resumen liquidacion de obra

7
VAL. FECHA N° FACT. MONTO DIRECTO IGV 19% MONTO C.PAGO PAGO DE DETRACCION N° C. PAGO MONTO ORIGINAL CONT. 1 OCT. 2013 00051 139,716.91 26,546.21 166,263.12 149,472.59 0.00 167,905.32 2 NOV. 2013 00054 1,380.00 262.20 1,642.20 1,642.20 0.00 141,096.91 26,808.41 167,905.32 151,114.79 0.00 49304.88 217,210.20 VAL. FECHA N° FACT. MONTO DIRECTO IGV 18% MONTO C.PAGO PAGO DE DETRACCION N° C. PAGO MONTO ORIGINAL CONT 1 8/31/2013 00076 0.00 0.00 0.00 0.00 0.00 6459 0.00 0.00 0.00 0.00 0.00 0.00 49,304.88 106308.26 83123.644 151148.29 TOTAL TOTAL

Upload: abimael-beltran

Post on 02-Jun-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: resumen LIQUIDACION DE OBRA

8/10/2019 resumen LIQUIDACION DE OBRA

http://slidepdf.com/reader/full/resumen-liquidacion-de-obra 1/7

VAL. FECHA N° FACT.

MONTO

DIRECTO IGV 19% MONTO C.PAGO

PAGO DE

DETRACCION

N° C.

PAGO

MONTO

ORIGINAL CONT.

1 OCT. 2013 00051 139,716.91 26,546.21 166,263.12 149,472.59 0.00 167,905.32

2 NOV. 2013 00054 1,380.00 262.20 1,642.20 1,642.20 0.00

141,096.91 26,808.41 167,905.32 151,114.79 0.00

49304.88

217,210.20

VAL. FECHA N° FACT.

MONTO

DIRECTO IGV 18% MONTO C.PAGO

PAGO DE

DETRACCION

N° C.

PAGO

MONTO

ORIGINAL CONT

1 8/31/2013 00076 0.00 0.00 0.00 0.00 0.00 6459 0.00

0.00 0.00 0.00 0.00 0.00

49,304.88

106308.26

83123.644 151148.29

TOTAL

TOTAL

Page 2: resumen LIQUIDACION DE OBRA

8/10/2019 resumen LIQUIDACION DE OBRA

http://slidepdf.com/reader/full/resumen-liquidacion-de-obra 2/7

10% R.F.G

MONTO

PAGADO

16,790.53 167,905.32   151,114.79 14229.2644

0

16,790.53 167,905.32   167,905.32

167,905.32

10% R.F.G

MONTO

PAGADO

0.00 0.00

0.00 0.00

480640.6

0 167,905.33   567155.908

170,938.55 MONTO TOTAL DE OBRA

Page 3: resumen LIQUIDACION DE OBRA

8/10/2019 resumen LIQUIDACION DE OBRA

http://slidepdf.com/reader/full/resumen-liquidacion-de-obra 3/7

TOTAL 16,790.53

TOTAL 0.00

RETENCION POR GARANTIA DE FIEL CUMPLIMIENTO

RETENCION POR GARANTIA DE FIEL CUMPLIMIENTO ADICIONAL

Page 4: resumen LIQUIDACION DE OBRA

8/10/2019 resumen LIQUIDACION DE OBRA

http://slidepdf.com/reader/full/resumen-liquidacion-de-obra 4/7

CONTRATO ORIGINAL

MONTO CONTRACTUAL 167,905.32

MONTO PAGADO CONTRACTUAL 151,114.79

REAJUSTES 3,033.23

FONDO DE GARANTIA 16,790.53

SUB TOTAL 16,790.53ADICIONAL

MONTO CONTRATUAL 0.00

MONTO PAGADO CONTRACTUAL 0.00

DETRACCION 0.00

FONDO DE GARANTIA 0.00

SUBTOTAL 0.00

MONTO TOTAL A DEVOLVER AL CONTRATISTA 16,790.53

Page 5: resumen LIQUIDACION DE OBRA

8/10/2019 resumen LIQUIDACION DE OBRA

http://slidepdf.com/reader/full/resumen-liquidacion-de-obra 5/7

A

VAL.  PERIODO DE

VALORIZACION

REAJUSTE

CALCULO SIN

IGV

IGV 19 % PARCIAL

18%

1 NOV 2,364.01 449.16 2,813.16   425.52

2 DIC 184.92 35.13 220.05   33.29

3,033.23

B

VAL.  PERIODO DE

VALORIZACION

REAJUSTE

CALCULO SIN

IGV

IGV 18 % PARCIAL

1 SETIEMBRE 0.00 0.00 0.00

0.00

C TOTAL 2,548.93 484.30 3,033.23

TOTAL A

TOTAL B

CONTRATO ORIGINAL

ADICIONAL

Page 6: resumen LIQUIDACION DE OBRA

8/10/2019 resumen LIQUIDACION DE OBRA

http://slidepdf.com/reader/full/resumen-liquidacion-de-obra 6/7

23.64

1.85

Page 7: resumen LIQUIDACION DE OBRA

8/10/2019 resumen LIQUIDACION DE OBRA

http://slidepdf.com/reader/full/resumen-liquidacion-de-obra 7/7

ITEM RESUMEN TOTAL MONTO

1 DEVOL. RETENCION DE GARANTIA 10% 16,790.53   167,905.32

2 REAJUSTE FORM. POLINOMICA 3,033.23

4 REGULARIZACION IGV DE REAJUSTES -25.48

19,798.29TOTAL A PAGAR AL CONTRATISTA