metrado pavimentacion

Post on 16-Dec-2015

14 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

pv

TRANSCRIPT

Metrado-PavimentoHOJA DE METRADOSPROYECTO:PAVIMENTADO JIRON LOS ALISOSFORMULA 1:PAVIMENTOITEMDESCRIPCIONUNIDADAREAVECESLARGOANCHOALTURAPARCIALMETRADOTOTAL01.00.00PAVIMENTO01.01.00OBRAS PRELIMINARES01.01.01OFICINA Y ALMACEN DE OBRAMES666.0001.01.02CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40MUND222.0001.01.03TRANSPORTE DE MAQUINARIA Y EQUIPOGLB111.0001.01.04TRANSPORTE DE MATERIALES Y HERRAMIENTASGLB111.0001.02.00TRABAJOS PRELIMINARES01.02.01TRAZO, NIVELACION Y REPLANTEOM2314.517.602390.282,390.2801.02.02TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVOM2314.517.602390.282,390.2801.03.00MOVIMIENTO DE TIERRAS01.03.01DEMOLICION DE PAVIMENTO DE CONCRETO DE 8"M22,390.28Cuadra I1100.007.60760.00Cuadra II1100.007.60760.00Cuadra III1114.517.60870.2801.03.02DEMOLICION DE VEREDAS DE 0.15 m.M2377.41Cuadra I11001.2120.00Cuadra II1100.001.2120.00Cuadra III1114.511.2137.4101.03.03CORTE C/MAQUINARIA DE MAT. SUELTOM3478.06Cuadra I1100.007.600.2152.00Cuadra II1100.007.600.2152.00Cuadra III1114.517.600.2174.0601.03.04NIVELACION Y COMPACTACION DE SUB-RASANTEM22,390.28Cuadra I1100.007.60760.00Cuadra II1100.007.60760.00Cuadra III1114.517.60870.2801.03.05SUB BASE COMPACTADO E=20cmM22,390.28Cuadra I1100.007.60760.00Cuadra II1100.007.60760.00Cuadra III1114.517.60870.2801.03.06RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO (CONF. TER E=0.10cmM3239.03Cuadra I1100.007.600.1076.00Cuadra II1100.007.600.1076.00Cuadra III1114.517.600.1087.0301.03.07ELIMINACION DE MATERIAL EXCEDENTEM3630.28PROVENIENTE DE DEMOLICION DE CONCRETO2,390.2810.20478.06PROVENIENTE DE DEMOLICION DE VEREDA377.4110.1556.61PROVENIENTE DE DEMOLICION DEL CORTE C/MAQ.478.0610.2095.6101.04.00PAVIMENTO RIGIDO01.04.01ENCOFRADO DE PAVIMENTO RIGIDOM22 USOS221.36LONGITUDINAL4314.510.2062.90125.80TRANSVERSAL806.000.201.2095.5501.04.02PAVIMENTO RIGIDO F'C=210 KG/CM2, E=8"M3478.06Cuadra I100.007.600.20152.00Cuadra II100.007.600.20152.00Cuadra III114.517.600.20174.0601.04.03JUNTA LONGITUDINAL DE CONSTRUCCION DE (1/2" @ 0.45m)M7080.35247.68247.6801.04.04JUNTA TRANSVERSAL DE CONTRACCION DE (1/2" @ 0.30m.)M14800.35518.00518.0001.04.05JUNTA TRANSVERSAL DE DILATACION DE (3/4" CON DOWELL @ 0.30m )M1200.3542.0042.0001.04.06RELLENO DE JUNTASM1,551.53LONGITUDINAL3314.51943.53TRANSVERSAL807.60608.0001.04.07CURADOM2314.517.602390.282,390.28601.05.00VEREDAS01.05.01NIVELACIN, PERFILADO Y COMPACTADO PARA VEREDAS CON EQUIPOM2314.511.20377.41377.4101.05.02ENCOFRADO Y DESENCOFRADO PARA VEREDAS H=0.15mM247.36LONGITUDINAL314.510.1547.18TRANSVERSAL1051.200.150.1801.05.03VEREDAS DE CONCRETO F'C=175 kg/cm2 +30%PM E=15cmM356.61Cuadra I100.001.200.1518.00Cuadra II100.001.200.1518.00Cuadra III114.511.200.1520.6101.05.04JUNTAS ASFLTICAS PARA VEREDASM1051.20125.80125.8001.05.05CURADO PARA VEREDASM2314.511.20377.41377.41

&RPgina &P de &NLuis Guzmn:ANCHO PROMEDIOLUIS GUZMAN:Ancho PromedioLUIS GUZMAN:Ancho promedioLUIS GUZMAN:Ancho PromedioLUIS GUZMAN:Ancho promedioLUIS GUZMAN:ANCHO PROMEDIOLUIS GUZMAN:Ancho Promedio

PresupuestoHOJA DE METRADOSPROYECTO:FORMULA 1:PAVIMENTOItemDescripcinUnidadAreaVecesLargoAnchoAlturaParcialMetrado TotalCOSTOSUNITARIOPARCIALTOTAL01.00.00PAVIMENTO01.01.00OBRAS PRELIMINARES01.01.01OFICINA Y ALMACEN DE OBRAMES666.00700.0042006905.3401.01.02CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40MUND222.00600120001.01.03TRANSPORTE DE MAQUINARIA Y EQUIPOGLB111.00708.0070801.01.04GASTO DE OPERACINGLB111.00797.34797.3401.02.00TRABAJOS PRELIMINARES01.02.01TRAZO, NIVELACION Y REPLANTEOM2314.517.602390.282,390.281.694039.566449800.131601.02.02TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVOM2314.517.602390.282,390.282.415760.5651601.03.00MOVIMIENTO DE TIERRAS01.03.01DEMOLICION DE PAVIMENTO DE CONCRETO(con tractor 140-160HP)M22,390.2869.48166076.37648166076.37648Cuadra I1100.007.60760.00Cuadra II1100.007.60760.00Cuadra III1114.517.60870.2801.03.02DEMOLICION DE VEREDAS DE 0.15 m.M2377.4126.8210122.1898410122.18984Cuadra I11001.2120.00Cuadra II1100.001.2120.00Cuadra III1114.511.2137.4101.03.03CORTE C/MAQUINARIA DE MAT. SUELTOM3478.065.062418.9593122418.959312Cuadra I1100.007.600.2152.00Cuadra II1100.007.600.2152.00Cuadra III1114.517.600.2174.0601.03.04NIVELACION Y COMPACTACION DE SUB-RASANTEM22,390.282.977099.119727099.11972Cuadra I1100.007.60760.00Cuadra II1100.007.60760.00Cuadra III1114.517.60870.2801.03.05BASE COMPACTADO E=20cmM22,390.2813.9633368.2529633368.25296Cuadra I1100.007.60760.00Cuadra II1100.007.60760.00Cuadra III1114.517.60870.2801.03.06RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO (CONF. TER E=0.10cmM3239.0315.93800.538843800.53884Cuadra I1100.007.600.1076.00Cuadra II1100.007.600.1076.00Cuadra III1114.517.600.1087.0301.03.07ELIMINACION DE MATERIAL EXCEDENTE( c/volq. 12m3 d=10km)M3630.2811.587298.61970327298.6197032PROVENIENTE DE DEMOLICION DE CONCRETO2,390.2810.20478.06PROVENIENTE DE DEMOLICION DE VEREDA377.4110.1556.61PROVENIENTE DE DEMOLICION DEL CORTE C/MAQ.478.0610.2095.6101.04.00PAVIMENTO RIGIDO01.04.01ENCOFRADO DE PAVIMENTO RIGIDOM22 USOS221.3638.648553.234488553.23448LONGITUDINAL4314.510.2062.90125.80TRANSVERSAL806.000.201.2095.5501.04.02PAVIMENTO RIGIDO F'C=210 KG/CM2, E=8"M3478.06355.54169967.745808169967.745808Cuadra I100.007.600.20152.00Cuadra II100.007.600.20152.00Cuadra III114.517.600.20174.0601.04.03JUNTA LONGITUDINAL DE CONSTRUCCION DE (1/2" @ 0.45m)M7080.35247.68247.686.151523.211243759606.2859437501.04.04JUNTA TRANSVERSAL DE CONTRACCION DE (1/2" @ 0.30m.)M14800.35518.00518.006.153185.701.04.05JUNTA TRANSVERSAL DE DILATACION DE (3/4" CON DOWELL @ 0.30m )M1200.3542.0042.006.15258.301.04.06RELLENO DE JUNTASM1,551.532.994639.0747LONGITUDINAL3314.51943.53TRANSVERSAL807.60608.0001.04.07CURADOM2314.517.602390.282,390.281.263011.747763011.7477601.05.00VEREDAS01.05.01NIVELACIN, PERFILADO Y COMPACTADO PARA VEREDAS CON EQUIPOM2314.511.20377.41377.412.05773.6946773.694601.05.02ENCOFRADO Y DESENCOFRADO PARA VEREDAS H=0.15mM247.3631.621497.412531497.41253LONGITUDINAL314.510.1547.18TRANSVERSAL1051.200.150.1801.05.03VEREDAS DE CONCRETO F'C=175 kg/cm2 +30%PM E=15cmM356.61290.7016457.0502616457.05026Cuadra I100.001.200.1518.00Cuadra II100.001.200.1518.00Cuadra III114.511.200.1520.6101.05.04JUNTAS ASFLTICAS PARA VEREDASM1051.20125.80125.802.57323.31628323.3162801.05.05CURADO PARA VEREDASM2314.511.20377.41377.411.26475.53912475.53912COSTO DIRECTO457555.55523695GASTOS GENERALES0.145755.555523695UTILIDAD0.0732028.8888665865SUB TOTAL535339.999627232I.G.V =0.1896361.1999329017COSTO TOTAL631701.199560133

LUIS GUZMAN:Ancho PromedioLUIS GUZMAN:Ancho PromedioLUIS GUZMAN:Ancho promedioLUIS GUZMAN:Ancho PromedioLUIS GUZMAN:Ancho promedioLUIS GUZMAN:ANCHO PROMEDIOLuis Guzmn:ANCHO PROMEDIO

top related