OBRA: DESCRIPCION UND ELEM T L A H SUB TOTAL TOTAL 01.00.00 TRABAJOS PRELIMINARES 01.01.00 LIMPIEZA DE TERRENO MANUAL M2 0 29.70 8.00 0.00 0.00 01.02.00 TRAZO Y REPLANTEO 01.02.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR CON VALLAS AISLADAS M2 1 17.95 8.00 143.60 143.60 01.03.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M UND 1 2.40 3.00 1.00 1.00 02.00.00 MOVIMIENTO DE TIERRAS 02.01.00 NIVELACION DEL TERRENO 02.02.00 EXCAVACIONES 02.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.40 MT TERRENO NORMAL M3 12 1.75 0.50 0.85 8.93 JE A Y C EJES 1,4 Y 7 6 1.35 0.50 0.85 3.44 ZAPATAS 17 1.20 1.20 0.85 20.81 33.18 02.03.00 RELLENOS 02.03.01 RELLENO CON MATERIAL PROPIO M3 17 0.95 1.05 0.20 3.39 ZAPATA EJES 1,4 Y 6 12 1.75 0.35 0.20 1.47 EJES A y C 6 1.35 0.25 0.20 0.41 5.27 02.04.00 ELIMINACION CON TRANSPORTE (CARGUIO A MANO) REN.=25 M3/DIA M3 1.25 26.59 33.24 33.24 02.05.00 NIVELACION Y APISONADO DE INTERIORES M2 2 8.60 6.00 103.20 103.20 03.00.00 CONCRETO SIMPLE 03.01.00 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA M3 8 1.75 0.50 0.60 4.20 EJES A y C, entre 1-2 y 6-7 4 1.28 0.50 0.60 1.53 EJES 1,4 Y 6 6 1.35 0.50 0.60 2.43 8.16 03.02.00 ZAPATAS 03.02.01 CONCRETO EN ZAPATAS F'C= 175 KG/CM2 M3 17 1.20 1.20 0.60 14.69 14.69 03.02.02 SOLADO PARA ZAPATAS e=4", 1:12 Cemento:Hormigón M2 17 1.20 1.20 24.48 EJES 1,4 Y 6 6 1.53 0.50 4.59 Ejes Ay C, entre 2-6 8 1.75 0.50 7.00 EJES A y C, entre 1-2 y 6-7 4 1.28 0.50 2.55 38.62 03.02.03 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS KG # kg/m DIRECCION X 3/8" 17 1.05 8.00 0.559 79.83 DIRECCION Y 3/8" 17 1.05 8.00 0.559 79.83 159.65 04.00.00 CONCRETO ARMADO 04.01.00 VIGA DE CIMENTACION 04.01.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 M3 6 0.25 0.35 2.625 1.38 1.38 04.01.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACION M2 6 2.00 0.35 2.625 11.03 11.03 04.01.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CIMENTACION KG # kg/m ACERO PRINCIPAL 5/8" 3 6.60 5.00 1.552 153.65 ACERO PRINCIPAL 1/2" 3 6.60 1.00 0.993 19.66 ESTRIBO 3/8" 6 1.26 16.00 0.559 67.62 240.93 04.02.00 SOBRECIMIENTOS 04.02.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS M3 10 0.15 0.35 2.70 1.42 EJE A y C Eje A y C, en las puertas 2 0.15 0.35 1.50 0.16 1.58 04.02.02 ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT M2 12 2.00 0.50 2.70 32.40 32.40 04.02.03 ACERO ESTRUCTURAL TRABAJADO PARA SOBRECIMIENTO REFORZADO KG # kg/m ACERO PRINCIPAL 1/2" 2 18.90 4.00 0.993 150.14 ACERO PRINCIPAL 3/8" 2 18.90 2.00 0.559 42.26 Esponjamie= METRADOS “RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA Nº 10372 DEL CASERÍO CUÑANQUE-DISTRITO DE SOCOTA"

Upload: omar-julca-mendoza

Post on 14-Nov-2015

216 views

Category:

Documents


2 download

DESCRIPTION

metrado para formacion de una adecuada estudio de ing.civil

TRANSCRIPT

  • OBRA:

    DESCRIPCION UNDN

    ELEM

    T

    L A HSUB

    TOTALTOTAL

    01.00.00 TRABAJOS PRELIMINARES

    01.01.00 LIMPIEZA DE TERRENO MANUAL M2 0 29.70 8.00 0.00 0.00

    01.02.00 TRAZO Y REPLANTEO

    01.02.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR CON VALLAS AISLADAS M2 1 17.95 8.00 143.60 143.60

    01.03.00 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M UND 1 2.40 3.00 1.00 1.00

    02.00.00 MOVIMIENTO DE TIERRAS

    02.01.00 NIVELACION DEL TERRENO

    02.02.00 EXCAVACIONES

    02.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.40 MT TERRENO NORMAL M3 12 1.75 0.50 0.85 8.93EJE A Y C

    EJES 1,4 Y 7 6 1.35 0.50 0.85 3.44

    ZAPATAS 17 1.20 1.20 0.85 20.81 33.18

    02.03.00 RELLENOS

    02.03.01 RELLENO CON MATERIAL PROPIO M3 17 0.95 1.05 0.20 3.39 ZAPATA

    EJES 1,4 Y 6 12 1.75 0.35 0.20 1.47

    EJES A y C 6 1.35 0.25 0.20 0.41 5.27

    02.04.00 ELIMINACION CON TRANSPORTE (CARGUIO A MANO) REN.=25 M3/DIA M3 1.25 26.59 33.24 33.24

    02.05.00 NIVELACION Y APISONADO DE INTERIORES M2 2 8.60 6.00 103.20 103.20

    03.00.00 CONCRETO SIMPLE

    03.01.00 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA M3 8 1.75 0.50 0.60 4.20

    EJES A y C, entre 1-2 y 6-7 4 1.28 0.50 0.60 1.53

    EJES 1,4 Y 6 6 1.35 0.50 0.60 2.43 8.16

    03.02.00 ZAPATAS

    03.02.01 CONCRETO EN ZAPATAS F'C= 175 KG/CM2 M3 17 1.20 1.20 0.60 14.69 14.69

    03.02.02 SOLADO PARA ZAPATAS e=4", 1:12 Cemento:Hormign M2 17 1.20 1.20 24.48

    EJES 1,4 Y 6 6 1.53 0.50 4.59

    Ejes Ay C, entre 2-6 8 1.75 0.50 7.00

    EJES A y C, entre 1-2 y 6-7 4 1.28 0.50 2.55 38.62

    03.02.03 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS KG # kg/m

    DIRECCION X 3/8" 17 1.05 8.00 0.559 79.83

    DIRECCION Y 3/8" 17 1.05 8.00 0.559 79.83 159.65

    04.00.00 CONCRETO ARMADO

    04.01.00 VIGA DE CIMENTACION

    04.01.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 M3 6 0.25 0.35 2.625 1.38 1.38

    04.01.02 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACION M2 6 2.00 0.35 2.625 11.03 11.03

    04.01.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS DE CIMENTACION KG # kg/m

    ACERO PRINCIPAL 5/8" 3 6.60 5.00 1.552 153.65

    ACERO PRINCIPAL 1/2" 3 6.60 1.00 0.993 19.66

    ESTRIBO 3/8" 6 1.26 16.00 0.559 67.62 240.93

    04.02.00 SOBRECIMIENTOS

    04.02.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS M3 10 0.15 0.35 2.70 1.42EJE A y C

    Eje A y C, en las puertas 2 0.15 0.35 1.50 0.16 1.58

    04.02.02 ENCOFRADO Y DEDESENCOFRADO SOBRECIMIENTO HASTA 0.30 MT M2 12 2.00 0.50 2.70 32.40 32.40

    04.02.03 ACERO ESTRUCTURAL TRABAJADO PARA SOBRECIMIENTO REFORZADO KG # kg/m

    ACERO PRINCIPAL 1/2" 2 18.90 4.00 0.993 150.14

    ACERO PRINCIPAL 3/8" 2 18.90 2.00 0.559 42.26

    Esponjamie=

    METRADOSRECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA N 10372 DEL CASERO

    CUANQUE-DISTRITO DE SOCOTA"

  • OBRA:

    DESCRIPCION UNDN

    ELEM

    T

    L A HSUB

    TOTALTOTAL

    METRADOSRECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA N 10372 DEL CASERO

    CUANQUE-DISTRITO DE SOCOTA"

    ESTRIBO 1/4" 12 0.69 22.00 0.250 45.54 237.94

    04.03.00 COLUMNAS

    04.03.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 M3 14 0.25 0.40 5.90 8.26

    COL C-2 3 0.25 0.25 6.10 1.14 9.40

    04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 14 1.30 5.90 107.38

    COL C-2 3 1.00 6.10 18.30 125.68

    04.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS KG # kg/m

    ACERO PRINCIPAL C-1 5/8" 14 7.10 10.00 1.552 1,542.69

    ESTRIBO C-1 3/8" 14 1.46 40.00 0.559 457.04

    ACERO PRINCIPAL C-2 5/8" 3 7.10 4.00 1.552 132.23

    ESTRIBO C-2 3/8" 3 1.06 40.00 0.559 71.10 2,203.06

    04.04.00 VIGAS

    04.04.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 4 0.25 0.50 7.95 3.98 vp-102

    VP-101 (EJE 1,4 y 7) 3 0.25 0.20 5.75 0.86

    VS-101 EJE (A y C) 12 0.25 0.20 2.70 1.62

    VS-102 6 0.15 0.20 2.70 0.49

    VP-202 (EJE 2,3,5 y 6) 4 0.25 0.35 6.30 2.21

    VP-201 (EJE 1,4 y 7) 3 0.25 0.20 6.30 0.95

    VS-201 (EJE A y C) 12 0.25 0.20 2.70 1.62 11.71

    04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 4 0.85 7.15 24.31 vp-102

    VP-101 (EJE 1,4 y 7) 2 0.45 6.90 6.21

    VP-101 (EJE 4) 1 0.25 6.90 1.73

    VS-101 EJE A 6 0.45 2.70 7.29

    VS-101 EJE C 6 0.25 2.70 4.05

    VS-102 6 0.35 2.70 5.67

    VP-202 (EJE 2,3,5 y 6) 4 0.95 5.50 20.90

    VP-201 (EJE 1,4 y 7) 3 0.65 5.25 10.24

    VS-201 (EJE A y C) 12 0.65 2.70 21.06 101.45

    04.04.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELES KG # kg/m

    ACERO PRINCIPAL VP-101 1/2" 3 8.15 6.00 0.993 145.67

    ESTRIBO VP-101 1/4" 6 0.86 31.00 0.250 39.99

    ACERO PRINCIPAL VP-102 3/4" 4 8.25 3.00 2.235 221.27

    ACERO PRINCIPAL VP-102 5/8" 4 8.25 3.00 1.552 153.65

    ACERO PRINCIPAL VP-102 3/8" 4 8.25 4.00 0.559 73.79

    ESTRIBO VP-102 3/8" 4 1.60 40.00 0.559 143.10

    ACERO PRINCIPAL VS-101/VS-201 1/2" 4 18.40 4.00 0.993 292.34

    ESTRIBO VS-101/VS-201 1/4" 24 0.89 17.00 0.250 90.78

    ACERO PRINCIPAL VS-102 3/8" 1 18.25 4.00 0.559 40.81

    ESTRIBO VS-102 1/4" 6 0.65 31.00 0.250 30.23

    ACERO PRINCIPAL VP-201 1/2" 3 6.50 4.00 0.993 77.45

    ESTRIBO VS-201 1/4" 6 0.65 31.00 0.250 30.23

    ACERO PRINCIPAL VS-203 5/8" 4 6.60 3.00 1.552 122.92

    ACERO PRINCIPAL VS-203 1/2" 4 6.60 3.00 0.993 78.65

    ESTRIBO VS-203 1/4" 4 1.19 43.00 0.250 51.17 1,592.03

    04.05.00 LOSA ALIGERADA

  • OBRA:

    DESCRIPCION UNDN

    ELEM

    T

    L A HSUB

    TOTALTOTAL

    METRADOSRECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA N 10372 DEL CASERO

    CUANQUE-DISTRITO DE SOCOTA"

    04.05.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 M3 6 5.80 2.70 0.05 4.70 LOSA

    LOSA DE VOLADO 6 1.50 2.70 0.05 1.22

    19 VIGUETA 114 0.10 0.15 2.70 4.62 10.53

    04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS M2 6 5.80 2.70 93.96

    VOLADO 6 1.50 2.70 24.30 118.26

    04.05.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS KG # kg/m

    ACERO INFERIOR DE 3/8" 19 18.15 1.00 0.559 192.77

    ACERO SUPERIOR 3/8" 19 8.50 1.00 0.559 90.28

    ACERO TEMPERATURA 1/4" 72 8.20 1.00 0.250 147.60 430.65

    04.05.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO UND 8.33 rea= 118.26 1,034 1,034

    05.00.00 ESTRUCTURAS METALICAS Y COBERTURAS

    05.03.00 COBERTURA DE CALAMINA GALVANIZADA M2 1 18.45 9.86 181.92 181.92

    05.04.00 CUMBRERA DE CALAMINA GALVANIZADA M 1 18.45 18.45 18.45

    06.00.00 MUROS DE ALBAILERIA

    06.01.00 MURO DE LADRILLO KING KONG

    06.01.01 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARENA M2 12 2.63 3.00 94.50 94.50

    06.01.02 MURO DE LADRILLO KK ASENTADO EN SOGA M2 6 1.70 2.70 27.54 Eje A

    Eje C Primer piso 4 2.00 2.70 21.60

    Eje C Primer piso puerta 2 2.00 1.50 6.00

    Eje A Segundo piso 6 1.00 2.70 16.20

    Eje C Segundo piso 4 1.70 2.70 18.36

    Eje C Segundo piso puerta 2 1.70 1.50 5.10

    Muro de volado segundo piso 6 1.20 2.70 19.44

    Muro de fachada 1 2.80 3.15 8.82 123.06

    07.00.00 REVOQUES ENLUCIDOS Y MOLDURAS

    07.01.00 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA M2 16 2.63 3.00 126.00 cabeza

    Eje A primer piso 6 1.70 2.70 27.54

    Eje C Primer piso 4 2.00 2.70 21.60

    Eje C Primer piso puerta 2 2.00 1.50 6.00

    Eje A Segundo piso 6 1.00 2.70 16.20

    Eje C Segundo piso 4 1.70 2.70 18.36

    Eje C Segundo piso puerta 2 1.70 1.50 5.10

    Muro de volado segundo piso 6 1.20 2.70 19.44 240.24

    07.02.00 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA M2 8 2.63 3.00 63.00 cabeza

    Eje A primer piso 6 1.70 2.70 27.54

    Eje C Primer piso 4 2.00 2.70 21.60

    Eje C Primer piso puerta 2 2.00 1.50 6.00

    Eje A Segundo piso 6 1.00 2.70 16.20

    Eje C Segundo piso 4 1.70 2.70 18.36

    Eje C Segundo piso puerta 2 1.70 1.50 5.10

    Eje C Muro de volado segundo piso 6 1.20 2.70 19.44

    Eje 1 Muro de volado segundo piso 1 1.20 1.20 1.44

    Muro de fachada 2.80 8.00 0.00 178.68

    07.03.00 TARRAJEO DE COLUMNAS

    07.03.01 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA M2 4 0.90 6.00 21.60 Esquina

  • OBRA:

    DESCRIPCION UNDN

    ELEM

    T

    L A HSUB

    TOTALTOTAL

    METRADOSRECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA N 10372 DEL CASERO

    CUANQUE-DISTRITO DE SOCOTA"

    Eje B, dos pisos 3 0.50 6.00 9.00

    Col interiores, dos pisos 8 1.00 6.00 48.00 78.60

    07.04.00 TARRAJEO EN VIGAS

    07.04.01 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA M2 4 0.20 7.95 6.36 Eje 1 y 7

    VP-102 4 0.85 7.15 24.31

    VS-101,VS-102 Primer piso 2 0.20 17.95 7.18

    VS-202, Segundo piso 3 0.40 6.30 7.56

    VS-203, Segundo piso 2 0.95 5.50 10.45

    VS-201 2 0.40 17.95 14.36 70.22

    08.00.00 CIELORRASOS

    08.01.00 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA M2 6 2.70 5.80 93.96

    6 2.70 1.50 24.30 118.26

    08.02.00 CIELORASO SUSPENDIDO

    08.02.01 CIELORASO SUSPENDIDO DE PANELES M2 0 2.70 5.80 0.00

    0 2.70 1.50 0.00 0.00

    09.00.00 PISOS Y PAVIMENTOS

    09.01.00 PISOS DE CONCRETO

    09.01.01 PISOS DE CONCRETO COLOREADO FROTACHADO E=2.5 CMS. ESPESOR M2 2 8.60 6.00 103.20 103.20

    10.00.00 CARPINTERIA DE MADERA

    10.01.00 PUERTAS

    10.01.01 PUERTA DE TABLERO LISO M2 4 2.10 1.20 10.08 10.08

    10.02.00 VENTANAS

    10.02.01 VENTANA DE MADERA CON HOJAS DE CEDRO M2 6 2.70 0.90 3.28 47.83

    6 2.70 1.10 3.28 58.46

    6 2.70 1.20 3.28 63.78

    6 2.70 1.80 3.28 95.67 265.75

    11.00.00 VIDRIOS, CRISTALES Y SIMILARES

    11.01.00 VIDRIO SEMIDOBLE. PROVISION Y COLOCACION EN VENTANAS MADERA P2

    6 2.00 0.80 9.60

    6 2.00 1.00 12.00

    6 2.00 1.10 13.20

    6 2.00 1.70 20.40 55.20

    12.00.00 PINTURA

    12.01.00 PINTADO DE MURO INTERIOR C/LATEX VINILICO (VINILATEX O SIMI) M2 16 2.63 3.00 126.00

    Eje A primer piso 6 1.70 2.70 27.54

    Eje C Primer piso 4 2.00 2.70 21.60

    Eje C Primer piso puerta 2 2.00 1.50 6.00

    Eje A Segundo piso 6 1.00 2.70 16.20

    Eje C Segundo piso 4 1.70 2.70 18.36

    Eje C Segundo piso puerta 2 1.70 1.50 5.10

    Muro de volado segundo piso 0 1.20 2.70 0.00

    Columna Esquina 4 0.25 3.00 3.00

    Eje B, dos pisos 4 0.25 3.00 3.00

    Col interiores, dos pisos 8 0.75 3.00 18.00

    VP-102 0 0.85 7.15 0.00

  • OBRA:

    DESCRIPCION UNDN

    ELEM

    T

    L A HSUB

    TOTALTOTAL

    METRADOSRECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA N 10372 DEL CASERO

    CUANQUE-DISTRITO DE SOCOTA"

    VS-202, Segundo piso 0 0.20 6.30 0.00

    VS-203, Segundo piso 0 0.95 5.50 0.00

    VS-201 0 0.20 17.95 0.00 244.80

    12.02.00 PINTADO DE MURO EXTERIOR C/LATEX ACRILICO (SUPERLATEX O SIM) M2

    Eje A primer piso 6 1.70 2.70 27.54

    Eje C Primer piso 4 2.00 2.70 21.60

    Eje C Primer piso puerta 2 2.00 1.50 6.00

    Eje A Segundo piso 6 1.00 2.70 16.20

    Eje C Segundo piso 4 1.70 2.70 18.36

    Eje C Segundo piso puerta 2 1.70 1.50 5.10

    Eje C Muro de volado segundo piso 6 1.20 2.70 19.44

    Eje 1 Muro de volado segundo piso 1 1.20 1.20 1.44

    Muro de fachada 0 2.80 8.00 0.00

    Columna Esquina 4 0.65 3.00 7.80

    Eje B, dos pisos 2 0.25 3.00 1.50

    Col interiores, dos pisos 8 0.25 3.00 6.00

    Viga Eje 1 y 7 2 0.20 7.95 3.18

    VS-101,VS-102 Primer piso 2 0.20 17.95 7.18

    VS-202, Segundo piso 0 0.20 6.30 0.00

    VS-201 0 0.20 17.95 0.00 141.34

    12.03.00 PINTADO DE CIELO RASO C/LATEX VINILICO (VINILATEX O SIMILAR) M2 6 2.70 5.80 93.96

    6 2.70 1.50 24.30 118.26

    12.04.00 PINTURA DE CONTRAZOCALO C/ESMALTE ECONOMICO M 4 17.40 69.60

    13.00.00 VARIOS 0 6.30 0.00 69.60

    13.01.00 LIMPIEZA FINAL GLB 1 1.00 1.00

    13.02.00 FLETE ZONAL RURAL EST 1 1.00 1.00

    13.03.00 PIZARRA MURAL M2 4 3.00 1.45 17.40 17.40

    13.04.00 PLACA RECORDATORIA EN BRONCE UND 1 0.50 0.70 1.00 1.00

    14.00.00 INSTALACIONES ELECTRICAS

    14.02.00 SALIDA PARA SPOT-LIGHT CON PVC PTO 43 18.00 18.00

    14.03.00 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC PTO 17 16.00 16.00

    14.04.00 TUBERIAS PVC SAP (ELECTRICAS) D=3/4" M 110.00 110.00