practica calificada n2
DESCRIPTION
construccionTRANSCRIPT
-
MURO CONFINADOa) MOVIMIENTO DE TIERRASCIMIENTOALTURA 0.70ANCHO 0.60LARGO 96.00ALTURA DE CORTE 1.00
Vexcavacin 57.6
b) CONCRETO CICLPEOCIMIENTO
Vconcreto 40.32Mezcla de 1:10 (C-H) + 30% PG (6'')PARA (M3): 1 40.32CEMENTO (bls) 2.9 116.928HORMIGON (M3) 0.83 33.4656PIEDRA GRANDE (M3) 0.48 19.3536AGUA (M3) 0.1 4.032
c) C0NCRETO ARMADO COLUMNAS#COLUMNAS 25H columna 3.1b 0.3t 0.15
Vconcreto (M3) 3.4875
f'c = 175 kg/cm2 TM 3/4''SLUMP 4''
PARA (M3): 1 3.4875CEMENTO (bls) 8.43 29.400PIEDRA (M3) 0.55 1.918ARENA (M3) 0.54 1.883AGUA (M3) 0.185 0.645
d) ALBAILERIALADRILLOSL A H
0.24 0.13 0.09
c1 1/[(L+J)*(H+J)]c2 37 lad/m2#veces L muro H muro
2 3.55 2.522 3.7 2.5
-
#ladrillos 8187
-
PARA EL ACEROLONGITUDINALH columna (M) 4.2754 de 1/2''/columna 2TOTAL (barras) 50
0.99TOTAL (kg) 423.225
JUNTA0.015
A muro V muro17.75 2.3075203.5 26.455
Peso de 1/2'' (kg/m)
-
221.25 28.7625
-
SOBRECIMIENTOALTURA 0.6ANCHO 0.15LARGO 96ALTURA DE RELLENO 0.5
Vrelleno 21.6
SOBRECIMIENTOVconcreto 8.64
Mezcla de 1:8 (C-H) + 25%PM(3'')PARA (M3): 1 8.64CEMENTO (bls) 3.7 31.968HORMIGON (M3) 0.85 7.344PIEDRA MEDIANA (M3) 0.4 3.456AGUA (M3) 0.13 1.1232
ESTRIBOS#ESTRIBOS 20long estribo 0.88TOTAL (m) 440
0.25TOTAL (kg) 110
CONCRETOn 8187L 0.002808VM 5.77
Peso de 1/4'' (kg/m)
-
C) CANTIDAD DE MATERIALESMORTERO Cemento:Arena Gruesa (1:4)
1 M3 8.90 1.00Vm total 51.383 5.773
CEMENTO (bolsas)
ARENA GRUESA
(m3)
-
AGUA (lts)
2721570.366
Hoja1