VALORIZACION FINAL DE OBRA Nombre del proyecto: CONSTRUCCION 02 AULAS EN C.P. ALTO CUSHIVIANI MONTO DEDUCTIVO Departamento: JUNIN MONTO ASIGNADO Provincia: SATIPO Plazo de Ejecucion: Distrito: RIO NEGRO Fecha de Inicio: Localidad: C.P. ALTO CUSHIVIANI Fecha de Termino: Fecha de Presentacion de Liquidacion de Obra : ENERO DEL 2013 Fecha Real de Termin ITEM DESCRIPCION PRESUPUESTO VALORIZACIONES UND METRADO ANTERIOR ACTUAL METRADO MONTO S/. % METRADO MONTO S/. % METRADO 01.00.00 OBRAS PRELIMINARES 01.01.00 LIMPIEZA DE TERRENO MANUAL M2 133.25 0.84 111.93 0.00 0.00 0% 133.25 111.93 100% 133.25 01.02.00 TRAZO, NIVELES Y REPLANTEO PRELIMINAR CON VALLAS AISLADAS M2 133.25 0.60 79.95 0.00 0.00 0% 133.25 79.95 100% 133.25 01.03.00 CARTEL DE OBRA UND 1.00 450.00 450.00 0.00 0.00 0% 1.00 250.00 100% 1.00 02.00.00 MOVIMIENTO DE TIERRAS 02.01.00 EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL M3 22.36 9.61 214.88 0.00 0.00 0% 22.36 214.88 100% 22.36 02.02.00 EXCAVACION PARA ZAPATAS DE 1.00 MT A 1.40 MT DE PROFUNDIDAD M3 15.43 32.96 508.57 0.00 0.00 0% 15.43 508.57 100% 15.43 02.03.00 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLAM3 26.65 4.81 128.19 0.00 0.00 0% 26.65 128.19 100% 26.65 02.04.00 NIVELACION INTERIOR APISONADO MANUAL M2 89.98 3.50 314.93 0.00 0.00 0% 89.98 314.93 100% 89.98 02.05.00 AFIRMADO DE 4" PARA VEREDAS M2 46.68 4.00 186.72 0.00 0.00 0% 46.68 186.72 100% 46.68 03.00.00 OBRAS DE CONCRETO SIMPLE 03.01.00 SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO-HORMIGON M2 30.10 20.83 626.98 0.00 0.00 0% 30.10 626.98 100% 30.10 03.02.00 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA M3 13.58 140.00 1901.20 0.00 0.00 0% 13.58 1,901.20 100% 13.58 03.03.00 FALSO PISO DE 4" DE CONCRETO 1:10 M2 89.06 18.00 1603.08 0.00 0.00 0% 89.06 1,603.08 100% 89.06 03.04.00 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS M3 2.00 171.03 342.06 0.00 0.00 0% 2.00 342.06 100% 2.00 03.05.00 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS M2 26.64 20.32 541.32 0.00 0.00 0% 26.64 541.32 100% 26.64 04.00.00 OBRAS DE CONCRETO ARMADO 04.01.00 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 M3 6.05 240.00 1452.00 0.00 0.00 0% 6.05 1,452.00 100% 6.05 04.02.00 ACERO PARA ZAPATAS f'y =4200Kg/cm20 KG 135.66 4.00 542.64 0.00 0.00 0% 135.66 542.64 100% 135.66 04.03.00 CONCRETO EN VIGAS DE CIMENTACION F'C=210 KG/CM2 M3 2.03 254.00 515.62 0.00 0.00 0% 2.03 515.62 100% 2.03 04.04.00 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CIMENTACION M2 27.00 28.00 756.00 0.00 0.00 0% 27.00 756.00 100% 27.00 04.05.00 ACERO EN VIGAS DE CIMENTACION f'y =4,200K/cm2 KG 182.24 3.50 637.84 0.00 0.00 0% 182.24 728.96 100% 182.24 04.06.00 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 2.55 290.40 740.52 0.00 0.00 0% 2.55 740.52 100% 2.55 04.07.00 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 37.40 26.21 980.25 0.00 0.00 0% 37.40 980.25 100% 37.40 04.08.00 ACERO EN COLUMNAS f'y =4200 K/cm2 KG 405.78 3.50 1420.23 0.00 0.00 0% 405.78 1,420.23 100% 405.78 04.09.00 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 4.25 250.00 1062.50 0.00 0.00 0% 4.25 1,062.50 100% 4.25 04.10.00 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 48.15 25.00 1203.75 0.00 0.00 0% 48.15 1,203.75 100% 48.15 04.11.00 ACERO EN VIGAS f'y =4,200K/cm2 KG 585.23 3.50 2048.31 0.00 0.00 0% 585.23 2,048.31 100% 585.23 04.12.00 CONCRETO EN COLUMNETAS F'C=175 KG/CM2 M3 1.42 230.50 327.31 0.00 0.00 0% 1.42 327.31 100% 1.42 04.13.00 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETA M2 18.92 17.35 328.26 0.00 0.00 0% 18.92 328.26 100% 18.92 COSTO UNIT.(S/.) COSTO PARCIAL(S/.)

Upload: miguel-d-sanchez-espinoza

Post on 11-Nov-2015

213 views

Category:

Documents


1 download

TRANSCRIPT

VALORIZACION OBRA C. 02VALORIZACION FINAL DE OBRANombre del proyecto:CONSTRUCCION 02 AULAS EN C.P. ALTO CUSHIVIANIMONTO DEDUCTIVO123.77

Departamento:JUNINMONTO ASIGNADO70000

Provincia:SATIPO Plazo de Ejecucion:90 DIAS CALENDARIOS

Distrito:RIO NEGROFecha de Inicio:21 DE OCTUBRE DEL 200930 DE MAYO DEL 2008Localidad:C.P. ALTO CUSHIVIANIFecha de Termino:18 DE ENERO DEL 2010

Fecha de Presentacion de Liquidacion de Obra :ENERO DEL 2013Fecha Real de Termino:18 DE ENERO DEL 2010

ITEMDESCRIPCIONPRESUPUESTOVALORIZACIONESSALDOSUNDMETRADOCOSTOUNIT.(S/.)COSTO PARCIAL(S/.)ANTERIOR ACTUALACUMULADOMETRADOMONTO S/.%METRADOMONTO S/.%METRADOMONTO S/.%METRADO MONTO S/.%01.00.00OBRAS PRELIMINARES01.01.00LIMPIEZA DE TERRENO MANUALM2133.250.84111.930.000.000%133.25111.93100%133.25111.93100%0.000.000.0001.02.00TRAZO, NIVELES Y REPLANTEO PRELIMINAR CON VALLAS AISLADASM2133.250.6079.950.000.000%133.2579.95100%133.2579.95100%0.000.000.0001.03.00CARTEL DE OBRA UND1.00450.00450.000.000.000%1.00250.00100%1.00250.00100%0.000.000.0002.00.00MOVIMIENTO DE TIERRAS02.01.00EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMALM322.369.61214.880.000.000%22.36214.88100%22.36214.88100%0.000.000.0002.02.00EXCAVACION PARA ZAPATAS DE 1.00 MT A 1.40 MT DE PROFUNDIDADM315.4332.96508.570.000.000%15.43508.57100%15.43508.57100%0.000.000.0002.03.00ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)M326.654.81128.190.000.000%26.65128.19100%26.65128.19100%0.000.000.0002.04.00NIVELACION INTERIOR APISONADO MANUALM289.983.50314.930.000.000%89.98314.93100%89.98314.93100%0.000.000.0002.05.00AFIRMADO DE 4" PARA VEREDASM246.684.00186.720.000.000%46.68186.72100%46.68186.72100%0.000.000.0003.00.00OBRAS DE CONCRETO SIMPLE03.01.00SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO-HORMIGONM230.1020.83626.980.000.000%30.10626.98100%30.10626.98100%0.000.000.0003.02.00CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAM313.58140.001901.200.000.000%13.581,901.20100%13.581,901.20100%0.000.000.0003.03.00FALSO PISO DE 4" DE CONCRETO 1:10M289.0618.001603.080.000.000%89.061,603.08100%89.061,603.08100%0.000.000.0003.04.00CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOSM32.00171.03342.060.000.000%2.00342.06100%2.00342.06100%0.000.000.0003.05.00ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOSM226.6420.32541.320.000.000%26.64541.32100%26.64541.32100%0.000.000.0004.00.00OBRAS DE CONCRETO ARMADO04.01.00CONCRETO PARA ZAPATAS F'C=210 KG/CM2M36.05240.001452.000.000.000%6.051,452.00100%6.051,452.00100%0.000.000.0004.02.00ACERO PARA ZAPATAS f'y =4200Kg/cm20KG135.664.00542.640.000.000%135.66542.64100%135.66542.64100%0.000.000.0004.03.00CONCRETO EN VIGAS DE CIMENTACION F'C=210 KG/CM2M32.03254.00515.620.000.000%2.03515.62100%2.03515.62100%0.000.000.0004.04.00ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CIMENTACIONM227.0028.00756.000.000.000%27.00756.00100%27.00756.00100%0.000.000.0004.05.00ACERO EN VIGAS DE CIMENTACION f'y =4,200K/cm2KG182.243.50637.840.000.000%182.24728.96100%182.24728.96100%0.000.000.0004.06.00CONCRETO EN COLUMNAS F'C=210 KG/CM2M32.55290.40740.520.000.000%2.55740.52100%2.55740.52100%0.000.000.0004.07.00ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASM237.4026.21980.250.000.000%37.40980.25100%37.40980.25100%0.000.000.0004.08.00ACERO EN COLUMNAS f'y =4200 K/cm2KG405.783.501420.230.000.000%405.781,420.23100%405.781,420.23100%0.000.000.0004.09.00CONCRETO EN VIGAS F'C=210 KG/CM2M34.25250.001062.500.000.000%4.251,062.50100%4.251,062.50100%0.000.000.0004.10.00ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASM248.1525.001203.750.000.000%48.151,203.75100%48.151,203.75100%0.000.000.0004.11.00ACERO EN VIGAS f'y =4,200K/cm2KG585.233.502048.310.000.000%585.232,048.31100%585.232,048.31100%0.000.000.0004.12.00CONCRETO EN COLUMNETAS F'C=175 KG/CM2M31.42230.50327.310.000.000%1.42327.31100%1.42327.31100%0.000.000.0004.13.00ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAM218.9217.35328.260.000.000%18.92328.26100%18.92328.26100%0.000.000.0004.14.00ACERO EN COLUMNETAS f'y =4200 K/cm2KG199.584.06810.290.000.000%199.58810.29100%199.58810.29100%0.000.000.0004.15.00CONCRETO EN VIGUETAS F'C=175 KG/CM2M30.40227.1290.850.000.000%0.4090.85100%0.4090.85100%0.000.000.0004.16.00ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETASM25.2925.83136.640.000.000%5.29136.64100%5.29136.64100%0.000.000.0004.17.00ACERO EN VIGUETAS f'y =4,200K/cm2KG34.863.82133.170.000.000%34.86133.17100%34.86133.17100%0.000.000.0004.18.00CONCRETO EN VIGA TIMPANO F'C=210 KG/CM2M32.43259.51630.610.000.000%2.43630.61100%2.43630.61100%0.000.000.0004.19.00ENCOFRADO Y DESENCOFRADO NORMAL EN VIGA TIMPANOM231.5927.94882.620.000.000%31.59882.62100%31.59882.62100%0.000.000.0004.20.00ACERO EN VIGA TIMPANO f'y =4,200K/cm2KG169.603.92664.830.000.000%169.60664.83100%169.60664.83100%0.000.000.0005.00.00MUROS Y TABIQUES DE ALBAELERIA05.01.00MURO DE LADRILLO DE ARCILLA K-K DE SOGA (9x12x24)M283.0429.002408.160.000.000%83.042,408.16100%83.042,408.16100%0.000.000.0005.02.00MURO ACERO REFUERZO f'y =4,200K/cm2KG10.883.9542.980.000.000%10.8842.98100%10.8842.98100%0.000.000.0005.03.00JUNTA SISMICA DE 1" EN MUROSM19.2015.51297.790.000.000%19.20297.79100%19.20297.79100%0.000.000.0006.00.00CUBIERTAS06.01.00TIJERALES TIPO IUND9.00280.002520.000.000.000%9.002,520.00100%9.002,520.00100%0.000.000.0006.02.00CORREAS DE 2" x 3"M226.807.041596.670.000.000%226.802,041.20100%226.802,041.20100%0.000.000.0006.03.00FRISO DE MADERA 1"x10"x10' M51.609.48489.170.000.000%51.60489.17100%51.60489.17100%0.000.000.0006.04.00COBERTURA DE PLANCHA DE FLEXIFORTE + ACCESORIOSM2146.1344.086441.410.000.000%146.136,441.41100%146.136,441.41100%0.000.000.0006.05.00CUMBRERAS DE FLEXIFORTEM16.2518.56301.600.000.000%16.25301.60100%16.25301.60100%0.000.000.0007.00.00REVOQUES ENLUCIDOS Y MOLDURAS07.01.00TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO-ARENAM2220.8110.002208.100.000.000%220.812,208.10100%220.812,208.10100%0.000.000.0007.03.00TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENAM229.7018.28542.920.000.000%29.70542.92100%29.70542.92100%0.000.000.0007.04.00TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENAM238.4319.16736.320.000.000%38.43736.32100%38.43736.32100%0.000.000.0007.05.00VESTIDURA DE DERRAMES ANCHO=15 CM.M57.806.51376.280.000.000%57.80376.28100%57.80376.28100%0.000.000.0008.00.00CIELORRASOS08.01.00CIELORRASOS CON MULTIPLACAM248.0023.001104.000.000.000%48.001,200.00100%48.001,200.00100%0.000.000.0009.00.00PISOS Y PAVIMENTOS09.01.00ENCOFRADO DE VEREDAS DE 4"M289.0615.961421.400.000.000%89.061,421.40100%89.061,421.40100%0.000.000.0009.02.00VEREDA DE CONCRETO DE 4" CON ACABADO PULIDO Y FROTACHADOM236.9348.761800.710.000.000%36.931,800.71100%36.931,800.71100%0.000.000.0009.03.00PISOS DE CEMENTO PULIDO COLOREADOS E=2.5 CMS. ESPESORM289.0630.002671.800.000.000%89.062,671.80100%89.062,671.80100%0.000.000.0010.00.00ZOCALOS10.01.00CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CMM51.208.03411.140.000.000%51.20411.14100%51.20411.14100%0.000.000.0011.00.00CARPINTERIA METALICA11.01.00VENTANA METALICA V-1 CORREDIZA C/MARCO T/CUAD. 40x60x2mm Y REFUERZOS DE A ACUERDO A DISEO INC. /VIDRIOS E INSTALACIONM232.63190.006199.700.000.000%32.656,203.50100%32.656,203.50100%0.023.800.0012.00.00CARPINTERIA DE MADERA12.01.00PUERTA APANELADA DE MADERA MOHENA BARNIZAD, INC/MARCO, BISAGRAS E INSTALACIONUND2.00500.001000.000.000.000%2.001,000.00100%2.001,000.00100%0.000.000.0013.00.00CERRAJERIA13.01.00CHAPA FORTE DE 02 GOLPES CON MANIJAPZA2.0077.36154.720.000.000%2.00154.72100%2.00154.72100%0.000.000.0014.00.00PINTURA14.01.00PINTADO DE MURO EN EXTERIORES E INTERIORESM2220.814.36962.730.000.000%220.811,104.05100%220.811,104.05100%0.000.000.0014.02.00PINTADO DE CIELO RASO C/LATEX (BLANCO) EN PASADIZOM240.982.91119.250.000.000%40.98119.25100%40.98119.25100%0.000.000.0014.03.00PINTADO DE SUPERFICIE DE COLUMNAS Y VIGASM270.835.66400.900.000.000%70.83400.90100%70.83400.90100%0.000.000.0014.04.00PINTADO DE VESTIDURAS DE DERRAMESM257.8010.97634.070.000.000%57.80634.07100%57.80634.07100%0.000.000.0014.05.00PINTURA DE CONTRAZOCALO CON ESMALTE ECONOMICOM245.803.09141.520.000.000%45.80141.52100%45.80141.52100%0.000.000.0015.00.00INSTALACIONES ELECTRICAS15.01.00SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 19MM(3/4)PTO12.0062.19746.280.000.000%12.00746.28100%12.00746.28100%0.000.000.0015.02.00SALIDA TOMACORRIENTE C/AWG TW 4.0MM(12)+D PVC SAP 19MM(3/4)PTO20.0065.191303.800.000.000%20.001,303.80100%20.001,303.80100%0.000.000.0015.03.00SALIDA INTERRUPTOR DOBLE C/AWG TW 2.5MM(14)+D PVC SAP 19MM(3/4)PTO2.0065.45130.900.000.000%2.00130.90100%2.00130.90100%0.000.000.0015.04.00ACOMETIDA EXTERIOR M30.004.69140.700.000.000%30.00140.70100%30.00140.70100%0.000.000.0016.00.00TABLERO Y CUCHILLAS (LLAVES)16.01.00TABLERO ELECTRICO GAB.METALICO P/DISTRIBUCION DE 3 CIRCUITOSUND1.00187.08187.080.000.000%1.00187.08100%1.00187.08100%0.000.000.0017.00.00ARTEFACTOS17.01.00FLUORESCENTE RECTO ISPE 1X40W. INCLUIDO EQUIPOUND10.0036.18361.800.000.000%10.00361.80100%10.00361.80100%0.000.000.0017.02.00LAMPARA AHORRADORA DE 40WUND2.0069.44138.880.000.000%2.00138.88100%2.00138.88100%0.000.000.0018.00.00SISTEMA DE AGUA DE LLUVIAS18.01.00CANALETA GALVANIZADA DE 6"M32.4022.56730.940.000.000%32.40730.94100%32.40730.94100%0.000.000.0018.02.00TUBERIA DE PVC SAL 3" P/LLUVIASM28.0015.29428.120.000.000%28.00428.12100%28.00428.12100%0.000.000.0019.00.00OTROS 19.01.00PLACA RECORDATORIAEST1.00404.11404.110.000.000%1.00450.00100%1.00450.00100%0.000.000.0019.02.00FLETEGLB1.002694.002694.000.000.000%1.001,961.38100%1.001,961.38100%0.000.000.00COSTO DIRECTO (S/.)64,624.000.00%0.0099.83%64,514.0399.83%64,514.030.01%3.80GASTOS GENERALES (S/.)8876.000.008862.208862.200.00TOTAL (S/.)73,500.000.0073,376.2373,376.233.80

ANALISIS DEL AVANCE FISICO