volumenes de materiales original
DESCRIPTION
generador de volumenes de obraTRANSCRIPT
ZAPATA DE 60 CENTIMETROSUNIDAD ALTO ANCHO
CIMENTACION EXCAVACION M3 1.4 0.65
PLANTILLA DE CONCRETO POBRE M3 0.05 0.65ZAPATA (60 CMTS)CONCRETO 200KG/CM2 M3 0.15 0.4
ACERO KILOSESTRIBOS KILOS
BLOCK 12X20X40 M2 1.2ESCALERILLA ML 1
MUROSPLANTA BAJA
CADENA DE DEZPLANTE MLMURO DE LADRILLO M2 2.2 0.12
CADENA INTERMEDIA MLMURO DE LADRILLO SEGUNDO NIVEL M2 1.6 0.12
MURO DE LADRILLO PLANTA ALTA M2 2.2 0.12CADENA INTERMEDIA ML
MURO DE LADRILLO SEGUNDO NIVEL M2 1.6 0.12
CASTILLOS MLCASTILLOS ML
LARGO CANTIDAD/METRO METROS TOTALES CANTIDAD TOTAL
1 0.91 752.49 684.771 0.0325 752.49 24.461 0.06 752.49 45.151 1.114 752.49 838.271 1.4482 752.49 1089.761 1.2 752.49 902.991 1 752.49 752.49
1 1 423.257 423.261 2.2 423.257 731.171 1 423.257 423.261 1.6 423.257 527.21
423.2571 2.2 423.257 731.171 1 423.257 423.261 1.6 356 419.60
8 127 1016.002.8 96 268.80
1284.80
ZAPATA DE 40 CENTIMETROS ZAPATA DE 60 CENTIMETROS
10.73 2 21.46 1.35 1 1.3522.02 1 22.02 4.1 1 4.1
14.6 1 14.6 1.5 1 1.51.3 18 23.4 1.21 1 1.21
1 6 6 5.05 1 5.053.7 1 3.7 21.1 1 21.1
2.03 1 2.03 4.45 6 26.738.85 1 38.85 17.35 1 17.3537.75 1 37.75 1.2 1 1.2
4.6 10 46 11.15 1 11.1516.37 1 16.37 1.3 1 1.3
2.65 1 2.65 2.63 1 2.632.85 1 2.85 1.05 1 1.052.25 1 2.25 1.22 1 1.226.28 1 6.28 3 1 33.18 1 3.18 5.52 1 5.523.18 1 3.18 3.1 3 9.33.23 1 3.23 2.95 1 2.953.06 1 3.06 5.35 1 5.35
3.1 1 3.1 14.1 1 14.11.93 1 1.93 2.2 6 13.23.75 1 3.75 1.13 1 1.132.98 1 2.98 0.83 1 0.832.44 1 2.44 10.52 1 10.52
1.2 2 2.4 4.7 2 9.43.75 1 3.75 0.5 1 0.58.25 1 8.25 2.85 1 2.85
3.1 1 3.1 3.95 1 3.957.36 1 7.36 4.7 2 9.4
2.5 2 5 2.25 1 2.253.2 1 3.2
5.55 1 5.550.88 1 0.88
10.99 1 10.993.04 2 6.089.89 1 9.890.48 1 0.48
116.007 1 116.007
455.997 191.16
PRECIO POR METRO LINEAL $ 11.65 $ 15.60
$ 5,312.37 $ 2,982.10
647.157
$ 8,294.46
UNIDAD TOTAL MTSZAPATAS CORRIDAS DE 40 CMS ML 527.50 ZAPATAS CORRIDAS DE 60 CMS ML 224.99 CASTILLOS REFORZADOS, ARMEX 12X12X4 CON 2 VARILLAS DE 3/8" ML 1,284.00 CASTILLO SENCILLO ARMEX 12X12X4 ML 196.10 CASTILLOS AHOGADOS ML 921.60
PRECIO TOTAL $ 11.65 $ 6,145.38 $ 15.60 $ 3,509.84 $ 14.74 $18,926.16 $ 12.00 $ 2,353.20 $ 4.00 $ 3,686.40
$34,620.98 NOSOTROS
$33,689.94 FIERRERO
UNIDAD ML ML
UNIDAD CASTILLO SENCILLO, ARMEX 12X12X4 ML
UNIDAD CASTOLLOS AHOGADOS VARILLA DE 3/8" ML
CASTILLOS K-1, ARMADO CON 4 VARILLAS 5/8", CON ESTRIBOS DE 1/4" kilos estribos a cada 20
ZAPATAS 1.0X1.0 VARILLAS
DADOS VARILLAS VARILLAS ESTRIBOS
ZAPATAS 0.95X0.95 VARILLAS
CADENA DE DEZPLANTE DE 15X15, ML
CASTILLO REFORZADO, ARMEX 12X12X4 REFORZADO CON DOS VARILLAS DE 3/8" , ( VARILLAS ENCONTRADAS)
CANTIDAD DISTANCIA CANTIDAD TOTAL 98.00 6.00 588.00 116.00 6.00 696.00
1,284.00
CANTIDAD DISTANCIA CANTIDAD TOTAL 12.00 6.00 72.00 73.00 1.70 124.10
196.10
CANTIDAD DISTANCIA CANTIDAD TOTAL 219.00 1.80 394.20 90.00 1.80 162.00 203.00 1.80 365.40
921.60
52.00 7.25 377.00 585.10 455.00 0.80 364.00 91.00
676.10 $ 2.80 $ 1,893.09
136.00 1.25 1.00 170.00 $ 2.80 $ 476.00
68.00 1.80 1.55 189.96 $ 4.80 $ 911.83 68.00 1.80 0.56 68.18 $ 5.80 $ 395.43 119.00 1.35 0.56 89.48 $ 6.80 $ 608.48
347.62 17.40 1,915.73
24.00 1.10 1.00 26.40 $ 2.80 $ 73.92
731.00 18.07 $ 13,209.17
OBRA CENTRO DE CONTROL DE RABIA Y OTRAS ZOONOSISDESTAJO DE LA SEM DEL 3 AL 9 DE NOVIEMBRE 2014SR. JUAN MANUEL NEGRETE
CANTIDAD PRECIO TOTALZAPATAS CORRIDAS DE 40 CMS ML 527.50 $ 11.65 $ 6,145.38 ZAPATAS CORRIDAS DE 60 CMS ML 224.99 $ 15.60 $ 3,509.84 CASTILLOS REFORZADOS, ARMEX 12X12X4 CON 2ML 1,284.00 $ 14.74 $ 18,926.16 CASTILLO SENCILLO ARMEX 12X12X4 ML 196.10 $ 12.00 $ 2,353.20 CASTILLOS AHOGADOS ML 921.60 $ 4.00 $ 3,686.40 CASTILLOS K-1 KILOS 676.10 $ 2.80 $ 1,893.08 ZAPATAS DE 1.0 X 1.0 KILOS 170.00 $ 2.80 $ 476.00 DADOS PARA ZAPATA KILOS 347.62 $ 2.80 $ 973.34 ZAPATAS DE 0.95X0.95 KILOS 26.40 $ 2.80 $ 73.92
$ - $ - $ - $ -
ÁREA A P.BEJE TRAMO LONGITUD ALTURA TOTAL35 W-Y 5.05 3.90 19.7034 W-W' 0.80 3.90 3.1233 W-Y 5.05 3.90 19.7029 W-Y 5.05 3.90 19.7027 W-Y 5.05 3.90 19.7024 W-Y 5.05 3.90 19.7019 W-Y 5.05 3.90 19.7025 W'-Y 1.20 3.90 4.68Y 19-35 17.04 3.90 66.46W 19-35 17.04 3.90 66.46
258.88
ÁREA B P.BEJE TRAMO LONGITUD ALTURA TOTAL18 W-Y 5.05 3.90 19.7011 W-W' 13.20 3.90 51.4810 W-Y 3.06 3.90 11.93X W-Y 4.95 3.90 19.317 W-Y 3.00 3.90 11.708 W-Y 12.32 3.90 48.05O W-Y 3.30 3.90 12.87Q W'-Y 4.35 3.90 16.9714 19-35 17.04 3.90 66.4611 19-35 17.04 3.90 66.46U Nov-17 17.04 3.90 66.46V 19-33 17.04 3.90 66.46
19 V-N 17.04 3.90 66.4621 T-V 17.04 3.90 66.46
324.91