  LAS INFORMACIONES DE ESTE DOCUMENTO SON PROPIEDAD DE PETROBRAS BOLIVIA S.A., SIENDO PROHIBIDA SU UTILIZACIÓN FUERA DE SU FINALIDAD. PE-5I3-00004 - ANEXO A  PADRONIZADO POR LA NORMA PETROBR AS N-381 REV. G.  HOJA DE DATOS N O  E-FD-7020.18-1210-561-IPK-001 CLIENTE: PETROBRAS BOLIVIA S.A. HOJA: 1 De  3 PROYECTO: ING. BÁSICA DUCTO Y FACILIDADES MODULO III + SBL-6  ÁREA: CAMPO DE SABALO 11 PEB / STO TÍTULO: HOJA DE DATOS FILTRO SEPARADOR  ARCHIVO: E-FD-70 20.18-1210-561-IPK-001=B.DOC CONTRATO: PEB-AJUR-301/2 013 ÍNDICE DE REVISIONES REV. DESCRIPCIÓN Y/U HOJAS AFECTADAS 0  A B EMISIÓN ORIGINAL PARA APROBACIÓN PARA APROBACIÓN REV. 0 REV. A REV. B REV. C REV. D REV. E REV. F REV. G REV. H FECHA 02-05-14 03-06-14 07-07-14 PROYECTÓ IPE IPE IPE EJECUCIÓN M. MERCADO M. MERCADO M. MERCADO VERIFICACIÓN D.DELGADILLO D.DELGADILLO D.DELGADILLO  APROBACIÓN W.CHAVEZ W.CHAVEZ W.CHAVEZ

Upload: lu1228

Post on 04-Nov-2015

1 views

Category:

Documents


1 download

DESCRIPTION

Electric

TRANSCRIPT

  • LAS INFORMACIONES DE ESTE DOCUMENTO SON PROPIEDAD DE PETROBRAS BOLIVIA S.A., SIENDO PROHIBIDA SU UTILIZACIN FUERA DE SU FINALIDAD.

    PE-5I3-00004 - ANEXO A PADRONIZADO POR LA NORMA PETROBRAS N-381 REV. G.

    HOJA DE DATOS N

    O

    E-FD-7020.18-1210-561-IPK-001

    CLIENTE: PETROBRAS BOLIVIA S.A.

    HOJA: 1 De 3

    PROYECTO: ING. BSICA DUCTO Y FACILIDADES MODULO III + SBL-6

    REA: CAMPO DE SABALO 11

    PEB / STO TTULO:

    HOJA DE DATOS FILTRO SEPARADOR

    ARCHIVO: E-FD-7020.18-1210-561-IPK-001=B.DOC

    CONTRATO: PEB-AJUR-301/2013

    NDICE DE REVISIONES

    REV. DESCRIPCIN Y/U HOJAS AFECTADAS

    0

    A

    B

    EMISIN ORIGINAL

    PARA APROBACIN

    PARA APROBACIN

    REV. 0 REV. A REV. B REV. C REV. D REV. E REV. F REV. G REV. H

    FECHA 02-05-14 03-06-14 07-07-14

    PROYECT IPE IPE IPE

    EJECUCIN M. MERCADO M. MERCADO M. MERCADO

    VERIFICACIN D.DELGADILLO D.DELGADILLO D.DELGADILLO

    APROBACIN W.CHAVEZ W.CHAVEZ W.CHAVEZ

  • HOJA DE DATOS N

    O

    E-FD-7020.18-1210-561-IPK-001 REV.

    B

    PROYECTO: ING. BSICA DUCTO Y FACILIDADES

    MODULO III + SBL-6

    HOJA:

    2 de 3

    TTULO:

    HOJA DE DATOS FILTRO SEPARADOR

    LAS INFORMACIONES DE ESTE DOCUMENTO SON PROPIEDAD DE PETROBRAS BOLIVIA S.A., SIENDO PROHIBIDA SU UTILIZACIN FUERA DE SU FINALIDAD.

    PE-5i3-00004 - ANEXO A PADRONIZADO POR LA NORMA PETROBRAS N-381 REV. G.

    GENERAL DATA

    Tag F-9111 A/B Quantity 2

    Client Petrobras Application Particles Separator

    Service Combustible Gas Line number 11-91011-GS-"-CW150-H1 1/2" 11-91012-GS-"-CW150-H1 1/2"

    Manufacturer By Purchaser Model By Purchaser

    PROCESS DATA

    Fluid Gas Condensate Water

    Flow Max. MSCFD 15.7

    Operating Pressure Psig 838.4

    Operating Temperature F 148

    Density lb/ft3 2.287

    Fraction Flow 15 MSCFD 0.374 BPD 0.0381 BPD

    INTERNALS

    Filtering element Coalescing element

    Quantity 1

    Mist Extractor By Vendor

    Baffles By Vendor

    Max. Temperature (F) 200

    Liquid Remove Efficiency 99.99%, 10 m & larger

    Solids Remove Efficiency 99.98%, 10 m & larger

    Media Epoxy satured borosilicate glass microfiber and includes polyester

    drain layer

    Seals Fluorocarbon

    Backing Ring Nitrile

    DESIGN

    Design Code ASME Boiler & Pressure Vessel Code Section VIII. Div I; and

    Stamped with ASME U

    Standard Certification ASME B31.8

    Configuration Geometric Vertical

    Design Pressure (Psig) 1440

    Design Temperature (F) 200

    Outside Diameter (inch) By Vendor

    Inside Diameter (inch) By Vendor

    Port to Port distance (inch) 3.62

    Length S/S (inch) 7.4

    Weight (lb) 9

    Admissible Corrosion (inch) 0,125

    Efficiency Joints 100%

    Seismic Zone Zone 1 Low Danger

    Isolation No

    Painting PER N-002

    MATERIALS

    Body SA-106-C or similar

    Headers SA-516-70 or similar

    Flanges SA-105 or similar

    Nozzles SA-106 B or similar

    Internals SS 304 or similar

    Bolts /Nuts SA-193 B7/ SA-194 2H or similar

  • HOJA DE DATOS N

    O

    E-FD-7020.18-1210-561-IPK-001 REV.

    B

    PROYECTO: ING. BSICA DUCTO Y FACILIDADES

    MODULO III + SBL-6

    HOJA:

    3 de 3

    TTULO:

    HOJA DE DATOS FILTRO SEPARADOR

    LAS INFORMACIONES DE ESTE DOCUMENTO SON PROPIEDAD DE PETROBRAS BOLIVIA S.A., SIENDO PROHIBIDA SU UTILIZACIN FUERA DE SU FINALIDAD.

    PE-5i3-00004 - ANEXO A PADRONIZADO POR LA NORMA PETROBRAS N-381 REV. G.

    BASIC CONNECTIONS (Note 3)

    Item Service Size (in) Quantity Type

    1 Inlet 1 NPT

    2 Outlet 1 NPT

    3 Lower Drain 1 SAE-6

    References: E-DE-7020.18-1210-943-IPK-001 Diagrama de Flujo (PFD) Facilidades y Servicios Auxiliares del Pozo E-MD-7020.18-1210-941-IPK-001 Bases de diseo Instalaciones de Superficie del Pozo SBL-11 E-RL-7020.18-6500-940-IPK-001 Reporte de Simulacin Termo-Hidrulica de SBL-11 E-DE-7020.18-1210-944-IPK-002 P&ID Regulacin de Gas Notes:

    1) The Vendor must include a list of recommended spare parts for two years, certificates, test results and catalogs 2) The name of the manufacturer is only suggestion 3) Size Connections must be confirmed By Vendor. Connections Quantities are represented for one filter 4) Minimum instrumentation elements. They must be confirmed By Vendor. Instruments are described for one filter.

    DRAWING