Individual part:Beloslava Ivanova

assembly

DD2production

List of contents:Production

Facades north/southFacades east/west

Vision and missionCross sectionCurtain wall connected to skan dek

Connection between two skan dek elementsSkan dek-ridge connectionSkan dek + Kerto roof –connection

Longitudinal sectionSkan dek on concrete sandwich wallSkan dek element with middle support(SIB beam)Skan dek element resting on SIB beamQuality controlHealth and safety building site specificationBuilding site plan

DD2Moisture calculationProduction drawing 1Production drawing 2Factory layoutLocation based scheduleBudget

AssemblyLocation based schedule

Budget

9 control sheet10b control sheetLoad tableDelivery planAssembly planUnits schemeExtra schemeDelivery planFinal delivery plan

(revision1/2)

Tender control planPlanning and management

Planning and management

Planning and management

Steel trusses on concrete sandwich wall

Personal planning-DD2

DD2

FacadesDD2

Our vision for sustainable buildings aims to change people’s perceptions in terms of how

we treat the nature and its resources.

Existing already 10 years on the market ,skan dek has gone through a lot of researches ,the best results of which are already implemented in skan dek roof elements.Providing a light weight construction with the longest span in the industry ,skan dek had implemented plenty of sustainable approaches:

Economic aspects:-with span of 22m,skan dek serve with the longest span in the industry.-fast to assemble-1500m2 in a day-continuous surface up to 80m2-reduction of supporting parts and more flexibility in terms of design-less materials for foundations and joists to be used-long service life and low maintenance-min 50 years(due to the inorganic materials used)

Environmental aspects:-U value is reduced in order to achieve lower energy consumption-recycling of the materials(easy in separating the individual parts and recycling them)

DD2

DD2

Cross section1.Curtain wall connected to skan dek 2.Connection between two skan dek elements

3.Skan dek-ridge connection4.Skan dek + Kerto roof –connection

reference:

revision 1 /2

reference:

Longitudinal sectionDD2

Skan dek on concrete sandwich wallSkan dek element with middle support(SIB beam)Skan dek element resting on SIB beam

reference:

Quality control

DD2

Tender control plan

DD2

1.Health and safety building site specification2.Building site plan

DD2

Personal planningproduction

Production of skan dek(roof element)

production

reference

Moisture calculations:

production

reference:

Production drawingsproduction

reference:

Factory layout

production

Location-based schedule-production of skan dek

production

Budget

production

Personal planning-assembly

assembly

Location-based schedule

assembly

reference

Quality control Q9,10B

assembly

Delivery plan

assembly

reference:

Assembly planassembly

Logistic

assembly

Budget

assembly