CRONOGRAMA DE EJECUCION DE OBRA VALORIZADO FECHADO MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINAL LA MARINA, PROVINCIA DE PADRE ABAD - UCAYALI GOBIERNO REGIONAL DE UCAYALI Lugar UCAYALI - PADRE ABAD - PADRE ABAD Item Descripción Und. Metrado Precio S/. Parcial S/. SEPTIEMBRE 2014 OCTUBRE 2014 NOVIEMBRE 2014 DICIEMBRE 2014 ENERO 2015 FEBRERO 2015 MARZO 2015 ABRIL 2015 MAYO 2015 JUNIO 2015 JULIO 2015 01 MEJORAMIENTO DE CALLES 01.01 OBRAS PROVISIONALES 01.01.0 ALQUILER DE ALMACEN MES 6.00 1,000.00 6,000.00 1,000.00 1,000.00 500.00 500.00 600.00 600.00 1,000.00 400.00 400.00 01.01.0 REUBICACION DE POSTES DE LUZ und 10.00 498.62 4,986.20 4,986.20 01.01.0 REUBICACION DE POSTES DE TELEFONO und 6.00 498.62 2,991.72 2,991.72 01.01.0 DEMOLICION DE VEREDAS EXISTENTES m3 1,400.00 13.35 18,690.00 11,347.50 7,342.50 01.01.0 NIVELACION DE BUZONES EN GENERAL und 24.00 300.96 7,223.04 3,611.52 3,611.52 01.01.0 und 25.00 900.96 22,524.00 22,524.00 01.01.0 MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO hm 1.00 5,696.00 5,696.00 2,848.00 1,139.20 1,708.80 01.02 TRABAJOS PRELIMINARES 01.02.0 TRAZO, NIVELES Y REPLANTEO m2 20,328.29 1.14 23,174.25 23,174.25 01.02.0 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00 12,000.00 12,000.00 1,200.00 1,200.00 1,200.00 4,800.00 2,400.00 1,200.00 01.02.0 CARTEL DE IDENTIFICACION DE LA OBRA 8.50 x 3.60M und 1.00 1,861.32 1,861.32 1,861.32 01.02.0 LIMPIEZA DE TERRENO MANUAL m2 20,328.29 0.43 8,741.16 8,741.16 01.03 MOVIMIENTO DE TIERRAS 01.03.0 CORTE DE MATERIAL A NIVEL DE SUB-RASANTE m3 7,173.08 4.14 29,696.55 6,339.87 4,576.73 13,069.95 5,710.00 01.03.0 CORTE DE TERRENO CON EQUIPO EN ZONA DE MATERIAL ORGANICO m3 85.61 5.79 495.68 495.68 01.03.0 CORTE SUPERFICIAL MANUAL HASTA 0.15 MT EN VEREDA Y MARTILLO m3 476.23 30.87 14,701.22 7,639.40 4,630.50 2,431.32 01.03.0 EXCAVACION MANUAL PARA CANALETAS EN TERRENO COMPACTO M3 1,661.91 43.21 71,811.13 17,120.67 36,539.24 9,656.57 8,494.65 01.03.0 EXCAVACION MANUAL PARA UÑA DE CONCRETO EN TERRENO COMPACTO m3 123.27 43.21 5,326.50 5,326.50 01.03.0 m3 5,758.86 45.25 260,588.42 142,215.32 66,970.00 40,725.00 10,678.10 01.03.0 COMPACTACION Y CONFORMACION DE SUB-RASANTE m2 12,217.48 3.88 47,403.82 15,635.00 22,348.80 9,420.02 01.03.0 RELLENO COMPACTADO CON MATERIAL PROPIO - MARTILLO m3 585.43 56.76 33,229.01 33,229.01 01.03.0 ELIMINACION DE MATERIAL EXCEDENTE m3 14,001.35 10.47 146,594.13 5,185.48 73,201.95 40,581.72 27,624.98 02 PAVIMENTOS 02.01 BASE DE 0.20M 02.01.0 BASE DE 0.20 M. m2 12,217.48 9.47 115,699.54 61,346.66 27,176.44 27,176.44 02.02 OBRAS DE CONCRETO 02.02.0 ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETO m2 2,026.43 24.69 50,032.56 7,601.56 18,931.55 10,400.54 13,098.91 02.02.0 PAVIMENTO DE CONCRETO F'C= 210 KG/CM2 E=0.20 M m2 12,217.48 65.52 800,489.29 122,653.44 291,240.33 158,253.50 228,342.02 02.02.0 ACERO CORRUGADO (BASTONES EN JUNTAS) kg 1,397.11 5.04 7,041.43 1,069.29 2,539.00 1,519.36 1,913.78 02.02.0 ACERO LISO (BASTONES EN JUNTAS) - TRANVERSALES kg 5,621.84 6.27 35,248.94 5,352.76 12,710.11 7,152.05 10,034.02 02.02.0 UÑA DE CONCRETO F'C= 210 KG/CM2 EN LOSA m3 102.73 330.95 33,998.49 5,162.82 12,258.39 8,544.05 8,033.23 JUNTAS 02.03.0 JUNTA DE CONSTRUCCION CON TEKNOPORT m 513.65 5.60 2,876.44 436.80 1,037.18 652.48 749.98 02.03.0 JUNTA DE CONTRACCION (E=1" H=2") m 2,054.58 3.87 7,951.22 1,207.44 2,867.05 1,523.23 2,353.50 02.03.0 JUNTA DE DILATACION (E=1" H=8") m 1,027.29 4.91 5,043.99 765.96 1,818.76 1,005.25 1,454.02 02.03.0 JUNTA LONGITUDINAL (E=1" H=8") m 1,712.15 4.34 7,430.73 1,128.40 2,679.39 1,203.23 2,419.71 02.04 CURADO Y LIMPIEZA DE LOSA - VEREDA 02.04.0 TENDIDO DE ARROCERA Y CURADO m2 16,120.37 1.21 19,505.65 2,265.12 6,042.73 4,523.20 6,674.60 03 OBRAS DE DRENAJE 03.01 TRABAJOS PRELIMINARES 03.01.0 TRAZO, NIVELACION Y REPLANTEO EN CANALETAS ML 3,164.83 0.67 2,120.44 505.65 1,128.70 240.53 50.58 194.98 03.02 OBRAS DE CONCRETO ARMADO 03.02.0 m3 1,383.58 328.99 455,183.98 107,431.68 172,499.33 53,312.83 44262.31 23,029.30 54,648.53 03.02.0 ENCOFRADO Y DESENCOFRADO DE CANALETAS M2 9,840.37 26.79 263,623.51 61,098.88 97,821.01 35,472.91 27420.1 15,263.24 26,547.37 03.02.0 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 64,559.21 5.31 342,809.41 81,291.75 142,575.84 58,395.40 8008.54 20,158.59 32,379.29 03.02.0 WATER STOP NEOPRENE 6" EN CANALETAS M 636.64 37.74 24,026.79 5,829.70 8,772.29 5464.37 1,023.58 2,936.85 03.02.0 und 478.00 77.33 36,963.74 11599.5 25,364.24 03.02.0 REJILLA METALICA CON MARCO 0.60x0.80 EN CANALETA GLB 253.00 300.00 75,900.00 45000 30,900.00 04 MURO DE CONTENSION 04.01 TRABAJOS PRELIMINARES 04.01.0 TRAZO NIVEL Y REPLANTEO m2 529.60 1.73 916.21 916.21 04.02 MOVIMIENTO DE TIERRAS 04.02.0 EXCAVACION MANUAL PARA CIMIENTO MURO m3 571.45 86.42 49,384.71 49,384.71 04.02.0 RELLENO CON MATERIAL PROPIO - MURO DE CONTENCION m3 441.93 21.63 9,558.95 9,558.95 04.02.0 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL CON VOLQUETE m3 161.91 64.33 10,415.67 10,415.67 04.03 OBRAS DE CONCRETO SIMPLE 04.03.0 SOLADO DE CONCRETO E=0.10 M m2 529.60 20.19 10,692.62 10,692.62 04.04 OBRAS DE CONCRETO ARMADO 04.04.0 CONCRETO FC=210 KG/CM2 - EN MURO DE CONTENCION m3 302.42 333.61 100,890.34 100,890.34 04.04.0 ENCOFRADO Y DESENCOFRADO DE MURO DE CONSTENCION m2 1,408.76 30.27 42,643.17 42,643.17 04.04.0 ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 14,005.62 5.31 74,369.84 74,369.84 04.04.0 TUBOS DE PVC D=3" C-7.5 SAP PARA LLORADORES m 184.50 21.52 3,970.44 3,970.44 04.05 JUNTAS 04.06 JUNTA DE CONSTRUCCION CON TEKNOPORT m 140.88 5.60 788.93 788.93 05 VEREDAS Y MARTILLOS DE CONCRETO 05.01 M2 515.39 47.86 24,666.57 3,350.20 21,316.37 05.02 CONCRETO F'C=140 KG/CM2VEREDAS E=0.10 m m2 3,387.50 41.33 140,005.38 22,687.28 40,256.23 77,061.87 05.03 CONCRETO F'C= 140 KG/CM2 EN UÑAS DE VEREDAS m3 53.17 317.54 16,883.60 2,730.84 5,710.96 8,441.80 05.04 RAMPA DE ACCESOS DE CONCRETO EN VEREDAS. m2 259.30 38.45 9,970.09 9,970.09 05.05 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 426.52 17.68 7,540.87 1,115.43 1,398.24 5,027.20 05.06 JUNTAS DE DILATACION EN VEREDA E = 5 MM H=4" m 426.52 6.02 2,567.65 413.09 870.74 1,283.82 05.07 JUNTAS DE CONSTRUCCION EN VEREDA E = 1" m 2,843.49 4.94 14,046.84 2,259.75 4,763.67 7,023.42 06 SEÑALIZACION 06.01 PINTURA TRAFICO EN LINEAS CONTINUAS EN PAVIMENTO M 342.43 20.70 7,088.30 7,088.30 06.02 PINTURA DE SIMBOLOS Y LETRAS EN PAVIMENTO m2 932.45 20.70 19,301.72 19,301.72 06.03 PINTURA EN SARDINEL DE CANALETA m 318.32 7.81 2,486.08 2,486.08 06.04 SEÑALES PREVENTIVAS INCLUIDO POSTES DE SOPORTE und 20.00 378.85 7,577.00 7,577.00 06.05 SEÑALES REGLAMENTARIAS INCLUIDO POSTES DE SOPORTE und 20.00 523.95 10,479.00 10,479.00 07 VARIOS 07.01 LIMPIEZA FINAL DE OBRA GLB 1.00 5,000.00 5,000.00 5,000.00 08 PLAN DE MANEJO AMBIENTAL 08.01 NORMATIVIDAD AMBIENTAL 08.01.0 APLICACION DE NORMAS DE COMPORTAMIENTO mes 1.00 400.00 400.00 400.00 08.01.0 SEGUIMIENTO Y CUMPLIMIENTO A LAS PAUTAS SOCIO AMBIENTALES mes 1.00 500.00 500.00 500.00 08.02 PLAN DE FORESTACION Y REVEGETACION 08.02.0 COMO ORNAMENTACIÒN 08.02.0 ARBOLES ORNAMENTALES 08.02.0 TRAZO, REPLANTEO Y LIMPIEZA DE TERRENO m2 1,820.52 1.05 1,911.55 1,911.55 08.02.0 ADQUISICION Y TRANSPORTE DE PLANTONES ORNAMENTALES. und 50.00 16.05 802.50 802.50 08.02.0 PLANTADO DE PLANTONES ORNAMENTALES und 50.00 9.20 460.00 460.00 08.02.0 GRAS 08.02.0 TRAZO, REPLANTEO Y LIMPIEZA DE TERRENO m2 1,820.52 1.05 1,911.55 1,911.55 08.02.0 ADQUISICION Y TRANSPORTE DE PLANTONES DE GRASS SACO/15M2 und 100.00 16.35 1,635.00 1,635.00 08.02.0 PLANTADO DE GRASS AMERICANO m2 1,820.52 2.65 4,824.38 4,824.38 08.03 MANEJO DE CANTERA 08.03.0 MANEJO DEL AREA DE CANTERA DE AGREGADOS Y MATERIAL DE RELLENO GLB 1.00 800.00 800.00 400.00 160.00 240.00 08.03.0 mes 1.50 912.00 1,368.00 912.00 182.40 273.60 08.04 SEÑALIZACION 08.04.0 und 5.00 186.51 932.55 373.02 279.77 279.77 08.04.0 und 10.00 87.59 875.90 437.95 175.18 262.77 08.05 MANEJO DE CAMPAMENTO 08.05.0 ADECUACION DE ALMACEN, OFICINAS, COMEDOR Y OTROS GLB 1.00 1,689.36 1,689.36 1,689.36 08.05.0 RECOLECTORES DE RESIDUOS SOLIDOS TIPO BASCULANTE METALICO und 2.00 383.73 767.46 767.46 08.05.0 INSTALACION DE LETRINA PORTATIL (FIBRA DE VIDRIO) und 2.00 1,847.45 3,694.90 3,694.90 08.05.0 IMPLEMENTACION DE BOTIQUIN und 1.00 445.00 445.00 445.00 08.06 EDUCACION AMBIENTAL 08.06.0 CHARLAS AL PERSONAL DE OBRA und 3.00 466.75 1,400.25 466.75 513.43 420.08 08.06.0 CHARLAS A LA COMUNIDAD und 2.00 466.75 933.50 466.75 186.70 280.05 08.06.0 POLOS DE ALGODON CON LOGOTIPO AMBIENTAL und 100.00 18.00 1,800.00 1,260.00 540.00 08.06.0 und 100.00 3.50 350.00 350.00 08.07 PROGRAMA DE SEGURIDAD Y CONTINGENCIA EN OBRA 08.07.0 INSTALACION DE CINTAS DE SEGURIDAD ALREDEDOR DE LA OBRA ML 2,500.00 0.32 800.00 480.00 160.00 160.00 08.07.0 PROGRAMA DE CONTINGENCIAS DURANTE LA EJECUCION DE LA OBRA GLB 1.00 1,300.00 1,300.00 650.00 260.00 390.00 08.08 PROGRAMA DE ABANDONO DE OBRA 08.08.0 RESTAURACION DEL AREA DE CAMPAMENTO Y REVEGETACION m2 200.00 2.06 412.00 412.00 08.08.0 CIERRE DE CANTERAS m2 500.00 1.45 725.00 725.00 08.08.0 CIERRE DE BOTADEROS m2 550.00 1.29 709.50 709.50 08.09 PARTICIPACION CIUDADANA 08.09.0 und 1.00 87.25 87.25 87.25 COSTO DIRECTO 3,612,459.93 337,746.29 332,196.78 722,923.04 157,337.71 211,875.17 199,789.14 0.00 150,504.91 381,330.88 444,754.76 674,001.30 GASTOS GENERALES (13%) 469,619.79 43,907.02 43,185.58 93,980.00 20,453.90 27,543.77 25,972.59 0.00 19,565.64 49,573.01 57,818.12 87,620.17 UTILIDAD (12.9999995%) 469,619.77 34,557.53 33,989.72 73,968.06 16,098.48 21,678.65 74,750.32 0.00 19,565.64 49,573.01 57,818.12 87,620.17 TOTAL PRESUPUESTO 4,551,699.49 416,210.84 409,372.08 890,871.10 193,890.09 261,097.59 300,512.05 0.00 189,636.19 480,476.90 560,391.00 849,241.64 AVANCE PARCIAL 9.35 9.20 20.01 4.36 5.87 6.60 0.00 4.17 10.56 12.31 18.66 AVANCE ACUMULADO 9.35 18.55 38.56 42.92 47.71 54.31 54.31 58.48 69.04 81.35 100.01 ADICIONAL N°01 Item Descripción Und. Metrado Precio S/. Parcial S/. SEPTIEMBRE 2014 OCTUBRE 2014 NOVIEMBRE 2014 DICIEMBRE 2014 ENERO 2015 FEBRERO 2015 MARZO 2015 ABRIL 2015 MAYO 2015 JUNIO 2015 JULIO 2015 7.00 MURO DE CONTENCION (ADICIONAL N°02) 7.01 TRABAJOS PRELIMINARES TRAZO, NIVEL Y REPLANTEO m2 671.40 1.73 1,161.52 834.85 203.71 7.02 MOVIMIENTO DE TIERRAS EXCAVACION DE ZAPATAS DE MURO DE CONTENCION CON MAQUINARA m3 2,480.13 14.16 35,118.64 22917.11 5,688.07 RELLENO CON MATERIAL PROPIO EN MURO DE CONTENCION m3 1,793.68 21.63 38,797.30 24811.12 6,261.89 ELIMINACION DE MATERIAL EXCEDENTE m3 858.06 11.47 9,841.95 6758.35 1,606.67 CAMA DE PIEDRAS - FILTRO m3 21.85 55.50 1,212.68 1,212.68 7.03 OBRAS DE CONCRETO SIMPLE SOLADO DE CONCRETO E= 10 CM m2 590.93 20.19 11,930.88 9743.09 2,377.37 SUB ZAPATA F'c = 100 KG/CM2 EN MUROS DE CONTENCION m3 24.14 243.45 5,876.88 4406.45 7.04 OBRAS DE CONCRETO ARMADO CONCRETO FC=210 KG/CM2 EN MUROS DE CONTENCION m3 523.36 333.61 174,598.13 115615.88 28,823.90 ENCOFRADO Y DESENCOFRADO EN MUROS DE CONTENCION m2 2,001.30 30.27 60,579.35 41442.66 10,170.72 ACERO fy=4200 kg/cm2 GRADO 60 kg 28,495.66 5.31 151,311.95 98584.56 22,845.32 TUBOS DE PVC D= 3 " 7.5 SAP PARALLORONES tub 194.24 21.52 4,180.04 2425.73 677.88 7.05 JUNTAS JUNTAS DE CONSTRUCCIO CON TECNOPORT m 334.41 5.60 1,872.70 1297.63 320.04 COSTO DIRECTO 496,482.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 330,050.11 78,975.57 0.00 87,456.34 496,482.02 0.00 GASTOS GENERALES (10.2318025%) 50,799.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33,770.08 8,080.62 0.00 8,948.36 50,799.06 UTILIDAD (8.34%) 0.0833971 41,405.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27,525.22 6,586.33 0.00 7,293.61 41,405.16 TOTAL PRESUPUESTO 588,686.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 391,345.41 93,642.52 0.00 103,698.31 588,686.24 AVANCE PARCIAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 66.48 15.91 0.00 17.62 AVANCE ACUMULADO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 66.48 82.39 82.39 100.01 RESUMEN COSTO DIRECTO 4,108,941.95 337,746.29 332,196.78 722,923.04 157,337.71 211,875.17 199,789.14 0.00 480,555.02 460,306.45 444,754.76 761,457.64 GASTOS GENERALES (13%) 520,418.85 43,907.02 43,185.58 93,980.00 20,453.90 27,543.77 25,972.59 0.00 53,335.72 57,653.63 57,818.12 96,568.53 UTILIDAD (10.2318025%) 511,024.93 34,557.53 33,989.72 73,968.06 16,098.48 21,678.65 74,750.32 0.00 47,090.86 56,159.34 57,818.12 94,913.78 TOTAL PRESUPUESTO 5,140,385.73 416,210.84 409,372.08 890,871.10 193,890.09 261,097.59 300,512.05 0.00 580,981.60 574,119.42 560,391.00 952,939.95 5,140,385.72 AVANCE PARCIAL 8.10 7.96 17.33 3.77 5.08 5.85 0.00 11.30 11.17 10.90 18.54 AVANCE ACUMULADO 8.10 16.06 33.39 37.16 42.24 48.09 48.09 59.39 70.56 81.46 100.00 Presup Client e NIVELACION DE BUZONES, REPARACION DE TUBERIAS DE AGUA Y RELLENO COMPACTADO CON MATERIAL DE PRESTAMO, PARA NIVELAR SUB CONCRETO F'C=210 KG/CM2 EN LOSA FONDO , MUROS Y TECHO DE TAPAS DE CONCRETO PARA INSPECCION Y LIMPIEZA 0.60X0.60, CONCRETO F'C= 175 KG/CM2 BRUÑADO EN VEREDAS DE MARTILLO E = 0.15 CONTROL DE POLVO EN MOVIMIENTO DE TIERRA Y TRASALADO A LETREROS DE SEÑALIZACION AMBIENTAL DE 1.00x0.50 M. C/PLANCHA LETREROS DE SEÑALIZACION AMBIENTAL DE 0.50x0.30 M. C/PLANCHA AFICHES AMBIENTALES DE 1.00x0.70 M. CON CARTULINA DUPLEX SEGUN FORMACION DEL COMITE DE MANTENIMIENTO DE LA INFRAESTRUCTURA Y 07.01. 01 07.02. 01 07.02. 02 07.02. 03 07.02. 04 07.03. 01 07.03. 02 07.04. 01 07.04. 02 07.04. 03 07.04. 04 07.05. 01

Upload: carlos-ortega-urdanivia

Post on 10-Sep-2015

218 views

Category:

Documents


3 download

DESCRIPTION

hoja de valorizacion de obras publicas

TRANSCRIPT

CRONOGRAMACRONOGRAMA DE EJECUCION DE OBRA VALORIZADO FECHADOPresupuestoMEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINAL LA MARINA, PROVINCIA DE PADRE ABAD - UCAYALIClienteGOBIERNO REGIONAL DE UCAYALILugarUCAYALI - PADRE ABAD - PADRE ABADItemDescripcinUnd.MetradoPrecio S/.Parcial S/.SEPTIEMBRE 2014OCTUBRE 2014NOVIEMBRE 2014DICIEMBRE 2014ENERO 2015FEBRERO 2015MARZO 2015ABRIL 2015MAYO 2015JUNIO 2015JULIO 201501MEJORAMIENTO DE CALLES01.01OBRAS PROVISIONALES01.01.01ALQUILER DE ALMACENMES6.001,000.006,000.001,000.001,000.00500.00500.00600.00600.001,000.00400.00400.0001.01.02REUBICACION DE POSTES DE LUZund10.00498.624,986.204,986.2001.01.03REUBICACION DE POSTES DE TELEFONOund6.00498.622,991.722,991.7201.01.04DEMOLICION DE VEREDAS EXISTENTESm31,400.0013.3518,690.0011,347.507,342.5001.01.05NIVELACION DE BUZONES EN GENERALund24.00300.967,223.043,611.523,611.5201.01.06NIVELACION DE BUZONES, REPARACION DE TUBERIAS DE AGUA Y DESAGUE, NIVELACION DE CAJAS DE REJISTRO.und25.00900.9622,524.0022,524.0001.01.07MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADOhm1.005,696.005,696.002,848.001,139.201,708.8001.02TRABAJOS PRELIMINARES01.02.01TRAZO, NIVELES Y REPLANTEOm220,328.291.1423,174.2523,174.2501.02.02TRANSPORTE DE EQUIPOS Y HERRAMIENTASGLB1.0012,000.0012,000.001,200.001,200.001,200.004,800.002,400.001,200.0001.02.03CARTEL DE IDENTIFICACION DE LA OBRA 8.50 x 3.60Mund1.001,861.321,861.321,861.3201.02.04LIMPIEZA DE TERRENO MANUALm220,328.290.438,741.168,741.1601.03MOVIMIENTO DE TIERRAS01.03.01CORTE DE MATERIAL A NIVEL DE SUB-RASANTEm37,173.084.1429,696.556,339.874,576.7313,069.955,710.0001.03.02CORTE DE TERRENO CON EQUIPO EN ZONA DE MATERIAL ORGANICOm385.615.79495.68495.6801.03.03CORTE SUPERFICIAL MANUAL HASTA 0.15 MT EN VEREDA Y MARTILLOm3476.2330.8714,701.227,639.404,630.502,431.3201.03.04EXCAVACION MANUAL PARA CANALETAS EN TERRENO COMPACTOM31,661.9143.2171,811.1317,120.6736,539.249,656.578,494.6501.03.05EXCAVACION MANUAL PARA UA DE CONCRETO EN TERRENO COMPACTOm3123.2743.215,326.505,326.5001.03.06RELLENO COMPACTADO CON MATERIAL DE PRESTAMO, PARA NIVELAR SUB RASANTEm35,758.8645.25260,588.42142,215.3266,970.0040,725.0010,678.1001.03.07COMPACTACION Y CONFORMACION DE SUB-RASANTEm212,217.483.8847,403.8215,635.0022,348.809,420.0201.03.08RELLENO COMPACTADO CON MATERIAL PROPIO - MARTILLOm3585.4356.7633,229.0133,229.0101.03.09ELIMINACION DE MATERIAL EXCEDENTEm314,001.3510.47146,594.135,185.4873,201.9540,581.7227,624.9802PAVIMENTOS02.01BASE DE 0.20M02.01.01BASE DE 0.20 M.m212,217.489.47115,699.5461,346.6627,176.4427,176.4402.02OBRAS DE CONCRETO02.02.01ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETOm22,026.4324.6950,032.567,601.5618,931.5510,400.5413,098.9102.02.02PAVIMENTO DE CONCRETO F'C= 210 KG/CM2 E=0.20 Mm212,217.4865.52800,489.29122,653.44291,240.33158,253.50228,342.0202.02.03ACERO CORRUGADO (BASTONES EN JUNTAS)kg1,397.115.047,041.431,069.292,539.001,519.361,913.7802.02.04ACERO LISO (BASTONES EN JUNTAS) - TRANVERSALESkg5,621.846.2735,248.945,352.7612,710.117,152.0510,034.0202.02.05UA DE CONCRETO F'C= 210 KG/CM2 EN LOSAm3102.73330.9533,998.495,162.8212,258.398,544.058,033.23JUNTAS02.03.01JUNTA DE CONSTRUCCION CON TEKNOPORTm513.655.602,876.44436.801,037.18652.48749.9802.03.02JUNTA DE CONTRACCION (E=1" H=2")m2,054.583.877,951.221,207.442,867.051,523.232,353.5002.03.03JUNTA DE DILATACION (E=1" H=8")m1,027.294.915,043.99765.961,818.761,005.251,454.0202.03.04JUNTA LONGITUDINAL (E=1" H=8")m1,712.154.347,430.731,128.402,679.391,203.232,419.7102.04CURADO Y LIMPIEZA DE LOSA - VEREDA02.04.01TENDIDO DE ARROCERA Y CURADOm216,120.371.2119,505.652,265.126,042.734,523.206,674.6003OBRAS DE DRENAJE03.01TRABAJOS PRELIMINARES03.01.01TRAZO, NIVELACION Y REPLANTEO EN CANALETASML3,164.830.672,120.44505.651,128.70240.5350.58194.9803.02OBRAS DE CONCRETO ARMADO03.02.01CONCRETO F'C=210 KG/CM2 EN LOSA FONDO , MUROS Y TECHO DE CANALETASm31,383.58328.99455,183.98107,431.68172,499.3353,312.8344262.3123,029.3054,648.5303.02.02ENCOFRADO Y DESENCOFRADO DE CANALETASM29,840.3726.79263,623.5161,098.8897,821.0135,472.9127420.115,263.2426,547.3703.02.03ACERO DE REFUERZO F'Y=4200 KG/CM2kg64,559.215.31342,809.4181,291.75142,575.8458,395.408008.5420,158.5932,379.2903.02.04WATER STOP NEOPRENE 6" EN CANALETASM636.6437.7424,026.795,829.708,772.295464.371,023.582,936.8503.02.05TAPAS DE CONCRETO PARA INSPECCION Y LIMPIEZA 0.60X0.60, F'c=210 kg/cm2und478.0077.3336,963.7411599.525,364.2403.02.06REJILLA METALICA CON MARCO 0.60x0.80 EN CANALETAGLB253.00300.0075,900.004500030,900.0004MURO DE CONTENSION04.01TRABAJOS PRELIMINARES04.01.01TRAZO NIVEL Y REPLANTEOm2529.601.73916.21916.2104.02MOVIMIENTO DE TIERRAS04.02.01EXCAVACION MANUAL PARA CIMIENTO MUROm3571.4586.4249,384.7149,384.7104.02.02RELLENO CON MATERIAL PROPIO - MURO DE CONTENCIONm3441.9321.639,558.959,558.9504.02.03ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL CON VOLQUETEm3161.9164.3310,415.6710,415.6704.03OBRAS DE CONCRETO SIMPLE04.03.01SOLADO DE CONCRETO E=0.10 Mm2529.6020.1910,692.6210,692.6204.04OBRAS DE CONCRETO ARMADO04.04.01CONCRETO FC=210 KG/CM2 - EN MURO DE CONTENCIONm3302.42333.61100,890.34100,890.3404.04.02ENCOFRADO Y DESENCOFRADO DE MURO DE CONSTENCIONm21,408.7630.2742,643.1742,643.1704.04.03ACERO DE REFUERZO F'Y=4200 KG/CM2kg14,005.625.3174,369.8474,369.8404.04.04TUBOS DE PVC D=3" C-7.5 SAP PARA LLORADORESm184.5021.523,970.443,970.4404.05JUNTAS04.06JUNTA DE CONSTRUCCION CON TEKNOPORTm140.885.60788.93788.9305VEREDAS Y MARTILLOS DE CONCRETO05.01CONCRETO F'C= 175 KG/CM2 BRUADO EN VEREDAS DE MARTILLO E = 0.15 m.M2515.3947.8624,666.573,350.2021,316.3705.02CONCRETO F'C=140 KG/CM2VEREDAS E=0.10 mm23,387.5041.33140,005.3822,687.2840,256.2377,061.8705.03CONCRETO F'C= 140 KG/CM2 EN UAS DE VEREDASm353.17317.5416,883.602,730.845,710.968,441.8005.04RAMPA DE ACCESOS DE CONCRETO EN VEREDAS.m2259.3038.459,970.099,970.0905.05ENCOFRADO Y DESENCOFRADO DE VEREDASm2426.5217.687,540.871,115.431,398.245,027.2005.06JUNTAS DE DILATACION EN VEREDA E = 5 MM H=4"m426.526.022,567.65413.09870.741,283.8205.07JUNTAS DE CONSTRUCCION EN VEREDA E = 1"m2,843.494.9414,046.842,259.754,763.677,023.4206SEALIZACION06.01PINTURA TRAFICO EN LINEAS CONTINUAS EN PAVIMENTOM342.4320.707,088.307,088.3006.02PINTURA DE SIMBOLOS Y LETRAS EN PAVIMENTOm2932.4520.7019,301.7219,301.7206.03PINTURA EN SARDINEL DE CANALETAm318.327.812,486.082,486.0806.04SEALES PREVENTIVAS INCLUIDO POSTES DE SOPORTEund20.00378.857,577.007,577.0006.05SEALES REGLAMENTARIAS INCLUIDO POSTES DE SOPORTEund20.00523.9510,479.0010,479.0007VARIOS07.01LIMPIEZA FINAL DE OBRAGLB1.005,000.005,000.005,000.0008PLAN DE MANEJO AMBIENTAL08.01NORMATIVIDAD AMBIENTAL08.01.01APLICACION DE NORMAS DE COMPORTAMIENTOmes1.00400.00400.00400.0008.01.02SEGUIMIENTO Y CUMPLIMIENTO A LAS PAUTAS SOCIO AMBIENTALESmes1.00500.00500.00500.0008.02PLAN DE FORESTACION Y REVEGETACION08.02.01COMO ORNAMENTACIN08.02.01.01ARBOLES ORNAMENTALES08.02.01.01.01TRAZO, REPLANTEO Y LIMPIEZA DE TERRENOm21,820.521.051,911.551,911.5508.02.01.01.02ADQUISICION Y TRANSPORTE DE PLANTONES ORNAMENTALES.und50.0016.05802.50802.5008.02.01.01.03PLANTADO DE PLANTONES ORNAMENTALESund50.009.20460.00460.0008.02.01.02GRAS08.02.01.02.01TRAZO, REPLANTEO Y LIMPIEZA DE TERRENOm21,820.521.051,911.551,911.5508.02.01.02.02ADQUISICION Y TRANSPORTE DE PLANTONES DE GRASS SACO/15M2und100.0016.351,635.001,635.0008.02.01.02.03PLANTADO DE GRASS AMERICANOm21,820.522.654,824.384,824.3808.03MANEJO DE CANTERA08.03.01MANEJO DEL AREA DE CANTERA DE AGREGADOS Y MATERIAL DE RELLENOGLB1.00800.00800.00400.00160.00240.0008.03.02CONTROL DE POLVO EN MOVIMIENTO DE TIERRA Y TRASALADO A BOTADEROSmes1.50912.001,368.00912.00182.40273.6008.04SEALIZACION08.04.01LETREROS DE SEALIZACION AMBIENTAL DE 1.00x0.50 M. C/PLANCHA METALICA e=1/40, BASTIDORES DE MADERA TORNILLO DE 1"X1.1/2"und5.00186.51932.55373.02279.77279.7708.04.02LETREROS DE SEALIZACION AMBIENTAL DE 0.50x0.30 M. C/PLANCHA METALICA e=1/40, BASTIDORES DE MADERA TORNILLO DE 1"X1.1/2"und10.0087.59875.90437.95175.18262.7708.05MANEJO DE CAMPAMENTO08.05.01ADECUACION DE ALMACEN, OFICINAS, COMEDOR Y OTROSGLB1.001,689.361,689.361,689.3608.05.02RECOLECTORES DE RESIDUOS SOLIDOS TIPO BASCULANTE METALICOund2.00383.73767.46767.4608.05.03INSTALACION DE LETRINA PORTATIL (FIBRA DE VIDRIO)und2.001,847.453,694.903,694.9008.05.04IMPLEMENTACION DE BOTIQUINund1.00445.00445.00445.0008.06EDUCACION AMBIENTAL08.06.01CHARLAS AL PERSONAL DE OBRAund3.00466.751,400.25466.75513.43420.0808.06.02CHARLAS A LA COMUNIDADund2.00466.75933.50466.75186.70280.0508.06.03POLOS DE ALGODON CON LOGOTIPO AMBIENTALund100.0018.001,800.001,260.00540.0008.06.04AFICHES AMBIENTALES DE 1.00x0.70 M. CON CARTULINA DUPLEX SEGUN MODELOund100.003.50350.00350.0008.07PROGRAMA DE SEGURIDAD Y CONTINGENCIA EN OBRA08.07.01INSTALACION DE CINTAS DE SEGURIDAD ALREDEDOR DE LA OBRAML2,500.000.32800.00480.00160.00160.0008.07.02PROGRAMA DE CONTINGENCIAS DURANTE LA EJECUCION DE LA OBRAGLB1.001,300.001,300.00650.00260.00390.0008.08PROGRAMA DE ABANDONO DE OBRA08.08.01RESTAURACION DEL AREA DE CAMPAMENTO Y REVEGETACIONm2200.002.06412.00412.0008.08.02CIERRE DE CANTERASm2500.001.45725.00725.0008.08.03CIERRE DE BOTADEROSm2550.001.29709.50709.5008.09PARTICIPACION CIUDADANA08.09.01FORMACION DEL COMITE DE MANTENIMIENTO DE LA INFRAESTRUCTURA Y EQUIPOSund1.0087.2587.2587.25COSTO DIRECTO3,612,459.93337,746.29332,196.78722,923.04157,337.71211,875.17199,789.140.00150,504.91381,330.88444,754.76674,001.30GASTOS GENERALES (13%)469,619.7943,907.0243,185.5893,980.0020,453.9027,543.7725,972.590.0019,565.6449,573.0157,818.1287,620.17UTILIDAD (12.9999995%)469,619.7734,557.5333,989.7273,968.0616,098.4821,678.6574,750.320.0019,565.6449,573.0157,818.1287,620.17TOTAL PRESUPUESTO4,551,699.49416,210.84409,372.08890,871.10193,890.09261,097.59300,512.050.00189,636.19480,476.90560,391.00849,241.64AVANCE PARCIAL9.359.2020.014.365.876.600.004.1710.5612.3118.66AVANCE ACUMULADO9.3518.5538.5642.9247.7154.3154.3158.4869.0481.35100.01ADICIONAL N01ItemDescripcinUnd.MetradoPrecio S/.Parcial S/.SEPTIEMBRE 2014OCTUBRE 2014NOVIEMBRE 2014DICIEMBRE 2014ENERO 2015FEBRERO 2015MARZO 2015ABRIL 2015MAYO 2015JUNIO 2015JULIO 20157.00MURO DE CONTENCION (ADICIONAL N02)7.01TRABAJOS PRELIMINARES07.01.01TRAZO, NIVEL Y REPLANTEOm2671.401.731,161.52834.85203.717.02MOVIMIENTO DE TIERRAS07.02.01EXCAVACION DE ZAPATAS DE MURO DE CONTENCION CON MAQUINARAm32,480.1314.1635,118.6422917.115,688.0707.02.02RELLENO CON MATERIAL PROPIO EN MURO DE CONTENCIONm31,793.6821.6338,797.3024811.126,261.8907.02.03ELIMINACION DE MATERIAL EXCEDENTEm3858.0611.479,841.956758.351,606.6707.02.04CAMA DE PIEDRAS - FILTROm321.8555.501,212.681,212.687.03OBRAS DE CONCRETO SIMPLE07.03.01SOLADO DE CONCRETO E= 10 CMm2590.9320.1911,930.889743.092,377.3707.03.02SUB ZAPATA F'c = 100 KG/CM2 EN MUROS DE CONTENCIONm324.14243.455,876.884406.457.04OBRAS DE CONCRETO ARMADO07.04.01CONCRETO FC=210 KG/CM2 EN MUROS DE CONTENCIONm3523.36333.61174,598.13115615.8828,823.9007.04.02ENCOFRADO Y DESENCOFRADO EN MUROS DE CONTENCIONm22,001.3030.2760,579.3541442.6610,170.7207.04.03ACERO fy=4200 kg/cm2 GRADO 60kg28,495.665.31151,311.9598584.5622,845.3207.04.04TUBOS DE PVC D= 3 " 7.5 SAP PARALLORONEStub194.2421.524,180.042425.73677.887.05JUNTAS07.05.01JUNTAS DE CONSTRUCCIO CON TECNOPORTm334.415.601,872.701297.63320.04COSTO DIRECTO496,482.020.000.000.000.000.000.000.00330,050.1178,975.570.0087,456.34496,482.020.00GASTOS GENERALES (10.2318025%)50,799.060.000.000.000.000.000.000.0033,770.088,080.620.008,948.3650,799.06UTILIDAD (8.34%)0.083397098741,405.160.000.000.000.000.000.000.0027,525.226,586.330.007,293.6141,405.16TOTAL PRESUPUESTO588,686.240.000.000.000.000.000.000.00391,345.4193,642.520.00103,698.31588,686.24AVANCE PARCIAL0.000.000.000.000.000.000.0066.4815.910.0017.62AVANCE ACUMULADO0.000.000.000.000.000.000.0066.4882.3982.39100.01RESUMENCOSTO DIRECTO4,108,941.95337,746.29332,196.78722,923.04157,337.71211,875.17199,789.140.00480,555.02460,306.45444,754.76761,457.64GASTOS GENERALES (13%)520,418.8543,907.0243,185.5893,980.0020,453.9027,543.7725,972.590.0053,335.7257,653.6357,818.1296,568.53UTILIDAD (10.2318025%)511,024.9334,557.5333,989.7273,968.0616,098.4821,678.6574,750.320.0047,090.8656,159.3457,818.1294,913.78TOTAL PRESUPUESTO5,140,385.73416,210.84409,372.08890,871.10193,890.09261,097.59300,512.050.00580,981.60574,119.42560,391.00952,939.955,140,385.72AVANCE PARCIAL8.107.9617.333.775.085.850.0011.3011.1710.9018.54AVANCE ACUMULADO8.1016.0633.3937.1642.2448.0948.0959.3970.5681.46100.00

RESUMEN SUPRESUMEN DE VALORIZACIN N 09 - MES DE JUNIO - 2015(DEL 01/06/2015 AL 30/06/2015)PARA PAGO AL SUPERVISOROBRA:"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"PROPIETARIO:SUB REGION DE PADRE ABADCONTRATISTA:CONSORCIO LA MARINARESIDENTE DE OBRA:ING. CIELO GARAY, ALEJANDROSUPERVISION:CONSORCIO SUPERVISOR LA MARINAJEFE DE SUPERVISION:ING. PERCY RIOS COHENMONTO CONTRACTUAL S/. =169,491.52ADELANTO DIRECTO PARA SUPERVISIN S/. =0.00.00%GARANTIA DE FIEL CUMPLIMIENTO16,949.1510.00%AVANCE DEL MES (%) =1.92%ITEMDESCRIPCIONACUMULADOAVANCEACUMULADOSALDOANTERIORACTUALACTUAL1)VALORIZACION CONTRACTUAL117,169.483,254.24120,423.7249,067.80Monto por supervisin117,169.483,254.242)REINTEGROSREAJUSTE POR FORM. POLINOMICA0.00.00.03)VALORIZACION BRUTA (1) + (2)117,169.483,254.24120,423.7249,067.804)AMORTIZACIONES Y GARANTIA16,949.150.016,949.150.0AMORTIZACIONES0.00.00.00.0ADELANTO DIRECTO0.00.00.00.0ADELANTO POR MATERIALES0.00.00.00.0GARANTIA DE FIEL CUMPLIMIENTO16,949.150.016,949.150.0GARANTIA DE FIEL CUMPLIMIENTO16,949.150.016,949.150.0FACTURACION5)TOTAL A FACTURAR117,169.483,254.24120,423.726)MONTO A CANCELAR A LA SUPERVISION100,220.333,254.24103,474.57EN EFECTIVO (5)SON : TRES MIL DOSCIENTOS CINCUENTA Y CUATRO CON 24/100 NUEVOS SOLES

resumenOBRA"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"PROPIETARIOSUB REGION DE PADRE ABADCONTRATISTACONSORCIO LA MARINASUPERVISORCONSORCIO SUPERVISOR LA MARINAMONTO CONTRACTUAL4551699.49NUEVO MONTO CONTRATADO5140385.73ADICIONAL DE OBRA N01588686.24AD. DIRECTO910339.9Fecha03/09/2014 Y 24/12/2014CP N750 Y 1034AD. DE MATERIALES1820679.8Fecha03/09/14CP N749RESUMEN DE VALORIZACION N 09 - JUNIO 2015CONCEPTOVAL. ACUMULADO ANTERIORVALORIZACION ACTUALVAL. ACUMULADO ACTUAL% DE AVANCE TOTALSALDO POR VALORIZAR1.00.- VALORIZACION DE OBRA1.01Valorizacin Mensual3,142,066.9487,274.693,229,341.6370.95%1,322,357.861.02Reajuste por for. Pol.60,113.230.0060,113.230.001.03Deducc. Reaj. Adel. Directo3,099.320.003,099.320.001.04Deduccin Reaj. Adel. Materiales0.000.000.000.001.05Reintegro Valoriz. Anterior0.000.000.000.001.06Reconocimiento Mayores Gastos Generales0.000.000.000.001.07Adicional de Obra N01484,990.310.00484,990.3182.39%103,695.93TOTAL VALORIZACION BRUTA (VB)3,684,071.1687,274.693,771,345.851,426,053.792.00.- AMORTIZACIONES2.01Por Adelanto directo266,159.005,000.00271,159.0029.79%639,180.902.02Por Adelanto para Materiales1,064,635.9934,909.881,099,545.8760.39%721,133.93TOTAL AMORTIZACIONES (A)1,330,794.9939,909.881,370,704.871,360,314.833.00.- VALORIZACION NETA (VN)2,353,276.1747,364.812,400,640.9865,738.964.00.- FACTURACION-VALORIZACION NETA (VN)2,353,276.1747,364.812,400,640.9865,738.96-I.G.V. (00% VN)TOTAL A FACTURAR2,353,276.1747,364.812,400,640.9865,738.96RESUMEN-TOTAL A FACTURAR2,353,276.1747,364.812,400,640.9865,738.96-MULTA ATRASO EN EJEC. OBRA0.000.000.000.00TOTAL A CANCELAR AL CONTRATISTA2,353,276.1747,364.812,400,640.9865,738.96AVANCE REAL ACUMULADO72.26%AVANCE PROGRAMADO ACUMULADO81.46%

Hoja1VALORIZACION N 06 - FEBRERO - 2015Obra"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"ContratistaCONSORCIO LA MARINASUPERVISOR:ING. PERCY RIOS COHENPLAZO EJECUCION:270DIASClienteSUB REGION DE PADRE ABADDistritoPADRE ABADFECHA P.BASEJUNIO 2014PERIODO :01/01/2015AL31/01/2015LugarJJVV LA MARINACONTRATO:002-2014-GRU-P-GSRPA-AMONTO CONTRATO :4,551,699.49ItemDescripcinUnidadMetradoPrecioParcialANTERIORACTUALACUMULADOSALDOMETRADOMONTO%METRADOMONTO%METRADOMONTO%METRADOMONTO%01MEJORAMIENTO DE CALLES01.01OBRAS PROVISIONALES01.01.01ALQUILER DE ALMACENMES6.001,000.006,000.005.205,200.0086.670.80800.0013.336.006,000.00100.000.000.000.0001.02TRABAJOS PRELIMINARES0.000.000.000.000.000.000.0001.02.01TRAZO, NIVELES Y REPLANTEOm220,328.291.1423,174.2520,328.2923,174.25100.000.0020,328.2923,174.25100.000.000.0001.02.02TRANSPORTE DE EQUIPOS Y HERRAMIENTASGLB1.0012,000.0012,000.000.9010,800.0090.000.101,200.0010.001.0012,000.00100.000.000.000.0001.03MOVIMIENTO DE TIERRAS0.0001.03.01CORTE DE MATERIAL A NIVEL DE SUB-RASANTEm37,173.084.1429,696.555,793.8623,986.5880.77662.812,744.039.2402PAVIMENTOS0.0002.01BASE DE 0.20M0.0002.01.01BASE DE 0.20 M.m212,217.489.47115,699.546,478.0061,346.6653.022,834.0826,838.7423.2002.02OBRAS DE CONCRETO0.0002.02.01ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETOm22,026.4324.6950,032.561,074.6526,533.1153.03356.688,806.4317.6002.02.02PAVIMENTO DE CONCRETO F'C= 210 KG/CM2 E=0.20 Mm212,217.4865.52800,489.296,317.06413,893.7751.711,618.00106,011.3613.2402.02.03ACERO CORRUGADO (BASTONES EN JUNTAS)kg1,397.115.047,041.43715.933,608.2951.24195.84987.0314.0202.02.04ACERO LISO (BASTONES EN JUNTAS) - TRANVERSALESkg5,621.846.2735,248.942,880.8418,062.8751.24788.044,941.0114.0202.02.05UA DE CONCRETO F'C= 210 KG/CM2 EN LOSAm3102.73330.9533,998.4952.6417,421.2151.2414.404,765.6814.0202.03JUNTAS0.0002.03.01JUNTA DE CONSTRUCCION CON TEKNOPORTm513.655.602,876.44263.211,473.9851.2432.45181.726.3202.03.02JUNTA DE CONTRACCION (E=1" H=2")m2,054.583.877,951.221,052.844,074.4951.24288.001,114.5614.0202.03.03JUNTA DE DILATACION (E=1" H=8")m1,027.294.915,043.99526.422,584.7251.24144.00707.0414.0202.03.04JUNTA LONGITUDINAL (E=1" H=8")m1,712.154.347,430.73877.373,807.7951.24240.001,041.6014.0202.04CURADO Y LIMPIEZA DE LOSA - VEREDA0.0002.04.01TENDIDO DE ARROCERA Y CURADOm216,120.371.2119,505.656,865.998,307.8542.592,107.662,550.2713.0705VEREDAS Y MARTILLOS DE CONCRETO0.0005.02CONCRETO F'C=140 KG/CM2VEREDAS E=0.10 mm23,387.5041.33140,005.38548.9322,687.2816.20489.6620,237.6514.4505.03CONCRETO F'C= 140 KG/CM2 EN UAS DE VEREDASm353.17317.5416,883.608.602,730.8416.177.632,422.8314.3505.05ENCOFRADO Y DESENCOFRADO DE VEREDASm2426.5217.687,540.8763.091,115.4314.7961.211,082.1914.3505.06JUNTAS DE DILATACION EN VEREDA E = 5 MM H=4"m426.526.022,567.6568.62413.0916.0961.21368.4814.3505.07JUNTAS DE CONSTRUCCION EN VEREDA E = 1"m2,843.494.9414,046.84457.442,259.7516.09408.052,015.7714.3508PLAN DE MANEJO AMBIENTAL0.0008.01NORMATIVIDAD AMBIENTAL0.0008.01.01APLICACION DE NORMAS DE COMPORTAMIENTOmes1.00400.00400.000.000.000.001.00400.00100.0008.01.02SEGUIMIENTO Y CUMPLIMIENTO A LAS PAUTAS SOCIO AMBIENTALESmes1.00500.00500.000.000.000.001.00500.00100.0008.02PLAN DE FORESTACION Y REVEGETACION0.0008.02.01COMO ORNAMENTACIN0.0008.07PROGRAMA DE SEGURIDAD Y CONTINGENCIA EN OBRA0.0008.07.01INSTALACION DE CINTAS DE SEGURIDAD ALREDEDOR DE LA OBRAML2,500.000.32800.002,000.00640.0080.00500.00160.0020.0008.07.02PROGRAMA DE CONTINGENCIAS DURANTE LA EJECUCION DE LA OBRAGLB1.001,300.001,300.000.70910.0070.000.10130.0010.00

Valorizacion 09VALORIZACION N 09 - JUNIO - 2015Obra"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"ContratistaCONSORCIO LA MARINASUPERVISOR:ING. PERCY RIOS COHENPLAZO EJECUCION:270DIASAMP. DE PLAZO N01 :0 D.C.AMP. DE PLAZO N05 :3ClienteSUB REGION DE PADRE ABADDistritoPADRE ABADFECHA P.BASEJUNIO 2014PERIODO :01/04/2015AL30/04/2015AMP. DE PLAZO N02 :24INICIO DE OBRA9/4/15LugarJJVV LA MARINACONTRATO:002-2014-GRU-P-GSRPA-AMONTO CONTRATO :4,551,699.49AMP. DE PLAZO N03 :31CULM. DE OBRA7/30/16AMP. DE PLAZO N04 :2ItemDescripcinUnidadMetradoPrecioParcialANTERIORACTUALACUMULADOSALDOMETRADOMONTO%METRADOMONTO%METRADOMONTO%METRADOMONTO%01MEJORAMIENTO DE CALLES01.01OBRAS PROVISIONALES01.01.01ALQUILER DE ALMACENMES6.001,000.006,000.005.205,200.0086.670.80800.0013.336.006,000.00100.000.000.000.0001.01.02REUBICACION DE POSTES DE LUZund10.00498.624,986.2010.004,986.20100.000.000.0010.004,986.20100.000.000.000.0001.01.03REUBICACION DE POSTES DE TELEFONOund6.00498.622,991.726.002,991.72100.000.000.006.002,991.72100.000.000.000.0001.01.04DEMOLICION DE VEREDAS EXISTENTESm31,400.0013.3518,690.001,400.0018,690.00100.000.000.001,400.0018,690.00100.000.000.000.0001.01.05NIVELACION DE BUZONES EN GENERALund24.00300.967,223.040.000.000.000.000.000.000.000.0024.007,223.04100.0001.01.06NIVELACION DE BUZONES, REPARACION DE TUBERIAS DE AGUA Y DESAGUE, NIVELACION DE CAJAS DE REJISTRO.und25.00900.9622,524.0025.0022,524.00100.000.000.0025.0022,524.00100.000.000.000.0001.01.07MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADOhm1.005,696.005,696.000.703,987.2070.000.000.000.703,987.2070.000.301,708.8030.0001.02TRABAJOS PRELIMINARES0.000.0001.02.01TRAZO, NIVELES Y REPLANTEOm220,328.291.1423,174.2520,328.2923,174.25100.000.000.0020,328.2923,174.25100.000.000.000.0001.02.02TRANSPORTE DE EQUIPOS Y HERRAMIENTASGLB1.0012,000.0012,000.000.9010,800.0090.000.101,200.0010.001.0012,000.00100.000.000.000.0001.02.03CARTEL DE IDENTIFICACION DE LA OBRA 8.50 x 3.60Mund1.001,861.321,861.321.001,861.32100.000.000.001.001,861.32100.000.000.000.0001.02.04LIMPIEZA DE TERRENO MANUALm220,328.290.438,741.1620,328.298,741.16100.000.000.0020,328.298,741.16100.000.000.000.0001.03MOVIMIENTO DE TIERRAS0.000.0001.03.01CORTE DE MATERIAL A NIVEL DE SUB-RASANTEm37,173.084.1429,696.555,793.8623,986.5880.77662.812,744.039.246,456.6726,730.6190.01716.412,965.949.9901.03.02CORTE DE TERRENO CON EQUIPO EN ZONA DE MATERIAL ORGANICOm385.615.79495.6885.61495.68100.000.000.0085.61495.68100.000.000.000.0001.03.03CORTE SUPERFICIAL MANUAL HASTA 0.15 MT EN VEREDA Y MARTILLOm3476.2330.8714,701.22397.4712,269.9083.460.000.00397.4712,269.9083.4678.762,431.3216.5401.03.04EXCAVACION MANUAL PARA CANALETAS EN TERRENO COMPACTOM31,661.9143.2171,811.131,465.3263,316.4888.170.000.001,465.3263,316.4888.17196.598,494.6511.8301.03.05EXCAVACION MANUAL PARA UA DE CONCRETO EN TERRENO COMPACTOm3123.2743.215,326.500.000.000.000.000.000.000.000.00123.275,326.50100.0001.03.06RELLENO COMPACTADO CON MATERIAL DE PRESTAMO, PARA NIVELAR SUB RASANTEm35,758.8645.25260,588.425,522.88249,910.3295.900.000.005,522.88249,910.3295.90235.9810,678.104.1001.03.07COMPACTACION Y CONFORMACION DE SUB-RASANTEm212,217.483.8847,403.829,789.6437,983.8080.130.000.009,789.6437,983.8080.132,427.849,420.0219.8701.03.08RELLENO COMPACTADO CON MATERIAL PROPIO - MARTILLOm3585.4356.7633,229.010.000.000.000.000.000.000.000.00585.4333,229.01100.0001.03.09ELIMINACION DE MATERIAL EXCEDENTEm314,001.3510.47146,594.1311,362.86118,969.1581.160.000.0011,362.86118,969.1581.162,638.4927,624.9818.8402PAVIMENTOS0.000.0002.01BASE DE 0.20M0.000.0002.01.01BASE DE 0.20 M.m212,217.489.47115,699.546,478.0061,346.6653.022,834.0826,838.7423.209,312.0888,185.4076.222,905.4027,514.1423.7802.02OBRAS DE CONCRETO0.000.0002.02.01ENCOFRADO Y DESENCOFRADO LOSA DE CONCRETOm22,026.4324.6950,032.561,074.6526,533.1153.03356.688,806.4317.601,431.3335,339.5470.63595.1014,693.0229.3702.02.02PAVIMENTO DE CONCRETO F'C= 210 KG/CM2 E=0.20 Mm212,217.4865.52800,489.296,317.06413,893.7751.711,618.00106,011.3613.247,935.06519,905.1364.954,282.42280,584.1635.0502.02.03ACERO CORRUGADO (BASTONES EN JUNTAS)kg1,397.115.047,041.43715.933,608.2951.24195.84987.0314.02911.774,595.3265.26485.342,446.1134.7402.02.04ACERO LISO (BASTONES EN JUNTAS) - TRANVERSALESkg5,621.846.2735,248.942,880.8418,062.8751.24788.044,941.0114.023,668.8823,003.8865.261,952.9612,245.0634.7402.02.05UA DE CONCRETO F'C= 210 KG/CM2 EN LOSAm3102.73330.9533,998.4952.6417,421.2151.2414.404,765.6814.0267.0422,186.8965.2635.6911,811.6034.7402.03JUNTAS0.000.0002.03.01JUNTA DE CONSTRUCCION CON TEKNOPORTm513.655.602,876.44263.211,473.9851.2432.45181.726.32295.661,655.7057.56217.991,220.7442.4402.03.02JUNTA DE CONTRACCION (E=1" H=2")m2,054.583.877,951.221,052.844,074.4951.24288.001,114.5614.021,340.845,189.0565.26713.742,762.1734.7402.03.03JUNTA DE DILATACION (E=1" H=8")m1,027.294.915,043.99526.422,584.7251.24144.00707.0414.02670.423,291.7665.26356.871,752.2334.7402.03.04JUNTA LONGITUDINAL (E=1" H=8")m1,712.154.347,430.73877.373,807.7951.24240.001,041.6014.021,117.374,849.3965.26594.782,581.3434.7402.04CURADO Y LIMPIEZA DE LOSA - VEREDA0.000.0002.04.01TENDIDO DE ARROCERA Y CURADOm216,120.371.2119,505.656,865.998,307.8542.592,107.662,550.2713.078,973.6510,858.1255.667,146.728,647.5344.3303OBRAS DE DRENAJE0.000.0003.01TRABAJOS PRELIMINARES0.000.0003.01.01TRAZO, NIVELACION Y REPLANTEO EN CANALETASML3,164.830.672,120.442,798.331,874.8888.420.000.002,798.331,874.8888.42366.50245.5611.5803.02OBRAS DE CONCRETO ARMADO0.000.0003.02.01CONCRETO F'C=210 KG/CM2 EN LOSA FONDO , MUROS Y TECHO DE CANALETASm31,383.58328.99455,183.981,147.47377,506.1682.930.000.001,147.47377,506.1682.93236.1177,677.8217.0703.02.02ENCOFRADO Y DESENCOFRADO DE CANALETASM29,840.3726.79263,623.518,279.69221,812.9184.140.000.008,279.69221,812.9184.141,560.6841,810.6015.8603.02.03ACERO DE REFUERZO F'Y=4200 KG/CM2kg64,559.215.31342,809.4154,665.07290,271.5384.670.000.0054,665.07290,271.5384.679,894.1452,537.8815.3303.02.04WATER STOP NEOPRENE 6" EN CANALETASM636.6437.7424,026.79531.7020,066.3783.520.000.00531.7020,066.3783.52104.943,960.4216.4803.02.05TAPAS DE CONCRETO PARA INSPECCION Y LIMPIEZA 0.60X0.60, F'c=210 kg/cm2und478.0077.3336,963.74150.0011,599.5031.380.000.00150.0011,599.5031.38328.0025,364.2468.6203.02.06REJILLA METALICA CON MARCO 0.60x0.80 EN CANALETAGLB253.00300.0075,900.00150.0045,000.0059.290.000.00150.0045,000.0059.29103.0030,900.0040.71232,250.9604MURO DE CONTENSION0.000.0004.01TRABAJOS PRELIMINARES0.000.0004.01.01TRAZO NIVEL Y REPLANTEOm2529.601.73916.21529.60916.21100.00-316.02-546.71-59.67213.58369.5040.33316.02546.7159.6704.02MOVIMIENTO DE TIERRAS0.000.0004.02.01EXCAVACION MANUAL PARA CIMIENTO MUROm3571.4586.4249,384.71571.4549,384.71100.00-319.62-27,621.56-55.93251.8321,763.1544.07319.6227,621.5655.9304.02.02RELLENO CON MATERIAL PROPIO - MURO DE CONTENCIONm3441.9321.639,558.95441.939,558.95100.00-244.99-5,299.13-55.44196.944,259.8244.56244.995,299.1355.4404.02.03ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MANUAL CON VOLQUETEm3161.9164.3310,415.67161.9110,415.67100.00-93.30-6,001.99-57.6268.614,413.6842.3893.306,001.9957.6204.03OBRAS DE CONCRETO SIMPLE0.000.0004.03.01SOLADO DE CONCRETO E=0.10 Mm2529.6020.1910,692.62529.6010,692.62100.00-277.77-5,608.18-52.45251.835,084.4447.55277.775,608.1852.4504.04OBRAS DE CONCRETO ARMADO0.000.0004.04.01CONCRETO FC=210 KG/CM2 - EN MURO DE CONTENCIONm3302.42333.61100,890.34302.42100,890.34100.00-129.58-43,229.18-42.85172.8457,661.1657.15129.5843,229.1842.8504.04.02ENCOFRADO Y DESENCOFRADO DE MURO DE CONSTENCIONm21,408.7630.2742,643.171,408.7642,643.17100.00-200.47-6,068.23-14.231,208.2936,574.9485.77200.476,068.2314.2304.04.03ACERO DE REFUERZO F'Y=4200 KG/CM2kg14,005.625.3174,369.8414,005.6274,369.84100.00-4,724.17-25,085.34-33.739,281.4549,284.5066.274,724.1725,085.3433.7304.04.04TUBOS DE PVC D=3" C-7.5 SAP PARA LLORADORESm184.5021.523,970.44184.503,970.44100.00-59.50-1,280.44-32.25125.002,690.0067.7559.501,280.4432.2504.05JUNTAS0.000.0004.06JUNTA DE CONSTRUCCION CON TEKNOPORTm140.885.60788.93140.88788.93100.000.000.00140.88788.93100.000.000.000.0005VEREDAS Y MARTILLOS DE CONCRETO0.000.0005.01CONCRETO F'C= 175 KG/CM2 BRUADO EN VEREDAS DE MARTILLO E = 0.15 m.M2515.3947.8624,666.570.000.000.000.000.000.000.000.00515.3924,666.57100.0005.02CONCRETO F'C=140 KG/CM2VEREDAS E=0.10 mm23,387.5041.33140,005.38548.9322,687.2816.20489.6620,237.6514.451,038.5942,924.9330.652,348.9197,080.4569.3405.03CONCRETO F'C= 140 KG/CM2 EN UAS DE VEREDASm353.17317.5416,883.608.602,730.8416.177.632,422.8314.3516.235,153.6730.5236.9411,729.9369.4805.04RAMPA DE ACCESOS DE CONCRETO EN VEREDAS.m2259.3038.459,970.090.000.000.000.000.000.000.000.00259.309,970.09100.0005.05ENCOFRADO Y DESENCOFRADO DE VEREDASm2426.5217.687,540.8763.091,115.4314.7961.211,082.1914.35124.302,197.6229.14302.225,343.2570.8605.06JUNTAS DE DILATACION EN VEREDA E = 5 MM H=4"m426.526.022,567.6568.62413.0916.0961.21368.4814.35129.83781.5730.44296.691,786.0869.5605.07JUNTAS DE CONSTRUCCION EN VEREDA E = 1"m2,843.494.9414,046.84457.442,259.7516.09408.052,015.7714.35865.494,275.5230.441,978.009,771.3269.5606SEALIZACION0.000.0006.01PINTURA TRAFICO EN LINEAS CONTINUAS EN PAVIMENTOM342.4320.707,088.300.000.000.000.000.000.000.000.00342.437,088.30100.0006.02PINTURA DE SIMBOLOS Y LETRAS EN PAVIMENTOm2932.4520.7019,301.720.000.000.000.000.000.000.000.00932.4519,301.72100.0006.03PINTURA EN SARDINEL DE CANALETAm318.327.812,486.080.000.000.000.000.000.000.000.00318.322,486.08100.0006.04SEALES PREVENTIVAS INCLUIDO POSTES DE SOPORTEund20.00378.857,577.0020.007,577.00100.000.000.0020.007,577.00100.000.000.000.0006.05SEALES REGLAMENTARIAS INCLUIDO POSTES DE SOPORTEund20.00523.9510,479.000.000.000.000.000.000.000.000.0020.0010,479.00100.0007VARIOS0.000.0007.01LIMPIEZA FINAL DE OBRAGLB1.005,000.005,000.000.000.000.000.000.000.000.000.001.005,000.00100.0008PLAN DE MANEJO AMBIENTAL0.000.0008.01NORMATIVIDAD AMBIENTAL0.000.0008.01.01APLICACION DE NORMAS DE COMPORTAMIENTOmes1.00400.00400.000.000.000.001.00400.00100.001.00400.00100.000.000.000.0008.01.02SEGUIMIENTO Y CUMPLIMIENTO A LAS PAUTAS SOCIO AMBIENTALESmes1.00500.00500.000.000.000.001.00500.00100.001.00500.00100.000.000.000.0008.02PLAN DE FORESTACION Y REVEGETACION0.000.0008.02.01COMO ORNAMENTACIN0.000.0008.02.01.01ARBOLES ORNAMENTALES0.000.0008.02.01.01.01TRAZO, REPLANTEO Y LIMPIEZA DE TERRENOm21,820.521.051,911.550.000.000.000.000.000.000.000.001,820.521,911.55100.0008.02.01.01.02ADQUISICION Y TRANSPORTE DE PLANTONES ORNAMENTALES.und50.0016.05802.500.000.000.000.000.000.000.000.0050.00802.50100.0008.02.01.01.03PLANTADO DE PLANTONES ORNAMENTALESund50.009.20460.000.000.000.000.000.000.000.000.0050.00460.00100.0008.02.01.02GRAS0.000.0008.02.01.02.01TRAZO, REPLANTEO Y LIMPIEZA DE TERRENOm21,820.521.051,911.550.000.000.000.000.000.000.000.001,820.521,911.55100.0008.02.01.02.02ADQUISICION Y TRANSPORTE DE PLANTONES DE GRASS SACO/15M2und100.0016.351,635.000.000.000.000.000.000.000.000.00100.001,635.00100.0008.02.01.02.03PLANTADO DE GRASS AMERICANOm21,820.522.654,824.380.000.000.000.000.000.000.000.001,820.524,824.38100.0008.03MANEJO DE CANTERA0.000.0008.03.01MANEJO DEL AREA DE CANTERA DE AGREGADOS Y MATERIAL DE RELLENOGLB1.00800.00800.000.70560.0070.000.000.000.70560.0070.000.30240.0030.0008.03.02CONTROL DE POLVO EN MOVIMIENTO DE TIERRA Y TRASALADO A BOTADEROSmes1.50912.001,368.001.201,094.4080.000.000.001.201,094.4080.000.30273.6020.0008.04SEALIZACION0.000.0008.04.01LETREROS DE SEALIZACION AMBIENTAL DE 1.00x0.50 M. C/PLANCHA METALICA e=1/40, BASTIDORES DE MADERA TORNILLO DE 1"X1.1/2"und5.00186.51932.555.00932.55100.000.000.005.00932.55100.000.000.000.0008.04.02LETREROS DE SEALIZACION AMBIENTAL DE 0.50x0.30 M. C/PLANCHA METALICA e=1/40, BASTIDORES DE MADERA TORNILLO DE 1"X1.1/2"und10.0087.59875.9010.00875.90100.000.000.0010.00875.90100.000.000.000.0008.05MANEJO DE CAMPAMENTO0.000.0008.05.01ADECUACION DE ALMACEN, OFICINAS, COMEDOR Y OTROSGLB1.001,689.361,689.361.001,689.36100.000.000.001.001,689.36100.000.000.000.0008.05.02RECOLECTORES DE RESIDUOS SOLIDOS TIPO BASCULANTE METALICOund2.00383.73767.460.000.000.000.000.000.000.002.00767.46100.0008.05.03INSTALACION DE LETRINA PORTATIL (FIBRA DE VIDRIO)und2.001,847.453,694.902.003,694.90100.000.000.002.003,694.90100.000.000.000.0008.05.04IMPLEMENTACION DE BOTIQUINund1.00445.00445.001.00445.00100.000.000.001.00445.00100.000.000.000.0008.06EDUCACION AMBIENTAL0.000.0008.06.01CHARLAS AL PERSONAL DE OBRAund3.00466.751,400.253.001,400.25100.000.000.003.001,400.25100.000.000.000.0008.06.02CHARLAS A LA COMUNIDADund2.00466.75933.501.40653.4570.000.000.001.40653.4570.000.60280.0530.0008.06.03POLOS DE ALGODON CON LOGOTIPO AMBIENTALund100.0018.001,800.0070.001,260.0070.000.000.0070.001,260.0070.0030.00540.0030.0008.06.04AFICHES AMBIENTALES DE 1.00x0.70 M. CON CARTULINA DUPLEX SEGUN MODELOund100.003.50350.000.000.000.000.000.000.000.000.00100.00350.00100.0008.07PROGRAMA DE SEGURIDAD Y CONTINGENCIA EN OBRA0.000.0008.07.01INSTALACION DE CINTAS DE SEGURIDAD ALREDEDOR DE LA OBRAML2,500.000.32800.002,000.00640.0080.00500.00160.0020.002,500.00800.00100.000.000.000.0008.07.02PROGRAMA DE CONTINGENCIAS DURANTE LA EJECUCION DE LA OBRAGLB1.001,300.001,300.000.70910.0070.000.10130.0010.000.801,040.0080.000.20260.0020.0008.08PROGRAMA DE ABANDONO DE OBRA0.000.0008.08.01RESTAURACION DEL AREA DE CAMPAMENTO Y REVEGETACIONm2200.002.06412.000.000.000.000.000.000.000.000.00200.00412.00100.0008.08.02CIERRE DE CANTERASm2500.001.45725.000.000.000.000.000.000.000.000.00500.00725.00100.0008.08.03CIERRE DE BOTADEROSm2550.001.29709.500.000.000.000.000.000.000.000.00550.00709.50100.0008.09PARTICIPACION CIUDADANA0.000.0008.09.01FORMACION DEL COMITE DE MANTENIMIENTO DE LA INFRAESTRUCTURA Y EQUIPOSund1.0087.2587.250.000.000.000.000.000.000.000.001.0087.25100.000.000.000.000.00COSTO DIRECTO3,612,459.932,493,703.9369,265.632,562,969.560.001,049,490.37GASTOS GENERALES (13.000000%)469,619.79324,181.519,004.53333,186.040.00136,433.75UTILIDAD (12.99999950%)469,619.77324,181.509,004.53333,186.030.00136,433.74TOTAL PRESUPUESTO4,551,699.493,142,066.9487,274.693,229,341.630.001,322,357.860.000.00AVANCE PARCIAL69.03%1.92%70.95%29.05%

RESUMEN DEVALRESUMEN DE VALORIZACIN N09 - JUNIO 2015Obra"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"ContratistaCONSORCIO LA MARINASUPERVISOR:ING. PERCY RIOS COHENPLAZO EJECUCION:270DIASAMP. DE PLAZO N01 :00 D.C.AMP. DE PLAZO N04 :2ClienteSUB REGION DE PADRE ABADDistritoPADRE ABADFECHA P.BASEJUNIO 2014PERIODO :01/04/2015AL30/04/2015AMP. DE PLAZO N02 :24AMP. DE PLAZO N05 :3LugarJJVV LA MARINACONTRATO:002-2014-GRU-P-GSRPA-AMONTO CONTRATO :4551699.49AMP. DE PLAZO N03 :31INICIO DE OBRA9/4/15ADICIONAL DE OBRA N01588686.24NUEVO MONTO CONTRATADO5140385.73CULM. DE OBRA7/30/16ItemDescripcinUnidadMetradoPrecioParcialANTERIORACTUALACUMULADOSALDOMETRADOMONTO%METRADOMONTO%METRADOMONTO%METRADOMONTO%01VALORIZACIN CONTRATUAL0.000.00COSTO DIRECTO3,612,459.932,493,703.9369,265.632,562,969.560.001,049,490.37GASTOS GENERALES (13.000000%)469,619.79324,181.519,004.53333,186.040.00136,433.75UTILIDAD (12.99999950%)469,619.77324,181.509,004.53333,186.030.00136,433.74TOTAL PRESUPUESTO4,551,699.493,142,066.9487,274.693,229,341.630.001,322,357.860.000.00AVANCE PARCIAL69.03%1.92%70.95%29.05%02ADICIONAL DE OBRA N010.000.00COSTO DIRECTO496,482.02409,027.680.00409,027.680.0087,454.34GASTOS GENERALES (10.2318025%)50,799.0641,850.900.0041,850.900.008,948.16UTILIDAD (8.3397099%)41,405.1634,111.720.0034,111.720.007,293.44TOTAL PRESUPUESTO588,686.24484,990.300.00484,990.300.00103,695.940.000.00AVANCE PARCIAL82.39%0.00%82.39%17.61%01+02TOTAL0.000.00COSTO DIRECTO4,108,941.952,902,731.6169,265.632,971,997.240.001,136,944.71GASTOS GENERALES (10.2318025%)520,418.85366,032.419,004.53375,036.940.00145,381.91UTILIDAD (8.3397099%)511,024.93358,293.229,004.53367,297.750.00143,727.18TOTAL PRESUPUESTO5,140,385.733,627,057.2487,274.693,714,331.930.001,426,053.800.000.00AVANCE PARCIAL70.56%1.70%72.26%27.74%NOTA: LA VALORIZACION PARA EL PAGO DEL ADICIONAL DE OBRA N01, SE TRAMITA DE FORMA INDEPENDIENTE, SOLO PARA FINES DE CLCULO DE PORCENTAJE DE AVANCE SE HACE MENCIN EN LA PRESENTE VALORIZACION

Comp. val 08INFORME DE VALORIZACION N 09 - MES DE JUNIO - 2015( DEL 01/06/15 AL 30/06/15 )CUADRO COMPARATIVO ENTRE AVANCE PROGRAMADO Y EJECUTADOObra:"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"Entidad:SUB REGION DE PADRE ABADEjecuta:CONSORCIO LA MARINASupervisa :CONSORCIO SUPERVISOR LA MARINAResidente de Obra:ING. CIRILO ALEJANDRO CIELO GARAYJefe Supervisin:ING PERCY RIOS COHENMonto de Contrato:4551699.49Adicional de Obra N01588686.24Nuevo Monto Contratado5140385.73VALORIZACINAVANCE PROGRAMADO DE OBRAAVANCE EJECUTADO DE OBRASITUACION DESITUACION DEPORCENTAJEPORCENTAJENMESMENSUAL% PARCIALACUMULADO%MENSUAL%ACUMULADO%OBRA POR MESOBRA TOTALDE ATRASODE ADELANTO01Sep-14416,210.848.10%416,210.848.10%416,210.848.10%416,210.848.10%AVANZADOAVANZADO0.00%02Oct-14409,372.087.96%825,582.9216.06%409,372.087.96%825,582.9216.06%AVANZADOAVANZADO0.00%03Nov-14890,871.1017.33%1,716,454.0233.39%890,871.1017.33%1,716,454.0233.39%AVANZADOAVANZADO0.00%04Dec-14193,890.093.77%1,910,344.1137.16%193,890.093.77%1,910,344.1137.16%AVANZADOAVANZADO0.00%05Jan-15261,097.595.08%2,171,441.7042.24%261,097.595.08%2,171,441.7042.24%AVANZADOAVANZADO0.00%06Feb-15300,512.055.85%2,471,953.7548.09%300,512.055.85%2,471,953.7548.09%AVANZADOAVANZADO0.00%Mar-150.00.00%2,471,953.7548.09%0.000.00%2,471,953.7548.09%OBRA PARALIZADA07Apr-15580,981.6011.30%3,052,935.3559.39%580,981.6011.30%3,052,935.3559.39%AVANZADOAVANZADO0.00%08May-15574,119.4211.17%3,627,054.7770.56%574,121.8011.17%3,627,057.1570.56%AVANZADOAVANZADO0.00%09Jun-15560,391.0010.90%4,187,445.7781.46%87,274.691.70%3,714,331.8472.26%ATRASADAATRASADA-9.20%10Jul-15952,939.9518.54%5,140,385.72100.00%TOTAL5,140,385.72100.00%3,714,331.8472.26%

RES-CALEND INFORME DE VALORIZACION N 09 - MES DE JUNIO - 2015( DEL 01/06/15 AL 30/06/15 )CUADRO COMPARATIVO ENTRE AVANCE PROGRAMADO Y EJECUTADOObra:"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"Entidad:SUB REGION DE PADRE ABADEjecuta:CONSORCIO LA MARINASupervisa :CONSORCIO SUPERVISOR LA MARINAResidente de Obra:ING. CIRILO ALEJANDRO CIELO GARAYJefe Supervisin:ING PERCY RIOS COHENMonto de Contrato:4551699.49Adicional de Obra N01588686.24Nuevo Monto Contratado5140385.73RESUMEN DE CALENDARIO VALORIZADO DE AVANCE DE OBRA ACTUALIZADOMesCosto Directo S/Gastos Gener.UtilidadSub TotalIGV 18%TOTALAvance Parcial Prog S/.( % ) de Avance Parcial progAvance Acum. Prog S/.( % ) de Avance Acum. ProgAvance Parcial Real S/.( % ) de Avance Parcial RealAvance Acum. Real S/.( % ) de Avance Acum. ProgSep-14337,746.2943,907.0234,557.53416,210.840.00416,210.84416,210.848.10%416,210.848.10%416,210.848.10%416,210.848.10%Oct-14332,196.7843,185.5833,989.72409,372.080.00409,372.08409,372.087.96%825,582.9216.06%409,372.087.96%825,582.9216.06%Nov-14722,923.0493,980.0073,968.06890,871.100.00890,871.10890,871.1017.33%1,716,454.0233.39%890,871.1017.33%1,716,454.0233.39%Dec-14157,337.7120,453.9016,098.48193,890.090.00193,890.09193,890.093.77%1,910,344.1137.16%193,890.093.77%1,910,344.1137.16%Jan-15211,875.1727,543.7721,678.65261,097.590.00261,097.59261,097.595.08%2,171,441.7042.24%261,097.595.08%2,171,441.7042.24%Feb-15199,789.1425,972.5974,750.32300,512.050.00300,512.05300,512.055.85%2,471,953.7548.09%300,512.055.85%2,471,953.7548.09%Mar-150.00.000.000.000.000.000.000.00%2,471,953.7548.09%0.000.00%2,471,953.7548.09%Apr-15480,555.0253,335.7247,090.86580,981.600.00580,981.60580,981.6011.30%3,052,935.3559.39%580,981.6011.30%3,052,935.3559.39%May-15460,306.4557,653.6356,159.34574,119.420.00574,119.42574,119.4211.17%3,627,054.7770.56%574,121.8011.17%3,627,057.1570.56%Jun-15444,754.7657,818.1257,818.12560,391.000.00560,391.00560,391.0010.90%4,187,445.7781.46%87,274.691.70%3,714,331.8472.26%Jul-15761,457.6496,568.5394,913.78952,939.950.00952,939.95952,939.9518.54%5,140,385.72100.00%Totales4,108,942.00520,418.86511,024.865,140,385.720.005,140,385.725,140,385.72100.00%3,714,331.841333.62461.8461.8UTILIDADG.G312.640.000.000.000.00132,063.35110,052.7928,804.2213,206.3412.146415002.27871372214.42512872164,591.01137,159.17510,972.7316,459.11101,231.4484,359.5336,748.7610,123.1529,547.2524,622.7081,969.822,954.72

RES-CALEND

AVANCE PROGRAMADOAVANCE REALMESVALORIZACIONCONTROL FINANCIERO DE AVANCE DE OBRA

AMORTIZ. ADEL. DIRECTOOBRA"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"PROPIETARIOSUB REGION DE PADRE ABADCONTRATISTACONSORCIO LA MARINASUPERVISORCONSORCIO SUPERVISOR LA MARINAMONTO CONTRACTUAL4551699.49ADELANTO DIRECTO910339.9ADELANTO DE MATERIALES1820679.8AMORTIZACION DEL ADELANTO EN EFECTIVOSaldo Monto Contractual a la4551699.49fecha de entrega del A.D.03/09/2014 Y 24/12/2014% del Adelanto Directo20.00%VALORIZACIONAVANCE REALAMORTIZ. ADELANTO DIRECTO MENSUALSALDOPOR#% MENSUALMENSUAL% ACUM.ACUMULADOCALCULADOREALACUMULADOAMORTIZARVALORIZACION N 01Setiembre 20149.14%416,210.849.14%416,210.8483,242.1741,621.0841,621.08868,718.82VALORIZACION N 02Octubre20148.99%409,372.0818.13%825,582.9281,874.4240,937.2182,558.29827,781.61VALORIZACION N 03Noviembre 201419.57%890,871.1037.70%1,716,454.02178,174.2289,087.11171,645.40738,694.50VALORIZACION N 04Diciembre 20144.26%193,890.0941.96%1,910,344.1138,778.0219,389.01191,034.41719,305.49VALORIZACION N 05Enero 20155.74%261,097.5947.70%2,171,441.7052,219.5226,109.76217,144.17693,195.73VALORIZACION N 06Febrero 20156.60%300,512.0554.30%2,471,953.7560,102.4130,051.21247,195.38663,144.52Marzo 20150.00%0.054.30%2,471,953.750.00.00247,195.38663,144.52VALORIZACION N 07Abril 20154.17%189,636.1958.47%2,661,589.9437,927.2418,963.62266,159.00644,180.90VALORIZACION N 08Mayo201510.56%480,476.9069.03%3,142,066.8496,095.38200,000.00466,159.00444,180.90VALORIZACION N 09Junio 20151.92%87,274.6970.95%3,229,341.5317,454.945,000.00471,159.00439,180.90AMORTIZACION ACUMULADA ADELANTO DIRECTO645868.32471159AMORTIZACION PRESENTE VALORIZACIN5000

AMORTIZ. ADEL. MAT. (1)OBRA"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"PROPIETARIOSUB REGION DE PADRE ABADCONTRATISTACONSORCIO LA MARINAINSPECCIONCONSORCIO SUPERVISOR LA MARINAMONTO CONTRACTUAL4551699.49ADELANTO DIRECTO910339.9ADELANTO DE MATERIALES1820679.8AMORTIZACION DEL ADELANTO DE MATERIALESSaldo Monto Contractual a la4551699.49fecha de entrega del A.M.9/3/14% del Adelanto de Materiales40.00%VALORIZACIONAVANCE REALAMORTIZ. ADELANTO DE MATERIALES MENSUALSALDOPOR#MES% MENSUALMENSUAL% ACUM.ACUMULADOCALCULADOREALACUMULADOAMORTIZARVALOR. N 01Setiembre 20149.14%416,210.849.14%416,210.84166,484.34166,484.34166,484.341,654,195.46VALOR. N 02Octubre 20148.99%409,372.0818.13%825,582.92163,748.83163,748.83330,233.171,490,446.63VALOR. N 03Noviembre 201419.57%890,871.1037.70%1,716,454.02356,348.44356,348.44686,581.611,134,098.19VALOR. N 04Diciembre 20144.26%193,890.0941.96%1,910,344.1177,556.0477,556.04764,137.651,056,542.15VALOR. N 05Enero 20155.74%261,097.5947.70%2,171,441.70104,439.04104,439.04868,576.69952,103.11VALOR. N 06Febrero 20156.60%300,512.0554.30%2,471,953.75120,204.82120,204.82988,781.51831,898.29Marzo 20150.00%0.054.30%2,471,953.750.00.0988,781.51831,898.29VALOR. N 07Abril 20154.17%189,636.1958.47%2,661,589.9475,854.4875,854.481,064,635.99756,043.81VALOR. N 08Mayo 201510.56%480,476.9069.03%3,142,066.84192,190.76192,190.761,256,826.75563,853.05VALOR. N 09Junio 20151.92%87,274.6970.95%3,229,341.5334,909.8834,909.881,291,736.63528,943.17AMORTIZACION ACUMULADA ADELANTO DE MATERIALES1291736.631291736.63AMORTIZACION PRESENTE VALORIZACIN34909.88

RES COBROS CONTCONTROL DE PAGOS REALIZADOS AL CONTRATISTAObra:"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"Entidad:SUB REGION DE PADRE ABADEjecuta:CONSORCIO LA MARINASupervisa :CONSORCIO SUPERVISOR LA MARINAResidente de Obra:ING. CIRILO ALEJANDRO CIELO GARAYJefe Supervisin:ING PERCY RIOS COHENMonto de Contrato:4551699.49Adicional de Obra N01588686.24Nuevo Monto Contratado5140385.73VALORIZACINMONTOSNETO COBRADONMESVALORIZADORETENCION POR FIEL CUMPLIMIENTOAMORTIZACIONESREINTEGROSDEDUCIONESAD. DIRECTOAD. MATERIALESAD. DIRECTOAD. MATERIALESAD. DIRECTO910,339.90AD. MATERIALES1,820,679.8001Sep-14416,210.840.0041,621.08166,484.346,243.160.000.00214,348.5802Oct-14409,372.080.0040,937.21163,748.836,140.580.000.00210,826.6203Nov-14890,871.100.0089,087.11356,348.4439,198.332,545.350.00482,088.5304Dec-14193,890.090.0019,389.0177,556.048,531.16553.970.00104,922.2305Jan-15261,097.590.0026,109.76104,439.040.000.000.00130,548.7906Feb-15300,512.050.0030,051.21120,204.820.000.000.00150,256.02Mar-150.000.000.000.000.000.000.000.0001 ADICIONAL N01Apr-15391,345.410.000.000.000.000.000.00391,345.4107Apr-15189,636.190.0018,963.6275,854.480.000.000.0094,818.0902 ADICIONAL N01May-1593,644.900.000.000.000.000.000.0093,644.9008May-15480,476.900.00200,000.00192,190.760.000.000.0088,286.1409Jun-1587,274.690.005,000.0034,909.880.000.000.0047,364.8110Jul-15TOTAL3,714,331.840.00471,159.001,291,736.6360,113.233,099.320.004,739,469.82400,915.91NOTA: PRESENTO CARTA FIANZA DE FIEL CUMPLIMIENTO

RES COBROS SUPCONTROL DE PAGOS REALIZADOS AL SUPERVISORObra:"MEJORAMIENTO DE LAS PRINCIPALES CALLES DE LA JUNTA VECINA LA MARINA - PROVINCIA DE PADRE ABAD - REGION DE UCAYALI"Entidad:SUB REGION DE PADRE ABADEjecuta:CONSORCIO LA MARINASupervisa :CONSORCIO SUPERVISOR LA MARINAResidente de Obra:ING. CIRILO ALEJANDRO CIELO GARAYJefe Supervisin:ING PERCY RIOS COHENMonto de Contrato:169491.52VALORIZACINMONTOSNETO COBRADONMESVALORIZADORETENCION POR FIEL CUMPLIMIENTOAMORTIZACIONESREINTEGROSDEDUCIONESAD. DIRECTOAD. DIRECTO0.0001Sep-1415,491.528,000.000.000.000.000.000.007,491.5202Oct-1415,237.298,949.150.000.000.000.000.006,288.1403Nov-1433,169.490.000.000.000.000.000.0033,169.4904Dec-147,389.830.000.000.000.000.000.007,389.8305Jan-159,728.810.000.000.000.000.000.009,728.8106Feb-1511,186.440.000.000.000.000.000.0011,186.44Mar-150.000.000.000.000.000.000.000.0007Apr-157,067.800.000.000.000.000.000.007,067.8082,322.0308May-1517,898.300.000.000.000.000.000.0017,898.3009Jun-153,254.240.000.000.000.000.000.003,254.2410Jul-150.000.000.000.000.000.00TOTAL120,423.7216,949.150.000.000.000.000.00103,474.57120,423.7249,067.809927118.00%