1 Página : S10 Precios y cantidades de recursos requeridos por tipo Obra MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES DE ESPINAR-AGOSTO 2008 0702023 Subpresupuesto 001 LINEA DE CONDUCCION 07/08/2008 Fecha CUSCO - ESPINAR - ESPINAR Lugar 080801 Código Cantidad Unidad Recurso Parcial S/. Precio S/. MANO DE OBRA 5.9430 80.77 13.59 DIBUJANTE 0147000008 HH 46.9169 637.60 13.59 TOPOGRAFO 0147000032 HH 370.0466 5,484.09 14.82 CAPATAZ 0147010001 HH 1,964.9341 24,266.94 12.35 OPERARIO 0147010002 HH 837.1698 9,208.87 11.00 OFICIAL 0147010003 HH 6,442.9930 64,107.78 9.95 PEON 0147010004 HH 103,786.05 MATERIALES 28.0620 194.47 6.93 ALAMBRE NEGRO RECOCIDO # 16 0202000007 KG 32.2136 223.24 6.93 ALAMBRE NEGRO RECOCIDO # 8 0202000008 KG 19.9149 138.01 6.93 CLAVOS CC/ P/CONSTRUCCION D. PROMEDIO 0202320001 KG 52.9207 467.29 8.83 TUB. RED. FE NEGRO DE 2" x 1/16" 0202850004 M 63.0000 425.25 6.75 TUB. RED. FE NEGRO DE 1 1/2" x 1/16" 0202850009 M 1,492.0380 7,654.15 5.13 ACERO CORRUGADO FY=4200 KG/CM2 0203020005 KG 25.1990 422.84 16.78 PIEDRA GRANDE 0205020021 M3 1,150.6994 33,796.04 29.37 CEMENTO PORTLAND TIPO I (42.5KG) 0221000000 BOL 15.6000 226.98 14.55 COPIAS OZALID 0230040003 M2 432.8615 12,033.55 27.80 ADITIVO ACELERANTE FRAGUA 0230120003 GLN 16.6400 149.76 9.00 HIPOCLORITO DE CALCIO 70% 0230220011 KG 1.4560 20.56 14.12 YESO DE 28 KG. 0230220012 UND 35.9520 329.68 9.17 ADITIVO IMPERMEHABILIZANTE EN POLVO 0230220013 KG 4.0000 280.00 70.00 CONTENEDOR (CILINDRO-TECHO CALAMINA) 0230220014 UND 8.3200 1,248.00 150.00 PRUEBA : PROCTOR MODIFICADO Y DENS. CAMPO 0230220015 UND 5.0404 74.80 14.84 SOLDADURA CELLOCORD P 1/8" 0230470002 KG 4.0000 200.00 50.00 LETRERO DE UBICACION (MADERA) 0230540002 UND 3.7002 119.59 32.32 LUBRICANTE P/TUBERIA PVC UF 0230860081 GLN 7.5600 12.25 1.62 LIJA PARA FIERRO 0230990022 HJA 1.0000 92,695.90 92,695.90 FLETE TERRESTRE 0232000055 GLB 840.3935 2,327.89 2.77 MADERA AGUANO O SIMILAR 0243010003 P2 9.0000 221.58 24.62 TRIPLAY 4'x8'x4MM 0243030005 PLN 8.0000 3,405.92 425.74 GAVIONES TIPO COLCHON 5.0 x 2.0 x 0.30m 0246900004 UND 4.0000 851.48 212.87 GAVIONES TIPO COLCHON 5.0 x 1.0 x 0.30m 0246900005 UND 3.1200 17.97 5.76 SEGUNDO ORIGINAL 0249050032 M2 21.0000 11,288.13 537.53 MARCO Y TAPA FIERRO FUNDIDO 0.60 M. P/BUZON 0250040002 PZA 2.0160 80.96 40.16 PLATINA FE 2"x3/16"x6M. 0251130050 PZA 0.2520 4.81 19.09 THINER 0253030027 GLN 1.2600 49.67 39.42 PINTURA ANTICORROSIVA 0254060000 GLN 5.3000 208.93 39.42 PINTURA ESMALTE 0254110090 GLN 18.0000 10,251.90 569.55 TEE HD BB DN 250MM X 80MM 0271040073 UND 3.0000 4,449.99 1,483.33 TEE HD BB DN 300MM X 100MM 0271040075 UND 3.0000 407.70 135.90 REDUCCION HD BB DN 100MM X 80MM 0271060016 UND 9.0000 9,153.27 1,017.03 TRANSICION HD BB - PVC ISO 4422 DN 300MM x 315MM 0271690007 UND 36.0000 24,181.56 671.71 TRANSICION HD BB - PVC ISO 4422 DN 250MM x 250MM 0271690008 UND 9.0000 2,447.82 271.98 MANGUITO (NIPLE) HD BB DN 80MM L=0.15M 0271690011 UND 10.0000 1,583.60 158.36 TRANSICION HD BB - PVC ISO 4422 DN 80MM x 90MM 0271690012 UND 3,570.0000 208,916.40 58.52 TUBO PVC AGUA UF ISO 4422 C-5 DN 250 MM C/ANILLO 0272000005 M 673.2000 61,739.17 91.71 TUBO PVC AGUA UF ISO 4422 C-5 DN 315 MM C/ANILLO 0272000006 M 27.0000 24,085.08 892.04 CURVA DE 22.5º PVC UF ISO 4422 DN 250 MM C/ANILLO 0272060045 UND 1.0000 911.50 911.50 CURVA DE 45º PVC UF ISO 4422 DN 250 MM C/ANILLO 0272060046 UND 2.0000 2,184.42 1,092.21 CURVA DE 90º PVC UF ISO 4422 DN 250 MM C/ANILLO 0272060047 UND 2.0000 1,806.08 903.04 CURVA DE 22.5º PVC UF ISO 4422 DN 315 MM C/ANILLO 0272060048 UND 2.0000 1,852.88 926.44 CURVA DE 45º PVC UF ISO 4422 DN 315 MM C/ANILLO 0272060049 UND 1.0000 478.16 478.16 REDUCCION PVC UF ISO 4422 DN 315MM x 250MM 0272150079 UND 1.0000 1,225.77 1,225.77 TEE PVC UF ISO 4422 DN 250MM C/ANILLO 0273130030 UND 11.0000 14,989.48 1,362.68 VALVULA DE AIRE TRIPLE EFECTO HD BB DN 80 MM 0277120091 UND 21.0000 9,128.07 434.67 VALVULA COMPUERTA HD BB DN 80 MM 150 PSI 0278000077 UND 1.0000 4,446.20 4,446.20 VALVULA MARIPOSA HD BB DN 300 MM 150 PSI 0278030015 UND 553,408.75 EQUIPOS 3,423.29 HERRAMIENTAS MANUALES 0337010001 %MO 1,569.92 COMBUSTIBLE, LUBRICANTES, ETC 0337020051 %EQ 35.0318 87.58 2.50 MIRAS TOPOGRAFICA Y JALONES 0337540006 HM 1.2600 20.16 16.00 EQUIPO DE PINTURA 0337900050 HM 59.5123 1,524.11 25.61 MEZCLADORA CONCRETO TAMBOR 11 P3-23 HP 0348010011 HM 31.3369 8,331.23 265.86 CAMION VOLQUETE 6x4 330 HP 10 M3. 0348040036 HM 406.0160 941.96 2.32 MOTOBOMBA 10 HP 4" INCL. MANGUERA Y ACCS. 0348080009 HM 100.0773 230.18 2.30 ANDAMIO METAL C/TABLAS ALQUILER 0348090002 HM 124.5412 16,166.69 129.81 CAMION CISTERNA 4X2 (AGUA) 2,000 GAL. 0348120002 HM 1.2600 32.32 25.65 MOTOSOLDADORA 250 AMP. 0348210004 HM 11.8855 83.20 7.00 EQUIPO DE COMPUTO INCLUYE SOFTWARE 0348210066 HM 40.1296 140.45 3.50 CIZALLA 0348960002 HM

Upload: andres-ci

Post on 08-Feb-2016

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2. Linea de Conduccion

1Página :S10

Precios y cantidades de recursos requeridos por tipoObra MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO

DE AGUAS RESIDUALES DE ESPINAR-AGOSTO 20080702023

Subpresupuesto 001 LINEA DE CONDUCCION 07/08/2008Fecha

CUSCO - ESPINAR - ESPINARLugar 080801Código CantidadUnidadRecurso Parcial S/.Precio S/.

MANO DE OBRA5.9430 80.7713.59DIBUJANTE0147000008 HH

46.9169 637.6013.59TOPOGRAFO0147000032 HH370.0466 5,484.0914.82CAPATAZ0147010001 HH

1,964.9341 24,266.9412.35OPERARIO0147010002 HH837.1698 9,208.8711.00OFICIAL0147010003 HH

6,442.9930 64,107.789.95PEON0147010004 HH

103,786.05MATERIALES

28.0620 194.476.93ALAMBRE NEGRO RECOCIDO # 160202000007 KG32.2136 223.246.93ALAMBRE NEGRO RECOCIDO # 80202000008 KG19.9149 138.016.93CLAVOS CC/ P/CONSTRUCCION D. PROMEDIO0202320001 KG52.9207 467.298.83TUB. RED. FE NEGRO DE 2" x 1/16"0202850004 M63.0000 425.256.75TUB. RED. FE NEGRO DE 1 1/2" x 1/16"0202850009 M

1,492.0380 7,654.155.13ACERO CORRUGADO FY=4200 KG/CM20203020005 KG25.1990 422.8416.78PIEDRA GRANDE0205020021 M3

1,150.6994 33,796.0429.37CEMENTO PORTLAND TIPO I (42.5KG)0221000000 BOL15.6000 226.9814.55COPIAS OZALID0230040003 M2

432.8615 12,033.5527.80ADITIVO ACELERANTE FRAGUA0230120003 GLN16.6400 149.769.00HIPOCLORITO DE CALCIO 70%0230220011 KG

1.4560 20.5614.12YESO DE 28 KG.0230220012 UND35.9520 329.689.17ADITIVO IMPERMEHABILIZANTE EN POLVO0230220013 KG

4.0000 280.0070.00CONTENEDOR (CILINDRO-TECHO CALAMINA)0230220014 UND8.3200 1,248.00150.00PRUEBA : PROCTOR MODIFICADO Y DENS. CAMPO0230220015 UND5.0404 74.8014.84SOLDADURA CELLOCORD P 1/8"0230470002 KG4.0000 200.0050.00LETRERO DE UBICACION (MADERA)0230540002 UND3.7002 119.5932.32LUBRICANTE P/TUBERIA PVC UF0230860081 GLN7.5600 12.251.62LIJA PARA FIERRO0230990022 HJA1.0000 92,695.9092,695.90FLETE TERRESTRE0232000055 GLB

840.3935 2,327.892.77MADERA AGUANO O SIMILAR0243010003 P29.0000 221.5824.62TRIPLAY 4'x8'x4MM0243030005 PLN8.0000 3,405.92425.74GAVIONES TIPO COLCHON 5.0 x 2.0 x 0.30m0246900004 UND4.0000 851.48212.87GAVIONES TIPO COLCHON 5.0 x 1.0 x 0.30m0246900005 UND3.1200 17.975.76SEGUNDO ORIGINAL0249050032 M2

21.0000 11,288.13537.53MARCO Y TAPA FIERRO FUNDIDO 0.60 M. P/BUZON0250040002 PZA2.0160 80.9640.16PLATINA FE 2"x3/16"x6M.0251130050 PZA0.2520 4.8119.09THINER0253030027 GLN1.2600 49.6739.42PINTURA ANTICORROSIVA0254060000 GLN5.3000 208.9339.42PINTURA ESMALTE0254110090 GLN

18.0000 10,251.90569.55TEE HD BB DN 250MM X 80MM0271040073 UND3.0000 4,449.991,483.33TEE HD BB DN 300MM X 100MM0271040075 UND3.0000 407.70135.90REDUCCION HD BB DN 100MM X 80MM0271060016 UND9.0000 9,153.271,017.03TRANSICION HD BB - PVC ISO 4422 DN 300MM x 315MM0271690007 UND

36.0000 24,181.56671.71TRANSICION HD BB - PVC ISO 4422 DN 250MM x 250MM0271690008 UND9.0000 2,447.82271.98MANGUITO (NIPLE) HD BB DN 80MM L=0.15M0271690011 UND

10.0000 1,583.60158.36TRANSICION HD BB - PVC ISO 4422 DN 80MM x 90MM0271690012 UND3,570.0000 208,916.4058.52TUBO PVC AGUA UF ISO 4422 C-5 DN 250 MM C/ANILLO0272000005 M

673.2000 61,739.1791.71TUBO PVC AGUA UF ISO 4422 C-5 DN 315 MM C/ANILLO0272000006 M27.0000 24,085.08892.04CURVA DE 22.5º PVC UF ISO 4422 DN 250 MM C/ANILLO0272060045 UND

1.0000 911.50911.50CURVA DE 45º PVC UF ISO 4422 DN 250 MM C/ANILLO0272060046 UND2.0000 2,184.421,092.21CURVA DE 90º PVC UF ISO 4422 DN 250 MM C/ANILLO0272060047 UND2.0000 1,806.08903.04CURVA DE 22.5º PVC UF ISO 4422 DN 315 MM C/ANILLO0272060048 UND2.0000 1,852.88926.44CURVA DE 45º PVC UF ISO 4422 DN 315 MM C/ANILLO0272060049 UND1.0000 478.16478.16REDUCCION PVC UF ISO 4422 DN 315MM x 250MM0272150079 UND1.0000 1,225.771,225.77TEE PVC UF ISO 4422 DN 250MM C/ANILLO0273130030 UND

11.0000 14,989.481,362.68VALVULA DE AIRE TRIPLE EFECTO HD BB DN 80 MM0277120091 UND21.0000 9,128.07434.67VALVULA COMPUERTA HD BB DN 80 MM 150 PSI0278000077 UND

1.0000 4,446.204,446.20VALVULA MARIPOSA HD BB DN 300 MM 150 PSI0278030015 UND

553,408.75EQUIPOS

3,423.29HERRAMIENTAS MANUALES0337010001 %MO1,569.92COMBUSTIBLE, LUBRICANTES, ETC0337020051 %EQ

35.0318 87.582.50MIRAS TOPOGRAFICA Y JALONES0337540006 HM1.2600 20.1616.00EQUIPO DE PINTURA0337900050 HM

59.5123 1,524.1125.61MEZCLADORA CONCRETO TAMBOR 11 P3-23 HP0348010011 HM31.3369 8,331.23265.86CAMION VOLQUETE 6x4 330 HP 10 M3.0348040036 HM

406.0160 941.962.32MOTOBOMBA 10 HP 4" INCL. MANGUERA Y ACCS.0348080009 HM100.0773 230.182.30ANDAMIO METAL C/TABLAS ALQUILER0348090002 HM124.5412 16,166.69129.81CAMION CISTERNA 4X2 (AGUA) 2,000 GAL.0348120002 HM

1.2600 32.3225.65MOTOSOLDADORA 250 AMP.0348210004 HM11.8855 83.207.00EQUIPO DE COMPUTO INCLUYE SOFTWARE0348210066 HM40.1296 140.453.50CIZALLA0348960002 HM

Page 2: 2. Linea de Conduccion

2Página :S10

Precios y cantidades de recursos requeridos por tipoObra MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE, ALCANTARILLADO Y TRATAMIENTO

DE AGUAS RESIDUALES DE ESPINAR-AGOSTO 20080702023

Subpresupuesto 001 LINEA DE CONDUCCION 07/08/2008Fecha

CUSCO - ESPINAR - ESPINARLugar 080801Código CantidadUnidadRecurso Parcial S/.Precio S/.

130.2000 455.703.50ENCOFRADO METALICO P/BUZON0348990002 HM662.6883 13,392.9320.21COMPACTADOR VIBR. TIPO PLANCHA 4 HP0349030001 HM

26.9633 4,633.10171.83CARGADOR S/LLANTAS 125-155 HP 3 YD3.0349040010 HM121.3789 19,043.14156.89RETROEXCAVADOR S/ORUGA 80-110HP 0.5-1.3Y30349040022 HM

91.5014 646.007.06VIBRADOR DE CONCRETO 4 HP 1.50"0349070003 HM17.5031 572.3532.70ZARANDA VIBRATORIA DE 15 HP0349140051 HM17.5045 176.9710.11GRUPO ELECTROGENO 56 HP 37.5 KW0349150013 HM35.0318 245.227.00NIVEL TOPOGRAFICO0349880002 HM46.9176 985.2721.00EQUIPO DE ESTACION TOTAL INCL. PRISMA JALONES

TELESCOPICOS0349890002 HM

72,701.77

Total S/. 729,896.57