E L E M E N T A L C O S T A N A LY S I S

NO. NAME STUDENT ID1 CALVIN WONG PING KET 03224812 CHAN TIAN JI 03208313 VIVIAN TAY HUEY SHUEN 03238694 WONG JIA JING 03272215 YEAP PHAY SHIAN 03222436 SOO PING ZHENG 03313657 SOO YON LI 03228218 TAM ZHAO WEI 03225879 LOO SIAH MONG 0321995

10 MICHELLE TUNG MAN KAYE 032417511 LEE FONG YEN 032197612 LEE JIA KIAM 032002913 LEE LIN HUI 032279714 ELISSA CHANG YUH TING 032690915 FARAH AIDA 0322962

GROUP F MEMBERS

ECA FORM 1

ECA FORM 1

ECA FORM 1

PROJECT DETAIL

BRISTOL TECHNOLOGY

Client : Bristol Trading Sdn Bhd

Proposed Project : Proposed Corporate Headquarters For Bristol Trading Sdn Bhd on lot 5178, 5179 and 8609

Location : Mukim Kajang, Daerah Hulu Langat, Selangor Darul Ehsan.

PROJECT DETAIL

Contract Sum : Lump sum of RM4,898,990.00 Date of Possession of Site : 21st May 2003 Date of Completion : 21st January 2004 Completion Period : 8 months (inclusive of public holidays)

Quantities provided in the Bills of Quantity act only as a guidance where contractor shall compute their own quantities.

CONTRACT DETAIL

Liquidated and Ascertain Damages for non-completion : RM 2,000.00 per day

Defects Liability Period : 12 months from the date of Certificate of Practical Completion

Completion Period of final measurement and valuation : 6 months from the date of Certificate of Practical Completion

CONTRACT DETAIL

LOCATION PLAN

SITE PLAN

Proposed Corporate Headquarters for Bristol Trading Sdn Bhd on lot 5178, 5179, and 8609

BUILDING ANALYSIS

INTERNAL BUILDING

ECA FORM 1

ECA FORM 1

ECA FORM 1

GROSS FLOOR AREA TO BE MEASURED

LOWER GROUND FLOOR PLAN OFFICE

GROUND FLOOR PLAN GALLERY & FOYER

MEZZANINE FLOOR PLAN GALLERY, MEETING & TRAINING ROOM

FIRST FLOOR PLAN OFFICE

ROOF PLAN CEO OFFICE

NET FLOOR AREA

Usable Area Circulation Area

Ancillary Area Internal Division

NET FLOOR AREA

Total area of all enclosed spaces fulfilling the main functional requirements of the building.

USABLE AREA

CIRCULATION AREATotal area of all enclosed spaces forming entrance halls, corridors, staircases, lift wells, connecting links and the like.

NET FLOOR AREA

ANCILLARY AREA

INTERNAL DIVISIONTotal area of all enclosed spaces forming entrance halls, corridors, staircases, lift wells, connecting links and the like.

Total area of all enclosed spaces for lavatories, cloakrooms, kitchens, cleaner’s room, lift, plant and tank rooms and the like, supplementary to main function of the building.

ECA FORM 1

LOWER GROUND FLOOR

LOWER GROUND FLOOR PLANUsable Area

Circulation Area

Ancillary Area

Internal Division

GFA :1585 m2

GROUND FLOOR

GROUND FLOOR PLANUsable Area

Circulation Area

Ancillary Area

Internal Division

GFA : 1357 m2

UPPER FLOORSMezzanine Floor | First Floor | Roof Floor

GFA : 1755m2

MEZZANINE FLOOR PLANUsable Area

Circulation Area

Ancillary Area

Internal Division

FIRST FLOOR PLANUsable Area

Circulation Area

Ancillary Area

Internal Division

ROOF PLANUsable Area

Circulation Area

Ancillary Area

Internal Division

UNENCLOSED AREA

UNENCLOSED AREANot Enclosed Area

26.96m2

ROOF AREA

UPPER ROOF PLANUpper Roof Area

1956m2

ECA FORM 1

ECA FORM 1

ECA FORM 1

ECA FORM 1

FUNCTIONAL UNIT COST

ECA FORM 2

ECA FORM 2

1. SUBSTRUCTURE

1.1 Work Below Lowest Floor Finish

Total Cost of Element : RM 140,636.10 Cost per m2 GFA : 30.19

Element Unit Quantity : 1585 m2 Element Unit Rate : 88.73

Element Ratio per m2 GFA : 0.340 Reinforced Concrete : 12,399 m3

Reinforcement (kg) : 27,537 kg Formwork (m2) : 778 m2

1. SUBSTRUCTURE

1.1 Work Below Lowest Floor Finish

1. SUBSTRUCTURE

1.1 Work Below Lowest Floor Finish

2. SUPERSTRUCTURE

Total Cost of Element : RM 307,836.20 Cost per m2 GFA : 66.09

Element Unit Quantity : 4658 m2 Element Unit Rate : 65.54

Element Ratio per m2 GFA : 1.008 Reinforced Concrete : 345 m3 Reinforcement (kg) : 70,257 kg

Formwork (m2) : 4462 m2

2. SUPERSTRUCTURE

2.1 Frame

2. SUPERSTRUCTURE

2.1 Frame

Total Cost of Element : RM 233,346.70 Cost per m2 GFA : 50.10

Element Unit Quantity : 3278 m2 Element Unit Rate : 71.19

Element Ratio per m2 GFA : 0.704 m2 Reinforced Concrete : 421.00 m3 Reinforcement (kg) : 41,342.00 kg

Formwork (m2) : 2,812.00 m2

2. SUPERSTRUCTURE

2.2 Upper Floors

2. SUPERSTRUCTURE

2.2 Upper Floors

Total Cost of Element : RM 407,168.30 Cost per m2 GFA : 87.41

Element Unit Quantity : 1,671 m2 Element Unit Rate : 243.67

Element Ratio per m2 GFA : 0.359 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

2. SUPERSTRUCTURE

2.3 Roof

2. SUPERSTRUCTURE

2.3 Roof

2. SUPERSTRUCTURE

2.3 Roof

2. SUPERSTRUCTURE

2.3 Roof

Total Cost of Element : RM 98,529.00 Cost per m2 GFA : 21.15 Element Unit Quantity : -

Element Unit Rate : - Element Ratio per m2 GFA : - Reinforced Concrete : 64 m2 Reinforcement (kg) : 1791 kg

Formwork (m2) : 352 m2

2. SUPERSTRUCTURE

2.4 Stairs

2. SUPERSTRUCTURE

2.4 Stairs

Total Cost of Element : RM 135,746.00 Cost per m2 GFA : 29.14

Element Unit Quantity : 2,114 m2 Element Unit Rate : 64.21

Element Ratio per m2 GFA : 0.450 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

2. SUPERSTRUCTURE

2.5 External Walls

2. SUPERSTRUCTURE

2.5 External Walls

Total Cost of Element : RM 402,028.90 Cost per m2 GFA : 86.31

Element Unit Quantity : 763 m2 Element Unit Rate : 526.91

Element Ratio per m2 GFA : 0.164 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

2. SUPERSTRUCTURE

2.6 Windows & External Doors

2. SUPERSTRUCTURE

2.6 Windows & External Doors

Total Cost of Element : RM 63,218.90 Cost per m2 GFA : 13.57

Element Unit Quantity : 2142 m2 Element Unit Rate : 29.51

Element Ratio per m2 GFA : 0.460 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

2. SUPERSTRUCTURE

2.7 Internal Walls & Partitions

2. SUPERSTRUCTURE

2.7 Internal Walls & Partitions

Total Cost of Element : RM 24,346.90 Cost per m2 GFA : 53.01

Element Unit Quantity : 614 m2 Element Unit Rate : 39.65

Element Ratio per m2 GFA : 0.132 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

2. SUPERSTRUCTURE

2.8 Internal Doors

2. SUPERSTRUCTURE

2.8 Internal Doors

3. FINISHES

Total Cost of Element : RM33,140 Cost per m2 GFA : 7.11

Element Unit Quantity : 1657 Element Unit Rate : 20.00

Element Ratio per m2 GFA : 0.356 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

3. FINISHES

3.1 Wall Finishes

3. FINISHES

3.1 Wall Finishes

Total Cost of Element : RM103,748 Cost per m2 GFA : 22.27

Element Unit Quantity : 5608 Element Unit Rate : 18.50

Element Ratio per m2 GFA : 1.204 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

3. FINISHES

3.2 Internal Wall Finishes

3. FINISHES

3.2 Internal Wall Finishes

4. FITTINGS & FURNISHINGS

4. FITTINGS & FURNISHINGS

5. SERVICES

5. SERVICES

Total Cost of Element : RM35,395 Cost per m2 GFA : 7.60

Element Unit Quantity : 211 No. Element Unit Rate : 167.75

Element Ratio per m2 GFA : 0.045 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

5.1 Sanitary Appliances

5. SERVICES

5.1 Sanitary Appliances

5. SERVICES

5.1 Sanitary Appliances

5. SERVICES

6. EXTERNAL WORKS

Total Cost of Element : RM 120,000.00 Cost per m2 GFA : RM25.76

Element Unit Quantity : - Element Unit Rate : -

Element Ratio per m2 GFA : - Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

6. EXTERNAL WORKS

6.1 Site Work

6. EXTERNAL WORKS

6.1 Site Work

Total Cost of Element : RM 14,860.00 Cost per m2 GFA : RM3.19 Element Unit Quantity : -

Element Unit Rate : - Element Ratio per m2 GFA : -

Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

6. EXTERNAL WORKS

6.2 Drainage

6. EXTERNAL WORKS

6.2 Drainage

ECA FORM 2

ECA FORM 3

ECA FORM 3

ECA FORM 3

ECA FORM 3

ECA FORM 3

ECA FORM 3

ECA FORM 3