valorizacion n° 01 al 30-11-12
DESCRIPTION
S10TRANSCRIPT
VALORIZAn°1 AL 30 NOVIEMBRE 2012PRESUEPUESTO MAYO 2012
ADELANTO 0.0018
VALORIZACION Nº 01OBRA MEJORAMIENTO DEL SISTEMA DE INFRAESTRUCTURA VIAL EN AS CALLES DE LA URB. SANCHEZ CARRION,ENTIDAD MUNICIPALIDAD PROVINCIAL DE TRUJILLOCONTRATISTA SUMINISTRO, SERVICIOS Y CONSTRUCCIONES S.A.C. Monto refrencial : S/. 420,351.10
ING. SUPERVISOR ARQ. Periodo del 25 al 31de Oct 12 Monto contratado: S/. 378,315.99
ING. RESIDENTE ING.FECHA 10/25/2012 FORMULA N° 01: GENERAL
PRESUPUESTO AVANCES SALDOITEM DESCRIPCION ANTERIOR ACTUAL ACUMULADO
UND METRADO PRECIO UNIT PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO % METRADO VALORIZADO
01 OBRAS PROVISIONALES
01.01 MOVILIZACION Y DEMOVILIZACION DE EQUIPO glb 1.00 1,280.00 1,280.00 0.00 0.00 1.00 1,280.00 1.00 1,280.00 100.00 0.00 0.00
01.02 DESVIO Y MANTENIMIENTO DE TRAFICO glb 1.00 562.34 562.34 0.00 0.00 1.00 562.34 1.00 562.34 100.00 0.00 0.00
01.03 CARTEL DE OBRA DE 6.00 m x 3.60 m u 1.00 1,371.49 1,371.49 0.00 0.00 1.00 1,371.49 1.00 1,371.49 100.00 0.00 0.00
02 TRABAJOS PRELIMINARFES
02.01 TRAZO Y REPLANTEO EN VEREDAS m2 3,197.46 0.40 1,278.98 0.00 0.00 3,197.46 1,278.98 3,197.46 1,278.98 100.00 0.00 0.00
03 MOVIMIENTO DE TIERRAS
03.01 DEMOLICION DE VEREDAS DE CONCRETO A PULSO, e=10 cm m2 2,451.25 7.77 19,046.21 0.00 0.00 1,500.00 11,655.00 1,500.00 11,655.00 61.19 951.25 7,391.21
03.02 DEMOLICION DE SARDINELES, A PULSO m 90.19 1.95 175.87 0.00 0.00 90.19 175.87 90.19 175.87 100.00 0.00 0.00
03.03 EXCAVACION DE ZANJAS PARA SARDINELES m 76.41 1.30 99.33 0.00 0.00 76.41 99.33 76.41 99.33 100.00 0.00 0.00
03.04 CORTE DE TERRENO EN ZONA DE ACCESO A RAMPAS m3 4.72 19.44 91.76 0.00 0.00 4.72 91.76 4.72 91.76 100.00 0.00 0.00
03.05 BASE DE AFIRMADO, e=15 cm.(ZONA DE ACCESO A RAMPAS) m2 31.49 8.29 261.05 0.00 0.00 31.49 261.05 31.49 261.05 100.00 0.00 0.00
03.06 ELIMINACION DE MATERIAL EXCEDENTE CON ESPONJAMIENTO m3 375.49 18.43 6,920.28 0.00 0.00 200.00 3,686.00 200.00 3,686.00 53.26 175.49 3,234.28
04 PARCHADO
04.01 PERFILADO DE BORDE DE AREAS A PARCHAR m2 727.17 1.95 1,417.98 0.00 0.00 350.00 682.50 350.00 682.50 48.13 377.17 735.48
04.02 CORTE DE AFIRMADO EN PARCHES e=5cm m2 727.17 0.97 705.35 0.00 0.00 350.00 339.50 350.00 339.50 48.13 377.17 365.85
04.03 BARRIDO Y ELIMINACION DE MATERIALRESULTANTE DE PARCHES m2 727.17 0.74 538.11 0.00 0.00 350.00 259.00 350.00 259.00 48.13 377.17 279.11
04.04 REPOSICION DE BASE DE AFIRMADO EN PARCHE e= 5 cm m2 727.17 3.10 2,254.23 0.00 0.00 350.00 1,085.00 350.00 1,085.00 48.13 377.17 1,169.23
04.05 IMPRIMACION ASFALTICA MANUAL EN PARCHES m2 727.17 3.38 2,457.83 0.00 0.00 350.00 1,183.00 350.00 1,183.00 48.13 377.17 1,274.83
04.06 CARPETA ASFALTICA EN FRIO e=1.5" EN PARCHES m2 727.17 14.20 10,325.81 0.00 0.00 350.00 4,970.00 350.00 4,970.00 48.13 377.17 5,355.81
05 CAPA NIVELANTE
05.01 BARRIDO Y LIMPIEZA PARA LA CAPA NIVELANTE m2 806.50 0.16 129.04 0.00 0.00 280.00 44.80 280.00 44.80 34.72 526.50 84.24
05.02 RIEGO DE LIGA MANUAL PARA CAPA NIVELANTE m2 806.50 1.08 871.02 0.00 0.00 280.00 302.40 280.00 302.40 34.72 526.50 568.62
05.03 CAPA NIVELANTE MANUAL e PROM.= 1.5 cm m2 806.50 5.65 4,556.73 0.00 0.00 280.00 1,582.00 280.00 1,582.00 34.72 526.50 2,974.73
06 PAVIMENTACION
06.01 RIEGO DE LIGA CON EQUIPO PARA RECAPEO m2 7,789.75 1.01 7,867.65 0.00 0.00 4,000.00 4,040.00 4,000.00 4,040.00 51.35 3,789.75 3,827.65
06.02 CARPETA ASFALTICA EN FRIO DE e = 1 1/2" CON EQUIPO m2 7,789.75 13.15 102,435.21 0.00 0.00 4,000.00 52,600.00 4,000.00 52,600.00 51.35 3,789.75 49,835.21
06.03 SELLO ASFALTICO CON EQUIPO m2 7,789.75 3.20 24,927.20 0.00 0.00 4,000.00 12,800.00 4,000.00 12,800.00 51.35 3,789.75 12,127.20
07 CONCRETO SIMPLE
07.01 VEREDAS DE CONCRETO
07.01.01 BASE DE HORMIGON PARA VEREDAS, e=10cm. m2 2,478.15 7.01 17,371.83 0.00 0.00 1,000.00 7,010.00 1,000.00 7,010.00 40.35 1,478.15 10,361.83
07.01.02 VEREDA DE CONCRETO DE 4", f'c=140Kg/cm2, a=1.50m, una uña m2 2,175.62 37.08 80,671.99 0.00 0.00 1,000.00 37,080.00 1,000.00 37,080.00 45.96 1,175.62 43,591.99
07.01.03 VEREDA DE CONCRETO DE 4", f'c=140Kg/cm2,a=1.50m, dos uñas m2 302.53 40.73 12,322.05 0.00 0.00 200.00 8,146.00 200.00 8,146.00 66.11 102.53 4,176.05
07.02 SARDINELES
07.02.01 SARDINELES EN FORMA DE "T" INVERTIDA: CONCRETO DE f'c=175 kg/cm2 b=0 m 161.06 38.17 6,147.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 161.06 6,147.66
07.02.02 ENCOFRADO DE SARDINELES m2 128.84 17.46 2,249.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 128.84 2,249.55
07.02.03 REPOSICION DE AFIRMADO EN COSTADO DE SARDINEL h=0.15m m2 7.86 8.29 65.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.86 65.16
07.02.04 JUNTAS DE DILATACION EN SARDINELES CADA TRES METROS, e=1/2" m 13.63 2.44 33.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.63 33.26
08 OTROS
08.01 NIVELACION DE CAJAS DE AGUA u 126.00 14.61 1,840.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 126.00 1,840.86
08.02 NIVELACION DE CAJAS DE DESAGUE u 88.00 21.11 1,857.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 88.00 1,857.68
08.03 JUNTAS DE DILATACION EN VEREDAS CADA 4 METROS, e=1/2" m 583.50 1.39 811.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 583.50 811.07
09 SEÑALIZACIONES
09.01 PINTURA DE LINEAS CONTINUAS m 573.40 2.81 1,611.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 573.40 1,611.25
09.02 PINTURA DE SIMBOLOS Y LETRAS m2 428.50 10.88 4,662.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 428.50 4,662.08
09.03 PINTURA DE SARDINELES m 633.20 3.01 1,905.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 633.20 1,905.93
COSTO DIRECTO S/. 321,123.84 0.00 152,586.02 152,586.02 168,537.82 GATOS GENERALES (6%) 19267.43 0.00 9155.16 9155.16 10112.27UTILIDAD (4%) 12844.95 0.00 6103.44 6103.44 6741.51SUBTOTAL 353236.22 0.00 167844.62 167844.62 185391.60POR EL FACTOR DE RELACION (0.9) 317912.60 0.00 151060.16 151060.16 166852.44
SALDO
%
0.00
0.00
0.00
0.00
38.81
0.00
0.00
0.00
0.00
46.74
51.87
51.87
51.87
51.87
51.87
51.87
65.28
65.28
65.28
48.65
48.65
48.65
59.65
54.04
33.89
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
calculo de K
SIMB. INDICE ELEMENTO REPRESENTAUNIFIC.
MO 47 MANO DE OBRA INCLUYE L
C21 CEMENTO PORTLAND TIPO I
AG 5 AGREGADO GRUESO
A 13 ASFALTO
MAQ 49 MAQUINARIA Y EQUIPO I
I 39 INDICE GENERAL DE PREC
K =
K = 0.240*(MOr / MOo) + 0.266*(Ar / Ao) + 0.133*(AGr / AGo) + 0.120*(Cr / Co) + 0.150*(MEr / MEo) + 0.091*(GGUr / GGUo)
Monomio Factor
1 0.240
2 0.266
3 0.133
4 0.120
5 0.150
6 0.091
Presupuesto referencial con IGV S/. 420,351.10
Monto del contrato: con IGV S/. 378,315.00
Monto adelanto directo con IGV S/. 56,747.40
CALCULO POR ADELANTO DIRECTO
valorizacion N1 151060.1598
VALORIZACION DEL PE 151060.160 0.000
REAJUSTES -1359.541 0.000
DEDUCCION DE REAJUSTES (-) D
VALORIZACION BRUTA VB = V + R – D
AMORTIZACION DE ADELANTOS A 0.000
VALORIZACION NETA VN = VB - A 0.000IGV IG 0.000
COEF. % IND. BASE REAJUS. REAJUS.INCID. INCID. Mayo-2,012 Oct-12 K Nov-12 K0.240 100.00 448.25 470.79 0.252 470.79 0.252
0.12 100 418.26 438.98 0.126 438.98 0.126CEMENTO PORTLAND TIPO I
0.133 100 433.49 429.98 0.132 435.45 0.134
0.266 100 1849.17 1697.48 0.244 1697.48 0.244
0.150 100.00 234.59 227.56 0.146 228.18 0.146
0.091 100.00 377.30 380.86 0.092 380.33 0.092
K 0.992 0.994
0.240*(MOr / MOo) + 0.266*(Ar / Ao) + 0.133*(AGr / AGo) + 0.120*(Cr / Co) + 0.150*(MEr / MEo) + 0.091*(GGUr / GGUo)
(%) Símbolo Indice Descripción
100.000 MO 47 MANO DE OBRA
100.000 A 13 ASFALTO
100.000 AG 05 AGREGADO GRUESO
100.000 C 21 CEMENTO PORTLAND TIPO I
100.000 ME 49 MAQUINARIA Y EQUIPO IMPORTADO
100.000 GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR
Fecha : ###
May-12 SIN IGV= 356229.746 0.899997644826
SIN IGV= 320605.932
Oct-12 SIN IGV= 48091.0169 15.00%
CALCULO DE REAJUSTES general
VAL N° valorizacion k R negativo
V1-nov 2012 151060.1598 0.991 -1359.54144 1359.54144
REAJUS.Dec-12 K470.79 0.252
442.7 0.127
431.79 0.132
1697.48 0.244
225.80 0.144
381.32 0.092
0.991
DEDUCCIONES
MONTO 151,060
K 0.991
Ka 0.992
(K/Ka)-1 0.00
D #VALUE!
VALORIZACION N° 01
PLANILLA DE METRADOSObra MEJORAMIENTO DEL SISTEMA DE INFRAESTRUCTURA VIAL EN AS CALLES DE LA URB. SANCHEZ CARRION,
Fórmula UNICA
Cliente MUNICIPALIDAD PROVINCIAL DE TRUJILLO
Contratista: SUMINISTRO, SERVICIOS Y CONSTRUCCIONES S.A.C.
FECHA. ###
Item Descripción UNIDAD METRADO
01 OBRAS PROVISIONALES
01.01 MOVILIZACION Y DEMOVILIZACION DE EQUIPO glb 1
01.02 DESVIO Y MANTENIMIENTO DE TRAFICO glb 1
01.03 CARTEL DE OBRA DE 6.00 m x 3.60 m u 1
02 TRABAJOS PRELIMINARFES
02.01 TRAZO Y REPLANTEO EN VEREDAS m2 3197.46
03 MOVIMIENTO DE TIERRAS
03.01 DEMOLICION DE VEREDAS DE CONCRETO A PULSO, e=10 m2 1500
03.02 DEMOLICION DE SARDINELES, A PULSO m 90.19
03.03 EXCAVACION DE ZANJAS PARA SARDINELES m 76.41
03.04 CORTE DE TERRENO EN ZONA DE ACCESO A RAMPAS m3 4.72
03.05 BASE DE AFIRMADO, e=15 cm.(ZONA DE ACCESO A RAMPA m2 31.49
03.06 ELIMINACION DE MATERIAL EXCEDENTE CON ESPONJAMIE m3 200
04 PARCHADO
04.01 PERFILADO DE BORDE DE AREAS A PARCHAR m2 350
04.02 CORTE DE AFIRMADO EN PARCHES e=5cm m2 350
04.03 BARRIDO Y ELIMINACION DE MATERIALRESULTANTE DE P m2 350
04.04 REPOSICION DE BASE DE AFIRMADO EN PARCHE e= 5 cm m2 350
04.05 IMPRIMACION ASFALTICA MANUAL EN PARCHES m2 350
04.06 CARPETA ASFALTICA EN FRIO e=1.5" EN PARCHES m2 350
05 CAPA NIVELANTE
05.01 BARRIDO Y LIMPIEZA PARA LA CAPA NIVELANTE m2 280
05.02 RIEGO DE LIGA MANUAL PARA CAPA NIVELANTE m2 280
05.03 CAPA NIVELANTE MANUAL e PROM.= 1.5 cm m2 280
06 PAVIMENTACION
06.01 RIEGO DE LIGA CON EQUIPO PARA RECAPEO m2 4000
06.02 CARPETA ASFALTICA EN FRIO DE e = 1 1/2" CON EQUIPO m2 4000
06.03 SELLO ASFALTICO CON EQUIPO m2 4000
07 CONCRETO SIMPLE
07.01 VEREDAS DE CONCRETO
07.01.01 BASE DE HORMIGON PARA VEREDAS, e=10cm. m2 1000
07.01.02 VEREDA DE CONCRETO DE 4", f'c=140Kg/cm2, a=1.50m, m2 1000
07.01.03 VEREDA DE CONCRETO DE 4", f'c=140Kg/cm2,a=1.50m, m2 200
07.02 SARDINELES
07.02.01 SARDINELES EN FORMA DE "T" INVERTIDA: CONCRETO m 0
07.02.02 ENCOFRADO DE SARDINELES m2 0
07.02.03 REPOSICION DE AFIRMADO EN COSTADO DE SARDINEL m2 0
07.02.04 JUNTAS DE DILATACION EN SARDINELES CADA TRES MET m 0
08 OTROS
08.01 NIVELACION DE CAJAS DE AGUA u 0
08.02 NIVELACION DE CAJAS DE DESAGUE u 0
08.03 JUNTAS DE DILATACION EN VEREDAS CADA 4 METROS, e=1 m 0
09 SEÑALIZACIONES
09.01 PINTURA DE LINEAS CONTINUAS m 0
09.02 PINTURA DE SIMBOLOS Y LETRAS m2 0
09.03 PINTURA DE SARDINELES m 0
MEJORAMIENTO DEL SISTEMA DE INFRAESTRUCTURA VIAL EN AS CALLES DE LA URB. SANCHEZ CARRION,