    Ind. Unid. Cantidad Total

    1,302,479.11

    47 HH 885.0360 14,718.15

    47 HH 17,696.7045 267,574.17

    47 HH 78,259.6732 926,594.53

    47 HH 91.4284 1,382.40

    47 HH 6,908.5992 90,778.99

    47 HH 108.8941 1,430.87

    1,860,671.85

    02 kg 1.5014 5.48

    02 kg 1.5014 5.48

    02 und 12.0000 46.80

    02 und 1.0000 150.00

    05 m 0.2835 31.19

    21 bol 24,813.3156 441,677.02

    38 m 2,269.3760 118,007.55

    39 m 3.0384 7.60

    43 p 150.0000 750.00

    02 kg 475.9524 1,737.23

    02 kg 180.1644 657.60

    26 und 4.7711 79.20

    26 und 9.6000 19.20

    43 p 23,903.6208 119,518.10

    45 pln 180.0308 3,501.60

    61 pln 79.2064 1,477.20

    32 est 1.0000 21,113.37

    02 kg 853.7927 3,116.34

    30 bol 335.5283 2,684.23

    54 m 49.1480 1,572.74

    27 m 2,837.5875 2,270.07

    27 und 3,783.4500 3,026.76

    28 kg 756.6900 9,836.97

    30 und 15.1338 5,296.83

    05 m 2,163.6750 259,641.00

    04 m 1,205.7391 144,688.69

    39 m 554.1031 1,385.26

    02 kg 3,199.9482 11,679.81

    02 kg 2,123.6020 7,751.15

    30 gln 2,300.2296 43,704.36

    54 gln 2.5968 83.10

    02 kg 574.2958 2,096.18

    02 kg 10,208.6679 28,584.27

    05 m 29.1423 2,331.38

    05 m 287.9941 34,559.29

    02 kg 445.7079 1,626.83

    43 p 84.8656 339.46

    30 bol 0.7155 5.72

    13 gln 1.1980 19.17

    05 und 1.5000 14,250.00

    02 und 1.5000 9,750.00

    02 und 1.5000 11,250.00

    46 und 1.0000 15.00

    72 gln 0.2740 20.55

    72 m 0.7360 2.58

    72 und 1.0000 1.50

    72 pza 4.0000 14.00

    72 und 4.0000 20.00

    65 pza 8.0000 16.00

    77 und 2.0000 90.00

    72 und 1.0000 3.50

    72 und 2.0000 11.20

    PROYECTO CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    ETAPA 1.0 TRABAJO PROGRA

    PROPIETARIO MUNICIPALIDAD DISTRITAL DE SANAGORAN

    UBICACION LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Descripcin Costo

    MANO DE OBRA

    Capataz 16.63

    Operario 15.12

    Peon 11.84

    TOPOGRAFO 15.12

    Oficial 13.14

    Controlador oficial 13.14

    MATERIALES

    Clavo para MAdera con Cabeza de 3" 3.65

    Clavos para Madera de 2 1/2", 3" y 4" 3.65

    Perno 5/8" x 8" C/Tuerca y Anillo 3.90

    Gigantografia 150.00

    PIEDRA MEDIANA DE 4" 110.00

    CEMENTO PORTLAND TIPO I (42.5 kg) 17.80

    HORMIGON 52.00

    Agua 2.50

    Madera Tornillo Comercial 5.00

    Clavos para madera 3" 3.65

    Clavos para Madera de 2 1/2" 3 y 4" 3.65

    Candado 16.60

    Armella 2.00

    MADERA TORNILLO 5.00

    Triplay de 4" x 8" x 6 mm 19.45

    Calamina Galvanizada Zinc 24 Canales 1.83 x 1.85m x 0.6mm 18.65

    Movilizacion y Desmovilizacion de Equipos 21,113.37

    CLAVOS PARA MADERA 2 1/2", 3" y 4" 3.65

    Yeso (25 Kg.) 8.00

    Pintura esmalte 32.00

    GUIA 0.80

    Fulminante 0.80

    Dinamita 13.00

    Barreno 5' x 1/8" 350.00

    Piedra chancada 1/2" 120.00

    ARENA FINA 120.00

    AGUA 2.50

    Alambre Negro N 8 3.65

    Clavos con cabeza promedio 3.65

    Aditivo impermeabilizante 19.00

    Pintura esmalte 32.00

    Alambre negro N 16 3.65

    Acero corrugado f'y = 4200 Kg/cm2 Grado 60 2.80

    Piedra Grande Max 8" 80.00

    ARENA GRUESA 120.00

    Alambre negro N 8 3.65

    Andamio de madera 4.00

    Yeso (bolsa de 28 kg) 8.00

    Asfalto RC-250 16.00

    Compuerta Metalica 9,500.00

    Compuerta de Regulacion de 0.40x1.00x1/16" 6,500.00

    Compuerta Metalica de 0.50x0.30 e=1/8" 7,500.00

    Malla Metalica 15.00

    Pegamento para PVC agua forduit 75.00

    Tuberia Pvc Sap 1/2" 3.50

    Codo PVC 1/2" x 90 1.50

    Transicion Pvc P/R 1/2" 3.50

    Union Universal de FG de 1/2" 5.00

    Niple de fierro galvanizado de 1/2" x 2" 2.00

    Valvula Compuerta de Bronce de 1/2" 45.00

    Reduccion Pvc Sap 1/2" 3.50

    TEE PVC SAP 5.60

  • ::

    :

    :

    Ind. Unid. Cantidad Total

    72 pza 2.0000 17.00

    72 pza 1.0000 7.50

    39 m 11.6680 4.67

    43 pza 11.6680 5.83

    54 gln 0.1094 3.50

    51 und 64.0000 960.00

    51 und 240.0000 2,880.00

    51 und 1,440.0000 25,920.00

    51 und 136.0000 3,400.00

    02 pza 8.0000 520.00

    02 pza 8.0000 600.00

    02 pza 240.0000 13,200.00

    02 pza 32.0000 25.60

    02 und 40.0000 260.00

    37 und 16.0000 192.00

    37 und 16.0000 240.00

    51 und 120.0000 1,800.00

    51 und 120.0000 3,000.00

    30 m 868.3500 56,442.75

    30 m 304.3385 13,628.28

    02 kg 79.9200 291.71

    02 m 599.4000 7,192.80

    02 pza 2,397.6000 3,596.40

    30 kg 79.9200 959.04

    30 pza 1,198.8000 5,514.48

    46 m 419.5800 6,293.70

    42 p 533.6000 2,934.80

    43 p 330.0000 2,435.40

    43 p 1,153.6655 6,345.16

    43 p 956.7760 5,262.27

    73 m 710.8135 219,037.18

    02 pza 18.0000 3,150.00

    30 und 6.0000 450.00

    30 und 1.0000 350.00

    32 gbl 1.0000 137,238.87

    32 gbl 1.0000 25,984.35

    182,399.58

    49 HM 42.8946 171.58

    30 HM 51.4735 257.37

    37 HM 105.6089 264.02

    37 HM 1,816.8240 16,351.42

    48 HM 897.4304 85,255.89

    49 HM 112.0847 22,416.93

    48 HM 761.3701 11,420.55

    48 HM 745.1942 6,520.45

    49 HM 8.6082 75.32

    48 HM 0.4000 4.00

    30 HM 1.7113 12.83

    37 %MO 3.0441 39,649.22

    PROYECTO CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    ETAPA 1.0 TRABAJO PROGRA

    Descripcin Costo

    MUNICIPALIDAD DISTRITAL DE SANAGORAN

    UBICACION LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Tee de Pvc Linea de Conduccion 8.50

    PROPIETARIO

    Tee de Pvc de Purga 7.50

    Cordel 0.40

    Estacas Madera 2"x2"x1" 0.50

    Pintura Esmalte DD Blanco 32.00

    Guardacabos de 2" 15.00

    Guardacabos de 1/2" 12.00

    Grapas Crosby 2" 18.00

    Grapas Crosby 2" 25.00

    Anclaje de Cable Espiral Geobrugg 65.00

    Tensor Crosby HG-226 de Tipo Ojo y Ojo 2" x 24" 75.00

    Tensor Crosby HG-226 De Tipo Ojo y Ojo 1/2" x 12" 55.00

    Pernos De 3/4" x 6" 0.80

    Rodillo De 1" 6.50

    Plancha De Acero A-36 e=1/2" 12.00

    Plancha De Acero e=1/2" De 7" x 8" 15.00

    Platina e=1/2" Acero Laminado En Caliente A-3 15.00

    Fierro Liso Con Tuercas y Pernos De 2" 25.00

    Cable Principal 1 1/4" Tipo Boa Alma De Acero 65.00

    Pendolas Con Cables 1/2" Tipo Boa 44.78

    Alambre galvanizado # 16 3.65

    Fierro Liso De 1/2" 12.00

    Pernos 1 1/4" x 2" 1.50

    Soldadura Cellocord 1/32" 12.00

    Lamina De Acero Curvo 2" 4.60

    Malla Fierro Galvanizado 1/4" 15.00

    Larguero De 4" x 4" 5.50

    Viguetas De 3" x 5" 7.38

    Tablas De 8" x 1" 5.50

    Tope De Liston De Madera 2' x 3" x 10" 5.50

    Tubo HDPE 12" (300mm) 308.15

    Compuerta Metalica Tipo Tarjeta 175.00

    Ensayo resistencia compresin de concreto 75.00

    Diseo de mezcla 350.00

    Flete terrestre 137,238.87

    Flete Rural 25,984.35

    EQUIPO

    NIVEL TOPOGRAFICO 4.00

    Teodolito 5.00

    Mira topogrfica y jalones 2.50

    Martillo neumtico 25 - 29 kg 9.00

    Camion Volquete de 6 x 4 330HP 10 m3 95.00

    Cargador frontal CAT 930 HP, 1.72 m3 200.00

    Mezcladora de Concreto Tipo Tambor 23 HP, 11-12 p3, 2,200 kg 15.00

    Vibradora de Concreto Gasolina 5HP 8.75

    Vibrador de Concreto Gasolina 5HP 8.75

    TOTAL: 3,345,550.54

    Motosoldadora de 250 amp 10.00

    Teodolito Convencional 7.50

    Herramientas 1,302,479.11

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5

    29965,17 29965,17

    und 1289,4 1289,4 1289,4

    m 63,02 7562,4 7562,4

    est 21113,37 21113,37 21113,37

    2131376,78 138147,33 329798 236325,53

    17559,67 17559,67

    m 0,48 6823,05 6823,05

    m 1,42 10736,62 10736,62

    805560,91 69286,57 323178,53 20620,97

    m 24,39 351762,58 69286,57 138573,14

    m 16,26 164967,78 20620,97

    m 59,68 180522,45 180522,45

    m 2,7 20414,7 4082,94

    m 9,63 87893,4

    969919,71

    m 436,69 780277,69

    m 18,52 189642,02

    280415,93 215704,56

    m 15,5 280415,93 215704,56

    57920,56 51301,09 6619,47

    269,4 269,4

    m 0,48 104,68 104,68

    m 1,42 164,72 164,72

    8304,39 8304,39

    m 24,39 5187,75 5187,75

    m 16,26 936,09 936,09

    m 2,7 313,2 313,2

    m 9,63 1867,35 1867,35

    36107,83 36107,83

    m 436,69 24061,62 24061,62

    m 18,52 7003,52 7003,52

    kg 4,2 5042,69 5042,69

    13238,94 6619,47 6619,47

    m 26,48 13238,94 6619,47 6619,47

    46642,49 17901,11 28741,38

    135,85 135,85

    m 0,48 34,32 34,32

    m 1,42 101,53 101,53

    98124,12

    5329,74

    92794,38

    147499,35

    147499,35

    64711,37

    64711,37

    Mes 4

    310334,84

    87893,4

    822420,36

    780277,69

    42142,67

    Mes 3

    1116771,09

    294350,73

    138573,14

    51552,43

    16331,76

    1200,64

    499,96

    71,5

    71,5

    9127,04

    1786,8

    10239,85

    18091,35

    218,08

    116

    212,7

    57,57

    116

    193,91

    55,1

    378,16

    CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    TRABAJO PROGRA

    MUNICIPALIDAD DISTRITAL DE SANAGORAN

    LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Cantidad

    1

    120

    1

    14214,68

    7561

    14422,41

    10145,62

    3024,84

    7561

    Eliminacion de Material Excedente

    OBRAS DE CONCRETO

    Concreto Simple Fc 175 kg/m2

    Encofrado y Desencofrado

    Acero Corrugado FY=4200 kg/cm2 Grado 60

    ENLUCIDOS Y REVESTIMIENTO

    Revestimiento de Canal Tapados de Concreto

    PUENTE CANAL

    TRABAJOS PRELIMINARES

    Limpieza de terreno

    TRAZO Y REPLANTEO

    Excavacion manual en Material Suelto

    Relleno Compactado Manual, Material Propio

    Excavacion en Roca Fija

    Refine y Nivelacion Zanja Terr. Normal

    Eliminacion de Material Excedente

    OBRAS DE CONCRETO

    MOVIMIENTO DE TIERRAS

    Excavacion manual en Material Suelto

    Relleno Compactado Manual, Material Propio

    Refine y Nivelacion Zanja Terr. Normal

    Concreto Simple Fc 175 kg/m2

    Encofrado y Desencofrado

    ENLUCIDOS Y REVESTIMIENTO

    Revestimiento de Canal con Aditivo Impermeabilizante

    CANALES TAPADOS DE CONCRETO

    TRABAJOS PRELIMINARES

    Descripcin

    TRABAJOS PRELIMINARES

    Cartel de Obra ( 7.20 x3.60 )

    Construccion de Almacen y Guardiania

    Movilizacin y desmovilizacin de equipo

    CANAL DE CONCRETO

    TRABAJOS PRELIMINARES

    Limpieza de terreno

    Trazo y replanteo con Instrumentos

    MOVIMIENTO DE TIERRAS

    Limpieza del Terreno (Manual)

    Trazo y replanteo con Instrumentos

    1.2.5.4.1

    1,3

    1.3.1

    1.3.1.1

    1.3.1.2

    1.2.3.1

    1.2.3.2

    1.2.5.3.1

    1.2.5.3.2

    1.2.5.3.3

    1.2.5.4

    1.2.5.2.2

    1.2.5.2.3

    1.2.5.2.4

    1.2.5.3

    1.2.4

    1.2.4.1

    1.2.5

    1.2.5.1

    1.2.5.1.1

    1.2.5.1.2

    PROYECTO

    ETAPA 1.0

    CLIENTE

    UBICACION

    1.2.5.2

    1.2.5.2.1

    1.2.2.3

    1.2.2.4

    1.2.2.5

    1.2.3

    Item

    1,1

    1.1.1

    1.1.2

    1.1.3

    1,2

    1.2.1

    1.2.1.1

    1.2.1.2

    1.2.2

    1.2.2.1

    1.2.2.2

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5

    1590,34 1590,34

    m 24,39 765,36 765,36

    m 4,83 151,47 151,47

    m 33,88 371,32 371,32

    m 9,63 302,19 302,19

    1739,11 1739,11

    m 18,92 593,33 593,33

    m 182,74 1145,78 1145,78

    35402,88 14435,81 20967,07

    2416,81 2416,81

    m 403,08 1318,07 1318,07

    m 33,47 599,78 599,78

    kg 4,2 498,96 498,96

    6379,15 6379,15

    m 454,29 1253,84 1253,84

    m 41,69 1495,84 1495,84

    kg 4,2 3629,47 3629,47

    8601,61 5639,85 2961,76

    m 428,7 2700,81 2700,81

    m 44,43 2939,04 2939,04

    kg 4,2 2961,76 2961,76

    18005,31 18005,31

    m 428,7 6349,05 6349,05

    m 33,47 2952,05 2952,05

    kg 4,2 8704,21 8704,21

    7774,31 7774,31

    m 15,5 2363,13 2363,13

    m 20,14 2880,22 2880,22

    m 35,73 2363,54 2363,54

    m 30,33 167,42 167,42

    129567,88 90930,37 38637,51

    111807,79 73170,28 38637,51

    235 235

    m 0,48 84,18 84,18

    m 0,86 150,82 150,82

    6866,89 6866,89

    m 24,39 4164,1 4164,1

    Descripcin Cantidad Mes 3 Mes 4

    5,52

    175,37

    175,37

    170,73

    17,92

    118,8

    2,76

    35,88

    864,16

    6,3

    66,15

    705,18

    14,81

    88,2

    2072,43

    152,46

    143,01

    66,15

    31,38

    31,36

    10,96

    31,38

    CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    TRABAJO PROGRA

    MUNICIPALIDAD DISTRITAL DE SANAGORAN

    LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    31,36

    6,27

    3,27

    ENLUCIDOS Y REVESTIMIENTO

    Revestimiento de Canal con Aditivo Impermeabilizante

    Revestimiento de Exterior de C:A 1:5

    Tarrajeo de Vigas

    Tarrajeo de Columnas

    BOCATOMA

    BOCATOMA O CAPTACION

    TRABAJOS PRELIMINARES

    Limpieza de terreno

    Trazo y Replanteo

    MOVIMIENTO DE TIERRAS

    Excavacion manual en Material Suelto

    Concreto Ciclopeo C.H 1:12+30% P.G. max 6"

    OBRAS DE CONCRETO ARMADO

    ZAPATAS

    Concreto f'c=210 Kg/cm2 Para Zapatas

    Encofrado y Desencofrado Normal para Zapatas

    Acero Corrugado FY=4200 kg/cm2 Grado 60

    COLUMNAS

    Concreto f'c=210 Kg/cm2 Para Columnas

    Encofrado y Desencofrado Normal para Columnas

    Acero Corrugado FY=4200 kg/cm2 Grado 60

    VIGAS

    Concreto f'c=210 Kg/cm2 Para Vigas

    Encofrado y Desencofrado Normal para Vigas

    Acero Corrugado FY=4200 kg/cm2 Grado 60

    CANAL DE CONCRETO

    Concreto f'c=210 Kg/cm2 Para Canal

    Encofrado y Desencofrado Normal para Canal

    Acero Corrugado FY=4200 kg/cm2 Grado 60

    MOVIMIENTO DE TIERRAS

    PROYECTO

    ETAPA 1.0

    CLIENTE

    UBICACION

    Excavacion manual en Material Suelto

    Refine y Nivelacion Zanja Terr. Normal

    Relleno de Zanjas Apisonado con Material Propio en Cpas de

    0.20m

    Eliminacion de Material Excedente

    CONCRETO SIMPLE

    Solado de Concreto C.H 1:10

    1.4.1

    1.4.1.1

    1.4.1.1.1

    1.4.1.1.2

    1.4.1.2

    1.4.1.2.1

    1.3.4.2

    1.3.4.2.1

    1.3.5.2

    1.3.5.3

    1.3.5.4

    1,4

    1.3.5

    1.3.5.1

    1.3.4.2.2

    1.3.4.2.3

    1.3.4.3

    1.3.4.3.1

    1.3.4.3.2

    1.3.4.3.3

    1.3.4.4

    1.3.4.4.1

    1.3.4.4.2

    1.3.4.4.3

    1.3.4.1

    1.3.4.1.1

    1.3.4.1.2

    1.3.4.1.3

    1.3.3.2

    1.3.4

    1.3.2

    1.3.2.1

    1.3.2.2

    Item

    1.3.2.3

    1.3.2.4

    1.3.3

    1.3.3.1

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5

    m 4,83 647,56 647,56

    m 9,63 2055,23 2055,23

    21070,49 21070,49

    m 348,25 7257,53 7257,53

    m 436,69 13362,71 13362,71

    m 41,69 450,25 450,25

    44997,9 44997,9

    m 395,82 30826,46 30826,46

    m 33,47 9859,26 9859,26

    kg 4,2 4312,18 4312,18

    6828,27 6828,27

    m 24,39 352,68 352,68

    m 16,29 92,69 92,69

    m 24,39 293,9 293,9

    und 231,7 6040,42 6040,42

    und 8,11 48,58 48,58

    7476 7476

    m 22,55 7476 7476

    24333,24 24333,24

    und 9611,08 14416,62 14416,62

    und 6611,08 9916,62 9916,62

    17760,09 17760,09

    10,66 10,66

    m 0,48 3,82 3,82

    m 0,86 6,84 6,84

    373,87 373,87

    m 24,39 224,39 224,39

    m 4,83 38,83 38,83

    m 9,63 110,65 110,65

    450,85 450,85

    m 18,92 147,39 147,39

    m 436,69 152,84 152,84

    m 33,47 150,62 150,62

    3767,12 3767,12

    m 456,15 1842,85 1842,85

    m 33,47 1202,58 1202,58

    kg 4,2 721,69 721,69

    UBICACION LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Item Descripcin Cantidad Mes 3 Mes 4

    PROYECTO CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    TRABAJO PROGRA

    MUNICIPALIDAD DISTRITAL DE SANAGORAN

    11,49

    7,79

    0,35

    4,5

    4,04

    35,93

    171,83

    14,46

    5,69

    12,05

    26,07

    5,99

    331,53

    1,5

    1,5

    7,95

    7,95

    9,2

    8,04

    134,07

    213,42

    20,84

    30,6

    10,8

    77,88

    294,57

    1026,71

    Trazo y replanteo con Instrumentos

    MOVIMIENTO DE TIERRAS

    Excavacion manual en Material Suelto

    Refine y Nivelacion Zanja Terr. Normal

    Eliminacion de Material Excedente

    CONCRETO SIMPLE

    Solado de Concreto C.H 1:10

    Concreto Simple Fc 175 kg/m2

    Encofrado y Desencofrado Normal para Desarenador

    CONCRETO ARMADO

    Concreto f'c=175 Kg/cm2 para Desarenador

    Encofrado y Desencofrado Normal para Desarenador

    Acero Corrugado FY=4200 kg/cm2 Grado 60

    CONCRETO ARMADO

    Concreto f'c=175 Kg/cm2 para Muros de Contencion

    Encofrado y Desencofrado Normal para Muros

    Acero Corrugado FY=4200 kg/cm2 Grado 60

    RELLENOS

    Relleno Compactado Manual, Material Propio

    Cama de Arena para Asentado de Piedra

    Piedra Asentada con Concreto

    Enrocado Acomodado Manualmente

    Junta Asfaltica

    ENLUCIDOS Y REVESTIMIENTO

    Revestimiento de Captacion con Aditivo Impermeabilizante

    CARPINTERA METLICA

    Compuerta de Limpia de 1.47x1.00x1/16"

    Compuerta de Regulacion de 0.40x1.00x1/16"

    DESARENADOR

    TRABAJOS PRELIMINARES

    Limpieza de terreno

    Refine y Nivelacion Zanja Terr. Normal

    Eliminacion de Material Excedente

    CONCRETO SIMPLE

    Concreto f'c=140 kg/cm2 para Captacion

    Concreto Simple Fc 175 kg/m2

    Encofrado y Desencofrado Normal para Captacion

    1.4.2.3.1

    1.4.2.3.2

    1.4.2.3.3

    1.4.2.4

    1.4.2.4.1

    1.4.2.4.2

    1.4.2.4.3

    1.4.1.5.2

    1.4.1.5.3

    1.4.2.2.1

    1.4.2.2.2

    1.4.2.2.3

    1.4.2.3

    1.4.2.1.2

    1.4.2.2

    1.4.1.5.4

    1.4.1.5.5

    1.4.1.6

    1.4.1.6.1

    1.4.1.7

    1.4.1.7.1

    1.4.1.7.2

    1.4.2

    1.4.2.1

    1.4.2.1.1

    1.4.1.4.2

    1.4.1.4.3

    1.4.1.5

    1.4.1.5.1

    1.4.1.4

    1.4.1.4.1

    1.4.1.2.2

    1.4.1.2.3

    ETAPA 1.0

    CLIENTE

    1.4.1.3

    1.4.1.3.1

    1.4.1.3.2

    1.4.1.3.3

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5

    1740,97 1740,97

    m 40,17 1740,97 1740,97

    11416,62 11416,62

    und 7611,08 11416,62 11416,62

    949,03 949,03

    1,71 1,71

    m 0,48 0,61 0,61

    m 0,86 1,1 1,1

    25,55 25,55

    m 24,39 9,27 9,27

    m 4,83 6,18 6,18

    m 33,88 6,44 6,44

    m 9,63 3,66 3,66

    535,92 535,92

    m 370,05 188,73 188,73

    m 37,58 252,54 252,54

    und 94,65 94,65 94,65

    220,76 220,76

    und 33,92 33,92 33,92

    und 14,54 10,18 10,18

    und 7,72 7,72 7,72

    und 9,72 19,44 19,44

    und 76,3 76,3 76,3

    und 24,65 24,65 24,65

    und 26,75 26,75 26,75

    und 21,8 21,8 21,8

    165,09 165,09

    und 20,8 20,8 20,8

    und 9,72 19,44 19,44

    und 76,3 76,3 76,3

    und 26,75 26,75 26,75

    und 21,8 21,8 21,8

    1865,59 1865,59

    2,8 2,8

    m 0,48 1 1

    m 0,86 1,8 1,8

    Descripcin Cantidad Mes 3 Mes 4

    CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    TRABAJO PROGRA

    MUNICIPALIDAD DISTRITAL DE SANAGORAN

    LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    1

    2

    1

    1

    1

    2,09

    2,09

    0,38

    1,28

    0,19

    0,38

    0,51

    6,72

    1

    1

    0,7

    1

    2

    1

    1

    1

    1

    43,34

    1,5

    1,28

    1,28

    Reduccion Pvc de 1/2"

    Tee de Pvc

    Tee de Pvc Linea de Conduccion

    VARIOS DE VALVULA PURGA

    Tee de Pvc de Purga

    Transicion Pvc P/R 1/2"

    Valvula de Compuerta de 1/2"

    Tee de Pvc

    Tee de Pvc Linea de Conduccion

    CAJA DE TRANSICION

    TRABAJOS PRELIMINARES

    Limpieza de terreno

    Trazo y Replanteo

    TRABAJOS PRELIMINARES

    Limpieza de terreno

    Trazo y Replanteo

    MOVIMIENTO DE TIERRAS

    Excavacion manual en Material Suelto

    Refine y Nivelacion Zanja Terr. Normal

    Relleno de Zanjas Apisonado con Material Propio en Cpas de

    0.20m

    Eliminacion de Material Excedente

    CONCRETO SIMPLE

    Concreto f'c=140 kg/cm2 para Valvula

    Encofrado y Desencofrado Normal para Valvula

    Tapa Sanitaria f'c=175 kg/cm2 De 0.70m x 0.70m

    VARIOS DE VALVULA AIRE MANUAL

    Malla Metalica

    Tubo Pvc Sap 1/2"

    Codo Pvc Sap 1/2 x 90"

    Transicion Pvc P/R 1/2"

    Valvula de Compuerta de 1/2"

    ENLUCIDOS Y REVESTIMIENTO

    Revestimiento de Desarenador con Aditivo Impermeabilizante

    CARPINTERA METLICA

    Compuerta Metalica de 0.50x0.30 e=1/8"

    VALVULAS DE PURGA Y LIMPIEZA

    PROYECTO

    ETAPA 1.0

    CLIENTE

    UBICACION

    1.5.5.3

    1.5.5.4

    1.5.5.5

    1,6

    1.6.1

    1.6.1.1

    1.6.1.2

    1.5.2.3

    1.5.2.4

    1.5.4.8

    1.5.5

    1.5.5.1

    1.5.5.2

    1.5.4.6

    1.5.4.7

    1.5.3

    1.5.3.1

    1.5.3.2

    1.5.3.3

    1.5.4

    1.5.4.1

    1.5.4.2

    1.5.4.3

    1.5.4.4

    1.5.4.5

    1.5.1.2

    1.5.2

    1.5.2.1

    1.5.2.2

    1.5.1

    1.5.1.1

    1.4.2.5

    Item

    1.4.2.5.1

    1.4.2.6

    1.4.2.6.1

    1,5

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5

    127,11 127,11

    m 24,39 58,54 58,54

    m 4,83 10,09 10,09

    m 15,82 33,06 33,06

    m 9,63 25,42 25,42

    1126,7 1126,7

    m 18,92 39,54 39,54

    m 436,69 541,5 541,5

    m 37,58 545,66 545,66

    608,98 608,98

    m 40,17 608,98 608,98

    529412,66 249818,21 57727,42

    211,19 211,19

    m 0,69 80,51 80,51

    und 1,12 130,68 130,68

    44637,73 44637,73

    m 24,39 29274,83 29274,83

    m 4,83 579,12 579,12

    m 33,88 335,41 335,41

    m 9,63 14448,37 14448,37

    204969,29 204969,29

    204969,29 204969,29

    m 18,92 374,62 374,62

    m 377,34 187160,64 187160,64

    m 29,37 17434,03 17434,03

    34276,89 34276,89

    9767,4 9767,4

    m 403,08 5586,69 5586,69

    m 33,47 899,67 899,67

    kg 4,2 3281,04 3281,04

    22306,03 22306,03

    m 454,29 6396,4 6396,4

    m 41,69 5869,95 5869,95

    kg 4,2 10039,68 10039,68

    2203,46 2203,46

    Mes 4

    PROYECTO CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    146054,57

    TRABAJO PROGRA

    MUNICIPALIDAD DISTRITAL DE SANAGORAN

    LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Descripcin

    75812,46

    Mes 3

    13,86

    26,88

    781,2

    14,08

    140,8

    2390,4

    15,16

    116,68

    116,68

    1200,28

    119,9

    9,9

    1500,35

    19,8

    496

    593,6

    2,4

    2,09

    Cantidad

    2,09

    2,64

    2,09

    1,24

    14,52

    Concreto Simple Fc=210 kg/m2 Para Canales de Anclaje

    Encofrado y Desencofrado Normal para Camaras de Anclaje

    OBRAS DE CONCRETO ARMADO

    ZAPATAS

    Concreto f'c=210 Kg/cm2 Para Zapatas

    Encofrado y Desencofrado Normal para Zapatas

    Acero Corrugado FY=4200 kg/cm2 Grado 60

    COLUMNAS

    Concreto f'c=210 Kg/cm2 Para Columnas

    Encofrado y Desencofrado Normal para Columnas

    Acero Corrugado FY=4200 kg/cm2 Grado 60

    VIGAS

    CONCRETO SIMPLE

    Solado de Concreto C.H 1:10

    Concreto Simple Fc 175 kg/m2

    Encofrado y Desencofrado Normal para para Caja de

    Transicion

    ENLUCIDOS Y REVESTIMIENTO

    Revestimiento de Caja con Aditivo Impermeabilizante

    PASE AEREO DE 58M

    TRABAJOS PRELIMINARES

    Limpieza de terreno

    Trazo, Nivelacion y Replanteo

    MOVIMIENTO DE TIERRAS

    Excavacion manual en Material Suelto

    Refine y Nivelacion Zanja Terr. Normal

    Relleno de Zanjas Apisonado con Material Propio en Cpas de

    0.20m

    Eliminacion de Material Excedente

    CONCRETO SIMPLE

    CAMARA DE ANCLAJE

    Solado de Concreto C.H 1:10

    MOVIMIENTO DE TIERRAS

    Excavacion manual en Material Suelto

    Refine y Nivelacion Zanja Terr. Normal

    Cama de Apoyo 0.10m

    Eliminacion de Material Excedente

    ETAPA 1.0

    CLIENTE

    UBICACION

    Item

    1.7.4.1.3

    1.7.4.2

    1.7.4.2.1

    1.7.4.2.2

    1.7.4.2.3

    1.7.4.3

    1,7

    1.7.1

    1.7.4

    1.7.4.1

    1.7.4.1.1

    1.7.4.1.2

    1.7.3.1.2

    1.7.3.1.3

    1.7.1.1

    1.7.1.2

    1.7.2

    1.7.2.1

    1.7.2.2

    1.7.2.3

    1.7.2.4

    1.7.3

    1.7.3.1

    1.7.3.1.1

    1.6.3.2

    1.6.3.3

    1.6.4

    1.6.4.1

    1.6.3

    1.6.3.1

    1.6.2

    1.6.2.1

    1.6.2.2

    1.6.2.3

    1.6.2.4

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5

    m 428,7 737,36 737,36

    m 44,43 639,79 639,79

    kg 4,2 826,31 826,31

    30834,43 23450,53

    m 35,73 720,32 720,32

    m 30,33 4270,46 4270,46

    m 20,14 25843,65 18459,75

    173733,22

    und 23,01 1472,64

    und 20,01 4802,4

    und 24,01 34574,4

    und 33,01 4489,36

    und 73,01 584,08

    und 83,01 664,08

    und 63,01 15122,4

    und 119,75 958

    und 48,01 5761,2

    m 72,18 59692,86

    m 58,82 17048,39

    m 71,48 28563,41

    21238,68

    und 85,17 3406,8

    und 56,31 3378,6

    und 29,59 8640,28

    und 49,82 5813

    19511,23

    m 334,44 19511,23

    10111,16 10111,16

    16,16 16,16

    m 0,48 5,79 5,79

    m 0,86 10,37 10,37

    199,7 199,7

    m 24,39 88,29 88,29

    m 4,83 58,25 58,25

    m 33,88 18,3 18,3

    m 9,63 34,86 34,86

    Mes 4

    PROYECTO CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    ETAPA 1.0 TRABAJO PROGRA

    CLIENTE MUNICIPALIDAD DISTRITAL DE SANAGORAN

    21238,68

    3406,8

    3378,6

    8640,28

    5813

    19511,23

    19511,23

    105304,66

    59692,86

    17048,39

    28563,41

    LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Descripcin Cantidad Mes 3

    34574,4

    4489,36

    584,08

    664,08

    15122,4

    958

    5761,2

    7383,9

    7383,9

    68428,56

    1472,64

    4802,4

    12,06

    12,06

    3,62

    12,06

    0,54

    3,62

    1440

    136

    8

    8

    240

    8

    120

    827

    289,84

    399,6

    40

    60

    292

    116,68

    58,34

    1,72

    14,4

    196,74

    20,16

    140,8

    1283,2

    64

    240

    Tope De Liston De Madera 2' x 3" x 10"

    TUBERIAS

    Tubo HDPE 12" (300mm)

    TOMAS LATERALES

    TRABAJOS PRELIMINARES

    Limpieza de terreno

    Trazo y Replanteo

    MOVIMIENTO DE TIERRAS

    Excavacion manual en Material Suelto

    Refine y Nivelacion Zanja Terr. Normal

    Relleno de Zanjas Apisonado con Material Propio en Cpas de

    0.20m

    Eliminacion de Material Excedente

    Revestimiento de Exterior de C:A 1:5

    CARPINTERA METLICA

    Guardacabo 2"

    Guardacabo 1/2"

    Grapas Crosby 1/2"

    Grapas Crosby 2"

    Anclajes de cable Espiral Geobrugg

    Tensor Crosby HG-226 De Tipo Ojo y Ojo 2" x 24"

    Tensor Crosby HG-226 De Tipo Ojo y Ojo 1/2" x 12"

    Carro De Dilatacion

    Elemento De Sujecion De Madera

    Cable Principal 1 1/4" Tipo Boa Alma De Acero

    Pendolas Con Cables 1/2" Tipo Boa

    Malla Gallinero Fierro Galvanizado 1/4" Con Fierro Liso De

    1/2"

    CARPINTERA DE MADERA

    Largueros De 4" x 4"

    Viguetas De 3" x 5"

    Tablas De 8" x 1"

    Concreto f'c=210 Kg/cm2 Para Vigas

    Encofrado y Desencofrado Normal para Vigas

    Acero Corrugado FY=4200 kg/cm2 Grado 60

    ENLUCIDOS Y REVESTIMIENTO

    Tarrajeo de Vigas

    Tarrajeo de Columnas

    1.8.1.2

    1.8.2

    1.8.2.1

    1.8.2.2

    1.8.2.3

    1.8.2.4

    1.7.6.5

    1.7.6.6

    1.7.8.1

    1,8

    1.8.1

    1.8.1.1

    1.7.7.4

    1.7.8

    1.7.6.7

    1.7.6.8

    1.7.6.9

    1.7.6.10

    1.7.6.11

    1.7.6.12

    1.7.7

    1.7.7.1

    1.7.7.2

    1.7.7.3

    1.7.6.1

    1.7.6.2

    1.7.6.3

    1.7.6.4

    1.7.5.3

    1.7.6

    1.7.4.3.1

    1.7.4.3.2

    UBICACION

    Item

    1.7.4.3.3

    1.7.5

    1.7.5.1

    1.7.5.2

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5

    5412,4 5412,4

    m 410,7 3154,18 3154,18

    m 33,47 2258,22 2258,22

    4482,9 4482,9

    und 249,05 4482,9 4482,9

    298234,9 298234,9

    86558,94 86558,94

    904,39 904,39

    m 0,69 295,75 295,75

    m 1,42 608,64 608,64

    85654,55 85654,55

    m 103,36 76642,47 76642,47

    m 2,7 1157,27 1157,27

    m 9,63 7854,81 7854,81

    211675,96 211675,96

    400,9 400,9

    m 0,69 131,1 131,1

    m 1,42 269,8 269,8

    2461,6 2461,6

    m 103,36 1767,46 1767,46

    m 2,7 513 513

    m 9,63 181,14 181,14

    1922,19 1922,19

    m 436,69 1349,37 1349,37

    m 18,52 572,82 572,82

    206891,27 206891,27

    m 334,44 206891,27 206891,27

    3401,66 3401,66

    23,48 23,48

    m 0,69 4,95 4,95

    m 1,42 18,53 18,53

    170,93 170,93

    m 24,39 101,46 101,46

    m 2,7 19,39 19,39

    m 9,63 50,08 50,08

    1810,14 1810,14

    m 18,92 135,85 135,85

    Mes 4

    PROYECTO CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    ETAPA 1.0 TRABAJO PROGRA

    CLIENTE MUNICIPALIDAD DISTRITAL DE SANAGORAN

    LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Descripcin Cantidad Mes 3

    13,05

    5,2

    7,18

    741,51

    428,62

    815,66

    190

    190

    17,1

    190

    18,81

    4,16

    7,18

    3,09

    30,93

    618,62

    7,18

    7,68

    67,47

    18

    428,62

    428,62

    Encofrado y Desencofrado Normal para Medidor sin Cuello

    TUBERIAS

    Tubo HDPE 12" (300mm)

    MEDIDOR TIPO SIN CUELLO

    TRABAJOS PRELIMINARES

    Limpieza de terreno

    TRAZO Y REPLANTEO

    MOVIMIENTO DE TIERRAS

    Excavacion manual en Material Suelto

    Refine y Nivelacion Zanja Terr. Normal

    Eliminacion de Material Excedente

    CONCRETO SIMPLE

    Solado de Concreto C.H 1:10

    CANAL DE DE TUBERIA POR ROCA

    TRABAJOS PRELIMINARES

    Limpieza de terreno

    TRAZO Y REPLANTEO

    MOVIMIENTO DE TIERRAS

    Corte De Roca Suelta Con Voladura

    Refine y Nivelacion Zanja Terr. Normal

    Eliminacion de Material Excedente

    CANAL DE DE TUBERIA POR TERRENO NORMAL

    TRABAJOS PRELIMINARES

    Limpieza de terreno

    TRAZO Y REPLANTEO

    MOVIMIENTO DE TIERRAS

    Corte De Roca Suelta Con Voladura

    Refine y Nivelacion Zanja Terr. Normal

    Eliminacion de Material Excedente

    OBRAS DE CONCRETO

    Concreto Simple Fc 175 kg/m2

    CONCRETO SIMPLE

    Concreto f'c=175 Kg/cm2 para Tomas Laterales

    Encofrado y Desencofrado Normal para Tomas Laterales

    CARPINTERA METLICA

    Compuerta Metalica Tipo Tarjeta

    CANAL DE TUBERIAS DE 300MM

    1.9.2.4.1

    1,1

    1.10.1

    1.10.1.1

    1.10.1.2

    1.10.2

    1.10.2.1

    1.10.2.2

    1.10.2.3

    1.10.3

    1.10.3.1

    1.9.1.2.2

    1.9.1.2.3

    1.9.2.3.2

    1.9.2.4

    1.9.2

    1.9.2.1

    1.9.2.1.1

    1.9.2.1.2

    1.9.2.2

    1.9.2.2.1

    1.9.2.2.2

    1.9.2.2.3

    1.9.2.3

    1.9.2.3.1

    1.9.1.1.1

    1.9.1.1.2

    1.9.1.2

    1.9.1.2.1

    1.9.1

    1.9.1.1

    1.8.3

    1.8.3.1

    UBICACION

    Item

    1.8.3.2

    1.8.4

    1.8.4.1

    1,9

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5

    m 436,69 681,24 681,24

    m 33,47 993,05 993,05

    1397,11 1397,11

    m 40,17 1397,11 1397,11

    450 450

    und 75 450 450

    350 350

    gbl 350 350 350

    163223,22 163223,22

    gbl 137238,87 137238,87 137238,87

    gbl 25984,35 25984,35 25984,35

    3345550,54 1005347,75 454904,31 236325,53

    401466,06 90.481,30 40.941,39 21.269,30

    1003665,16 149.717,91 27.294,26 14.179,53

    4750681,76 1427593,81 645964,12 335582,25

    855122,72 256966,89 116273,54 60404,81

    5605804,48 1684560,7 762237,66 395987,06

    30.05% 13.60% 7.06%

    30.05% 43.65% 100.00%

    Mes 4

    PROYECTO CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    ETAPA 1.0 TRABAJO PROGRA

    CLIENTE MUNICIPALIDAD DISTRITAL DE SANAGORAN

    456389,41

    41075,0469

    27383,3646

    648072,96

    116653,13

    764726,09

    13.64%

    92.94%

    LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Descripcin Cantidad Mes 3

    1192583,55

    107332,5195

    71555,013

    1693468,65

    304824,36

    1998293,01

    35.65%

    79.30%

    1,56

    29,67

    34,78

    6

    1

    1

    1

    Gastos Generales(9.00%)

    Utilidad (6.00%)

    Parcial

    I.G.V.(18.00%)

    TOTAL

    Ensayo Resistencia Compresion Concreto

    DISEO DE MEZCLAS

    Diseo de Mezcla

    FLETE

    Flete terrestre

    Porcentaje de avance por Mes

    Porcentaje de avance acumulado

    Costo directo:

    Flete Rural

    Concreto Simple Fc 175 kg/m2

    Encofrado y Desencofrado Normal para Medidor sin Cuello

    ENLUCIDOS Y REVESTIMIENTO

    Revestimiento de Aforador con Aditivo Impermeabilizante

    ENSAYO DE RESISTENCIA COMP. CONCRETO

    UBICACION

    Item

    1.10.4.1

    1,11

    1.11.1

    1,12

    1.10.3.2

    1.12.1

    1,13

    1.13.1

    1.13.2

    1.10.3.3

    1.10.4

  • PROYECTO : CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    CLIENTE : MUNICIPALIDAD DISTRITAL DE SANAGORAN

    UBICACION : LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13

    CRONOGRAMA PROGRAMADO 0,00% 30,05% 43,65% 79,30% 92,94% 100,00%

    CRONOGRAMA EJECUTADO 0,00% 17,00% 27,60% 45,00%

    CRONOFRAMA FINANCIERO 0,00% 13,80% 20,90% 55,00%

    MES-0

    0,00%

    20,00%

    40,00%

    60,00%

    80,00%

    100,00%

    120,00%

    MES

    1

    MES

    2

    MES

    3

    MES

    4

    MES

    5

    MES

    6

    MES-0

    CURVA DE AVANCE DE OBRA

    CRONOGRAMA PROGRAMADO CRONOGRAMA EJECUTADO CRONOFRAMA FINANCIERO

  • Materia: Exacavacion de material suelto

    Datos de planteamiento:

    14203,89 material empleado

    14422,41 material (Pronosticado en total)

    BAC= 103950,34 hh Tiempo= 4 meses

    PV= 77962,75 hh Tiempo (Analisis)= 3 meses

    AC= 60000,00 hh en tiempo(Analisis)

    EV= 102375,33 hh Equivalencia= 25987,58 hh/mes

    Resultados

    CV= 42375,33 Interpretacion: El proyecto no esta excedido en el presupuesto

    SV= 24412,58 Interpretacion: El proyecto no esta atrazado en el cronograma

    CPI= 1,71 Interpretacion: Por cada sol que se planeo gastar, solo se realizo

    1,71 soles de trabajo

    SPI= 1,31 Interpretacion: Por cada hora que se trabajo, solo se realizo 131,31%

    de lo que se habia planeado

    ETC= 923,08 hh

    EAC= 60923,08

    VAC= -43027,26 Interpretacion: -41,39% No existe sobrecosto

    Conclusiones:

    1.- El proyecto no esta excedido en el presupuesto

    2.- El proyecto no esta atrazado en el cronograma

    3.- Por cada sol que se planeo gastar, solo se realizo 1,71 soles de trabajo

    4.- Por cada hora que se trabajo, solo se realizo 131,31% de lo que se habia planeado

    5.- El estado del proyecto es que No existe sobrecosto

    6.- Que estamos ganando 41,39%

    Valor Ganado

    Valorizado programado

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5 Mes 6

    3345550,54 499059,7 781062,57 254402,14 194134,11

    29965,17 29965,17

    und 1289,4 1289,4 1289,4

    m 63,02 7562,4 7562,4

    est 21113,37 21113,37 21113,37

    2131376,78 95420,03 348640,85 254402,14 194134,11

    17559,67 17559,67

    m 0,48 6823,05 6823,05

    m 1,42 10736,62 10736,62

    805560,91 69286,57 323178,53 20620,97

    m 24,39 351762,58 69286,57 138573,14

    m 16,26 164967,78 20620,97

    m 59,68 180522,45 180522,45

    m 2,7 20414,7 4082,94

    m 9,63 87893,4

    969919,71 147499,35

    m 436,69 780277,69

    m 18,52 189642,02 147499,35

    280415,93 86281,82 194134,11

    m 15,5 280415,93 86281,82 194134,11

    57920,56 8573,79 25462,32

    269,4 269,4

    m 0,48 104,68 104,68

    m 1,42 164,72 164,72

    8304,39 8304,39

    m 24,39 5187,75 5187,75

    m 16,26 936,09 936,09

    m 2,7 313,2 313,2

    m 9,63 1867,35 1867,35

    36107,83 25462,32

    m 436,69 24061,62 24061,62

    m 18,52 7003,52 1400,7

    kg 4,2 5042,69

    13238,94

    m 26,48 13238,94

    46642,49 1726,19 25198,86

    135,85 135,85

    m 0,48 34,32 34,32

    1.3.1 TRABAJOS PRELIMINARES

    1.3.1.1 Limpieza de terreno 71,5

    1.2.5.3.3 Acero Corrugado FY=4200 kg/cm2 Grado 60 1200,64 5042,69

    1.2.5.4 ENLUCIDOS Y REVESTIMIENTO 13238,94

    1.2.5.4.1 Revestimiento de Canal Tapados de Concreto 499,96 13238,94

    1,3 PUENTE CANAL 19717,45

    1.2.5.2.4 Eliminacion de Material Excedente 193,91

    1.2.5.3 OBRAS DE CONCRETO 10645,51

    1.2.5.3.1 Concreto Simple Fc 175 kg/m2 55,1

    1.2.5.3.2 Encofrado y Desencofrado 378,16 5602,82

    1.2.5.2 MOVIMIENTO DE TIERRAS

    1.2.5.2.1 Excavacion manual en Material Suelto 212,7

    1.2.5.2.2 Relleno Compactado Manual, Material Propio 57,57

    1.2.5.2.3 Refine y Nivelacion Zanja Terr. Normal 116

    1.2.5 CANALES TAPADOS DE CONCRETO 23884,45

    1.2.5.1 TRABAJOS PRELIMINARES

    1.2.5.1.1 Limpieza del Terreno (Manual) 218,08

    1.2.5.1.2 Trazo y replanteo con Instrumentos 116

    1.2.3.1 Concreto Simple Fc 175 kg/m2 1786,8 780277,69

    1.2.3.2 Encofrado y Desencofrado 10239,85 42142,67

    1.2.4 ENLUCIDOS Y REVESTIMIENTO

    1.2.4.1 Revestimiento de Canal con Aditivo Impermeabilizante 18091,35

    1.2.2.3 Excavacion en Roca Fija 3024,84

    1.2.2.4 Refine y Nivelacion Zanja Terr. Normal 7561 16331,76

    1.2.2.5 Eliminacion de Material Excedente 9127,04 87893,4

    1.2.3 OBRAS DE CONCRETO 822420,36

    1.2.1.2 Trazo y replanteo con Instrumentos 7561

    1.2.2 MOVIMIENTO DE TIERRAS 294350,73 98124,12

    1.2.2.1 Excavacion manual en Material Suelto 14422,41 138573,14 5329,74

    1.2.2.2 Relleno Compactado Manual, Material Propio 10145,62 51552,43 92794,38

    1.1.3 Movilizacin y desmovilizacin de equipo 1

    1,2 CANAL DE CONCRETO 318235,18 920544,48

    1.2.1 TRABAJOS PRELIMINARES

    1.2.1.1 Limpieza de terreno 14214,68

    1 TRABAJO PROGRA 550292,99 1066599,05

    1,1 TRABAJOS PRELIMINARES

    1.1.1 Cartel de Obra ( 7.20 x3.60 ) 1

    1.1.2 Construccion de Almacen y Guardiania 120

    PROYECTO CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    ETAPA 1.0 VALORIZADO MODIFICADO

    CLIENTE MUNICIPALIDAD DISTRITAL DE SANAGORAN

    UBICACION LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Item Descripcin Cantidad Mes 3 Mes 4

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5 Mes 6

    m 1,42 101,53 101,53

    1590,34 1590,34

    m 24,39 765,36 765,36

    m 4,83 151,47 151,47

    m 33,88 371,32 371,32

    m 9,63 302,19 302,19

    1739,11 1739,11

    m 18,92 593,33 593,33

    m 182,74 1145,78 1145,78

    35402,88 15685,44

    2416,81 2416,81

    m 403,08 1318,07 1318,07

    m 33,47 599,78 599,78

    kg 4,2 498,96 498,96

    6379,15 4564,42

    m 454,29 1253,84 1253,84

    m 41,69 1495,84 1495,84

    kg 4,2 3629,47 1814,74

    8601,61

    m 428,7 2700,81

    m 44,43 2939,04

    kg 4,2 2961,76

    18005,31 8704,21

    m 428,7 6349,05

    m 33,47 2952,05

    kg 4,2 8704,21 8704,21

    7774,31 7774,31

    m 15,5 2363,13 2363,13

    m 20,14 2880,22 2880,22

    m 35,73 2363,54 2363,54

    m 30,33 167,42 167,42

    129567,88 20644,01 104611,69

    111807,79 7101,89 100393,72

    235 235

    m 0,48 84,18 84,18

    m 0,86 150,82 150,82

    6866,89 6866,89

    UBICACION LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Item Descripcin Cantidad Mes 3 Mes 4

    PROYECTO CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    ETAPA 1.0 VALORIZADO MODIFICADO

    CLIENTE MUNICIPALIDAD DISTRITAL DE SANAGORAN

    1.4.1.1.1 Limpieza de terreno 175,37

    1.4.1.1.2 Trazo y Replanteo 175,37

    1.4.1.2 MOVIMIENTO DE TIERRAS

    1.3.5.4 Tarrajeo de Columnas 5,52

    1,4 BOCATOMA 4312,18

    1.4.1 BOCATOMA O CAPTACION 4312,18

    1.4.1.1 TRABAJOS PRELIMINARES

    1.3.5 ENLUCIDOS Y REVESTIMIENTO

    1.3.5.1 Revestimiento de Canal con Aditivo Impermeabilizante 152,46

    1.3.5.2 Revestimiento de Exterior de C:A 1:5 143,01

    1.3.5.3 Tarrajeo de Vigas 66,15

    1.3.4.4 CANAL DE CONCRETO 9301,1

    1.3.4.4.1 Concreto f'c=210 Kg/cm2 Para Canal 14,81 6349,05

    1.3.4.4.2 Encofrado y Desencofrado Normal para Canal 88,2 2952,05

    1.3.4.4.3 Acero Corrugado FY=4200 kg/cm2 Grado 60 2072,43

    1.3.4.3 VIGAS 8601,61

    1.3.4.3.1 Concreto f'c=210 Kg/cm2 Para Vigas 6,3 2700,81

    1.3.4.3.2 Encofrado y Desencofrado Normal para Vigas 66,15 2939,04

    1.3.4.3.3 Acero Corrugado FY=4200 kg/cm2 Grado 60 705,18 2961,76

    1.3.4.2 COLUMNAS 1814,74

    1.3.4.2.1 Concreto f'c=210 Kg/cm2 Para Columnas 2,76

    1.3.4.2.2 Encofrado y Desencofrado Normal para Columnas 35,88

    1.3.4.2.3 Acero Corrugado FY=4200 kg/cm2 Grado 60 864,16 1814,74

    1.3.4.1 ZAPATAS

    1.3.4.1.1 Concreto f'c=210 Kg/cm2 Para Zapatas 3,27

    1.3.4.1.2 Encofrado y Desencofrado Normal para Zapatas 17,92

    1.3.4.1.3 Acero Corrugado FY=4200 kg/cm2 Grado 60 118,8

    1.3.3 CONCRETO SIMPLE

    1.3.3.1 Solado de Concreto C.H 1:10 31,36

    1.3.3.2 Concreto Ciclopeo C.H 1:12+30% P.G. max 6" 6,27

    1.3.4 OBRAS DE CONCRETO ARMADO 19717,45

    1.3.2.1 Excavacion manual en Material Suelto 31,38

    1.3.2.2 Refine y Nivelacion Zanja Terr. Normal 31,36

    1.3.2.3 Relleno de Zanjas Apisonado con Material Propio en Cpas de

    0.20m

    10,96

    1.3.2.4 Eliminacion de Material Excedente 31,38

    1.3.1.2 TRAZO Y REPLANTEO 71,5

    1.3.2 MOVIMIENTO DE TIERRAS

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5 Mes 6

    m 24,39 4164,1 4164,1

    m 4,83 647,56 647,56

    m 9,63 2055,23 2055,23

    21070,49 21070,49

    m 348,25 7257,53 7257,53

    m 436,69 13362,71 13362,71

    m 41,69 450,25 450,25

    44997,9 40685,72

    m 395,82 30826,46 30826,46

    m 33,47 9859,26 9859,26

    kg 4,2 4312,18

    6828,27 6828,27

    m 24,39 352,68 352,68

    m 16,29 92,69 92,69

    m 24,39 293,9 293,9

    und 231,7 6040,42 6040,42

    und 8,11 48,58 48,58

    7476 7476

    m 22,55 7476 7476

    24333,24 24333,24

    und 9611,08 14416,62 14416,62

    und 6611,08 9916,62 9916,62

    17760,09 13542,12 4217,97

    10,66 10,66

    m 0,48 3,82 3,82

    m 0,86 6,84 6,84

    373,87 373,87

    m 24,39 224,39 224,39

    m 4,83 38,83 38,83

    m 9,63 110,65 110,65

    450,85 450,85

    m 18,92 147,39 147,39

    m 436,69 152,84 152,84

    m 33,47 150,62 150,62

    3767,12 3767,12

    m 456,15 1842,85 1842,85

    m 33,47 1202,58 1202,58

    kg 4,2 721,69 721,69

    UBICACION LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Item Descripcin Cantidad Mes 3 Mes 4

    PROYECTO CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    ETAPA 1.0 VALORIZADO MODIFICADO

    CLIENTE MUNICIPALIDAD DISTRITAL DE SANAGORAN

    1.4.2.4.3 Acero Corrugado FY=4200 kg/cm2 Grado 60 171,83

    1.4.2.3.3 Encofrado y Desencofrado Normal para Desarenador 4,5

    1.4.2.4 CONCRETO ARMADO

    1.4.2.4.1 Concreto f'c=175 Kg/cm2 para Desarenador 4,04

    1.4.2.4.2 Encofrado y Desencofrado Normal para Desarenador 35,93

    1.4.2.2.3 Eliminacion de Material Excedente 11,49

    1.4.2.3 CONCRETO SIMPLE

    1.4.2.3.1 Solado de Concreto C.H 1:10 7,79

    1.4.2.3.2 Concreto Simple Fc 175 kg/m2 0,35

    1.4.2.1.2 Trazo y replanteo con Instrumentos 7,95

    1.4.2.2 MOVIMIENTO DE TIERRAS

    1.4.2.2.1 Excavacion manual en Material Suelto 9,2

    1.4.2.2.2 Refine y Nivelacion Zanja Terr. Normal 8,04

    1.4.1.7.2 Compuerta de Regulacion de 0.40x1.00x1/16" 1,5

    1.4.2 DESARENADOR

    1.4.2.1 TRABAJOS PRELIMINARES

    1.4.2.1.1 Limpieza de terreno 7,95

    1.4.1.6 ENLUCIDOS Y REVESTIMIENTO

    1.4.1.6.1 Revestimiento de Captacion con Aditivo Impermeabilizante 331,53

    1.4.1.7 CARPINTERA METLICA

    1.4.1.7.1 Compuerta de Limpia de 1.47x1.00x1/16" 1,5

    1.4.1.5.2 Cama de Arena para Asentado de Piedra 5,69

    1.4.1.5.3 Piedra Asentada con Concreto 12,05

    1.4.1.5.4 Enrocado Acomodado Manualmente 26,07

    1.4.1.5.5 Junta Asfaltica 5,99

    1.4.1.4.2 Encofrado y Desencofrado Normal para Muros 294,57

    1.4.1.4.3 Acero Corrugado FY=4200 kg/cm2 Grado 60 1026,71 4312,18

    1.4.1.5 RELLENOS

    1.4.1.5.1 Relleno Compactado Manual, Material Propio 14,46

    1.4.1.3.2 Concreto Simple Fc 175 kg/m2 30,6

    1.4.1.3.3 Encofrado y Desencofrado Normal para Captacion 10,8

    1.4.1.4 CONCRETO ARMADO 4312,18

    1.4.1.4.1 Concreto f'c=175 Kg/cm2 para Muros de Contencion 77,88

    1.4.1.2.2 Refine y Nivelacion Zanja Terr. Normal 134,07

    1.4.1.2.3 Eliminacion de Material Excedente 213,42

    1.4.1.3 CONCRETO SIMPLE

    1.4.1.3.1 Concreto f'c=140 kg/cm2 para Captacion 20,84

    1.4.1.2.1 Excavacion manual en Material Suelto 170,73

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5 Mes 6

    1740,97 1740,97

    m 40,17 1740,97 1740,97

    11416,62 11416,62

    und 7611,08 11416,62 11416,62

    949,03 391,31 557,72

    1,71 1,71

    m 0,48 0,61 0,61

    m 0,86 1,1 1,1

    25,55 25,55

    m 24,39 9,27 9,27

    m 4,83 6,18 6,18

    m 33,88 6,44 6,44

    m 9,63 3,66 3,66

    535,92 535,92

    m 370,05 188,73 188,73

    m 37,58 252,54 252,54

    und 94,65 94,65 94,65

    220,76 220,76

    und 33,92 33,92 33,92

    und 14,54 10,18 10,18

    und 7,72 7,72 7,72

    und 9,72 19,44 19,44

    und 76,3 76,3 76,3

    und 24,65 24,65 24,65

    und 26,75 26,75 26,75

    und 21,8 21,8 21,8

    165,09 143,29 21,8

    und 20,8 20,8 20,8

    und 9,72 19,44 19,44

    und 76,3 76,3 76,3

    und 26,75 26,75 26,75

    und 21,8 21,8 21,8

    1865,59 738,89 1126,7

    2,8 2,8

    m 0,48 1 1

    m 0,86 1,8 1,8

    127,11 127,11

    UBICACION LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Item Descripcin Cantidad Mes 3 Mes 4

    PROYECTO CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    ETAPA 1.0 VALORIZADO MODIFICADO

    CLIENTE MUNICIPALIDAD DISTRITAL DE SANAGORAN

    1.6.1.2 Trazo y Replanteo 2,09

    1.6.2 MOVIMIENTO DE TIERRAS

    1.5.5.5 Tee de Pvc Linea de Conduccion 1

    1,6 CAJA DE TRANSICION

    1.6.1 TRABAJOS PRELIMINARES

    1.6.1.1 Limpieza de terreno 2,09

    1.5.5.1 Tee de Pvc de Purga 1

    1.5.5.2 Transicion Pvc P/R 1/2" 2

    1.5.5.3 Valvula de Compuerta de 1/2" 1

    1.5.5.4 Tee de Pvc 1

    1.5.4.6 Reduccion Pvc de 1/2" 1

    1.5.4.7 Tee de Pvc 1

    1.5.4.8 Tee de Pvc Linea de Conduccion 1

    1.5.5 VARIOS DE VALVULA PURGA

    1.5.4.2 Tubo Pvc Sap 1/2" 0,7

    1.5.4.3 Codo Pvc Sap 1/2 x 90" 1

    1.5.4.4 Transicion Pvc P/R 1/2" 2

    1.5.4.5 Valvula de Compuerta de 1/2" 1

    1.5.3.2 Encofrado y Desencofrado Normal para Valvula 6,72

    1.5.3.3 Tapa Sanitaria f'c=175 kg/cm2 De 0.70m x 0.70m 1

    1.5.4 VARIOS DE VALVULA AIRE MANUAL

    1.5.4.1 Malla Metalica 1

    1.5.2.3 Relleno de Zanjas Apisonado con Material Propio en Cpas de

    0.20m

    0,19

    1.5.2.4 Eliminacion de Material Excedente 0,38

    1.5.3 CONCRETO SIMPLE

    1.5.3.1 Concreto f'c=140 kg/cm2 para Valvula 0,51

    1.5.1.2 Trazo y Replanteo 1,28

    1.5.2 MOVIMIENTO DE TIERRAS

    1.5.2.1 Excavacion manual en Material Suelto 0,38

    1.5.2.2 Refine y Nivelacion Zanja Terr. Normal 1,28

    1.4.2.6.1 Compuerta Metalica de 0.50x0.30 e=1/8" 1,5

    1,5 VALVULAS DE PURGA Y LIMPIEZA

    1.5.1 TRABAJOS PRELIMINARES

    1.5.1.1 Limpieza de terreno 1,28

    1.4.2.5 ENLUCIDOS Y REVESTIMIENTO

    1.4.2.5.1 Revestimiento de Desarenador con Aditivo Impermeabilizante 43,34

    1.4.2.6 CARPINTERA METLICA

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5 Mes 6

    m 24,39 58,54 58,54

    m 4,83 10,09 10,09

    m 15,82 33,06 33,06

    m 9,63 25,42 25,42

    1126,7 1126,7

    m 18,92 39,54 39,54

    m 436,69 541,5 541,5

    m 37,58 545,66 545,66

    608,98 608,98

    m 40,17 608,98 608,98

    529412,66 44848,92 130480,99

    211,19 211,19

    m 0,69 80,51 80,51

    und 1,12 130,68 130,68

    44637,73 44637,73

    m 24,39 29274,83 29274,83

    m 4,83 579,12 579,12

    m 33,88 335,41 335,41

    m 9,63 14448,37 14448,37

    204969,29 107030,46

    204969,29 107030,46

    m 18,92 374,62 374,62

    m 377,34 187160,64 93580,32

    m 29,37 17434,03 13075,52

    34276,89

    9767,4

    m 403,08 5586,69

    m 33,47 899,67

    kg 4,2 3281,04

    22306,03

    m 454,29 6396,4

    m 41,69 5869,95

    kg 4,2 10039,68

    2203,46

    m 428,7 737,36

    m 44,43 639,79

    kg 4,2 826,31

    UBICACION LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Item Descripcin Cantidad Mes 3 Mes 4

    PROYECTO CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    ETAPA 1.0 VALORIZADO MODIFICADO

    CLIENTE MUNICIPALIDAD DISTRITAL DE SANAGORAN

    1.7.4.3.1 Concreto f'c=210 Kg/cm2 Para Vigas 1,72 737,36

    1.7.4.3.2 Encofrado y Desencofrado Normal para Vigas 14,4 639,79

    1.7.4.3.3 Acero Corrugado FY=4200 kg/cm2 Grado 60 196,74 826,31

    1.7.4.2.1 Concreto f'c=210 Kg/cm2 Para Columnas 14,08 6396,4

    1.7.4.2.2 Encofrado y Desencofrado Normal para Columnas 140,8 5869,95

    1.7.4.2.3 Acero Corrugado FY=4200 kg/cm2 Grado 60 2390,4 10039,68

    1.7.4.3 VIGAS 2203,46

    1.7.4.1.1 Concreto f'c=210 Kg/cm2 Para Zapatas 13,86 5586,69

    1.7.4.1.2 Encofrado y Desencofrado Normal para Zapatas 26,88 899,67

    1.7.4.1.3 Acero Corrugado FY=4200 kg/cm2 Grado 60 781,2 3281,04

    1.7.4.2 COLUMNAS 22306,03

    1.7.3.1.2 Concreto Simple Fc=210 kg/m2 Para Canales de Anclaje 496 93580,32

    1.7.3.1.3 Encofrado y Desencofrado Normal para Camaras de Anclaje 593,6 4358,51

    1.7.4 OBRAS DE CONCRETO ARMADO 34276,89

    1.7.4.1 ZAPATAS 9767,4

    1.7.2.4 Eliminacion de Material Excedente 1500,35

    1.7.3 CONCRETO SIMPLE 97938,83

    1.7.3.1 CAMARA DE ANCLAJE 97938,83

    1.7.3.1.1 Solado de Concreto C.H 1:10 19,8

    1.7.2 MOVIMIENTO DE TIERRAS

    1.7.2.1 Excavacion manual en Material Suelto 1200,28

    1.7.2.2 Refine y Nivelacion Zanja Terr. Normal 119,9

    1.7.2.3 Relleno de Zanjas Apisonado con Material Propio en Cpas de

    0.20m

    9,9

    1,7 PASE AEREO DE 58M 208028,18 146054,57

    1.7.1 TRABAJOS PRELIMINARES

    1.7.1.1 Limpieza de terreno 116,68

    1.7.1.2 Trazo, Nivelacion y Replanteo 116,68

    1.6.3.2 Concreto Simple Fc 175 kg/m2 1,24

    1.6.3.3 Encofrado y Desencofrado Normal para para Caja de Transicion 14,52

    1.6.4 ENLUCIDOS Y REVESTIMIENTO

    1.6.4.1 Revestimiento de Caja con Aditivo Impermeabilizante 15,16

    1.6.2.3 Cama de Apoyo 0.10m 2,09

    1.6.2.4 Eliminacion de Material Excedente 2,64

    1.6.3 CONCRETO SIMPLE

    1.6.3.1 Solado de Concreto C.H 1:10 2,09

    1.6.2.1 Excavacion manual en Material Suelto 2,4

    1.6.2.2 Refine y Nivelacion Zanja Terr. Normal 2,09

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5 Mes 6

    30834,43 23450,53

    m 35,73 720,32 720,32

    m 30,33 4270,46 4270,46

    m 20,14 25843,65 18459,75

    173733,22

    und 23,01 1472,64

    und 20,01 4802,4

    und 24,01 34574,4

    und 33,01 4489,36

    und 73,01 584,08

    und 83,01 664,08

    und 63,01 15122,4

    und 119,75 958

    und 48,01 5761,2

    m 72,18 59692,86

    m 58,82 17048,39

    m 71,48 28563,41

    21238,68

    und 85,17 3406,8

    und 56,31 3378,6

    und 29,59 8640,28

    und 49,82 5813

    19511,23

    m 334,44 19511,23

    10111,16 4698,76 5412,4

    16,16 16,16

    m 0,48 5,79 5,79

    m 0,86 10,37 10,37

    199,7 199,7

    m 24,39 88,29 88,29

    m 4,83 58,25 58,25

    m 33,88 18,3 18,3

    m 9,63 34,86 34,86

    5412,4 5412,4

    m 410,7 3154,18 3154,18

    m 33,47 2258,22 2258,22

    4482,9 4482,9

    UBICACION LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Item Descripcin Cantidad Mes 3 Mes 4

    PROYECTO CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    ETAPA 1.0 VALORIZADO MODIFICADO

    CLIENTE MUNICIPALIDAD DISTRITAL DE SANAGORAN

    1.8.3 CONCRETO SIMPLE

    1.8.3.1 Concreto f'c=175 Kg/cm2 para Tomas Laterales 7,68

    1.8.3.2 Encofrado y Desencofrado Normal para Tomas Laterales 67,47

    1.8.4 CARPINTERA METLICA

    1.8.2.1 Excavacion manual en Material Suelto 3,62

    1.8.2.2 Refine y Nivelacion Zanja Terr. Normal 12,06

    1.8.2.3 Relleno de Zanjas Apisonado con Material Propio en Cpas de

    0.20m

    0,54

    1.8.2.4 Eliminacion de Material Excedente 3,62

    1.8.1 TRABAJOS PRELIMINARES

    1.8.1.1 Limpieza de terreno 12,06

    1.8.1.2 Trazo y Replanteo 12,06

    1.8.2 MOVIMIENTO DE TIERRAS

    1.7.7.4 Tope De Liston De Madera 2' x 3" x 10" 116,68 5813

    1.7.8 TUBERIAS 19511,23

    1.7.8.1 Tubo HDPE 12" (300mm) 58,34 19511,23

    1,8 TOMAS LATERALES

    1.7.7 CARPINTERA DE MADERA 21238,68

    1.7.7.1 Largueros De 4" x 4" 40 3406,8

    1.7.7.2 Viguetas De 3" x 5" 60 3378,6

    1.7.7.3 Tablas De 8" x 1" 292 8640,28

    1.7.6.9 Elemento De Sujecion De Madera 120 5761,2

    1.7.6.10 Cable Principal 1 1/4" Tipo Boa Alma De Acero 827 59692,86

    1.7.6.11 Pendolas Con Cables 1/2" Tipo Boa 289,84 17048,39

    1.7.6.12 Malla Gallinero Fierro Galvanizado 1/4" Con Fierro Liso De 1/2" 399,6 28563,41

    1.7.6.5 Anclajes de cable Espiral Geobrugg 8 584,08

    1.7.6.6 Tensor Crosby HG-226 De Tipo Ojo y Ojo 2" x 24" 8 664,08

    1.7.6.7 Tensor Crosby HG-226 De Tipo Ojo y Ojo 1/2" x 12" 240 15122,4

    1.7.6.8 Carro De Dilatacion 8 958

    1.7.6.1 Guardacabo 2" 64 1472,64

    1.7.6.2 Guardacabo 1/2" 240 4802,4

    1.7.6.3 Grapas Crosby 1/2" 1440 34574,4

    1.7.6.4 Grapas Crosby 2" 136 4489,36

    1.7.5.1 Tarrajeo de Vigas 20,16

    1.7.5.2 Tarrajeo de Columnas 140,8

    1.7.5.3 Revestimiento de Exterior de C:A 1:5 1283,2 7383,9

    1.7.6 CARPINTERA METLICA 68428,56 105304,66

    1.7.5 ENLUCIDOS Y REVESTIMIENTO 7383,9

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5 Mes 6

    und 249,05 4482,9 4482,9

    298234,9 298234,9

    86558,94 86558,94

    904,39 904,39

    m 0,69 295,75 295,75

    m 1,42 608,64 608,64

    85654,55 85654,55

    m 103,36 76642,47 76642,47

    m 2,7 1157,27 1157,27

    m 9,63 7854,81 7854,81

    211675,96 211675,96

    400,9 400,9

    m 0,69 131,1 131,1

    m 1,42 269,8 269,8

    2461,6 2461,6

    m 103,36 1767,46 1767,46

    m 2,7 513 513

    m 9,63 181,14 181,14

    1922,19 1922,19

    m 436,69 1349,37 1349,37

    m 18,52 572,82 572,82

    206891,27 206891,27

    m 334,44 206891,27 206891,27

    3401,66 1591,52 1810,14

    23,48 23,48

    m 0,69 4,95 4,95

    m 1,42 18,53 18,53

    170,93 170,93

    m 24,39 101,46 101,46

    m 2,7 19,39 19,39

    m 9,63 50,08 50,08

    1810,14 1810,14

    m 18,92 135,85 135,85

    m 436,69 681,24 681,24

    m 33,47 993,05 993,05

    1397,11 1397,11

    m 40,17 1397,11 1397,11

    450 450

    UBICACION LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Item Descripcin Cantidad Mes 3 Mes 4

    PROYECTO CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    ETAPA 1.0 VALORIZADO MODIFICADO

    CLIENTE MUNICIPALIDAD DISTRITAL DE SANAGORAN

    1.10.4.1 Revestimiento de Aforador con Aditivo Impermeabilizante 34,78

    1,11 ENSAYO DE RESISTENCIA COMP. CONCRETO

    1.10.3.1 Solado de Concreto C.H 1:10 7,18

    1.10.3.2 Concreto Simple Fc 175 kg/m2 1,56

    1.10.3.3 Encofrado y Desencofrado Normal para Medidor sin Cuello 29,67

    1.10.4 ENLUCIDOS Y REVESTIMIENTO

    1.10.2.1 Excavacion manual en Material Suelto 4,16

    1.10.2.2 Refine y Nivelacion Zanja Terr. Normal 7,18

    1.10.2.3 Eliminacion de Material Excedente 5,2

    1.10.3 CONCRETO SIMPLE

    1.10.1 TRABAJOS PRELIMINARES

    1.10.1.1 Limpieza de terreno 7,18

    1.10.1.2 TRAZO Y REPLANTEO 13,05

    1.10.2 MOVIMIENTO DE TIERRAS

    1.9.2.3.2 Encofrado y Desencofrado Normal para Medidor sin Cuello 30,93

    1.9.2.4 TUBERIAS

    1.9.2.4.1 Tubo HDPE 12" (300mm) 618,62

    1,1 MEDIDOR TIPO SIN CUELLO

    1.9.2.2.2 Refine y Nivelacion Zanja Terr. Normal 190

    1.9.2.2.3 Eliminacion de Material Excedente 18,81

    1.9.2.3 OBRAS DE CONCRETO

    1.9.2.3.1 Concreto Simple Fc 175 kg/m2 3,09

    1.9.2.1.1 Limpieza de terreno 190

    1.9.2.1.2 TRAZO Y REPLANTEO 190

    1.9.2.2 MOVIMIENTO DE TIERRAS

    1.9.2.2.1 Corte De Roca Suelta Con Voladura 17,1

    1.9.1.2.2 Refine y Nivelacion Zanja Terr. Normal 428,62

    1.9.1.2.3 Eliminacion de Material Excedente 815,66

    1.9.2 CANAL DE DE TUBERIA POR TERRENO NORMAL

    1.9.2.1 TRABAJOS PRELIMINARES

    1.9.1.1.1 Limpieza de terreno 428,62

    1.9.1.1.2 TRAZO Y REPLANTEO 428,62

    1.9.1.2 MOVIMIENTO DE TIERRAS

    1.9.1.2.1 Corte De Roca Suelta Con Voladura 741,51

    1.8.4.1 Compuerta Metalica Tipo Tarjeta 18

    1,9 CANAL DE TUBERIAS DE 300MM

    1.9.1 CANAL DE DE TUBERIA POR ROCA

    1.9.1.1 TRABAJOS PRELIMINARES

  • ::

    :

    :

    Unid. Precio Parcial Mes 1 Mes 2 Mes 5 Mes 6

    und 75 450 450

    350 350

    gbl 350 350 350

    163223,22 163223,22

    gbl 137238,87 137238,87 137238,87

    gbl 25984,35 25984,35 25984,35

    3345550,54 499059,7 781062,57 254402,14 194134,11

    401466,06 44.915,37 70.295,63 22896,1926 17472,0699

    1003665,16 149.717,91 46.863,75 15264,1284 11648,0466

    4750681,76 708664,77 1109108,85 361251,04 275670,43

    855122,72 127559,66 199639,59 65025,19 49620,68

    5605804,48 836224,43 1308748,44 426276,23 325291,11

    14.92% 23.35% 7.60% 5.80%

    14.92% 38.27% 94.20% 100.00%

    UBICACION LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    Item Descripcin Cantidad Mes 3 Mes 4

    PROYECTO CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    ETAPA 1.0 VALORIZADO MODIFICADO

    CLIENTE MUNICIPALIDAD DISTRITAL DE SANAGORAN

    Utilidad (6.00%) 33017,5794 63995,943

    Parcial 781416,05 1514570,64

    I.G.V.(18.00%) 140654,89 272622,72

    TOTAL 922070,94 1787193,36

    Porcentaje de avance por Mes 16.45% 31.88%

    Porcentaje de avance acumulado 54.72% 86.60%

    1.12.1 Diseo de Mezcla 1

    1,13 FLETE

    1.13.1 Flete terrestre 1

    1.13.2 Flete Rural 1

    Costo directo: 550292,99 1066599,05

    Gastos Generales(9.00%) 49526,3691 95993,9145

    1.11.1 Ensayo Resistencia Compresion Concreto 6

    1,12 DISEO DE MEZCLAS

  • PROYECTO : CONSTRUCCION DEL CANAL DE IRRIGACION EL HUAYO - VILCAS

    CLIENTE : MUNICIPALIDAD DISTRITAL DE SANAGORAN

    UBICACION : LA LIBERTAD - SANCHEZ CARRION - SANAGORAN

    MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 MES 11 MES 12 MES 13

    CRONOGRAMA PROGRAMADO 0,00% 14,92% 38,27% 54,72% 86,60% 94,20% 100,00%

    CRONOGRAMA EJECUTADO 0,00% 17,00% 27,60% 45,00%

    CRONOFRAMA FINANCIERO 0,00% 13,80% 20,90% 55,00%

    MES-0

    0,00%

    20,00%

    40,00%

    60,00%

    80,00%

    100,00%

    120,00%

    MES

    1

    MES

    2

    MES

    3

    MES

    4

    MES

    5

    MES

    6

    MES-0

    CURVA DE AVANCE DE OBRA

    CRONOGRAMA PROGRAMADO CRONOGRAMA EJECUTADO CRONOFRAMA FINANCIERO

  • Materia: Exacavacion de material suelto

    Datos de planteamiento:

    14203,89 material empleado

    14422,41 material (Pronosticado en total)

    BAC= 103950,34 hh Tiempo= 4 meses

    PV= 77962,75 hh Tiempo (Analisis)= 3 meses

    AC= 60000,00 hh en tiempo(Analisis)

    EV= 102375,33 hh Equivalencia= 25987,58 hh/mes

    Resultados

    CV= 42375,33 Interpretacion: El proyecto no esta excedido en el presupuesto

    SV= 24412,58 Interpretacion: El proyecto no esta atrazado en el cronograma

    CPI= 1,71 Interpretacion: Por cada sol que se planeo gastar, solo se realizo

    1,71 soles de trabajo

    SPI= 1,31 Interpretacion: Por cada hora que se trabajo, solo se realizo 131,31%

    de lo que se habia planeado

    ETC= 923,08 hh

    EAC= 60923,08

    VAC= -43027,26 Interpretacion: -41,39% No existe sobrecosto

    Conclusiones:

    1.- El proyecto no esta excedido en el presupuesto

    2.- El proyecto no esta atrazado en el cronograma

    3.- Por cada sol que se planeo gastar, solo se realizo 1,71 soles de trabajo

    4.- Por cada hora que se trabajo, solo se realizo 131,31% de lo que se habia planeado

    5.- El estado del proyecto es que No existe sobrecosto

    6.- Que estamos ganando 41,39%

    Valor Ganado

    Valorizado programado modificado