VALORIZAC n°1 AL 30 NOVIEMBRE 2012 PRESUEPUESTO MAYO 2012 ADELANTO 0.0018 VALORIZACION Nº 01 OBRA MEJORAMIENTO DEL SISTEMA DE INFRAESTRUCTURA VIAL EN AS CALLES DE LA URB. SANCHEZ CARRION, ENTIDAD MUNICIPALIDAD PROVINCIAL DE TRUJILLO CONTRATISTA SUMINISTRO, SERVICIOS Y CONSTRUCCIONES S.A.C. Monto refrencial : ING. SUPERVISOR ARQ. Periodo del 25 al 31de Oct 12 Monto contratado: ING. RESIDENTE ING. FECHA 10/25/2012 FORMULA N° 01: GENERAL PRESUPUESTO AVANCES ITEM DESCRIPCION ANTERIOR ACTUAL ACUMULADO UND METRADO PRECIO UNIT PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO % 01 OBRAS PROVISIONALES 01.01 MOVILIZACION Y DEMOVILIZACION DE EQUIPO glb 1.00 1,280.00 1,280.00 0.00 0.00 1.00 1,280.00 1.00 1,280.00 100.00 01.02 DESVIO Y MANTENIMIENTO DE TRAFICO glb 1.00 562.34 562.34 0.00 0.00 1.00 562.34 1.00 562.34 100.00 01.03 CARTEL DE OBRA DE 6.00 m x 3.60 m u 1.00 1,371.49 1,371.49 0.00 0.00 1.00 1,371.49 1.00 1,371.49 100.00 02 TRABAJOS PRELIMINARFES 02.01 TRAZO Y REPLANTEO EN VEREDAS m2 3,197.46 0.40 1,278.98 0.00 0.00 3,197.46 1,278.98 3,197.46 1,278.98 100.00 03 MOVIMIENTO DE TIERRAS 03.01 DEMOLICION DE VEREDAS DE CONCRETO A PULSO, e=10 cm m2 2,451.25 7.77 19,046.21 0.00 0.00 1,500.00 11,655.00 1,500.00 11,655.00 61.19 03.02 DEMOLICION DE SARDINELES, A PULSO m 90.19 1.95 175.87 0.00 0.00 90.19 175.87 90.19 175.87 100.00 03.03 EXCAVACION DE ZANJAS PARA SARDINELES m 76.41 1.30 99.33 0.00 0.00 76.41 99.33 76.41 99.33 100.00 03.04 CORTE DE TERRENO EN ZONA DE ACCESO A RAMPAS m3 4.72 19.44 91.76 0.00 0.00 4.72 91.76 4.72 91.76 100.00 03.05 BASE DE AFIRMADO, e=15 cm.(ZONA DE ACCESO A RAMPAS) m2 31.49 8.29 261.05 0.00 0.00 31.49 261.05 31.49 261.05 100.00 03.06 ELIMINACION DE MATERIAL EXCEDENTE CON ESPONJAMIENTO m3 375.49 18.43 6,920.28 0.00 0.00 200.00 3,686.00 200.00 3,686.00 53.26 04 PARCHADO 04.01 PERFILADO DE BORDE DE AREAS A PARCHAR m2 727.17 1.95 1,417.98 0.00 0.00 350.00 682.50 350.00 682.50 48.13 04.02 CORTE DE AFIRMADO EN PARCHES e=5cm m2 727.17 0.97 705.35 0.00 0.00 350.00 339.50 350.00 339.50 48.13 04.03 BARRIDO Y ELIMINACION DE MATERIALRESULTANTE DE PARCHES m2 727.17 0.74 538.11 0.00 0.00 350.00 259.00 350.00 259.00 48.13 04.04 REPOSICION DE BASE DE AFIRMADO EN PARCHE e= 5 cm m2 727.17 3.10 2,254.23 0.00 0.00 350.00 1,085.00 350.00 1,085.00 48.13 04.05 IMPRIMACION ASFALTICA MANUAL EN PARCHES m2 727.17 3.38 2,457.83 0.00 0.00 350.00 1,183.00 350.00 1,183.00 48.13 04.06 CARPETA ASFALTICA EN FRIO e=1.5" EN PARCHES m2 727.17 14.20 10,325.81 0.00 0.00 350.00 4,970.00 350.00 4,970.00 48.13 05 CAPA NIVELANTE 05.01 BARRIDO Y LIMPIEZA PARA LA CAPA NIVELANTE m2 806.50 0.16 129.04 0.00 0.00 280.00 44.80 280.00 44.80 34.72 05.02 RIEGO DE LIGA MANUAL PARA CAPA NIVELANTE m2 806.50 1.08 871.02 0.00 0.00 280.00 302.40 280.00 302.40 34.72 05.03 CAPA NIVELANTE MANUAL e PROM.= 1.5 cm m2 806.50 5.65 4,556.73 0.00 0.00 280.00 1,582.00 280.00 1,582.00 34.72 06 PAVIMENTACION 06.01 RIEGO DE LIGA CON EQUIPO PARA RECAPEO m2 7,789.75 1.01 7,867.65 0.00 0.00 4,000.00 4,040.00 4,000.00 4,040.00 51.35 06.02 CARPETA ASFALTICA EN FRIO DE e = 1 1/2" CON EQUIPO m2 7,789.75 13.15 102,435.21 0.00 0.00 4,000.00 52,600.00 4,000.00 52,600.00 51.35 06.03 SELLO ASFALTICO CON EQUIPO m2 7,789.75 3.20 24,927.20 0.00 0.00 4,000.00 12,800.00 4,000.00 12,800.00 51.35 07 CONCRETO SIMPLE 07.01 VEREDAS DE CONCRETO 07.01.01 BASE DE HORMIGON PARA VEREDAS, e=10cm. m2 2,478.15 7.01 17,371.83 0.00 0.00 1,000.00 7,010.00 1,000.00 7,010.00 40.35 07.01.02 VEREDA DE CONCRETO DE 4", f'c=140Kg/cm2, a=1.50m, una uña m2 2,175.62 37.08 80,671.99 0.00 0.00 1,000.00 37,080.00 1,000.00 37,080.00 45.96 07.01.03 VEREDA DE CONCRETO DE 4", f'c=140Kg/cm2,a=1.50m, dos uñas m2 302.53 40.73 12,322.05 0.00 0.00 200.00 8,146.00 200.00 8,146.00 66.11 07.02 SARDINELES 07.02.01 SARDINELES EN FORMA DE "T" INVERTIDA: CONCRETO DE f'c=175 kg/cm2 b=0.1 m 161.06 38.17 6,147.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 07.02.02 ENCOFRADO DE SARDINELES m2 128.84 17.46 2,249.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 07.02.03 REPOSICION DE AFIRMADO EN COSTADO DE SARDINEL h=0.15m m2 7.86 8.29 65.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 07.02.04 JUNTAS DE DILATACION EN SARDINELES CADA TRES METROS, e=1/2" m 13.63 2.44 33.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 08 OTROS 08.01 NIVELACION DE CAJAS DE AGUA u 126.00 14.61 1,840.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 08.02 NIVELACION DE CAJAS DE DESAGUE u 88.00 21.11 1,857.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 08.03 JUNTAS DE DILATACION EN VEREDAS CADA 4 METROS, e=1/2" m 583.50 1.39 811.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Upload: franklin-gonzalo-vejarano-ferrer

Post on 10-Dec-2015

13 views

Category:

Documents


3 download

DESCRIPTION

S10

TRANSCRIPT

Page 1: VALORIZACION N° 01 AL 30-11-12

VALORIZAn°1 AL 30 NOVIEMBRE 2012PRESUEPUESTO MAYO 2012

ADELANTO 0.0018

VALORIZACION Nº 01OBRA MEJORAMIENTO DEL SISTEMA DE INFRAESTRUCTURA VIAL EN AS CALLES DE LA URB. SANCHEZ CARRION,ENTIDAD MUNICIPALIDAD PROVINCIAL DE TRUJILLOCONTRATISTA SUMINISTRO, SERVICIOS Y CONSTRUCCIONES S.A.C. Monto refrencial : S/. 420,351.10

ING. SUPERVISOR ARQ. Periodo del 25 al 31de Oct 12 Monto contratado: S/. 378,315.99

ING. RESIDENTE ING.FECHA 10/25/2012 FORMULA N° 01: GENERAL

PRESUPUESTO AVANCES SALDOITEM DESCRIPCION ANTERIOR ACTUAL ACUMULADO

UND METRADO PRECIO UNIT PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO

01 OBRAS PROVISIONALES

01.01 MOVILIZACION Y DEMOVILIZACION DE EQUIPO glb 1.00 1,280.00 1,280.00 0.00 0.00 1.00 1,280.00 1.00 1,280.00 100.00 0.00 0.00

01.02 DESVIO Y MANTENIMIENTO DE TRAFICO glb 1.00 562.34 562.34 0.00 0.00 1.00 562.34 1.00 562.34 100.00 0.00 0.00

01.03 CARTEL DE OBRA DE 6.00 m x 3.60 m u 1.00 1,371.49 1,371.49 0.00 0.00 1.00 1,371.49 1.00 1,371.49 100.00 0.00 0.00

02 TRABAJOS PRELIMINARFES

02.01 TRAZO Y REPLANTEO EN VEREDAS m2 3,197.46 0.40 1,278.98 0.00 0.00 3,197.46 1,278.98 3,197.46 1,278.98 100.00 0.00 0.00

03 MOVIMIENTO DE TIERRAS

03.01 DEMOLICION DE VEREDAS DE CONCRETO A PULSO, e=10 cm m2 2,451.25 7.77 19,046.21 0.00 0.00 1,500.00 11,655.00 1,500.00 11,655.00 61.19 951.25 7,391.21

03.02 DEMOLICION DE SARDINELES, A PULSO m 90.19 1.95 175.87 0.00 0.00 90.19 175.87 90.19 175.87 100.00 0.00 0.00

03.03 EXCAVACION DE ZANJAS PARA SARDINELES m 76.41 1.30 99.33 0.00 0.00 76.41 99.33 76.41 99.33 100.00 0.00 0.00

03.04 CORTE DE TERRENO EN ZONA DE ACCESO A RAMPAS m3 4.72 19.44 91.76 0.00 0.00 4.72 91.76 4.72 91.76 100.00 0.00 0.00

03.05 BASE DE AFIRMADO, e=15 cm.(ZONA DE ACCESO A RAMPAS) m2 31.49 8.29 261.05 0.00 0.00 31.49 261.05 31.49 261.05 100.00 0.00 0.00

03.06 ELIMINACION DE MATERIAL EXCEDENTE CON ESPONJAMIENTO m3 375.49 18.43 6,920.28 0.00 0.00 200.00 3,686.00 200.00 3,686.00 53.26 175.49 3,234.28

04 PARCHADO

04.01 PERFILADO DE BORDE DE AREAS A PARCHAR m2 727.17 1.95 1,417.98 0.00 0.00 350.00 682.50 350.00 682.50 48.13 377.17 735.48

04.02 CORTE DE AFIRMADO EN PARCHES e=5cm m2 727.17 0.97 705.35 0.00 0.00 350.00 339.50 350.00 339.50 48.13 377.17 365.85

04.03 BARRIDO Y ELIMINACION DE MATERIALRESULTANTE DE PARCHES m2 727.17 0.74 538.11 0.00 0.00 350.00 259.00 350.00 259.00 48.13 377.17 279.11

04.04 REPOSICION DE BASE DE AFIRMADO EN PARCHE e= 5 cm m2 727.17 3.10 2,254.23 0.00 0.00 350.00 1,085.00 350.00 1,085.00 48.13 377.17 1,169.23

04.05 IMPRIMACION ASFALTICA MANUAL EN PARCHES m2 727.17 3.38 2,457.83 0.00 0.00 350.00 1,183.00 350.00 1,183.00 48.13 377.17 1,274.83

04.06 CARPETA ASFALTICA EN FRIO e=1.5" EN PARCHES m2 727.17 14.20 10,325.81 0.00 0.00 350.00 4,970.00 350.00 4,970.00 48.13 377.17 5,355.81

05 CAPA NIVELANTE

05.01 BARRIDO Y LIMPIEZA PARA LA CAPA NIVELANTE m2 806.50 0.16 129.04 0.00 0.00 280.00 44.80 280.00 44.80 34.72 526.50 84.24

05.02 RIEGO DE LIGA MANUAL PARA CAPA NIVELANTE m2 806.50 1.08 871.02 0.00 0.00 280.00 302.40 280.00 302.40 34.72 526.50 568.62

05.03 CAPA NIVELANTE MANUAL e PROM.= 1.5 cm m2 806.50 5.65 4,556.73 0.00 0.00 280.00 1,582.00 280.00 1,582.00 34.72 526.50 2,974.73

06 PAVIMENTACION

06.01 RIEGO DE LIGA CON EQUIPO PARA RECAPEO m2 7,789.75 1.01 7,867.65 0.00 0.00 4,000.00 4,040.00 4,000.00 4,040.00 51.35 3,789.75 3,827.65

06.02 CARPETA ASFALTICA EN FRIO DE e = 1 1/2" CON EQUIPO m2 7,789.75 13.15 102,435.21 0.00 0.00 4,000.00 52,600.00 4,000.00 52,600.00 51.35 3,789.75 49,835.21

06.03 SELLO ASFALTICO CON EQUIPO m2 7,789.75 3.20 24,927.20 0.00 0.00 4,000.00 12,800.00 4,000.00 12,800.00 51.35 3,789.75 12,127.20

07 CONCRETO SIMPLE

07.01 VEREDAS DE CONCRETO

07.01.01 BASE DE HORMIGON PARA VEREDAS, e=10cm. m2 2,478.15 7.01 17,371.83 0.00 0.00 1,000.00 7,010.00 1,000.00 7,010.00 40.35 1,478.15 10,361.83

07.01.02 VEREDA DE CONCRETO DE 4", f'c=140Kg/cm2, a=1.50m, una uña m2 2,175.62 37.08 80,671.99 0.00 0.00 1,000.00 37,080.00 1,000.00 37,080.00 45.96 1,175.62 43,591.99

07.01.03 VEREDA DE CONCRETO DE 4", f'c=140Kg/cm2,a=1.50m, dos uñas m2 302.53 40.73 12,322.05 0.00 0.00 200.00 8,146.00 200.00 8,146.00 66.11 102.53 4,176.05

07.02 SARDINELES

07.02.01 SARDINELES EN FORMA DE "T" INVERTIDA: CONCRETO DE f'c=175 kg/cm2 b=0 m 161.06 38.17 6,147.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 161.06 6,147.66

07.02.02 ENCOFRADO DE SARDINELES m2 128.84 17.46 2,249.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 128.84 2,249.55

07.02.03 REPOSICION DE AFIRMADO EN COSTADO DE SARDINEL h=0.15m m2 7.86 8.29 65.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.86 65.16

07.02.04 JUNTAS DE DILATACION EN SARDINELES CADA TRES METROS, e=1/2" m 13.63 2.44 33.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.63 33.26

08 OTROS

08.01 NIVELACION DE CAJAS DE AGUA u 126.00 14.61 1,840.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 126.00 1,840.86

08.02 NIVELACION DE CAJAS DE DESAGUE u 88.00 21.11 1,857.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 88.00 1,857.68

08.03 JUNTAS DE DILATACION EN VEREDAS CADA 4 METROS, e=1/2" m 583.50 1.39 811.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 583.50 811.07

Page 2: VALORIZACION N° 01 AL 30-11-12

09 SEÑALIZACIONES

09.01 PINTURA DE LINEAS CONTINUAS m 573.40 2.81 1,611.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 573.40 1,611.25

09.02 PINTURA DE SIMBOLOS Y LETRAS m2 428.50 10.88 4,662.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 428.50 4,662.08

09.03 PINTURA DE SARDINELES m 633.20 3.01 1,905.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 633.20 1,905.93

COSTO DIRECTO S/. 321,123.84 0.00 152,586.02 152,586.02 168,537.82 GATOS GENERALES (6%) 19267.43 0.00 9155.16 9155.16 10112.27UTILIDAD (4%) 12844.95 0.00 6103.44 6103.44 6741.51SUBTOTAL 353236.22 0.00 167844.62 167844.62 185391.60POR EL FACTOR DE RELACION (0.9) 317912.60 0.00 151060.16 151060.16 166852.44

Page 3: VALORIZACION N° 01 AL 30-11-12

SALDO

%

0.00

0.00

0.00

0.00

38.81

0.00

0.00

0.00

0.00

46.74

51.87

51.87

51.87

51.87

51.87

51.87

65.28

65.28

65.28

48.65

48.65

48.65

59.65

54.04

33.89

100.00

100.00

100.00

100.00

100.00

100.00

100.00

Page 4: VALORIZACION N° 01 AL 30-11-12

100.00

100.00

100.00

Page 5: VALORIZACION N° 01 AL 30-11-12

calculo de K

SIMB. INDICE ELEMENTO REPRESENTAUNIFIC.

MO 47 MANO DE OBRA INCLUYE L

C21 CEMENTO PORTLAND TIPO I

AG 5 AGREGADO GRUESO

A 13 ASFALTO

MAQ 49 MAQUINARIA Y EQUIPO I

I 39 INDICE GENERAL DE PREC

K =

K = 0.240*(MOr / MOo) + 0.266*(Ar / Ao) + 0.133*(AGr / AGo) + 0.120*(Cr / Co) + 0.150*(MEr / MEo) + 0.091*(GGUr / GGUo)

Monomio Factor

1 0.240

2 0.266

3 0.133

4 0.120

5 0.150

6 0.091

Presupuesto referencial con IGV S/. 420,351.10

Monto del contrato: con IGV S/. 378,315.00

Monto adelanto directo con IGV S/. 56,747.40

CALCULO POR ADELANTO DIRECTO

valorizacion N1 151060.1598

VALORIZACION DEL PE 151060.160 0.000

REAJUSTES -1359.541 0.000

DEDUCCION DE REAJUSTES (-) D

VALORIZACION BRUTA VB = V + R – D

AMORTIZACION DE ADELANTOS A 0.000

VALORIZACION NETA VN = VB - A 0.000IGV IG 0.000

Page 6: VALORIZACION N° 01 AL 30-11-12

COEF. % IND. BASE REAJUS. REAJUS.INCID. INCID. Mayo-2,012 Oct-12 K Nov-12 K0.240 100.00 448.25 470.79 0.252 470.79 0.252

0.12 100 418.26 438.98 0.126 438.98 0.126CEMENTO PORTLAND TIPO I

0.133 100 433.49 429.98 0.132 435.45 0.134

0.266 100 1849.17 1697.48 0.244 1697.48 0.244

0.150 100.00 234.59 227.56 0.146 228.18 0.146

0.091 100.00 377.30 380.86 0.092 380.33 0.092

K 0.992 0.994

0.240*(MOr / MOo) + 0.266*(Ar / Ao) + 0.133*(AGr / AGo) + 0.120*(Cr / Co) + 0.150*(MEr / MEo) + 0.091*(GGUr / GGUo)

(%) Símbolo Indice Descripción

100.000 MO 47 MANO DE OBRA

100.000 A 13 ASFALTO

100.000 AG 05 AGREGADO GRUESO

100.000 C 21 CEMENTO PORTLAND TIPO I

100.000 ME 49 MAQUINARIA Y EQUIPO IMPORTADO

100.000 GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR

Fecha : ###

May-12 SIN IGV= 356229.746 0.899997644826

SIN IGV= 320605.932

Oct-12 SIN IGV= 48091.0169 15.00%

CALCULO DE REAJUSTES general

VAL N° valorizacion k R negativo

V1-nov 2012 151060.1598 0.991 -1359.54144 1359.54144

Page 7: VALORIZACION N° 01 AL 30-11-12

REAJUS.Dec-12 K470.79 0.252

442.7 0.127

431.79 0.132

1697.48 0.244

225.80 0.144

381.32 0.092

0.991

DEDUCCIONES

MONTO 151,060

K 0.991

Ka 0.992

(K/Ka)-1 0.00

D #VALUE!

Page 8: VALORIZACION N° 01 AL 30-11-12

VALORIZACION N° 01

PLANILLA DE METRADOSObra MEJORAMIENTO DEL SISTEMA DE INFRAESTRUCTURA VIAL EN AS CALLES DE LA URB. SANCHEZ CARRION,

Fórmula UNICA

Cliente MUNICIPALIDAD PROVINCIAL DE TRUJILLO

Contratista: SUMINISTRO, SERVICIOS Y CONSTRUCCIONES S.A.C.

FECHA. ###

Item Descripción UNIDAD METRADO

01 OBRAS PROVISIONALES

01.01 MOVILIZACION Y DEMOVILIZACION DE EQUIPO glb 1

01.02 DESVIO Y MANTENIMIENTO DE TRAFICO glb 1

01.03 CARTEL DE OBRA DE 6.00 m x 3.60 m u 1

02 TRABAJOS PRELIMINARFES

02.01 TRAZO Y REPLANTEO EN VEREDAS m2 3197.46

03 MOVIMIENTO DE TIERRAS

03.01 DEMOLICION DE VEREDAS DE CONCRETO A PULSO, e=10 m2 1500

03.02 DEMOLICION DE SARDINELES, A PULSO m 90.19

03.03 EXCAVACION DE ZANJAS PARA SARDINELES m 76.41

03.04 CORTE DE TERRENO EN ZONA DE ACCESO A RAMPAS m3 4.72

03.05 BASE DE AFIRMADO, e=15 cm.(ZONA DE ACCESO A RAMPA m2 31.49

03.06 ELIMINACION DE MATERIAL EXCEDENTE CON ESPONJAMIE m3 200

04 PARCHADO

04.01 PERFILADO DE BORDE DE AREAS A PARCHAR m2 350

04.02 CORTE DE AFIRMADO EN PARCHES e=5cm m2 350

04.03 BARRIDO Y ELIMINACION DE MATERIALRESULTANTE DE P m2 350

04.04 REPOSICION DE BASE DE AFIRMADO EN PARCHE e= 5 cm m2 350

04.05 IMPRIMACION ASFALTICA MANUAL EN PARCHES m2 350

04.06 CARPETA ASFALTICA EN FRIO e=1.5" EN PARCHES m2 350

05 CAPA NIVELANTE

05.01 BARRIDO Y LIMPIEZA PARA LA CAPA NIVELANTE m2 280

05.02 RIEGO DE LIGA MANUAL PARA CAPA NIVELANTE m2 280

05.03 CAPA NIVELANTE MANUAL e PROM.= 1.5 cm m2 280

06 PAVIMENTACION

06.01 RIEGO DE LIGA CON EQUIPO PARA RECAPEO m2 4000

06.02 CARPETA ASFALTICA EN FRIO DE e = 1 1/2" CON EQUIPO m2 4000

06.03 SELLO ASFALTICO CON EQUIPO m2 4000

07 CONCRETO SIMPLE

07.01 VEREDAS DE CONCRETO

07.01.01 BASE DE HORMIGON PARA VEREDAS, e=10cm. m2 1000

07.01.02 VEREDA DE CONCRETO DE 4", f'c=140Kg/cm2, a=1.50m, m2 1000

07.01.03 VEREDA DE CONCRETO DE 4", f'c=140Kg/cm2,a=1.50m, m2 200

07.02 SARDINELES

07.02.01 SARDINELES EN FORMA DE "T" INVERTIDA: CONCRETO m 0

07.02.02 ENCOFRADO DE SARDINELES m2 0

07.02.03 REPOSICION DE AFIRMADO EN COSTADO DE SARDINEL m2 0

07.02.04 JUNTAS DE DILATACION EN SARDINELES CADA TRES MET m 0

08 OTROS

08.01 NIVELACION DE CAJAS DE AGUA u 0

08.02 NIVELACION DE CAJAS DE DESAGUE u 0

08.03 JUNTAS DE DILATACION EN VEREDAS CADA 4 METROS, e=1 m 0

09 SEÑALIZACIONES

09.01 PINTURA DE LINEAS CONTINUAS m 0

09.02 PINTURA DE SIMBOLOS Y LETRAS m2 0

Page 9: VALORIZACION N° 01 AL 30-11-12

09.03 PINTURA DE SARDINELES m 0

Page 10: VALORIZACION N° 01 AL 30-11-12

MEJORAMIENTO DEL SISTEMA DE INFRAESTRUCTURA VIAL EN AS CALLES DE LA URB. SANCHEZ CARRION,