PRESUPUSTOS:SUELO CON TIERRA DE CHACRA

*2 DOSIS THOR GEL = s/140*1 BARILLA DE COBRE 2.40 METROS = s/240*10 METRO DE CABLE DE 25 MM = s/100*2 CONECTORES ANDERSSON 3/4 = s/16*1 CAJA DE CONCRETO PARA POZO TIERRA = s/ 22*1 CAMIONADA DE TIERRA DE CHACRA = s/120*3 TUBOS DE LUZ = s/9*MANO DE OBRA =s/ 500 a s/600

SUELO CON PIEDRA (HORMIGON)

*1 BOLSA CEMENTO CONDUCTIVO =s/110*1 BARILLA DE COBRE 2.40 METROS = s/240*10 METRO DE CABLE DE 25 MM = s/100*2 CONECTORES ANDERSSON 3/4 = s/16*1 CAJA DE CONCRETO PARA POZO TIERRA = s/ 22*1 CAMIONADA DE TIERRA DE CHACRA = s/120*3 TUBOS DE LUZ = s/9*MANO DE OBRA =s/ 500 a s/600

ESO ES PARA UN POZO A TIERRA……..