  • VALORIZACION MENSUAL DE OBRA

    OBRA :

    EJECUTA : GOBIERNO REGIONAL APURIMAC DISTRITO: HAQUIRA CORRESPONDIENTE AL MES DE :

    PROVINCIA: COTABAMBAS FECHA DE PRESENTACION :

    REGION: APURIMAC FECHA DE VALORIZACION :

    PRESUPUESTO AVANCES

    PARTIDA DESCRIPCION ANTERIOR ACTUAL UND. METR P/UNIT. PRESUP. Metra Valorizado Metra

    S/. S/. S/.

    01 OBRAS PRELIMINARES 53,033.00 52,283.00 01.01 OBRAS PRELIMINARES 53,033.00 52,283.00

    01.01.01 CARTEL DE OBRA und 1.00 1,106.23 1,106.23 1.00 1,106.23 - 01.01.02 ALMACEN Y GUARDIANIA glb 9.00 250.00 2,250.00 6.00 1,500.00 - 01.01.03 CINTA DE SEGURIDAD m 6,000.00 3.79 22,753.02 6,000.00 22,753.02 - 01.01.04 PUENTE PEATONAL PROVISIONAL und 15.00 128.25 1,923.75 15.00 1,923.75 - 01.01.05 FLETE TERRESTRE glb 1.00 20,000.00 20,000.00 1.00 20,000.00 - 01.01.06 FLETE RURAL glb 1.00 5,000.00 5,000.00 1.00 5,000.00 - 02 CONST. DE CAPTACION TIPO LADERA (03UND) 19,353.05 14,813.11 2.01 TRABAJOS PRELIMINARES 62.06 62.06

    02.01.01 TRAZO, NIVELES Y REPLANTEO m2 20.28 1.20 24.34 20.28 24.34 - 02.01.02 LIMPIEZA DEL TERRENO MANUAL m2 20.28 1.86 37.72 20.28 37.72 - 2.02 MOVIMIENTO DE TIERRAS 2,400.30 511.66

    02.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 19.88 15.76 313.31 19.88 313.31 - 02.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 25.66 7.73 198.35 25.66 198.35 - 02.02.03 FILTRO DE GRAVA 1" m4 13.00 145.28 1,888.64 13.00

    2.03 OBRAS DE CONCRETO SIMPLE 3,813.75 3,813.75

    02.03.01 CONCRETO f'c=140 kg/cm2 CON MEZCLADORA m3 7.69 239.88 1,844.68 7.69 1,844.68 - 02.03.02 CONCRETO fc = 100 kg/cm2 (solado) m3 7.56 260.46 1,969.08 7.56 1,969.08 - 2.04 OBRAS DE CONCRETO ARMADO 3,138.01 3,138.01

    02.04.01 CONCRETO SIMPLE fc = 210 kg/cm2 m3 4.00 336.32 1,345.28 4.00 1,345.28 - 02.04.02 ENCOFRADO Y DESENCOFRADO m2 52.36 20.14 1,054.53 52.36 1,054.53 - 02.04.03 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 168.04 4.39 738.20 168.04 738.20 - 2.05 REVOQUES Y ENLUCIDOS 718.59 - 718.59

    02.05.01 TARRAJEO IMPERMEABILIZADO m2 14.24 23.08 328.66 14.24 328.66 - 02.05.02 TARRAJEO DE MUROS EXTERIORES m2 25.32 15.40 389.93 25.32 389.93 - 2.06 SUMINISTRO E INSTALACION DE ACCEOSRIOS PVC 3,881.52 - 2,039.40

    02.06.01 SUMINISTRO DE ACCESORIOS -CAPTACION glb 4.00 740.22 2,960.88 2.00 1,480.44 -

    "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, INSTALACION DEL SERVICIO DE ALCANTARILLADO Y DISPOSICION DE EXCRETAS EN LA LOCALIDAD DE PATAN - DISTRITO DE HAQUIRA PROVINCIA DE COTABAMBAS -APURIMAC"

    RESIDENTE: Ing. Renato Valdivia Sarmiento

    SUPERVISOR: Ing Ernesto Soto Elguera

  • 02.06.02 COLOCACION DE ACCESORIOS pza 84.00 10.96 920.64 51.00 558.96 - 2.07 PINTURA 146.86 - -

    02.07.01 PINTURA LATEX EN MUROS EXTERIORES m2 25.32 5.80 146.86 - - - 2.08 PRUEBA HIDRAULICA Y DESINFECCION 6.89 6.89

    02.08.01 PRUEBA HIDRAULICA PARA AGUA FRIA m3 2.05 1.00 2.05 2.05 2.05 - 02.08.02 DESINFECCION LINEA DE INGRESO m3 2.05 1.95 4.00 2.05 4.00 - 02.08.03 EVACUACION AGUA DE PRUEBA LINEA SALIDA m3 2.05 0.41 0.84 2.05 0.84 - 2.09 CERCO DE PROTECCION 5,185.07 - 4,522.75

    02.09.01 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 83.20 54.36 4,522.75 83.20 4,522.75 - 02.09.02 PUERTA DE MADERA ROLLIZO CON ALAMBRE DE PUAS m2 8.00 82.79 662.32 - - -

    - 03 CONST. DE CAMARA DE REUNION 3,339.19 - 3,168.95 3.01 TRABAJOS PRELIMINARES 2.38 - 2.38

    PRESUPUESTO AVANCES

    PARTIDA DESCRIPCION ANTERIOR ACTUAL

    UND. METR P/UNIT. PRESUP. Metra Valorizado Metra

    S/. S/. S/. 03.01.01 TRAZO, NIVELES Y REPLANTEO m2 2.00 1.19 2.38 2.00 2.38 - 3.02 MOVIMIENTO DE TIERRAS 65.94 - 65.94

    03.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 2.30 17.38 39.97 2.30 39.97 - 03.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 2.99 8.69 25.97 2.99 25.97 - 3.03 OBRAS DE CONCRETO ARMADO 987.96 - 987.96

    03.03.01 CONCRETO f'c=175 kg/cm2 m2 1.38 297.23 410.18 1.38 410.18 - 03.03.02 ENCOFRADO Y DESENCOFRADO m3 13.60 20.14 273.90 13.60 273.90 - 03.03.03 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 69.22 4.39 303.88 69.22 303.88 - 3.04 SUMINISTRO E INSTALACION DE ACCESORIOS 1,961.44 - 1,698.40

    03.04.01 SUMINISTRO DE ACCESORIOS EN CAMARA DE REUNION TIPO I glb 1.00 561.90 561.90 1.00 561.90 - 03.04.02 SUMINISTRO DE ACCESORIOS EN CAMARA DE REUNION TIPO II glb 1.00 588.50 588.50 1.00 588.50 - 03.04.03 COLOCACION DE ACCESORIOS pza 74.00 10.96 811.04 50.00 548.00 - 3.05 REVOQUES Y ENLUCIDOS 275.07 - 367.87

    03.05.01 TARRAJEO IMPERMEABILIZADO m2 6.58 23.08 151.87 6.58 151.87 - 03.05.02 TARRAJEO DE MUROS EXTERIORES m2 8.00 15.40 123.20 8.00 123.20 - 3.06 PINTURA 46.40 46.40

    03.06.01 PINTURA LATEX EN MUROS EXTERIORES m2 8.00 5.80 46.40 8.00 46.40 -

    04.00 CONSTRUCCION DE PASE AEREO 3,079.81 1,339.13 4.01 TRABAJOS PRELIMINARES 17.18 17.18

    04.01.01 TRAZO, NIVELES Y REPLANTEO m2 14.44 1.19 17.18 14.44 17.18 - 4.02 MOVIMIENTO DE TIERRAS 126.70 126.70

    04.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 4.42 17.38 76.82 4.42 76.82 - 04.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 5.74 8.69 49.88 5.74 49.88 - 4.03 OBRAS DE CONCRETO SIMPLE 229.33 229.33

  • 04.03.01 CONCRETO f'c=140 kg/cm2 CON MEZCLADORA m3 0.83 276.30 229.33 0.83 229.33 - 04.04.00 OBRAS DE CONCRETO ARMADO 1,226.67 1,226.67

    04.04.01 CONCRETO f'c=175 kg/cm2 m3 2.38 297.23 707.41 2.38 707.41 - 04.04.02 ENCOFRADO Y DESENCOFRADO m2 8.48 20.14 170.79 8.48 170.79 - 04.04.03 ACERO DE REFUERZO fy=4200 Kg/cm2. Kg 79.38 4.39 348.48 79.38 348.48 - 4.05 REVOQUES Y ENLUCIDOS 10.32 10.32

    04.05.01 TARRAJEO DE MUROS EXTERIORES m2 0.67 15.40 10.32 0.67 10.32 - 4.06 SUMINISTRO E INSTALACION DE ACCEOSRIOS PVC 955.60 955.60

    04.06.01 SUMINISTRO DE ACCESORIOS EN PASE AEREO TIPO I glb 1.00 271.72 271.72 1.00 271.72 - 04.06.02 SUMINISTRO DE ACCESORIOS EN PASE AEREO TIPO II glb 1.00 519.48 519.48 1.00 519.48 - 04.06.03 COLOCACION DE ACCESORIOS pza 15.00 10.96 164.40 15.00 164.40 - 4.07 PINTURA 3.89 -

    04.07.01 PINTURA LATEX EN MUROS EXTERIORES m2 0.67 5.80 3.89 - - - 4.08 CABLE DE SUSPENSION 510.12 - -

    4.08.01 CABLE DE SUSPENSION m 18.00 28.34 510.12 - - - -

    05.00.00 LINEA DE CONDUCCION, ADUCCION Y DISTRIBUCION 198,293.14 - 110,277.48 5.01 TRABAJOS PRELIMINARES 6,839.33 2,941.43

    05.01.01 TRAZO, NIVELES Y REPLANTEO m2 8,319.34 0.82 6,839.33 3,577.95 2,941.43 590.00 5.02 MOVIMIENTO DE TIERRAS 128,022.87 - 59,418.30

    05.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 8,306.00 7.45 61,879.70 2,199.95 16,389.63 247.80 05.02.02 REFINE Y NIVELACION DE ZANJAS m2 8,306.00 1.74 14,452.44 4,798.13 8,348.75 354.00 05.02.03 CAMA DE APOYO m 8,306.00 2.64 21,955.25 3,732.95 9,867.31 590.00 05.02.04 RELLENO COMPACTADO DE ZANJAS m 8,306.00 3.58 29,735.48 6,930.90 24,812.62 590.00

    PRESUPUESTO AVANCES

    PARTIDA DESCRIPCION ANTERIOR ACTUAL

    UND. METR P/UNIT. PRESUP. Metra Valorizado Metra

    S/. S/. S/. 5.03 SUMINISTRO, INSTALACION DE TUEBRIAS Y PRUEBA HIDRAULICA 56,015.48 - 42,632.99

    05.03.01 SUMINISTRO Y COLOCACION DE TUEBRIAS PVC SAP DE 3" C-7.5 m 106.00 17.01 1,802.64 - - - 05.03.02 SUMINISTRO Y COLOCACION DE TUEBRIAS PVC SAP DE 1 " C-10 m 3,038.24 4.35 13,202.67 2,136.50 9,284.16 590.00 05.03.03 SUMINISTRO Y COLOCACION DE TUEBRIAS PVC SAP DE 2 " C-7.5 m 368.65 7.81 2,879.16 368.65 2,879.16 - 05.03.04 SUMINISTRO Y COLOCACION DE TUEBRIAS PVC SAP DE 1 1/2 " C-7.5 m 3,072.55 5.92 18,191.34 2,465.81 14,599.07 - 05.03.05 SUMINISTRO Y COLOCACION DE TUEBRIAS PVC SAP DE 1 1/2 " C-10 m 222.80 6.76 1,506.13 - - - 05.03.06 SUMINISTRO Y COLOCACION DE TUEBRIAS PVC SAP DE 2 1/2" C-7.5 m 1,369.50 11.76 16,099.84 1,350.00 15,870.60 - 05.03.07 SUMINISTRO Y COLOCACION DE TUEBRIAS PVC SAP DE 2 1/2" C-10 m 141.60 16.48 2,333.71 - - - 5.04 SUMINISTRO E INSTALACION DE ACCESORIOS PVC 7,415.46 5,284.75

    05.04.01 COLOCACION DE ACCESORIOS EN TUBERIAS pza 1.00 403.20 403.20 0.25 100.80 - 05.04.02 COLOCACION DE ACCESORIOS pza 84.00 10.96 920.64 45.00 493.20 - 05.04.03 PRUEBA HIDRAULICA PARA AGUA FRIA glb 8,306.00 0.73 6,091.62 6,395.90 4,690.75 -

  • 06.00.00 CONST. DE CAMARA ROMPE PRESION T-06 4,319.12 2,349.22 6.01 TRABAJOS PRELIMINARES 4.92 4.92

    06.01.01 TRAZO, NIVELES Y REPLANTEO m2 3.98 1.24 4.92 3.98 4.92 - 6.02 MOVIMIENTO DE TIERRAS 121.79 121.79

    06.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 4.25 17.37 73.82 4.25 73.82 - 06.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 5.52 8.69 47.97 5.52 47.97 - 6.03 OBRAS DE CONCRETO ARMADO 1,370.98 485.16

    06.03.01 CONCRETO f'c=175 kg/cm2 m3 2.22 297.23 659.85 2.22 44.71 - 06.03.02 ENCOFRADO Y DESENCOFRADO m2 13.44 20.14 270.68 13.44

    06.03.03 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 100.33 4.39 440.45 100.33 440.45 - 6.04 SUMINISTRO E INSTALACION DE ACCESORIOS 2,372.60 1,350.70 06.04.01 SUMINISTRO DE ACCESORIOS EN CAMARA ROMPE PRESION T-06 glb 2.00 1,021.90 2,043.80 1.00 1,021.90 - 06.04.02 COLOCACION DE ACCESORIOS pza 30.00 10.96 328.80 30.00 328.80 - 6.05 REVOQUES Y ENLUCIDOS 386.66 - 386.66

    06.05.01 TARRAJEO IMPERMEABILIZADO m2 9.60 23.08 221.57 9.60 221.57 - 06.05.02 TARRAJEO DE MUROS EXTERIORES m2 10.72 15.40 165.09 10.72 165.09 - 6.06 PINTURA 62.18 - -

    06.06.01 PINTURA LATEX EN MUROS EXTERIORES m2 10.72 5.80 62.18 - - - -

    07.00.00 REHABILITACION DE RESERVORIO DE 30 M3 Y CAMARA VALVULAS 6,586.60 - 2,231.01 07.01 TRABAJOS PRELIMINARES 274.64 - 274.64 07.01.01 PICADO DE PISO Y MUROS PARA TARRAJEO m2 66.89 3.71 248.16 66.89 248.16 - 07.01.02 DEMOLICION DE ESTRUCTURAS DE CONCRETO m3 1.84 14.39 26.48 1.84 26.48 - 7.02 OBRAS DE CONCRETO 1,101.97 1,101.97

    07.02.01 TARRAJEO DE MUROS EXTERIORES m2 37.37 13.96 521.69 37.37 521.69 - 07.02.02 CONCRETO f'c=175 kg/cm2 m3 1.23 297.23 365.59 1.23 365.59 07.02.03 ENCOFRADO Y DESENCOFRADO m2 10.66 20.14 214.69 10.66 214.69 7.03 SUMINISTRO E INSTALACION DE ACCESORIOS 3,738.79 -

    07.03.01 SUMINISTRO DE ACCESORIOS EN RESERVORIO glb 1.00 3,431.91 3,431.91 - - - 07.03.02 COLOCACION DE ACCESORIOS pza 28.00 10.96 306.88 - - - 7.04 REVOQUES Y ENLUCIDOS 164.85 - -

    07.04.01 TARRAJEO IMPERMEABILIZADO m2 4.18 23.08 96.47 - - - 07.04.02 TARRAJEO DE MUROS EXTERIORES C.VALV. m2 4.44 15.40 68.38 - - - 7.05 PINTURA 243.84 - -

    07.05.01 PINTURA LATEX EN MUROS EXTERIORES (RESERVORIO) m2 33.60 6.18 207.65 - - - 07.05.02 PINTURA LATEX EN MUROS EXTERIORES(CAJA VALVULAS) m3 6.24 5.80 36.19 - - 7.06 TRABAJOS DE PROTECCION 1,062.51 - 854.40

    PRESUPUESTO AVANCES

    PARTIDA DESCRIPCION ANTERIOR ACTUAL

    UND. METR P/UNIT. PRESUP. Metra Valorizado Metra

  • S/. S/. S/. 07.06.01 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 40.00 21.36 854.40 40.00 854.40 - 07.06.02 PUERTA DE MADERA ROLLIZO CON ALAMBRE DE PUAS m2 1.00 208.11 208.11 - - -

    08.00.00 CONST. DE RESERVORIO DE 4.00 M3 PUCYUCANCHA 4,197.98 4,001.09 8.01 TRABAJOS PRELIMINARES 7.44 7.44

    08.01.01 TRAZO, NIVELES Y REPLANTEO m2 6.25 1.19 7.44 6.25 7.44 - 8.02 MOVIMIENTO DE TIERRAS 358.34 358.34

    08.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 12.50 17.37 217.13 12.50 217.13 - 08.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 16.25 8.69 141.21 16.25 141.21 - 8.03 OBRAS DE CONCRETO ARMADO 2,809.13 2,809.13

    08.03.01 SOLADO e=2" m2 6.25 23.30 145.63 6.25 145.63 - 08.03.02 CONCRETO SIMPLE fc = 210 kg/cm2 m3 3.67 336.59 1,235.29 3.67 1,235.29 - 08.03.03 ENCOFRADO Y DESENCOFRADO m2 28.59 20.14 575.80 28.59 575.80 - 08.03.04 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 194.04 4.39 852.42 194.04 852.42 - 8.04 REVOQUES Y ENLUCIDOS 826.18 826.18

    08.04.01 TARRAJEO IMPERMEABILIZADO m2 14.40 23.08 332.35 14.40 332.35 - 08.04.02 TARRAJEO DE MUROS EXTERIORES m2 17.43 15.40 268.42 17.43 268.42 - 08.04.03 CONFORMACION DE PENDIENTE DE FONDO FC=175 KG7CM2 m2 3.24 69.57 225.41 3.24 225.41 - 8.05 PINTURA 101.09 - -

    08.05.01 PINTURA LATEX EN MUROS EXTERIORES m2 17.43 5.80 101.09 - - 8.06 PRUEBA HIDRAULICA Y DESINFECCION 95.80 - -

    08.06.01 PRUEBA HIDRAULICA PARA AGUA FRIA glb 1.00 95.80 95.80 - - - -

    08.01.00 CAMARA DE VALVULA RESERVORIO 3,700.36 - 1,446.87 08.01.01 TRABAJOS PRELIMINARES 1.25 1.25 08.01.01.01 TRAZO, NIVELES Y REPLANTEO m2 1.05 1.19 1.25 1.05 1.25 - 08.01.02 MOVIMIENTO DE TIERRAS 30.07 30.07

    08.01.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 1.05 17.38 18.25 1.05 18.25 - 08.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 1.36 8.69 11.82 1.36 11.82 - 08.01.03 OBRAS DE CONCRETO SIMPLE 24.47 24.47

    08.01.03.01 SOLADO DE 2" MEZCLA 1:12 m2 1.05 23.30 24.47 1.05 24.47 - 08.01.04 OBRAS DE CONCRETO 526.77 - 439.51

    08.01.04.01 CONCRETO f'c=210 kg/cm2 m3 0.57 345.17 196.75 0.46 158.78 - 08.01.04.02 ENCOFRADO Y DESENCOFRADO m2 6.39 20.14 128.69 5.46 109.96 08.01.04.03 ACERO DE REFUERZO fy=4200 Kg/cm2. m2 45.86 4.39 201.33 38.90 170.77 - 08.01.05 REVOQUES Y ENLUCIDOS 117.81 - 117.81

    08.01.05.01 TARRAJEO MUROS EXTERIORES m2 7.65 15.40 117.81 7.65 117.81 - 08.01.06 SUMINISTRO E INSTALACION DE ACCESORIOS 1,727.81 - -

    08.01.06.01 SUMINISTRO DE ACCESORIOS EN RESERVORIO UND. 1.00 1,420.93 1,420.93 - - - 08.01.06.02 COLOCACION DE ACCESORIOS pza 28.00 10.96 306.88 - - -

  • 08.01.07 PINTURA 22.21 -

    08.01.07.01 PINTURA LATEX EN MUROS EXTERIORES m2 3.83 5.80 22.21 - - - 08.01.08 TRABAJOS DE PROTECCION 1,249.98 - 833.76

    08.01.08.01 CERCO PERIMETRICO DE ALAMBRE DE PUAS m 24.00 34.74 833.76 24.00 833.76 - 08.01.08.02 PUERTA DE MADERA ROLLIZO CON ALAMBRE DE PUAS Und 2.00 208.11 416.22 - - -

    -

    09.00.00 VALVULA DE PURGA 5,905.71 - 1,582.46 9.01 TRABAJOS PRELIMINARES 10.28 - 3.69

    9.01.01 TRAZO, NIVELES Y REPLANTEO m2 8.64 1.19 10.28 3.10 3.69 - 9.02 MOVIMIENTO DE TIERRAS 160.26 68.63

    PRESUPUESTO AVANCES

    PARTIDA DESCRIPCION ANTERIOR ACTUAL

    UND. METR P/UNIT. PRESUP. Metra Valorizado Metra

    S/. S/. S/. 9.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 5.18 17.38 90.03 2.45 42.58 - 9.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 6.74 10.42 70.23 2.50 26.05 - 9.03 OBRAS DE CONCRETO 1,763.29 752.90

    9.03.01 CONCRETO f'c=140 kg/cm2 m3 1.15 248.94 286.28 1.23 306.20 - 9.03.02 CONCRETO f'c=175 kg/cm2 m3 1.81 297.23 537.99 1.12 332.90 - 9.03.03 ENCOFRADO Y DESENCOFRADO m2 46.62 20.14 939.02 5.65 113.80 - 9.04 SUMINISTRO E INSTALACION DE ACCEOSRIOS PVC 3,971.88 757.24

    9.04.01 SUMINISTRO DE ACCEOSRIOS EN VALVULA DE PURGA 1 1/2" glb 4.00 192.30 769.20 2.00 384.60 - 9.04.02 SUMINISTRO DE ACCEOSRIOS EN VALVULA DE PURGA 1" glb 2.00 132.70 265.40 - - - 9.04.03 COLOCACION DE ACCESORIOS pza 268.00 10.96 2,937.28 34.00 372.64 -

    -

    10 VALVULA DE CONTROL 5,639.48 - - 10.01 TRABAJOS PRELIMINARES 7.28 - -

    10.01.01 TRAZO, NIVELES Y REPLANTEO m2 6.12 1.19 7.28 - - - 10.02 MOVIMIENTO DE TIERRAS 105.20 - -

    10.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 3.67 17.37 63.75 - - - 10.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 4.77 8.69 41.45 - - - 10.03 OBRAS DE CONCRETO SIMPLE 965.96 - -

    10.03.01 CONCRETO f'c=175 kg/cm2 m3 1.28 297.23 380.45 - - - 10.03.02 CONCRETO f'c=140 kg/cm2 m3 0.06 248.94 14.94 - - - 10.03.03 ENCOFRADO Y DESENCOFRADO m2 28.33 20.14 570.57 - - - 10.04 SUMINISTRO E INSTALACION DE ACCEOSRIOS PVC 4,561.04 - -

    10.04.01 SUMINISTRO DE ACCESORIOS EN VALVULA DE CONTROL DE 2" und 4.00 254.70 1,018.80 - - - 10.04.02 SUMINISTRO DE ACCESORIOS EN VALVULA DE CONTROL 1 1/2" und 4.00 192.90 771.60 - - - 10.04.03 SUMINISTRO DE ACCESORIOS EN VALVULA DE CONTROL DE 1" und 4.00 133.70 534.80 - - - 10.04.04 COLOCACION DE ACCESORIOS pza 204.00 10.96 2,235.84 - - -

    -

  • 11.00 CONEXIONES DOMICILIARIAS DE AGUA 22,974.40 - 19,177.60 11.01 CONEXIONES DOMICILIARIAS DE AGUA DE 2" A 1/2" und 17.00 193.20 3,284.40 10.00 1,932.00 -

    11.02 CONEXIONES DOMICILIARIAS DE AGUA DE 1 1/2" A 1/2" und 32.00 203.70 6,518.40 20.00 4,074.00 - 11.03 CONEXIONES DOMICILIARIAS DE AGUA DE 1" A 1/2" und 68.00 193.70 13,171.60 68.00 13,171.60 - 12 SISTEMA DE ALCANTARILLADO 503,002.84 456,031.37 12.01 OBRAS PRELIMINARES 31,532.80 31,312.10

    12.01.01 CINTA DE SEGURIDAD m 5,000.00 0.63 3,150.00 5,000.00 3,150.00 - 12.01.02 PUENTE PEATONAL PROVISIONAL und 20.00 44.14 882.80 15.00 662.10 - 12.01.03 FLETE TERRESTRE ALCANTARILLADO glb 1.00 25,000.00 25,000.00 1.00 25,000.00 - 12.01.04 FLETE RURAL ALCANTARILLADO glb 1.00 2,500.00 2,500.00 1.00 2,500.00 -

    13 TRAZO Y REPLANTEO INICIAL Y DURANTE LA EJECUCION DE OBRA 26,910.79 26,910.79

    13.01 TRAZO Y REPLANTEO INICIAL Y DURANTE LA EJECUCION DE OBRA m 5,464.12 4.93 26,910.79

    5,464.12 26,910.79 -

    13.02 MOVIMIENTO DE TIERRAS 444,559.25 397,808.48

    13.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 3,352.50 17.37 58,241.31 3,352.50 58,241.31 - 13.02.02 EXCAVACION A MANO EN TERRENO SEMIDURA m3 740.37 52.12 38,586.60 740.37 38,586.60 - 13.02.03 EXCAVACION A MANO EN ROCA FIJA Y BOLONES m3 1,729.55 26.06 45,072.07 1,729.55 45,072.07 - 13.02.04 PERFORACION Y VOLADURA(BOLONES) pto 600.00 28.71 17,226.00 600.00 17,226.00 - 13.02.05 REFINE Y NIVELACION DE ZANJAS PARA TUB PVC 200 mm m 5,980.80 1.55 9,270.24 5,044.80 7,819.44 538.00 13.02.06 CAMA DE APOYO PARA TUB PVC 200 mm m 5,980.80 7.10 42,463.68 5,044.80 35,818.08 269.00 13.02.07 RELLENO COMPACTADO DE ZANJAS PARA TUB PVC 200 mm m 5,980.80 3.58 21,427.41 5,044.80 18,074.00 265.00

    PRESUPUESTO AVANCES

    PARTIDA DESCRIPCION ANTERIOR ACTUAL

    UND. METR P/UNIT. PRESUP. Metra Valorizado Metra

    S/. S/. S/. 13.02.08 SUMINISTRO E INSTALACION DE TUBERIAS PVC UF NTP ISO 4435 S25 200 MM (8") *6M m 3,468.77 39.58 137,289.75 2,778.00 109,949.91 215.00 13.02.09 SUMINISTRO E INSTALACION DE TUBERIAS PVC UF NTP ISO 4435 S25 160 MM (6") m 2,512.30 27.45 68,962.64 2,272.90 62,391.11 6.00 13.02.10 PRUEBA A ZANJA TUBERIA DESAGUE 200MM m 5,980.08 1.01 6,019.55 4,599.60 4,629.96 -

    14 CAMARA DE REJAS 4,328.47 - - 14.01 TRABAJOS PRELIMINARES 58.77 - 14.01.01 LIMPIEZA DE TERRENO m2 11.13 1.77 19.70 - - - 14.01.02 TRAZO, NIVELES Y REPLANTEO m2 11.13 3.51 39.07 - - - 14.02 MOVIMIENTO DE TIERRAS 536.91 - 14.02.01 EXCAVACION MASIVA MANUAL EN TERRENO NORMAL m3 18.48 17.37 321.00 - - - 14.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 24.38 8.86 215.91 - - - 14.03 OBRAS DE CONCRETO 3,050.49 - 14.03.01 CONCRETO f'c=140kg/cm2 m3 0.71 263.79 187.29 - - - 14.03.02 CONCRETO f'c=210kg/cm3 m3 2.47 351.42 868.01 - - - 14.03.03 ENCOFRADO Y DESENCOFRADO EN REJAS m2 21.84 20.14 439.86 - - -

  • 14.03.04 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 354.29 4.39 1,555.33 - - - 14.04 TARRAJEO 520.50 - 14.04.01 TARRAJEO IMPERMEABILIZADO m2 23.52 22.13 520.50 - - - 14.05 PINTURA 75.52 - 14.05.01 PINTURA ESMALTE DOS MANOS m2 13.02 5.80 75.52 - - - 14.06 ACCESORIOS 86.29 - 14.06.01 INSTALACION DE REJILLA Und 1.00 86.29 86.29 - - -

    15 CAJAS DE DISTRIBUCION 1,071.63 56.85 15.01 TRABAJOS PRELIMINARES 2.04 2.04 15.01.01 TRAZO, NIVELES Y REPLANTEO m2 1.74 1.17 2.04 1.74 2.04 - 15.02 MOVIMIENTO DE TIERRAS 54.81 54.81 -

    15.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 1.91 17.37 33.18 1.91 33.18 - 15.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 2.49 8.69 21.64 2.49 21.64 - 15.03 OBRAS DE CONCRETO ARMADO 1,014.78 - 15.03.01 CONCRETO f'c=175 kg/cm2 m3 1.26 309.95 390.54 - - - 15.03.02 ENCOFRADO Y DESENCOFRADO m2 14.30 20.14 288.00 - - - 15.03.03 TAPA DE CA FC= 175 KG/CM2 (CAJA DE DISTRIBUCION) und 2.00 168.12 336.24 - - -

    16 TANQUE SEPTICO 65,211.16 - 46,516.98 16.01 TRABAJOS PRELIMINARES 1,162.36 162.36

    16.01.01 MOVILIZACION Y DESMOVILIZACION TRACTOR ORUGA Glb 1.00 1,000.00 1,000.00 - - - 16.01.02 TRAZO, NIVELES Y REPLANTEO m2 53.94 3.01 162.36 53.94 162.36 - 16.02 MOVIMIENTO DE TIERRAS 27,385.47 10,287.90

    16.02.01 CORTE Y EXPLANACION DE ROCA SUELTA CON TRACTOR ORUG m3 5,250.00 1.93 10,132.50 4,230.00 8,163.90 - 16.02.02 PERFILADO Y REFINE EN TERRENO MANUAL m3 1,500.00 1.77 2,655.00 1,200.00 2,124.00 - 16.02.03 PERFORACION Y VOLADURA EN ROCA FIJA m3 118.67 60.38 7,165.29 56.00 3,381.28 - 16.02.04 EXCAVACION Y DESQUINCHE MATERIAL m3 118.67 10.63 1,261.46 57.00 605.91 - 16.02.05 ELIMINACION DE MATERIAL EXCEDENTE DIST PROM 50 M m3 154.27 8.86 1,366.83 100.20 887.77 - 16.02.06 CERCO PERIMETRICO CON ALAMBRE PUAS m 230.00 15.69 3,608.70 - - - 16.02.07 PUERTA DE MADERA ROLLIZO CON ALAMBRE PUAS m2 8.00 149.46 1,195.68 - - - 16.03 LOSA DE CIMENTACION TANQUE SEPTICO 5,838.18 5,838.18

    16.03.01 SOLADO e=2" m2 53.94 20.01 1,079.34 53.94 1,079.34 - 16.03.02 CONCRETO f'c=175 kg/cm2 m3 10.78 298.01 3,212.55 10.78 3,212.55 - 16.03.03 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 352.23 4.39 1,546.29 352.23 1,546.29 -

    PRESUPUESTO AVANCES

    PARTIDA DESCRIPCION ANTERIOR ACTUAL

    UND. METR P/UNIT. PRESUP. Metra Valorizado Metra

    S/. S/. S/. 16.04 MURO DE TANQUE SEPTICO 21,873.96 21,873.96

    16.04.01 CONCRETO f'c=175 kg/cm2 m3 21.55 309.95 6,679.42 21.55 6,679.42 -

  • 16.04.02 ENCOFRADO Y DESENCOFRADO m2 215.54 20.14 4,340.98 215.54 4,340.98 - 16.04.03 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 1,385.80 4.39 6,083.66 1,385.80 6,083.66 - 16.04.04 TARRAJEO IMPERMEABILIZADO m2 215.54 22.13 4,769.90 215.54 4,769.90 - 16.05 TAPA DE TANQUE SEPTICO 8,022.13 8,022.13

    16.05.01 CONCRETO f'c=175 kg/cm2 m3 9.66 309.95 2,994.12 9.66 2,994.12 - 16.05.02 ENCOFRADO Y DESENCOFRADO m2 53.94 20.28 1,093.90 53.94 1,093.90 - 16.05.03 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 352.33 4.39 1,546.73 352.33 1,546.73 - 16.05.04 TARRAJEO IMPERMEABILIZADO m2 107.88 22.13 2,387.38 107.88 2,387.38 - 16.06 TAPA DE INSPECCION DE TANQUE SEPTICO 706.78 332.45

    16.06.01 CONCRETO f'c=175 kg/cm2 m3 0.84 309.95 260.36 0.84 260.36 - 16.06.02 ENCOFRADO Y DESENCOFRADO m2 5.62 20.28 113.97 5.62 113.97 - 16.06.03 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 67.21 4.39 295.05 67.21 295.05 - 16.06.04 TARRAJEO CON IMPERMEABILIZADO m2 1.69 22.13 37.40 1.69 37.40 - 16.07 ACCESORIOS 222.28 -

    16.07.01 SUMINISTRO Y COLOCACION DE ACCESORIOS und 2.00 111.14 222.28 - - -

    17.00.00 POZOS PERCOLADORES 74,981.11 73,800.31 17.01 TRABAJOS PRELIMINARES 139.50 139.50

    17.01.01 TRAZO, NIVELES Y REPLANTEO m2 95.55 1.46 139.50 95.55 139.50 - 17.02 MOVIMIENTO DE TIERRAS 11,127.88 11,127.88

    17.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 298.04 17.37 5,176.95 298.04 5,176.95 - 17.02.02 PERFORACION Y VOLADURA EN ROCA DURA(BOLONES) m3 90.00 28.71 2,583.90 90.00 2,583.90 - 17.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 387.46 8.69 3,367.03 387.46 3,367.03 - 17.03 ESTRUCTURA DE POZO DE PERCOLACION 53,314.47 52,133.67

    17.03.01 CONCRETO f'c=175 kg/cm2 m3 39.22 309.95 12,156.24 39.22 12,156.24 - 17.03.02 ENCOFRADO Y DESENCOFRADO m2 346.10 20.14 6,970.45 346.10 6,970.45 - 17.03.03 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 1,261.09 4.39 5,536.19 1,261.09 5,536.19 - 17.03.04 TARRAJEO CON IMPERMEABILIZADO m2 134.96 22.13 2,986.66 134.96 2,986.66 - 17.03.05 MURO DE LADRILLOS SIN JUNTAS m2 137.70 108.73 14,972.12 137.70 14,972.12 - 17.03.06 FORRO DE POZO CON GRAVA GRUESA m3 139.37 68.25 9,512.00 139.37 9,512.00 - 17.03.07 TUBERIA DE VENTILACION DE 2" Und 6.00 196.80 1,180.80 - - - 17.04 TAPA DE POZO DE PERCOLACION 10,399.26 10,399.26

    17.04.01 CONCRETO f'c=175 kg/cm2 m3 6.36 309.95 1,971.28 6.36 1,971.28 - 17.04.02 ENCOFRADO Y DESENCOFRADO m2 50.89 20.14 1,024.92 50.89 1,024.92 - 17.04.03 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 211.68 4.39 929.28 211.68 929.28 - 17.04.04 TARRAJEO CON IMPERMEABILIZADO m2 245.04 22.13 5,423.72 245.04 5,423.72 - 17.04.05 TAPA DE CA FC= 175 KG/CM2 und 6.00 175.01 1,050.06 6.00 1,050.06 -

    18 BUZONES 106,838.21 71,907.60 18.01 BUZON RED DE DESAUE D=1.20M H=1.00M (Pared) Und 4.00 801.57 3,206.28 4.00 3,206.28 - 18.02 BUZON RED DE DESAUE D=1.20M H=1.50M (Pared) Und 44.00 887.20 39,036.80 38.00 33,713.60 -

  • 18.03 BUZON RED DE DESAUE D=1.20M H=2.00M (Pared) Und 49.00 993.66 48,689.34 29.00 28,816.14 2.00 18.04 BUZON RED DE DESAUE D=1.20M H=2.50M (Pared) Und 8.00 1,196.75 9,574.00 4.00 4,787.00 - 18.05 BUZON RED DE DESAUE D=1.20M H=3.00M (Pared) Und 1.00 1,384.58 1,384.58 1.00 1,384.58 - 18.06 BUZON RED DE DESAUE D=1.20M H=3.50M (Pared) Und 3.00 1,649.07 4,947.21 - -

    PRESUPUESTO AVANCES

    PARTIDA DESCRIPCION ANTERIOR ACTUAL

    UND. METR P/UNIT. PRESUP. Metra Valorizado Metra

    S/. S/. S/. 19 CONEXIONES DOMICILIARIAS DESAGUE 21,741.36 18,585.00 19.01 SUMINISTRO, INSTALACION DE TUEBRIAS Y PRUEBA HIDRAULICA 21,741.36 18,585.00

    19.01.01 CONEXION DE DESAGUE TUBO PVC 8" A 4" und 58.00 188.94 10,958.52 50.00 9,447.00 - 19.01.02 CONEXION DE DESAGUE TUBO PVC 6" A 4" und 59.00 182.76 10,782.84 50.00 9,138.00 - 20 CONST. PASE AEREO DESAGUE 12,371.71 - 20.01 TRABAJOS PRELIMINARES 53.52 -

    20.01.01 LIMPIEZA TERRENO m2 24.00 1.06 25.44 - - - 20.01.02 TRAZO, NIVELES Y REPLANTEO m2 24.00 1.17 28.08 - - - 20.02 MOVIMIENTO DE TIERRAS 221.76 -

    20.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 7.64 17.37 132.71 - - - 20.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 2.46 17.90 44.03 - - - 20.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 5.18 8.69 45.01 - - - 20.03 OBRAS DE CONCRETO SIMPLE 199.92 -

    20.03.01 CONCRETO f'c=100 kg/cm2 m3 0.78 255.00 199.92 - - - 20.04 OBRAS DE CONCRETO ARMADO

    21.04.01 CINCRETO EN ZAPATAS 1,410.91

    20.04.01 CONCRETO ZAPATAS f'c=210 kg/cm2 m3 3.14 355.48 1,116.21 - - - 20.04.03 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 67.13 4.39 294.70 - - - 21.05 CINCRETO EN COLUMNAS 2,079.94 - 21.05.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 1.01 355.48 359.03 - - - 21.05.02 ENCOFRADO Y DESENCOFRADO VIGAS m2 3.36 20.14 67.67 - - - 21.05.03 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 376.59 4.39 1,653.23 - - - 21.06 CINCRETO EN VIGAS 6,483.12 - 21.06.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 7.80 355.48 2,772.74 - - - 21.06.02 ENCOFRADO Y DESENCOFRADO VIGAS m2 44.80 20.14 902.27 - - - 21.06.03 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 639.66 4.39 2,808.11 - - - 20.07 REVOQUES Y ENLUCIDOS 1,489.17 -

    20.07.01 TARRAJEO DE MUROS EXTERIORES m2 74.72 19.93 1,489.17 - - - 20.08 PINTURAS 433.38 - 20.08.01 PINTURA EN MUROS m2 74.72 5.80 433.38 - - -

  • 21 MODULO DE BATERIA DE SS.HH (03UND) 92,514.55 6,096.72 21.01 TRABAJOS PRELIMINARES 157.95 157.95

    21.01.01 TRAZO, NIVELES Y REPLANTEO m2 70.20 0.95 66.69 70.20 66.69 - 21.01.02 LIMPIEZA DEL TERRENO MANUAL m2 70.20 1.30 91.26 70.20 91.26 - 21.02 MOVIMIENTO DE TIERRAS 1,470.42 1,470.42

    21.02.01 EXCAVACION A MANO EN TERRENO NORMAL m3 38.53 17.37 669.27 38.53 669.27 - 21.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 13.72 37.96 520.81 13.72 520.81 - 21.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 32.26 8.69 280.34 32.26 280.34 - 21.03 OBRAS DE CONCRETO SIMPLE 8,922.10 4,468.35

    21.03.01 CIMIENTO CORRIDO MEZCLA 1:10, C:H + 30% PIEDRA m3 23.95 186.57 4,468.35 23.95 4,468.35 - 21.03.02 SOBRECIMIENTOCIMIENTO MEZCLA 1:8, C:H + 30% PIEDRA m3 3.93 186.57 733.22 - - 3.93 21.03.03 ENCOFRADO Y DESENCOFRADO SOBRECIMIENT m2 52.40 24.75 1,296.90 - - 52.40 21.03.04 CONCRETO f'c=175 kg/cm2 m3 4.71 313.31 1,475.69 - - 4.71 21.03.05 EMPEFRADO E=4" m2 47.10 14.17 667.41 - - - 21.03.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 9.42 29.78 280.53 - - - 21.04 OBRAS DE CONCRETO ARMADO 10,826.24 -

    21.04.01 CONCRETO ZAPATAS f'c=210 kg/cm2 m3 0.97 361.29 350.45 - - 0.97 21.04.02 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 116.42 4.44 516.90 - - 116.42 21.04.03 CONCRETO f'c=210 kg/cm2 EN COLUMNAS m3 3.35 361.29 1,210.32 - - 3.35

    PRESUPUESTO AVANCES

    PARTIDA DESCRIPCION ANTERIOR ACTUAL

    UND. METR P/UNIT. PRESUP. Metra Valorizado Metra

    S/. S/. S/. 21.04.04 ENCOFRADO Y DESENCOFRADO m2 55.80 29.78 1,661.72 - - 55.80 21.04.05 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 513.96 4.44 2,283.52 - - 513.96 21.04.06 CONCRETO f'c=210 kg/cm2 EN VIGAS m3 3.20 352.45 1,127.84 - - 1.02 21.04.07 ENCOFRADO Y DESENCOFRADO m2 48.06 29.78 1,431.23 - - 12.20 21.04.08 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 505.46 4.44 2,244.24 - - 1.35 21.05 ESTRUCTURA DE MADERA Y COBERTURAS 22,276.80 -

    21.05.01 ARMADO Y COLOCADO DE TIJERALES DE MADERA GUANO TIPO I pza 6.00 538.77 3,232.62 - - - 21.05.02 ARMADO Y COLOCADO DE TIJERALES DE MADERA GUANO TIPO II pza 6.00 457.86 2,747.16 - - - 21.05.03 ARMADO Y COLOCADO DE TIJERALES DE MADERA GUANO TIPO III pza 12.00 501.66 6,019.92 - - - 21.05.04 CORREA DE MADERA AGUANO m 289.08 8.30 2,399.36 - - - 21.05.05 COBERTURA DE CALAMINA SOBRE ESTRUCTURA DE MADERA m2 150.25 46.59 7,000.15 - - - 21.05.06 CUMBRERA DE PLANCHA METALICA m 56.40 15.56 877.58 - - - 21.06 MUROS Y TABIQUES DE ALBAILERIA 3,517.27 -

    21.06.01 MURO DE BLOQUE HUECO DE CONCRETO E=15 CM MEZCLA 1:5 m2 63.09 55.75 3,517.27 - - 63.09 21.07 REVOQUES Y ENLUCIDOS 4,771.48 -

    21.07.01 TARRAJEO DE MUROS INTERIORES m2 74.43 21.04 1,566.01 - - - 21.07.02 TARRAJEO DE MUROS EXTERIORES m2 51.75 16.17 836.80 - - -

  • 21.07.03 VESTIDURA DERRAMES A=0.15 m.MORTERO 1:3 m 164.01 6.13 1,005.38 - - - 21.07.04 CIELO RASOCON YESO CON CINTA DE MADERA m2 58.41 23.34 1,363.29 - - - 21.08 PISOS Y PAVIMENTOS 4,329.93 -

    21.08.01 PISO CERAMICO ANTIDESLIZANTE CELIMA 30x30 CM m2 58.41 46.87 2,737.68 - - - 21.08.02 FALSO PISO m2 58.41 27.26 1,592.26 - - - 21.09 CONTRAZOCALOS 1,245.70 -

    21.09.01 CONTRAZOCALO DE LOCETA CERAMICO 20x20 m. m 114.60 10.87 1,245.70 - - - 21.10 CARPINTERIA DE MADERA 1,692.54 -

    21.10.01 PUERTA DE MADERA TABLERO REBAJADO DE 4.5MM AGUANO m2 11.04 153.31 1,692.54 - - 21.11 CARPINTERIA METALICA 6,299.07 -

    21.11.01 VENTANA METALICA m2 10.50 93.97 986.69 - - - 21.11.02 PUERTA METALICA DE 1/16" C/MARCO 2X2X1/4" Y REFUERZOS m2 17.55 302.70 5,312.39 - - - 21.12 CERRAJERIA 586.50 -

    21.12.01 CERRADURA PARA PUERTA PRINCIPAL und 6.00 59.32 355.92 - - - 21.12.02 CERROJO DE FIERRO REDONDO DE 1/2"X35 CM und 18.00 12.81 230.58 - - - 21.13 PINTURAS 908.52 -

    21.13.01 PINTURA LATEX EN MUROS INTERIORES m2 74.43 4.76 354.29 - - - 21.13.02 PINTURA LATEX EN MUROS EXTERIORES m2 51.75 4.76 246.33 - - - 21.13.03 PINTURA EN ZOCALOS CON ESMALTE m 55.20 2.91 160.63 - - - 21.13.04 PINTURA BARNIZ EN PUERTA 2 MANOS m2 22.08 6.67 147.27 - - - 21.14 VIDRIOS 206.73 -

    21.14.01 VIDRIO SEMIDOBLE (3 mm.) m2 3.15 65.63 206.73 - - - 21.15 APARATOS SANITARIOS 8,462.40 -

    21.15.01 INODORO NACIONAL BABY INTEGRADO und 18.00 302.60 5,446.80 - - - 21.15.02 LAVADERO DE ALBAILERIA ENCHAPADO und 6.00 502.60 3,015.60 - - - 21.16 SISTEMA DE DESAGUE 10,307.79 - -

    21.16.01 EXCAVACION MASIVA EN TERRENO ARCILLOSO m3 80.46 17.37 1,397.59 - - - 21.16.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 80.46 37.96 3,054.26 - - - 21.16.03 SALIDA DESAGUE DE PVC pto 42.00 45.69 1,918.98 - - - 21.16.04 TUBERIA PVC SAL 2" m 23.76 15.38 365.43 - - - 21.16.05 TUBERIA PVC SAL 4" m 110.34 11.37 1,254.57 - - - 21.16.06 YEE PVC SAL DE 4" pza 36.00 19.44 699.84 - - - 21.16.07 TRAMPA PVC SAL PARA DESAGUE DE 2" und 6.00 65.50 393.00 - - -

    PRESUPUESTO AVANCES

    PARTIDA DESCRIPCION ANTERIOR ACTUAL

    UND. METR P/UNIT. PRESUP. Metra Valorizado Metra

    S/. S/. S/. 21.16.08 SUMIDERO DE BRONCE DE 4" PROV. Y COLOC. und 12.00 33.78 405.36 - - - 21.16.09 REGISTRO DE BRONCE DE 4" pza 6.00 25.41 152.46 - - - 21.16.10 CAJA DE REGISTRO DE 200 x 200 x 400 mm CON TAPA DE CONCRETO pza 6.00 111.05

    666.30 -

    - -

    21.17 SISTEMA DE AGUA FRIA 3,178.49 -

  • 21.17.01 SALIDA DE AGUA FRIA TUBERIA PVC D= 1/2", C-10 pto 15.00 46.45 696.75 - - - 21.17.02 RED DE DISTRIBUCION INTERNA CON TUBERIA DE PVC D= 1/2", C-10 m 116.85 13.04 1,523.72 - - - 21.17.03 VALVULA COMPUERTA DE 1" und 6.00 95.07 570.42 - - - 21.17.04 GRIFERIA PARA LAVADERO DE 1/2" pza 12.00 32.30 387.60 - - - 21.18 INSTALACIONES ELECTRICAS 1,753.80 -

    21.18.01 SALIDA PARA CENTRO DE LUZ pto 6.00 51.55 309.30 - - - 21.18.02 SALIDA PARA INTERRUPTOR SIMPLE pto 6.00 54.14 324.84 - - - 21.18.03 INSTALACIONES DE TUBERIAS m 81.00 3.09 250.29 - - - 21.18.04 CABLE ELCTRICO TW AWG 12 m 81.00 5.41 438.21 - - - 21.18.05 TABLERO DE CONTROL und 3.00 98.69 296.07 - - - 21.18.06 INTERRUPTOR THERMOMAGNETICO 2X30A pza 3.00 45.03 135.09 - - - 21.19 SISTEMA DE EVACUACION DE AGUAS PLUVIALES 1,600.83 - - 21.19.01 CANALETAS PARA AGUAS DE LLUVIA DE 6" INCLUYE SOPORTE m 84.60 18.32 1,549.87 - - - 21.19.02 MONTANTE DE TUBERIA PVC SAL 4" m 7.95 6.41 50.96 - - - 22 EXPEDIENTE TECNICO SOCIAL glb 1.00 19,168.77 19,168.77 - - -

    COSTO DIRECTO 1,231,651.64 885,664.73

    GASTOS GENERALES (14.28%) 175,871.10 -

    GASTOS DE SUPERVISION (4.90%) 60,347.93 -

    EXPEDIENTE TECNICO 35,827.33 -

    COSTO TOTAL 1,503,698.00 885,664.73

    AVANCE FISICO AL 31-08-2012 ( % ) 74.94

    ANTERIOR 71.91 ACTUAL

    1,503,698.00 ok

  • VALORIZACION MENSUAL DE OBRA

    CORRESPONDIENTE AL MES DE : SETIEMBRE10/10/2012

    9/15/2012 AVANCES

    SALDO ACTUAL ACUMULADO

    Valorizado Metra Valorizado % Metra Valorizado % S/. S/. S/.

    - 52,283.00 98.59 - 750.00 1.41 - 52,283.00 750.00

    - 1.00 1,106.23 100.00 - - 0.00 - 6.00 1,500.00 66.67 3.00 750.00 0.33 - 6,000.00 22,753.02 100.00 - - 0.00 - 15.00 1,923.75 100.00 - - 0.00 - 1.00 20,000.00 100.00 - - 0.00 - 1.00 5,000.00 100.00 - - 0.00

    - 14,813.11 76.54 - 2,651.30 13.70 - 62.06 100.00 -

    - 20.28 24.34 100.00 - - 0.00 - 20.28 37.72 100.00 - - 0.00 - 511.66 21.32 -

    - 19.88 313.31 100.00 - - 0.00 - 25.66 198.35 100.00 - - 0.00

    - 3,813.75 100.00 -

    - 7.69 1,844.68 100.00 - - 0.00 - 7.56 1,969.08 100.00 - - 0.00 - 3,138.01 100.00 -

    - 4.00 1,345.28 100.00 - - 0.00 - 52.36 1,054.53 100.00 - - 0.00 - 168.04 738.20 100.00 - - 0.00 - 718.59 100.00 -

    - 14.24 328.66 100.00 - - 0.00 - 25.32 389.93 100.00 - - 0.00 - 2,039.40 52.54 1,842.12

    - 2.00 1,480.44 50.00 2.00 1,480.44 50.00

    "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE, INSTALACION DEL SERVICIO DE ALCANTARILLADO Y DISPOSICION DE EXCRETAS EN LA LOCALIDAD DE PATAN - DISTRITO DE HAQUIRA PROVINCIA DE COTABAMBAS

  • - 51.00 558.96 60.71 33.00 361.68 39.29 - - - 146.86

    - - - - 25.32 146.86 100.00 - 6.89 100.00 - - - 2.05 2.05 100.00 - - 0.00 - 2.05 4.00 100.00 - - 0.00 - 2.05 0.84 100.00 - - 0.00 - 4,522.75 87.23 662.32

    - 83.20 4,522.75 100.00 - - 0.00 - - - - 8.00 662.32 100.00

    - - 3,168.95 94.90 - 263.04 7.88 - 2.38 -

    AVANCES SALDO

    ACTUAL ACUMULADO

    Valorizado Metra Valorizado % Metra Valorizado %

    S/.