1.33 3.99

Page 59: Trabajo Digregado 1

43.95

17.65 43.95

1,363.13

20.98 296.45

4.35 477.20

430.28 589.48

222.95

34.30 222.95

255.61

146.11 146.11

109.50 109.50

8,368.80

4,500.00 4,500.00

16.12 3,868.80

31,500.00

23,000.00 23,000.00

8,500.00 8,500.00

4,200.00

3,500.00 3,500.00

700.00 700.00

3,400.00

3,400.00 3,400.00

Page 60: Trabajo Digregado 1

ELABORACIÓN DE FÓRMULA POLINÓMICA

¤ Item Descripción Und.

I.U.

1 01 OBRAS PRELIMINARES

0 01.01 CARTEL DE OBRA und

0 01.02 ALQUILER PARA OFICINA Y ALMACEN DE OBRA GLB

2 02 CAPTACION (03 UNID)

0 02.01 TRABAJOS PRELIMINARES

0 02.01.01 LIMPIEZA DE TERRENO MANUAL m2

0 02.01.02 TRAZO Y REPLANTEO m2

0 02.02 MOVIMIENTO DE TIERRAS

0 02.02.01 EXCAVACION PARA ESTRUCTURAS EN TERRENO NORMAL m3

0 02.02.02 RELLENO CON MATERIAL PROPIO m3

0 02.03 OBRAS DE CONCRETO SIMPLE

0 02.03.01 CONCRETO SIMPLE FC=140 KG/CM2 m3

0 02.03.02 CONCRETO CON MAMPOSTERIA DE PIEDRA FC=175 KG/CM +30%PM m3

0 02.04 OBRAS DE CONCRETO ARMADO

0 02.04.01 CONCRETO FC=175 KG/CM2 m3

0 02.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2

0 02.04.03 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg

0 02.05 REVOQUES ENLUCIDOS Y MOLDURAS

0 02.05.01 TARRAJEO (MORTERO 1:3 e=1.5cm) m2

0 02.06 INSTALACIONES DE ACCESORIOS

0 02.06.01 INSTALACIONES DE ACCESORIOS GLB

0 02.07 CARPINTERIA METALICA

0 02.07.01 INSTALACION DE TAPA METALICA 60X60cm und

0 02.07.02 INSTALACION DE TAPA METALICA 40X40cm und

0 02.08 CERCO PERIMETRICO DE SEGURIDAD

0 02.08.01 TRABAJOS PRELIMINARES

0 02.08.01.01 TRAZO Y REPLANTEO m2

0 02.08.02 MOVIMIENTO DE TIERRAS

0 02.08.02.01 EXCAVACION MANUAL TERRENO NORMAL m3

0 02.08.02.02 ELIMINACION DE MATERIAL EXCEDENTE HASTA D=50M m3

0 02.08.03 CONCRETO SIMPLE

0 02.08.03.01 CONCRETO FC=140 KG/CM2 m3

0 02.08.04 COLOCACION DE CERCO PERIMETRICO

0 02.08.04.01 COLOCADO DE CUARTON DE EUCALIPTO DE 3"x3" x2.50 und

0 02.08.04.02 ALAMBRE DE PUAS Nº 12 m

0 02.08.04.03 COLOCADO DE PUERTA CON MARCO DE MADERA und

3 03 RESERVORIO NOCTURNO 216 M3 (01 UND)

0 03.01 TRABAJOS PRELIMINARES

0 03.01.01 LIMPIEZA DE TERRENO MANUAL m2

0 03.02 MOVIMIENTO DE TIERRAS

0 03.02.01 EXCAVACION PARA ESTRUCTURAS EN TERRENO NORMAL m3

0 03.02.02 REFINE, NIVELACION Y COMPACTACION m2

0 03.02.03 ELIMINACION DE MATERIAL EXCEDENTE HASTA D=50M m3

0 03.03 CONCRETO SIMPLE

Page 61: Trabajo Digregado 1

0 03.03.01 SOLADO DE CONCRETO C:H 1:10 E=0.10M m3

0 03.04 CONCRETO ARMADO

0 03.04.01 CONCRETO FC=210 KG/CM2 m3

0 03.04.02 ENCOFRADO Y DESENCOFRADO DE MUROS m2

0 03.04.03 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg

0 03.05 REVESTIMIENTO Y JUNTAS

0 03.05.01 TARRAJEO CON IMPERMEABILIZANTE MURO INTERIOR DE CONCRETO m2

0 03.05.02 TARRAJEO CON IMPERMEABILIZANTE FONDO DE LOSA m2

0 03.05.03 WATER STOP DE 9" PROVISION Y COLOCADO DE JUNTA m

0 03.05.04 BRUÑA DE DILATACION CON ASFALTO E=1" m

0 03.06 OTRAS PARTIDAS

0 03.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIOS GLB

0 03.06.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN CAJA DE VALVULAS GLB

0 03.07 CERCO PERIMETRICO DE SEGURIDAD

0 03.07.01 TRABAJOS PRELIMINARES

0 03.07.01.01 TRAZO Y REPLANTEO m2

0 03.07.02 MOVIMIENTO DE TIERRAS

0 03.07.02.01 EXCAVACION PARA ZAPATAS EN TERRENO NORMAL m3

0 03.07.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3

0 03.07.02.03 ELIMINACION DE MATERIAL DE EXCAVACION D>50m m3

0 03.07.03 OBRAS DE CONCRETO ARMADO

0 03.07.03.01 CONCRETO FC=175 KG/CM2 m3

0 03.07.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2

0 03.07.03.03 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg

0 03.07.04 INSTALACION DE ACCESORIOS DE CERCO PERIMETRICO

0 03.07.04.01 INSTALACION DE ACCESORIOS DE CERCO PERIMETRICO GLB

4 04 LINEA DE CONDUCCION TUB. PVC L = 534.00 ML

0 04.01 TRABAJOS PRELIMINARES

0 04.01.01 TRAZO Y REPLANTEO m2

0 04.02 MOVIMIENTO DE TIERRAS

0 04.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3

0 04.02.02 REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m. m

0 04.02.03 CAMA DE APOYO CON MATERIAL SELECCIONADO (E=10 cm) m

0 04.02.04 RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO m3

0 04.02.05 RELLENO COMPACTADO CON MATERIAL PROPIO m3

0 04.03 INSTALACION DE TUBERIAS PVC

0 04.03.01 INSTALACION DE TUBERIA 3" PVC C-7.5 m

0 04.03.02 DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC m

0 04.04 INSTALACION DE ACCESORIOS

0 04.04.01 INSTALACION DE ACCESORIOS EN LINEA DE CONDUCCION GLB

5 05 LINEA DE DISTRIBUCION Y ADUCCION TUB. PVC (L = 2331 ML)

0 05.01 TRABAJOS PRELIMINARES

0 05.01.01 TRAZO Y REPLANTEO m2

0 05.02 MOVIMIENTO DE TIERRAS

0 05.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3

0 05.02.02 REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m. m

0 05.02.03 CAMA DE APOYO CON MATERIAL SELECCIONADO (E=10 cm) m

0 05.02.04 RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO m3

0 05.02.05 RELLENO CON MATERIAL PROPIO m3

0 05.03 INSTALACION DE TUBERIAS PVC

0 05.03.01 INSTALACION DE TUBERIA 3" PVC C-7.5 m

0 05.03.02 INSTALACION DE TUBERIA 2" PVC C-7.5 m

0 05.03.03 DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC m

Page 62: Trabajo Digregado 1

0 05.04 INSTALACION DE ACCESORIOS

0 05.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN LINEA DE DISTRIBUCION GLB

6 06 LINEA DE RIEGO FIJO TUB. PVC (L = 3638 ML)

0 06.01 TRABAJOS PRELIMINARES

0 06.01.01 TRAZO Y REPLANTEO m2

0 06.02 MOVIMIENTO DE TIERRAS

0 06.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3

0 06.02.02 REFINE Y NIVELACION DE FONDO DE ZANJAS DE ANCHO 0.40 m. m

0 06.02.03 CAMA DE APOYO CON MATERIAL SELECCIONADO (E=5 cm) m

0 06.02.04 RELLENO COMPACTADO MANUAL COON MATERIAL SELECCIONADO m3

0 06.02.05 RELLENO CON MATERIAL PROPIO m3

0 06.03 INSTALACION DE TUBERIAS PVC

0 06.03.01 INSTALACION DE TUBERIA 1.5" PVC C-7.5 m

0 06.03.02 DOBLE PRUEBA HIDRAULICA EN TUBERIA PVC m

0 06.04 INSTALACION DE ACCESORIOS

0 06.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN LINEA DE RIEGO FIJO GLB

7 07 LINEAS PORTATILES DE RIEGO POR ASPERSION (77 UND)

0 07.01 SUMINISTRO E INSTALACION DE LINEA MOVIL DE 50 m. CON 4 ASPERSORES SILVER und

8 08 CABECERA DE RIEGO ( 3 UND)

0 08.01 TRABAJOS PRELIMINARES

0 08.01.01 TRAZO Y REPLANTEO m2

0 08.02 MOVIMIENTO DE TIERRAS

0 08.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3

0 08.03 OBRAS DE CONCRETO ARMADO

0 08.03.01 CONCRETO FC=175 KG/CM2 m3

0 08.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2

0 08.03.03 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg

0 08.04 ACABADOS

0 08.04.01 TARRAJEO (MEZCLA 1:3 e=1.5cm) m2

0 08.05 INSTALACIONES DE ACCESORIOS

0 08.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CABECERA DE RIEGO GLB

0 08.05.02 INSTALACION DE TAPA METALICA 0.60x1.10m e=1/8" und

9 09 HIDRANTES ( 77 UND)

0 09.01 TRABAJOS PRELIMINARES

0 09.01.01 TRAZO Y REPLANTEO m2

0 09.02 MOVIMIENTO DE TIERRAS

0 09.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3

0 09.03 OBRAS DE CONCRETO SIMPLE

0 09.03.01 CONCRETO FC=175 KG/CM2 m3

0 09.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2

0 09.04 ACABADOS

0 09.04.01 TARRAJEO (MORTERO 1:3 e=1.5cm) m2

0 09.05 INSTALACION DE ACCESORIOS

0 09.05.01 SUMIN. E INSTAL DE ACCES EN HIDRANTES C/CONEXION A TUB DE 1 1/2" und

0 09.05.02 INSTALACION DE TAPA METALICA 0.45mx0.45m e=1/8" und

10 10 VALVULAS DE CONTRO (12 UND)

0 10.01 TRABAJOS PRELIMINARES

0 10.01.01 TRAZO Y REPLANTEO m2

0 10.02 MOVIMIENTO DE TIERRAS

0 10.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3

0 10.03 OBRAS DE CONCRETO ARMADO

0 10.03.01 CONCRETO FC=175 KG/CM2 m3

0 10.03.02 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg

Page 63: Trabajo Digregado 1

0 10.03.03 ENCOFRADO Y DESENCOFRADO NORMAL m2

0 10.04 ACABADOS

0 10.04.01 TARRAJEO (MORTERO 1:3 e=1.5cm) m2

0 10.05 INSTALACION DE ACCESORIOS

0 10.05.01 SUM E INSTAL DE ACCESORIOS EN VALVULA CONTROL D=2" und

0 10.05.02 INSTALACION DE TAPA METALICA 0.80mx0.80m e=1/8" und

11 11 VALVULAS DE PURGA (11 UND)

0 11.01 TRABAJOS PRELIMINARES

0 11.01.01 TRAZO Y REPLANTEO m2

0 11.02 MOVIMIENTO DE TIERRAS

0 11.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3

0 11.03 OBRAS DE CONCRETO ARMADO

0 11.03.01 CONCRETO FC=175 KG/CM2 m3

0 11.03.02 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg

0 11.03.03 ENCOFRADO Y DESENCOFRADO NORMAL m2

0 11.04 ACABADOS

0 11.04.01 TARRAJEO (MORTERO 1:3 e=1.5cm) m2

0 11.05 INSTALACION DE ACCESORIOS

0 11.05.01 SUM E INSTAL DE ACCESORIOS EN VALVULA DE PURGA D=1 1/2" und

0 11.05.02 INSTALACION DE TAPA METALICA 0.50mx0.80m e=1/8" und

12 12 CAMARA DE ROMPE PRESION ( 05 UND)

0 12.01 TRABAJOS PRELIMINARES

0 12.01.01 LIMPIEZA DE TERRENO MANUAL m2

0 12.01.02 TRAZO Y REPLANTEO m2

0 12.02 MOVIMIENTO DE TIERRAS

0 12.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3

0 12.03 OBRAS DE CONCRETO ARMADO

0 12.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2

0 12.03.02 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg

0 12.03.03 CONCRETO FC=210 KG/CM2 m3

0 12.04 REVOQUES ENLUCIDOS Y MOLDURAS

0 12.04.01 TARRAJEO IMPERMEABILIZADO DE MUROS (MEZCLA 1:3 E=1.5 CM) m2

0 12.05 INSTALACION DE ACCESORIOS

0 12.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA ROMPE PRESION GLB

0 12.05.02 INSTALACION DE TAPA METALICA 0.50x0.50 e=1/8" und

13 13 CAMARA DE REUNION (01 UND)

0 13.01 TRABAJOS PRELIMINARES

0 13.01.01 LIMPIEZA DE TERRENO MANUAL m2

0 13.01.02 TRAZO Y REPLANTEO m2

0 13.02 MOVIMIENTO DE TIERRAS

0 13.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3

0 13.03 OBRAS DE CONCRETO ARMADO

0 13.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2

0 13.03.02 ACERO DE REFUERZO Fy = 4 200 KG/CM2 GRADO 60 kg

0 13.03.03 CONCRETO FC=210 KG/CM2 m3

0 13.04 REVOQUES ENLUCIDOS Y MOLDURAS

0 13.04.01 TARRAJEO IMPERMEABILIZADO DE MUROS (MEZCLA 1:3 E=1.5 CM) m2

0 13.05 INSTALACION DE ACCESORIOS

0 13.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA DE REUNION GLB

0 13.05.02 INSTALACION DE TAPA METALICA 0.40x0.60 e=1/8" und

14 14 MITIGACION DE IMPACTO AMBIENTAL

0 14.01 CONTROL Y MITIGACION DE IMPACTO AMBIENTAL GLB

0 14.02 CONFORMACION DE BOTADERO m2

Page 64: Trabajo Digregado 1

15 15 FLETE

0 15.01 FLETE TERRESTRE GLB

0 15.02 FLETE RURAL GLB

16 16 CAPACITACION EN EL MANEJO DE CULTIVO DE RIEGO

0 16.01 CAPTACION Y ASISTENCIA TECNICA EN TECNOLOGIA PRODUCTIVA Y GESTION EMPRESARGLB

0 16.02 CAPACITACION EN MANEJO DE RIEGO GLB

17 17 FORTALECIMIENTO EN GESTION DE RIEGO

0 17.01 CONSTITUCION, ORGANIZACIÓN Y O&M DEL SISTEMA DE RIEGO GLB

DESCRIPCION VARIABLE

COSTO DIRECTO NDIRECTO

GASTOS GENERALES 7% GG

UTILIDAD 5% UTI

SUB-TOTAL ST

IGV 18% IGV

TOTAL PRESUPUESTO

CONFORMACIÓN DE MONOMIOS

MONOMIOS I.U.

1 MANO DE OBRA 472 MAQUINARIA Y EQUIPO NACIONAL 483 ACERO 304 CEMENTO 215 TUBERIA 726 GG+UTI 39

LEYENDACOSTO TOTALES DE CADA PARTIDAS DEL PRESUPUESTO

COSTO TOTALES DE CADA UNO DE LOS ELEMENTODISGREGADO

𝐾𝑎𝑞=0.08312∗𝐶𝑟/𝐶𝑜+0.50105∗(𝑀𝑂𝐵 𝑟)/(𝑀𝑂𝐵 𝑜)+0.08605∗(𝑀𝐴𝑄 𝑟)/(𝑀𝐴𝑄 𝑜)+0.07728∗𝑇𝑟/𝑇𝑜+0.14536∗(𝐴 𝑟)/(𝐴 𝑜)+0.10714∗(𝐺𝑈 𝑟)/(𝐺𝑢 𝑜)

Page 65: Trabajo Digregado 1

ELABORACIÓN DE FÓRMULA POLINÓMICA

Metrado Precio (S/.) Parcial (S/.)

MANO DE OBRA equipo

OPERARIO OFICIAL PEON toporafo carretilla

47 47 47 37 37

1,585.40

1.00 685.40 685.40 18.00 3.00

1.00 900.00 900.00

12,327.04

214.20

90.00 1.05 94.50 12.00 450.00

90.00 1.33 119.70 4.80 2.40 270.00

317.18

8.71 28.25 246.06 9.95 19.91 26.13

5.18 13.73 71.12 5.18 15.54

1,419.22

1.16 407.47 472.67 2.32 2.32 11.60 3.48

7.72 122.61 946.55 2.47 2.47 4.94 23.16

3,968.45

3.74 336.52 1,258.58 1.66 3.32 8.31 11.22

30.79 20.98 645.97 4.10 20.53 92.37

474.46 4.35 2,063.90 18.98 18.98 1423.38

698.82

39.37 17.75 698.82 26.25 26.25 196.85

1,414.23

3.00 471.41 1,414.23 4.80 4.80 9.00

649.98

3.00 108.33 324.99 6.00 3.00 9.00

3.00 108.33 324.99 6.00 3.00 9.00

3,644.96

43.89

33.00 1.33 43.89 1.76 0.88 99.00

86.23

1.62 28.25 45.77 1.85 3.70 4.86

2.03 19.93 40.46 1.62 6.09 0.25

660.10

1.62 407.47 660.10 3.24 3.24 16.20 4.86

2,854.74

36.00 44.13 1,588.68 32.00 32.00 64.00 108.00

330.00 1.51 498.30 13.20 990.00

3.00 255.92 767.76 8.00 16.00 9.00

62,406.92

132.30

126.00 1.05 132.30 16.80 630.00

10,739.45

189.00 28.25 5,339.25 216.01 432.00 567.00

126.00 5.49 691.74 50.40 378.00

236.25 19.93 4,708.46 189.00 708.75 29.53

3,313.93

HERRAMIENTAS MANUALES

Page 66: Trabajo Digregado 1

12.60 263.01 3,313.93 10.08 10.08 40.32 37.80

35,474.02

64.56 430.28 27,778.88 103.30 103.30 516.48 322.80

179.76 26.28 4,724.09 102.71 102.71 20.55 539.28

683.00 4.35 2,971.05 27.32 27.32 2049.00

7,163.68

88.20 34.30 3,025.26 50.40 25.20 264.60

104.00 34.30 3,567.20 59.43 29.71 312.00

12.60 5.08 64.01 2.10 2.10 25.20

87.00 5.83 507.21 13.92 27.84 261.00

861.80

1.00 422.10 422.10 8.00 8.00 8.00 5.00

1.00 439.70 439.70 8.00 8.00 5.00

4,721.74

62.19

46.76 1.33 62.19 2.49 1.25 140.28

163.61

4.12 18.00 74.16 9.42 20.60

1.42 13.73 19.50 1.42 4.26

3.51 19.93 69.95 2.81 10.53 0.44

1,764.86

4.63 336.52 1,558.09 2.06 4.12 10.29 13.89

2.52 20.98 52.87 0.34 1.68 7.56

35.38 4.35 153.90 1.42 1.42 106.14

2,731.08

1.00 2,731.08 2,731.08 2.00 4.00 4.00 3.00

11,948.55

710.22

534.00 1.33 710.22 28.46 14.26 1602.00

6,820.89

170.88 17.65 3,016.03 390.58 512.64

534.00 0.62 331.08 42.72 1602.00

534.00 2.74 1,463.16 21.36 42.72 1602.00

21.36 11.75 250.98 2.44 24.41 64.08

128.16 13.73 1,759.64 128.16 384.48

4,330.74

534.00 7.02 3,748.68 19.44 38.82 2670.00

534.00 1.09 582.06 17.09 25.63 2670.00

86.70

1.00 86.70 86.70 0.40 0.80 3.00

77,676.60

3,100.23

2,331.00 1.33 3,100.23 124.24 62.24 699.30

55,701.58

745.92 17.65 13,165.49 1704.95 2237.76

2,331.00 0.62 1,445.22 186.48 6993.00

2,331.00 2.74 6,386.94 93.24 186.48 6993.00

93.24 11.75 1,095.57 10.66 13.32 279.72

1,398.60 24.03 33,608.36 1398.60 1398.60 4195.80

18,551.19

1,490.00 7.02 10,459.80 54.24 108.32 7450.00

841.00 6.60 5,550.60 30.61 61.14 4205.00

2,331.00 1.09 2,540.79 74.59 111.89 11655.00

Page 67: Trabajo Digregado 1

323.60

1.00 323.60 323.60 8.00 8.00 8.00 5.00

124,604.13

4,838.54

3,638.00 1.33 4,838.54 193.91 97.13 10914.00

92,759.90

1,164.16 17.65 20,547.42 19953.70 593.72

3,638.00 0.62 2,255.56 2182.80 72.76

3,638.00 3.14 11,423.32 1637.10 6839.44 436.56 2510.22

145.52 11.75 1,709.86 165.89 1247.11 42.20

2,364.70 24.03 56,823.74 23647.00 17735.25 1253.29

26,884.82

3,638.00 6.30 22,919.40 1309.68 2000.90 181.90

3,638.00 1.09 3,965.42 1164.16 1309.68 109.14

120.87

1.00 120.87 120.87 26.67 20.00 1.40

62,493.20

77.00 811.60 62,493.20 616.00 924.00 46.20

25,184.01

11.37

8.55 1.33 11.37 3.42 2.31 0.17

20,547.42

1,164.16 17.65 20,547.42 19953.70 593.72

3,274.88

5.73 336.52 1,928.26 25.44 45.84 95.52 4.99

24.48 20.98 513.59 32.56 122.40 4.65

191.50 4.35 833.03 76.60 68.94 3.83

649.81

25.92 25.07 649.81 172.89 155.52 129.60 22.81

700.53

3.00 120.85 362.55 39.99 36.00 30.00 5.31

3.00 112.66 337.98 48.00 18.00 1.98

20,657.77

25.60

19.25 1.33 25.60 7.70 5.20 0.39

203.86

11.55 17.65 203.86 197.97 5.89

3,650.01

7.39 336.52 2,486.88 32.81 59.12 123.19 6.43

55.44 20.98 1,163.13 73.74 277.20 10.53

492.03

27.72 17.75 492.03 184.89 166.32 17.46

16,286.27

77.00 108.85 8,381.45 1026.41 924.00 770.00 136.29

77.00 102.66 7,904.82 1232.00 462.00 50.82

10,894.89

10.21

7.68 1.33 10.21 3.07 2.07 0.15

108.37

6.14 17.65 108.37 105.24 3.13

6,039.55

12.55 336.52 4,223.33 55.72 100.40 209.21 10.92

287.88 4.35 1,252.28 115.15 103.64 5.76

Page 68: Trabajo Digregado 1

26.88 20.98 563.94 35.75 134.40 5.11

536.76

30.24 17.75 536.76 201.70 181.44 19.05

4,200.00

12.00 247.09 2,965.08 159.96 144.00 9.12

12.00 102.91 1,234.92 19.20 144.00 4.92

5,389.82

10.24

7.70 1.33 10.24 3.08 2.08 0.15

108.72

6.16 17.65 108.72 105.58 3.14

2,472.62

3.08 336.52 1,036.48 13.68 24.64 51.34 2.68

233.59 4.35 1,016.12 93.44 84.09 4.67

20.02 20.98 420.02 26.63 100.10 3.80

355.36

20.02 17.75 355.36 133.53 120.12 12.61

2,442.88

11.00 115.67 1,272.37 146.63 132.00 8.36

11.00 106.41 1,170.51 22.00 165.00 5.61

9,562.26

35.70

15.00 1.05 15.75 15.00 0.75

15.00 1.33 19.95 6.00 4.05 0.30

219.57

12.44 17.65 219.57 213.22 6.34

6,824.24

70.65 20.98 1,482.24 93.96 353.25 13.42

548.50 4.35 2,385.98 219.40 197.46 10.97

6.87 430.28 2,956.02 109.92 98.93 412.20 31.05

1,114.75

32.50 34.30 1,114.75 185.58 69.55 7.80

1,368.00

5.00 164.10 820.50 66.65 50.00 5.85

5.00 109.50 547.50 100.00 3.00

1,892.78

7.14

3.00 1.05 3.15 3.00 0.15

3.00 1.33 3.99 1.20 0.81 0.06

43.95

2.49 17.65 43.95 42.68 1.27

1,363.13

14.13 20.98 296.45 18.79 70.65 2.68

109.70 4.35 477.20 43.88 39.49 2.19

1.37 430.28 589.48 21.92 19.73 82.20 6.19

222.95

6.50 34.30 222.95 37.12 13.91 1.56

255.61

1.00 146.11 146.11 13.33 12.00 0.76

1.00 109.50 109.50 20.00 0.60

8,368.80

1.00 4,500.00 4,500.00

240.00 16.12 3,868.80 64.80 48.00 2.40

Page 69: Trabajo Digregado 1

31,500.00

1.00 23,000.00 23,000.00

1.00 8,500.00 8,500.00

4,200.00

1.00 3,500.00 3,500.00

1.00 700.00 700.00

3,400.00

1.00 3,400.00 3,400.00

34012.49 5077.4349 83233.35 194.681292 80712.4081 2540.44375

474,092.17

33,186.45 0.06406 0.00956 0.15675 0.00037 0.15201 0.00478

23,704.61

530,983.23 Suma de I.U. semejantes 0.23074 0.19071

95,576.98 la suma debe ser al 100% 0.85927

626,560.21

CONFORMACIÓN DE MONOMIOS FÓRMULA POLINÓMICA

0.346170.190710.138730.026830.049690.107140.85927

COEFICIENTE DE INCIDENCIA (insumos)

COEFICIENTE DE INCIDENCIA 𝐾𝑎𝑞=0.08312∗𝐶𝑟/𝐶𝑜+0.50105∗(𝑀𝑂𝐵 𝑟)/(𝑀𝑂𝐵 𝑜)+0.08605∗(𝑀𝐴𝑄 𝑟)/(𝑀𝐴𝑄 𝑜)+0.07728∗𝑇𝑟/𝑇𝑜+0.14536∗(𝐴 𝑟)/(𝐴 𝑜)+0.10714∗(𝐺𝑈 𝑟)/(𝐺𝑢 𝑜)

Page 70: Trabajo Digregado 1

equipo MATERIALES

ira y jalone teoolito

48 49 48 49 37 48 30 65

1.00

2.40 2.40

2.59

1.16

2.47

1.66 1.66

0.88 0.88

1.62

25.20

ezclaora e concreto e 9-11p3

vibraor e concreto 4p 240"

ezclaora e concreto tropo 8p

9p3

copactacion y vibraor tipo planca 4p

boba anual para prueba e tuberia

cartele e bra iprea lina fibra

eun ieño

Page 71: Trabajo Digregado 1

10.08

51.65

1.25 1.20

0.71

2.06 2.06

14.26 14.26

64.08

17.09

62.24 62.24

699.30

74.59

Page 72: Trabajo Digregado 1

97.13 97.13

14188.20

1382.44

1.45 3.25

114.60 63.66

3.27 7.32

147.80 82.10

1.31 2.92

139.43 251.00

Page 73: Trabajo Digregado 1

1.31 2.93

34.22 61.60

2.55 5.70

164.88

0.51 1.14

32.88

Page 74: Trabajo Digregado 1

281.448176 323.130276 562.008 14980.08 188.563292 1474.12 201.364332 1

0.00053 0.00061 0.00106 0.02821 0.00036 0.00278 0.00038 0.00000

0.19071 0.43783

𝐾𝑎𝑞=0.08312∗𝐶𝑟/𝐶𝑜+0.50105∗(𝑀𝑂𝐵 𝑟)/(𝑀𝑂𝐵 𝑜)+0.08605∗(𝑀𝐴𝑄 𝑟)/(𝑀𝐴𝑄 𝑜)+0.07728∗𝑇𝑟/𝑇𝑜+0.14536∗(𝐴 𝑟)/(𝐴 𝑜)+0.10714∗(𝐺𝑈 𝑟)/(𝐺𝑢 𝑜)

Page 75: Trabajo Digregado 1

MATERIALES

65 65 65 65 65 65 65 77

3.00 6.00

3.00

3.00

tapa etalica 0.45x0.45

e=1/8"(incluio arco)

tapa etalica 0.40x0.40

e=1/8 incluio arco

tapa etalica 0.80x0.80n

e=1/8"

tapa etalica 0.50x0.80n

e=1/8"

tapa etalica 0.60x1.1n

e=1/8" incluio arco

tapa etalica 0.40x0.60

e=1/8 incluio arco

tapa etalica 0.60x0.60

e=1/8 incluio arco

cono e reboe pvc 6"x4"

valvula e copuerta bb4"

Page 76: Trabajo Digregado 1
Page 77: Trabajo Digregado 1

270.00

6160.00

Page 78: Trabajo Digregado 1

1066.80

977.90

444.50

88.90

Page 79: Trabajo Digregado 1

6160 3 1066.8 1422.4 270 88.9 3 3 6

0.01160 0.00001 0.00201 0.00268 0.00051 0.00017 0.00001 0.00001 0.00001

0.43783

Page 80: Trabajo Digregado 1

MATERIALES

canatilla 3"

72 72 72 65 65 65

3.00 6.00 6.00 9.00 12.00 3.00

tee pvc al 3"x3"

union iple pvc ap 3"

coo e fierro e 1 1/2"x90

coo ovc ap 4"x90"

nilpe pvc ap 4" 1.00

niple e f° alvanizao e 1 1/2"x1 1/2"

niple e fo oe 3"x9"

union univeral e fo alvanizao

e 1 1/2"

Page 81: Trabajo Digregado 1

4.00

2.00

Page 82: Trabajo Digregado 1
Page 83: Trabajo Digregado 1

288.00 1152.00

110.00

Page 84: Trabajo Digregado 1

9 6 110 6 9 288 12 3 1152

0.00002 0.00001 0.00021 0.00001 0.00002 0.00054 0.00002 0.00001 0.00217

0.43783

Page 85: Trabajo Digregado 1

MATERIALES

alabre nero #8

65 2 3 43 2 2 2 2 2

110.23 9.24 5.23

507.67 28.47

0.79

12.00

union univeral e fo alv 3"

clavo para aera c/c 2"

acero e refuerzo

fy=4200 rao 60

aera tornillo inc/corte

p/encofrao

alabre nero recocio #8

alabre nero #16

alabre recocio #8

clavo para aera c/c 3"

Page 86: Trabajo Digregado 1

30.56 643.54 12.58 30.56

730.81 40.98

9.02 0.76 0.43

37.86 2.12

Page 87: Trabajo Digregado 1

306.73 30.11 17.14

635.78 47.88

694.66 68.19 38.81

2.22

955.76 71.97

Page 88: Trabajo Digregado 1

336.81 33.06 18.82

2.42

775.52 58.40

250.85 24.62 14.01

1.60

885.24 86.90 49.46

1821.02 137.13

177.05 17.38 9.89

364.20 27.43

Page 89: Trabajo Digregado 1

12 37.585 5828.6232 3414.1386 128.904 12.5832 414.3629 141.357 184.3419

0.00002 0.00007 0.01098 0.00643 0.00024 0.00002 0.00078 0.00027 0.00035

0.43783

Page 90: Trabajo Digregado 1

MATERIALES

yeo e 28k arena fina orion aua

5 30 43 21 4 38 39 45 2 26 30

0.90 0.90

8.12 1.11 0.10

3.86 6.72

31.53 3.63 0.69

4.72 0.63

0.33 0.33

115.02 1.56 0.15

93.60

330.00

3.00 3.00

piera rane e 8"

etaca e aera

ceento portlan tipo i

cuarton e eucalipto 3"x3"x2.5

alabre e pua #16

canao incluio alaba

puerta e calaina e 1.85x1

ipereabilizante cea o iilar

Page 91: Trabajo Digregado 1

36.54 15.75 1.85

629.46 67.79 13.56

53.36 2.12 793.80 17.64

62.92 2.50 0.94 20.80

0.17

0.47 0.47

39.03 4.49 0.86

1.00 1.00

32.04 16.02

23.31 23.31

Page 92: Trabajo Digregado 1

36.38 36.38

0.51 0.26

1019.20 555.81 3.21

109.38 59.62

1.16 0.58

1314.46 716.83 4.14

70.13 51.00

0.46 0.23

2232.27 1217.35 7.03

Page 93: Trabajo Digregado 1

76.51 55.64

0.46 0.23

547.84 298.76 1.72

50.65 36.84

0.90 0.45

1413.37 721.35 4.33

415.03 89.70 0.98 136.50

0.18 0.09

281.85 143.85 0.86

83.01 17.94 0.20 27.30

Page 94: Trabajo Digregado 1

3.86 97.0984 79.243 8594.384 316.15592 3754.9921 834.40565 93.6 330 4 4 202.24

0.00001 0.00018 0.00015 0.01619 0.00060 0.00707 0.00157 0.00018 0.00062 0.00001 0.00001 0.00038

0.43783

Page 95: Trabajo Digregado 1

MATERIALES

cinta teflon

30 30 13 30 77

aitivo epoxico ika 32

junta inper water top neoprene 9"

afalto liquio rc-250

peaento para pvc

canatilla e alia e 3"

cono e reboe epvc 3"

aaptaor para pvc ap 1 1/2"

aaptaor para pvc ap 3"

cono e 90 pvc ap 3"

valvula copuerta e bronce e 1 1/2"

valcula copuerta e bronce e 3"

Page 96: Trabajo Digregado 1

13.23

15.60

13.23

11.57

0.01 2.00 4.00 4.00 5.00

0.01 4.00 5.00 4.00 170.00

5.34

14.90

8.41

Page 97: Trabajo Digregado 1

2546.60

346.50

11.25 60.00 180.00

288.75 616.00 4620.00

Page 98: Trabajo Digregado 1

84.00 108.00 96.00 660.00

66.00 88.00 605.88

209.63

7.00 350.00 91.00 250.00

41.93

0.02 20.00 60.00

Page 99: Trabajo Digregado 1

280.38 13.23 11.571 2666.27 352 828.52 95 800 340 4 5885.88 410

0.00053 0.00002 0.00002 0.00502 0.00066 0.00156 0.00018 0.00151 0.00064 0.00001 0.01108 0.00077

0.43783

Page 100: Trabajo Digregado 1

MATERIALES

rapa

41 30 4 72 72 72 72 72 72 72 72

rollizo e eucalipto e 5"

alla cocaa 2" e alabre alvanizao e 8bw=2.0

tierra cernia

tuberia pvc ap preion 3" clae 7.5

tuberia pvc ap preion 1.5" clae 7.5

reuccion pvc 1.1/2"x1"

reuccion pvc ap 3"

reuccion pvc ap 3"a2"

coo pvc ap(aua)con roca 3"x90"

tee pvc con reuccion 3"-2"

tee pvc con reuccion 3"-1 1/2"

Page 101: Trabajo Digregado 1

35.00 52.50 40.00

26.70

1.07

550.02

2.00 4.00

116.55

4.66

1534.70

866.23

Page 102: Trabajo Digregado 1

2.00 1.00

254.66

16880.32

Page 103: Trabajo Digregado 1

38.50

9.00

Page 104: Trabajo Digregado 1

35 52.5 40 403.64 2950.95 16880.32 38.5 9 2 4 2 1

0.00007 0.00010 0.00008 0.00076 0.00556 0.03179 0.00007 0.00002 0.00000 0.00001 0.00000 0.00000

0.43783

Page 105: Trabajo Digregado 1

MATERIALES

tee pvc 3"

72 72 72 72 72 65 72 72 72 30 30 49

coo pvc con reuccion 3"-2"

yee pvc c/reuccion 3"-2"

yee pvc c/reuccion 2"-1 1/2"

yee pvc c/reuccion 3"-1 1/2"

coo e fierro e 3"x90

coo pv ap 1 1/2x90

coo pv ap 45° 1 1/2

coo pv ap 22° 1 1/2

aperor bronce ectoral 3/4" ilver boquilla 4nn

quebracorro e bronce e 3/4"

elevaor f° ° e 3/4"x80n conexión aco

Page 106: Trabajo Digregado 1
Page 107: Trabajo Digregado 1

1.00 1.00 8.00 2.00 1.00

20.80 15.60 36.40

24640.00 1540.00 7700.00

Page 108: Trabajo Digregado 1

10.00

Page 109: Trabajo Digregado 1

1 1 8 2 1 10 20.8 15.6 36.4 24640 1540 7700

0.00000 0.00000 0.00002 0.00000 0.00000 0.00002 0.00004 0.00003 0.00007 0.04640 0.00290 0.01450

0.43783

Page 110: Trabajo Digregado 1

MATERIALES

botaero reniiento

72 72 72 72 72 4

3.00

tripoe anotable e 3/4"

llave tipo tee e 1/2"

llave pvc tipo bayoneta e 3/4"

coo p.e. 32nnx3/4"

tee p.e. 32nnx3/4"

anuera platica e 3/4"

tapon pvc e 3/4"

tee pvc ap rocao 1 1/2"

tee pvc ap e 3" c/r para aua

tierra e cacra o veetal

Page 111: Trabajo Digregado 1
Page 112: Trabajo Digregado 1

15400.00 1270.50 770.00 770.00 8470.00

Page 113: Trabajo Digregado 1

264.00

38.50 38.50

14.00 7.00

4500.00

153.60 3600.00

Page 114: Trabajo Digregado 1

23000.00

8500.00

3500.00

700.00

3400.00

15400 264 1270.5 770 770 8470 52.5 38.5 7 153.6 3600 43603.00

0.02900 0.00050 0.00239 0.00145 0.00145 0.01595 0.00010 0.00007 0.00001 0.00029 0.00678 0.08212

0.43783

Page 115: Trabajo Digregado 1

GG+UTI SUB TOTAL

39

22.00 4.143E-05

3.00 5.65E-06

462.00 0.0008701

283.81 0.0005345

55.99 0.0001055

23.31 4.39E-05

30.22 5.691E-05

46.09 8.68E-05

63.69 0.0001199

241.70 0.0004552

1997.48 0.0037618

255.49 0.0004812

78.60 0.000148

21 3.955E-05

21 3.955E-05

104.0622 0.000196

10.41 1.961E-05

7.96775 1.501E-05

145.88 0.0002747

329.6016 0.0006207

1333.20 0.0025108

38.9991 7.345E-05

646.80 0.0012181

1215.0054 0.0022882

453.6 0.0008543

927.28 0.0017463

Page 116: Trabajo Digregado 1

162.50 0.000306

1808.33 0.0034056

1482.50 0.002792

2875.43 0.0054153

1220.34402 0.0022983

503.89 0.000949

42.63 8.029E-05

314.505 0.0005923

44.01 8.288E-05

208.01 0.0003917

147.41 0.0002776

30.017084 5.653E-05

6.39 1.203E-05

13.78 2.595E-05

78.84 0.0001485

19.78 3.726E-05

148.95 0.0002805

142.5 0.0002684

1721.2956 0.0032417

903.22 0.001701

1644.72 0.0030975

1692.78 0.003188

92.001792 0.0001733

576.72 0.0010861

3283.6194 0.006184

2729.808 0.005141

12.20 2.298E-05

1056.8754 0.0019904

3942.71 0.0074253

7179.48 0.0135211

7389.27 0.0139162

308.363328 0.0005807

7692.30 0.0144869

9162.16 0.0172551

5171.39 0.0097393

11916.072 0.0224415

Page 117: Trabajo Digregado 1

45.00 8.475E-05

11472.0692 0.0216053

20547.42 0.0386969

2255.56 0.0042479

11423.32 0.0215135

1709.86 0.0032202

56823.74 0.1070161

22919.40 0.0431641

3965.42 0.0074681

120.87 0.0002276

62493.20 0.1176934

11.37 2.142E-05

20547.42 0.0386969

1928.26 0.0036315

513.59 0.0009672

833.03 0.0015688

649.81 0.0012238

362.55 0.0006828

337.98 0.0006365

25.60 4.822E-05

203.86 0.0003839

2486.88 0.0046835

1163.13 0.0021905

492.03 0.0009266

8381.45 0.0157848

7904.82 0.0148871

10.21 1.924E-05

108.37 0.0002041

4223.33 0.0079538

1252.28 0.0023584

Page 118: Trabajo Digregado 1

563.94 0.0010621

536.76 0.0010109

2965.08 0.0055841

1234.92 0.0023257

10.24 1.929E-05

108.72 0.0002048

1036.48 0.001952

1016.12 0.0019137

420.02 0.000791

355.36 0.0006692

1272.37 0.0023963

1170.51 0.0022044

15.75 2.966E-05

19.95 3.757E-05

219.57 0.0004135

1482.24 0.0027915

2385.98 0.0044935

2956.02 0.0055671

1114.75 0.0020994

820.50 0.0015452

547.50 0.0010311

3.15 5.932E-06

3.99 7.514E-06

43.95 8.277E-05

296.45 0.0005583

477.20 0.0008987

589.48 0.0011102

222.95 0.0004199

146.11 0.00028

109.50 0.00021

4500.00 0.00847

3868.80 0.00729

Page 119: Trabajo Digregado 1

23000.00 0.04332

8500.00 0.01601

3500.00 0.00659

700.00 0.00132

3400.00 0.00640

56,891.06 456260.22 0.85927

0.10714 0.85927

0.43783

Page 120: Trabajo Digregado 1

CONFORMACIÓN DE MONOMIOS

MONOMIOS

1 MANO DE OBRA

OPERARIO 0.09995

OFICIAL 0.02051

PEON 0.23678

TOPOGRAFO 0.00342

0.00094

MADERA TORNILLO inc/corte p/encofrado 0.01429

ESTACA DE MADERA 0.00038

CUARTON EUCALIPTO 3"x3"x2.5 0.00088

CANDADO INCLUIDO ALDABA 0.00019

PUERTA DE CALAMINA DE 1.85x1 0.00124

GRAPA 0.00036

ROLLIZO DE EUCALIPTO DE 5" 0.00237

TIERRA CERNIDA 0.01030

MANGUERA PLASTICA DE 3/4" 0.01595

CINTA TEFLON 0.00157

TIERRA DE CHACRA O VEGETAL 0.00029

BOTADERO 0.00678

RENDIMIENTO 0.08381

2

HERRAMIENTAS MANUALES 0.01205

CARRETILLA 0.01099

MEZCLADORA DE CONCRETO DE 9-11p3 0.00205

VIBRADOR DE CONCRETOo 4p 240" 0.00084

0.00388

0.04462

MIRA Y JALONES 0.00216

0.00465

TEODOLITO 0.00482

3 BRONCE

0.01160

0.00045

TAPA METALICA 0.80x0.80n e=1/8" 0.00201

TAPA METALICA 0.50x0.80m e=1/8" 0.00268

0.00051

0.00017

0.00045

CONO DE REBOE PVC 6"x4" 0.00010

VALVULA COMPUERTA BB4" 0.00085

CODO DE FIERRO de 1 1/2"x90 0.00021

CODO PVC SAP 4"x90" 0.00017

NIPLE DE f° GALVANIZADO DE 1 1/2"x1 1/2" 0.00054

NIPLE e fo DE 3"x9" 0.00028

CANASTILLA 3" 0.00020

0.00217

UNION UNIVERSAL DE fo GALV 3" 0.00042

CLAVO PARA MADERA c/c 2" 0.00025

ACERO DE REFUERZO fy=4200 GRADO 60 0.01176

CARTELES DE OBRA IMPREA LAMINA FIBRA SEGÚN DISEÑO

MAQUINARIA Y EQUIPO NACIONAL MEZCLADORA DE CONCRETO TROMPO

8p 9p3

COMPACTACION Y VIBRADOR TIPO PLANCHA 4hp

BOMBA ANUAL PARA PRUEBA DE TUBERIA

TAPA METALICA 0.45x0.45 e=1/8"(incluido marco)

TAPA METALICAa 0.40x0.40 e=1/8 incluido marco

TAPA METALICA 0.60x1.1n e=1/8" incluio marco

TAPA METALICA 0.40x0.60 e=1/8 incluio marcoTAPA METALICA 0.60x0.60 e=1/8 incluio marco

UNION UNIVERSAL DE fo GALVANIZADO DE 1 1/2"

Page 121: Trabajo Digregado 1

3 BRONCE

ALAMBRE NEGRO RECOCIDO NEGRO #8 0.00024

OALAMBRE NEGRO #8 0.00010

ALAMBRE NEGRO #16 0.00121

ALAMBRE RECOCIDO #8 0.00032

CLAVO PARA MADERA c/c 3" 0.00056

ALAMBRE DE PUAS #16 0.00075

CANASTILLA DE SALIDA DE 3" 0.00079

0.01108

0.00077

0.00188

CODO DE FIERRO DE 3"x90 0.00002

0.04640

QUEBRACHORRO DE BRONCE DE 3/4" 0.00290

0.01450

TRIPODE ANGOTABLE DE 3/4" 0.02900

4 CEMENTO

PIEDRA GRANDE DE 8" 0.00015

YEO DE 28k 0.00076

CEMENTO PORTALND TIPO I 0.04920

ARENA FINA 0.00176

HORMIGON 0.02591

AGUA 0.00015

IMPERMEABILIZANTE 0.00183

ADITIVO EPOXICO SIKA 32 0.00281

ASFALTO LIQUIDO rc-250 0.00027

5 TUBERIA

TEE PVC SAL 3"x3" 0.00024

UNION NIPLE PVC SAP 3" 0.00012

NIPLE PVC SAP 4" 1.00 0.00025

JUNTA INTER WATER TOP NEOPRENE 9" 0.00005

PEGAMENTO PARA PVC 0.00875

CONO DE REBOSE DE PVC 3" 0.00031

ADAPATADOR PARA PVC SAP 1 1/2" 0.00151

aADAPATADOR PARA PVC SAP 3" 0.00081

CONO DE 90 PVC SAP 3" 0.00006

TUBERIA PVC AP PRESION 3"CLASE 7.5 0.02826

TUBERIA PVC AP PRESION 1.5" CLASE 7.5 0.03179

REDUCCION PVC 1.1/2"x1" 0.00007

REDUCCION PVC SAP 3" 0.00002

REDUCCION PVC SAP 3"a2" 0.00002

CODO PVC SAP(aua)con roca 3"x90" 0.00005

TEE PVC CON REDUCCION 3"-2" 0.00002

TEE PVC CON REDUCCION 3"-1 1/2" 0.00001

TEE PVC CON REDUCCION 3"-2" 0.00001

YEE PVC c/reuccion 3"-2" 0.00001

YEE PVC c/reuccion 2"-1 1/2" 0.00009

YEE PVC c/reuccion 3"-1 1/2" 0.00003

TEE PVC 3" 0.00001

CODO DE PVC SAP 1 1/2x90 0.00004

CODO DE PVC SAP 45° 1 1/2 0.00003

CODO DE PVC SAP 22° 1 1/2 0.00007

CODO p.e. 32mmx3/4" 0.00145

LLAVE TIPO TEE DE 1/2" 0.00050

LLAVE PVC TIPO BAYONETA DE 3/4" 0.00239

TEE p.e. 32mmx3/4" 0.00145

TAPON PVC DE 3/4" 0.00010

TEE PVC SAP ROSCADO 1 1/2" 0.00007

TEE PVC AP DE 3" c/r para agua 0.00001

6 GG+UTI GG+UTI 0.10714

VALVULA DE COMPUERTA DE BRONCE DE 1 1/2"

VALVULA DE COMPUERTA DE BRONCE DE 3"

MALLA COCADA 2" DE ALAMBRE GALVANIZADO 8bw=2.0

ASPEROR BRONCE SECTORAL 3/4" SILVER BOQUILLA 4MM

ELEVADOR f° ° e 3/4"X80m conexión de marco