PROYECTO EDIFICACION DE 5 PISOS EN ALBAÑILERIA CONFINAD 1 INFORMACION GENERAL UBICA CIÓ N DEL PRO YEC T CHICLAYO  VIVIENDA SISTEMA DE TECHADO : Loza maciza en dos direcciones e = PERALTE VIGAS SOLERAS 0.20 m PERALTE VIGAS DINTELES 0.30 m AZOTEA NO UTILIZABLE ALTURA DE PISO : 2.60 m ANCHO DE PUERTA : 0.80 m ALTURA DE ALFEIZER : 1.00 m ALTURA DE ALFEIZER S.H. > 1 m : 0.00 m LONGITUD VENT ANAS EN DORMI TORI O 2.60 m LONGITUD VENTANAS EN COCINA 1.30 m LONGITUD VENTANAS EN SALA COMED 3.20 m ALTU RA DE VENT ANAS SALA -COM EDO 1.45 m ALTU RA DE VENT ANAS EN DORMITORI 1.45 m ALTURA DE VENTANAS S.H. 0.00 m 2 CARACTERISTICAS DE LOS MATERIALES ALBAÑILERIA LADRILLOS CLASE IV SOLIDOS (30% HUECOS ) TIPO KING KONG ARCILLA t = 0.13 m f'b = 145 kg/cm² MORTERO TIPO P2 CEMENTO ARENA 1:2 PILAS : RESISTENCIA CARACTERISTICAS A COMPRESSION F'M = 65 Kg/cm² 650 TN/m² (LADRILLO INDUSTRIAL) MURETES: RESISTENCIA CARACTERISTICA A CORTE PURO V'M = 8.1 Kg/cm² 81 TN/m² MODULO ELASTICIDAD Em = 500* F'M Em = 32500 ########### MODULO DE CORTE Gm = 0.4* Em Gm = 13000 ########### MODULO DE POISSON v = 0.25 0.25 CONCRETO RESISTENCIA NOMINAL A LA COMPRESION f 'c = f'c = 210 MODULO DE ELASTICIDAD Ec = 15 000 v f'c Ec = Ec = ### ### ### ## ########### ACERO DE REFUERZO CORRUGADO GRADO 60 f' y = 4200 Kg/cm² 10 4. 2 TN / cm² 3 CARGAS UNI TARI AS PESOS VOLUMETRICOS * PESOS VOLUMETRICO S CONCRETO A  ɣc =  ɣ= 2.4 TIN/M³ 2.4 TN/m³ * PESO VOLUMETRIC O ALBAÑILERIA ɣa =  ɣ= 1.8 TIN/M³ 1.8 TN/m³ * PESO V OLUMETRICO AL TARRA JEO ɣt =  ɣ= 2.0 TIN/M³ 2.0 TN/m³ USO :

Upload: marbel-elias-garcia-mendo

Post on 04-Jun-2018

228 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 1/180

PROYECTO EDIFICACION DE 5 PISOS EN ALBAÑILERIA CONFIN1 INFORMACION GENERAL

UBICACIÓN DEL PROYECTCHICLAYO VIVIENDA

SISTEMA DE TECHADO :Loza maciza en dos direcciones e =PERALTE VIGAS SOLERAS 0.20 mPERALTE VIGAS DINTELES 0.30 mAZOTEA NO UTILIZABLEALTURA DE PISO : 2.60 mANCHO DE PUERTA : 0.80 mALTURA DE ALFEIZER : 1.00 mALTURA DE ALFEIZER S.H. > 1 m :0.00 mLONGITUD VENTANAS EN DORMITORIO2.60 mLONGITUD VENTANAS EN COCINA1.30 mLONGITUD VENTANAS EN SALA COMED3.20 mALTURA DE VENTANAS SALA-COMEDO 1.45 m

ALTURA DE VENTANAS EN DORMITORI 1.45 mALTURA DE VENTANAS S.H. 0.00 m

2 CARACTERISTICAS DE LOS MATERIALESALBAÑILERIALADRILLOS CLASE IV SOLIDOS (30% HUECOS ) TIPO KING KONGARCILLA t = 0.13 m f'b =145 kg/cm²MORTERO TIPO P2 CEMENTO ARENA 1:2PILAS : RESISTENCIA CARACTERISTICAS A COMPRESSION

F'M = 65 Kg/cm² 650 TN/m² (LADRILLO INDUSTRIAL)

MURETES: RESISTENCIA CARACTERISTICA A CORTE PUROV'M =8.1 Kg/cm² 81 TN/m²MODULO ELASTICIDAD Em = 500* F'MEm =32500 ###########MODULO DE CORTE Gm = 0.4* Em Gm =13000 ###########MODULO DE POISSON v = 0.25 0.25CONCRETORESISTENCIA NOMINAL A LA COMPRESIONf 'c = f'c =210MODULO DE ELASTICIDAD Ec = 15 000 v f'cEc = Ec = ###########

###########ACERO DE REFUERZOCORRUGADO GRADO 60 f' y =4200 Kg/cm² 10 4.2 TN/ cm²

3 CARGAS UNITARIASPESOS VOLUMETRICOS* PESOS VOLUMETRICOS CONCRETO A ɣc = ɣ= 2.4 TIN/M³2.4 TN/m³* PESO VOLUMETRICO ALBAÑILERIAɣa = ɣ= 1.8 TIN/M³1.8 TN/m³* PESO VOLUMETRICO AL TARRAJEOɣt = ɣ= 2.0 TIN/M³2.0 TN/m³

USO :

Page 2: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 2/180

TECHOS* PESO PROPIO DE LA LOSA DE TECHO2.4 TN/m³*0.12 = 0.288 Tn/M² 0.360 TN/m²* SOBRECARGA ( INCLUSO EN ESCALERA ) 0.2 TN/M² 0.2 Tn/m²Excepto la azotea 0.1 TN/M²* ACABADOS0.1 TN/M²

MUROS*ESPESOR DE TARRAJEO0.02 m* PESO DE LOS MUROS DE ALBAÑILERIA CON 0.01 m DE TARREJEO1.8TN/m³*0.13 + 2TN/m³* 0.020.274 TN/m²* PESO DE LOS MUROS DE CONCRETO CON 0.01 m DE TARREJEO2.4TN/m³*0.13 + 2TN/m³* 0. 0.352 TN/m²PESO DE LAS VENTANAS0.020 TN/m²

4 ESTRUCTURACIONMuros : La estructura esta compuesta en sus dos direcciones principalmente por murose ha considerado conveniente colocar Placas de concreto armadopara compensar rigideces y evitar problemas de torsion .

5 PREDIMENSIONAMIENTO5.1.- ESPESOR DEL MURO " t "COSTA : ZONA SISMICA III , ESPESOR MINIMO, DESCONTANDO LOS TARR

t = h/20 t = 0.13 m DONDE h : ALTURA LIBRE ALBAÑILERIESPESOR EF t =0.13 m t' = TENTATIVO 0.15 m

5.2.- DENSIDAD MINIMA DE MUROS REFORZADOSDONDE L : Longitud de muro incluyendo columnas ( L > 1.20 m )t : ESPESOR EFECTIVO DE MUROS ( EXCEPTO C° A° )Ap : AREA DE PLANTA

Z = 0.40 Costa Zona IIIU = 1 Uso : ViviendaS = 1.20 Suelos intermediosN = 5 Número de pisos

Σ L* t = Z U S N 2.4 0.042857143Ap 56 56

DENSIDAD DE MUROS REFORZADOSDIRECCCION X -X

MURO L ( m ) t ( m ) Ac ( m² ) NmMX1 1.550 0.25 0.3875 1MX2 1.325 0.25 0.3313 1

Page 3: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 3/180

MX3 1.900 0.25 0.4750 1MX4 1.750 0.13 0.2275 1MX5 1.750 0.13 0.2275 1MX6 1.500 0.13 0.1950 1MX7 1.450 0.13 0.1885 1MX8 1.500 0.13 0.1950 1MX9 1.550 0.25 0.3875 1MX10 1.725 0.25 0.4313 1MX11 2.375 0.25 0.59375 1

Σ L* t= 3.63975

AREA EN PLANTALARGO =9.35 m Ap =###########ANCHO =10.95 m

Σ L* t >= Z U S N 0.042857143

Ap 560.03555 0.04286Aumentar espesor de muros o colocar Placas

DIRECCCION Y -YMURO L ( m ) t ( m ) Ac ( m² ) NmMY1 10.95 0.13 1.4235 1MY2 5.35 0.13 0.6955 1MY3 5.35 0.13 0.6955 1MY4 4.05 0.13 0.5265 1MY5 4.70 0.13 0.6110 1

MY6 1.80 0.13 0.2340 1MY7 1.80 0.13 0.2340 1MY8 2.10 0.13 0.2730 1MY9 2.10 0.13 0.2730 1MY10 3.40 0.13 0.4420 1

Σ L* t = 4.563

Σ L* t >= Z U S N 0.042857143Ap 56

0.04457 0.04286O.K

5.3.- VERIFICACION DEL ESFUERZO AXIAL POR CARGAS DE GRAVEDAD

Fa = 0.2 F'm [ 1 - ( h/(35 * t ))² ] <= 0.15 * F'mFa = 87.55 TN/m² < 0.15 * F'm = 97.50 TN/m²

Page 4: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 4/180

MURO MAS ESFORZADO (Y2 ) Y CONTEMPLANDO AL 100 % DE SOBRECARGA,SE TIENE SOBRE UNA LONGITUD UNITARIA DE MUROANCHO TRIBUTARIO DE LOSA1.30m (DORMITORIO) +1.60 m( SALA - COMEDOR

a =2.90 mEspesor de mur t =0.13 m

CARGA PROVENIENTE DE LA LOSA AZOTEA*Peso de loza 0.360 TN/m²*Sobrecarga 0.1 TN/m² Σ 1.6240 TN/m*Acabados 0.1 TN/m²

CARGA PROVENIENTE DE LA LOSA EN PISOS TIPICOS*Peso de losa 0.360 TN/m²*Sobrecarga 0.2 TN/m² Σ 1.914 TN/m*Acabados 0.1 TN/m²

PESO PROPIO DEL MURO EN UN PISO TIPICO* Peso de muro (1.8 TN/m³ * 0.13 m +2.0 TN/m³ *0.02)*2.6

0.712 TN/mCARGA AXIAL TOTAL ( Pm )

Pm = 12.842 TN/m

ESFUERZO AXIAL MAXIMOσ

σ = ########### > Fa = 87.55 TN/m²Aumentar espesor de muro, mejorar f'm ó hacer f´m= f'c

Page 5: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 5/180

0.15 m

Kg/cm²Kg/cm²TN/m²

Page 6: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 6/180

confinados .

(Tarrajeado)

Page 7: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 7/180

O.K.

Page 8: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 8/180

)

Page 9: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 9/180

PROYECTO EDIFICACION DE 5 PISOS EN ALBAÑILERIA CONFINADA

1 INFORMACION GENERALUBICACIÓN DEL PROYECTCHICLAYO

VIVIENDASISTEMA DE TECHADO : L e 0.15 m

PERALTE VIGAS SOLERAS 0.20 mPERALTE VIGAS DINTELES 0.30 mAZOTEA NO UTILIZABLEALTURA DE PISO : 2.60 mANCHO DE PUERTA : 0.80 mALTURA DE ALFEIZER : 1.00 mALTURA DE ALFEIZER S.H. > 1 m :2.00 mLONGITUD VENTANAS DORMITORIOS2.60 mLONGITUD VENTANAS EN COCINA1.30 mLONGITUD VENTANAS EN SALA COMED3.20 m

ALTURA DE VENTANAS SALA-COMEDO 1.45 mALTURA DE VENTANAS EN DORMITORI 1.45 mALTURA VENTANAS S.H. 0.00 m

2 CARACTERISTICAS DE LOS MATERIALESALBAÑILERIALADRILLOS CLASE IV SOLIDOS (30% HUECOS ) TIPO KING KONGARCILLA t = 0.13 m f'b =145 kg/cm²MORTERO TIPO P2 CEMENTO ARENA 1:2PILAS : RESISTENCIA CARACTERISTICAS A COMPRESSION

F'M = 65 Kg/cm² 650 TN/m² (LADRILLO INDUSTRIAL)

MURETES: RESISTENCIA CARACTERISTICA A CORTE PUROV'M =8.1 Kg/cm² 81 TN/m²

MODULO ELASTICIDAD Em = 500* F'MEm =32500 ###########MODULO DE CORTE Gm = 0.4* Em Gm =13000 ###########MODULO DE POISSON v = 0.25 0.25

CONCRETORESISTENCIA NOMINAL A LAf 'c = ########### f'c = 2 100 TN/m²

MODULO DE ELASTICIDAD EEc =########### Ec = Kg/cm²########### TN/m²

MODULO DE POISSON ( v V =0.20ACERO DE REFUERZOCORRUGADO GRADO 60 f' y =########### 10 4.2 TN/ cm²

3 CARGAS UNITARIASPESOS VOLUMETRICOS

USO :

Page 10: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 10/180

* PESOS VOLUMETRICOS CONCRETO A ɣc = ɣ= 2.4 TIN/M³2.4 TN/m³* PESO VOLUMETRICO ALBAÑILERIAɣa = ɣ= 1.8 TIN/M³1.8 TN/m³* PESO VOLUMETRICO AL TARRAJEOɣt = ɣ= 2.0 TIN/M³2.0 TN/m³TECHOS* PESO PROPIO DE LA LOSA DE TECHO2.4 TN/m³*0.25 m = 0.288 Tn/M² 0.360 TN/m²* SOBRECARGA ( INCLUSO EN ESCALERA ) 0.2 Tn/m²0.200 TN/m²Excepto la azotea 0.100 TN/m²* Acabados : 0.100 TN/m²

MUROS*ESPESOR DE TARRAJEO0.02 m* PESO DE LOS MUROS DE ALBAÑILERIA CON 0.01 m DE TARREJEO1.8TN/m³*0.13 + 2TN/m³* 0.020.274 TN/m²* PESO DE LOS MUROS DE CONCRETO CON 0.01 m DE TARREJEO2.4TN/m³*0.13 + 2TN/m³* 0. 0.352 TN/m²PESO DE LAS VENTANAS0.020 TN/m²

4 ESTRUCTURACIONMuros : La estructura esta compuesta en sus dos direcciones principalmente por muroconfinados . Se ha considerado conveniente colocar Placas de concreto armado para compensar rigideces y evitar problemas de torsion .

5 PREDIMENSIONAMIENTO5.1.- ESPESOR DEL MURO " t "COSTA : ZONA SISMICA III , ESPESOR MINIMO, DESCONTANDO LOS TARR

t = h/20 t = 0.13 m DONDE h : ALTURA LIBRE ALBAÑILERIESPESOR EF t =0.13 m t' = TENTATIVO 0.15 m

(Tarrajeado)5.2.- DENSIDAD MINIMA DE MUROS REFORZADOSDONDE L : Longitud de muro incluyendo columnas ( L >1.20 m )t : ESPESOR EFECTIVO DE MUROS ( EXCEPTO C° A° )Ap : AREA DE PLANTA

Z = 0.40 Costa Zona IIIU = 1 Uso ViviendaS = 1.20 Suelos intermediosN = 5 Número de pisos

Σ L* t = Z U S N 2.4 0.042857143

Ap 56 56DENSIDAD DE MUROS REFORZADOSDIRECCCION X -X

MURO L ( m ) t ( m ) Ac ( m² ) NmMX1 1.550 0.25 0.3875 1MX2 1.325 0.25 0.3313 1MX3 1.900 0.25 0.4750 1MX4 1.750 0.13 0.2275 1

Page 11: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 11/180

MX5 1.750 0.13 0.2275 1MX6 1.500 0.13 0.1950 1MX7 1.450 0.13 0.1885 1MX8 1.500 0.13 0.1950 1MX9 1.550 0.25 0.3875 1MX10 1.725 0.25 0.4313 1MX11 2.375 0.25 0.5938 1

Σ L* t= 3.6398En las placas de C° A° debe multiplicarse el espesor del muro por la relación n =Ec /Epara concreto f'c = 210 Kg/cm² es n = 6.69 , entonces 0.13 m*6.69 = 0.87 m

AREA EN PLANTALARGO =9.35 m Ap =###########ANCHO =10.95 m

Σ L* t >= Z U S N 0.042857143

Ap 560.03555 0.04286Aumentar espesor de muros o colocar Placas

DIRECCCION Y -YMURO L ( m ) t ( m ) Ac ( m² ) Nm

Y1 10.95 0.13 1.4235 1Y2 5.35 0.13 0.6955 1Y3 5.35 0.13 0.6955 1Y4 4.05 0.13 0.5265 1

Y5 4.70 0.13 0.6110 1Y6 1.80 0.13 0.2340 1Y7 1.80 0.13 0.2340 1Y8 2.10 0.13 0.2730 1Y9 2.10 0.13 0.2730 1Y10 3.40 0.13 0.4420 1

Σ L* t = 4.9400

Σ L* t >= Z U S N 0.042857143Ap 56

0.04825 0.04286CUMPLE

5.3.- VERIFICACION DEL ESFUERZO AXIAL POR CARGAS DE GRAVEDADNueva f'm f'm = 810 TN/m²

Fa = 0.2 f'm [ 1 - ( h/(35 * t) )² ] <= 0.15 * F'mFa = ########### < 0.15 * f'm = ###########

CUMPLE

Page 12: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 12/180

MURO MAS ESFORZADO (Y2 ) Y CONTEMPLANDO AL 100 % DE SOBRECARGA,SOBRE UNA LONGITUD UNITARIA DE MUROANCHO TRIBUTARIO DE LOSA1.30m (DORMITORIO) +1.60 m( SALA - COMEDOR

a =2.90 m

CARGA PROVENIENTE DE LA LOSA AZOTEA*Peso de losa 0.360 TN/m²*Sobrecarga 0.1 TN/m² Σ 1.6240 TN/m*Acabados 0.1 TN/m²

CARGA PROVENIENTE DE LA LOSA EN PISOS TIPICOS*Peso de loza 0.360 TN/m²*Sobrecarga 0.2 TN/m² Σ 1.914 TN/m*Acabados 0.1 TN/m²

PESO PROPIO DEL MURO EN UN PISO TIPICO* Peso de muro (1.8 TN/m³ * 0.13 m +2.0 TN/m³ *0.02)*2.6

0.712 TN/mCARGA AXIAL TOTAL ( Pm )

Pm = 12.842 TN/m

ESFUERZO AXIAL MAXIMOσ

σ = ########### < Fa = ###########

CUMPLEEn consecuencia por carga vertical, se ha cambiado a una nueva calidad de albañileria f'm = 81 Kg/cm2

6 METRADO DE CARGAS6.1 CARGAS DIRECTAS

* Zonas de puertas ( Piso típico y azotea )0.0936 TN/m* Zona de muros de albañileria ( Piso Típico )0.7592 TN/m* Zona de muros de albañileria ( Azotea )0.4030 TN/m* Zona de Placas ( Piso Tipico ) 0.9620 TN/m* Zona de Placas ( Azotea ) 0.5044 TN/m* Zona de alfeizares h= 1 m (Piso tipico)0.3966 TN/m* Zona de alfeizares h= 1 m (Azotea)0.0936 TN/m* Zona de alfeizares h= 1.8 m (Piso tipico)0.0000 TN/m* Zona de alfeizares h= 1.8 m (Azotea)0.0000 TN/m

ESCALERACarga viva wL =0.200 TN/m²Acabados wacb=0.100 TN/m²Espesor garg t =0.12 m

Page 13: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 13/180

Contrapaso cp =0.175 m CUMPLE O.K.paso p =0.25 m CUMPLE2*Contrapaso 2 cp + p =0.60 m CUMPLE O.K.Carga losa es wlesc =0.288 TN/m²Carga perman wD =0.388 TN/m²los apoyosCarga tramo i wpp =0.562 TN/m²Carga perman wD =0.662 TN/m²el tramo inclinado

Según el R.N.C.p ≥ 0.25 m

0.15 m ≤ cp ≤ 0.175 m0.60 m≤ 2 cp + p ≤ 0.64 m

0.935 m 2.00 m 0.935 m

0.130 m

wL = 0.200 TN/m²

0.662 TN/m²wD = 0.388 TN/m² wD= 0.388 TN/m²

Page 14: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 14/180

1.00 m 2.00 m 1.00 mReacciones en los apoyos

R D =1.050 TN/m R L =0.400 TN/m

ZONA PISO TIPICO AZOTEAPuertas 0.094 TN/m 0.094 TN/mMuros albañil 0.759 TN/m 0.403 TN/mPlacas X 0.962 TN/m 0.504 TN/mAlfeizar h= 1 0.397 TN/m 0.094 TN/m

Alfeizar h= 1.8 0.000 TN/m 0.000 TN/mEscalera 1.050 TN/m ---- WL = 0.400 TN/m

6.2 CARGAS INDIRECTASPiso tipico AzoteaWD ( Peso propio y acabados ) WD ( Peso propio y acabados )Peso propio = ########### Peso propio = ########### ###########Acabados ########### Acabados = ######################

WD =########### WD =########### ###########WL =########### WL =######################

AI ( m2 ) PD = AI * WD PL = AI * WL AI ( m2 ) AI ( m2 )

MX1 2.4 1.104 0.480 2.4 2.4Mx2 3.5 1.61 0.700 3.5 3.5MX3 2.9 1.334 0.580 2.9 2.9Mx4 4.7 2.162 0.940 4.7 4.7Mx5 5 2.3 1.000 5 5Mx6 2.7 1.242 0.540 2.7 2.7Mx7 1.6 0.736 0.320 1.6 1.6Mx8 3 1.38 0.600 1.5Mx9 2.6 1.196 0.520 2.1

Tabla Nº 02 Cargas Directas ( Tn/m)

TABLA Nº 03 CARGAS INDIRECTAS

MUROPISO TIPICO AZO

Page 15: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 15/180

Mx10 1.8 0.828 0.360 1.23Mx11 2.7 1.242 0.540 1.24MY1 5.8 2.668 1.160 5.8 5.8MY2 6.7 3.082 1.340 6.7 6.7MY3 5.2 2.392 1.040 5.2 5.2MY4 4.7 2.162 0.940 4.7 4.7MY5 4.5 2.07 0.900 4.5 4.5MY6 4.7 2.162 0.940 4.7 4.7MY7 3.6 1.656 0.720 3.6 3.6MY8 3.58 1.6468 0.716 3.58 3.58MY9 1.15 0.529 0.230 1.23MY10 2 0.92 0.400 1.5

6.3 CARGAS POR NIVEL Y CENTRO DE GRAVEDAD

ZONA MURO PUERTA ALFEIZ. 1 m ESCALERA LFEIZ. 1.8 mMUROMX1 1.55 0.55Mx2 1.33 1.1MX3 1.90 1.1Mx4 1.75 0.4Mx5 1.75 0.4Mx6 1.50 0.4Mx7 1.45 0.4Mx8 1.50 0.4Mx9 1.55 0.55Mx10 1.73 1.1Mx11 2.38 0.75 0.55MY1 10.95 0.55MY2 5.35 0.8 0.55MY3 5.35 1.1MY4 4.05 0.475 0.55MY5 4.70 0.475

MY6 1.80MY7 1.80 0.8MY8 2.10 0.4MY9 2.10 0.4MY10 3.40 0.475 0.55

W5 =Ycg =

TABLA N º 05 A NIVEL DCARGAS DIRECTAS

LONGITUDES DE INFLUENCIA ( m )

Page 16: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 16/180

ZONA MURO PUERTA ALFEIZ. 1 m ESCALERA LFEIZ. 1.8 mMURO

MX1 1.55 0 0.55 0MX2 1.33 0 1.1 0MX3 1.90 0 1.1 0MX4 1.75 0.4 0 0MX5 1.75 0.4 0 0MX6 1.50 0.4 0 0MX7 1.45 0.4 0 0MX8 1.50 0.4 0 0MX9 1.55 0 0.55 0MX10 1.73 0 1.1 0

MX11 2.38 0 0.75 0.55MY1 10.95 0 0.55 0MY2 5.35 0.8 0.55 0MY3 5.35 0 1.1 0MY4 4.05 0.475 0.55 0MY5 4.70 0.475 0 0MY6 1.80 0 0 0MY7 1.80 0.8 0 0MY8 2.10 0.4 0 0MY9 2.10 0.4 0 0

MY10 3.40 0.475 0 0.55Con la informacion de la Tabla N º 06 se obtiene : W1 =

para el piso tipico i = 1, 2, 3, 4 Ycg =

Este peso ( con 25 % de sobrecarga ) repartido por unidad de area de planta resulta :

Longitud =9.35 m Ϭ = 0Ancho =10.95 m

Area de planta =###########

6.4 PESO TOTAL DEL EDIFICIO Y CARGAS ACUMULADAS

MURO L ( m ) AZOTEA PISO TIPICO PISO 5 PISO 5MX1 1.55 1.84013 2.61889 1.84013 1.84013MX2 1.33 2.334435 3.2272 2.334435 2.334435MX3 1.90 2.27516 4.794676002 2.27516 2.27516

TABLA N º 07 CARGAS DE GRAVEDADCARGAS POR NIVEL Car

TABLA N º 06 A NIVEL DE PCARGAS DIRECTAS

LONGITUDES DE INFLUENCIA ( m )

Page 17: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 17/180

MX4 1.75 3.02219 3.76304 3.02219 3.02219MX5 1.75 3.16769 3.91604 3.16769 3.16769MX6 1.50 1.95144 2.55324 1.95144 1.95144MX7 1.45 1.39779 1.95428 1.39779 1.39779MX8 1.50 3.45494 2.70624 3.45494 3.45494MX9 1.55 3.92563 2.72089 3.92563 3.92563MX10 1.73 3.320135 2.66388 3.320135 3.320135MX11 2.38 3.306825 3.47755 3.306825 3.306825MY1 10.95 6.64683 11.48937 6.64683 6.64683MY2 5.35 4.56191 7.77173 4.56191 4.56191MY3 5.35 4.00501 7.14998 4.00501 4.00501MY4 4.05 3.46439 5.73435 3.46439 3.46439MY5 4.70 4.12106 5.9077 4.12106MY6 1.80 3.0049 3.76356 3.0049MY7 1.80 2.54628 3.27744 2.54628MY8 2.10 2.62004 3.45756 2.62004

MY9 2.10 1.48029 2.21826 1.48029MY10 3.40 2.14216 3.64574 2.14216

Muro mas esforzado ###########

Page 18: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 18/180

Page 19: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 19/180

Page 20: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 20/180

Page 21: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 21/180

E TIENE

)

Page 22: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 22/180

0.15 m

1.24 m

0.12 m

1.24 m

0.15 m

0.130 m

Page 23: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 23/180

PD = AI * WD PL = AI * WL

1.104 0.241.61 0.351.334 0.292.162 0.472.3 0.5

1.242 0.270.736 0.160.69 0.150.966 0.21

EA

Page 24: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 24/180

0.5658 0.1230.5704 0.1242.668 0.583.082 0.672.392 0.522.162 0.472.07 0.452.162 0.471.656 0.361.6468 0.3580.5658 0.1230.69 0.15

CargaESCALERA Directa indirecta Pi ( TN ) Yi

P ( TN ) PD + 0.25PL ( m )0.67613 1.1640 1.84013 2.1500.636935 1.6975 2.334435 5.000

1.25 0.86866 1.4065 2.27516 8.0500.74269 2.2795 3.02219 1.0250.74269 2.4250 3.16769 1.0250.64194 1.3095 1.95144 5.7250.62179 0.7760 1.39779 8.2750.64194 2.8130 3.45494 3.9500.67613 3.2495 3.92563 0.9250.798135 2.5220 3.320135 3.9501.027325 2.2795 3.306825 7.8504.46433 2.1825 6.64683 5.4752.28241 2.2795 4.56191 2.6752.25901 1.7460 4.00501 2.6751.72809 1.7363 3.46439 3.3501.93856 2.1825 4.12106 8.600

0.7254 2.2795 3.0049 7.1500.80028 1.7460 2.54628 9.9000.88374 1.7363 2.62004 9.9000.88374 0.5966 1.48029 7.1501.41466 0.7275 2.14216 7.950

E AZOTEA

Page 25: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 25/180

CargaESCALERA Directa indirecta Pi Yi ( m )

P ( TN ) PD + 0.25PL ( TN )

0 1.39489 1.224 2.61889 2.1500 1.4422 1.785 3.2272 5.0001.25 3.315676002 1.479 4.7946760028.050

0 1.36604 2.397 3.76304 1.0250 1.36604 2.55 3.91604 1.0250 1.17624 1.377 2.55324 5.7250 1.13828 0.816 1.95428 8.2750 1.17624 1.53 2.70624 3.9500 1.39489 1.326 2.72089 0.9250 1.74588 0.918 2.66388 3.950

0 2.10055 1.377 3.47755 7.8500 8.53137 2.958 11.48937 5.4750 4.35473 3.417 7.77173 2.6750 4.49798 2.652 7.14998 2.6750 3.33735 2.397 5.73435 3.3500 3.6127 2.295 5.9077 8.6000 1.36656 2.397 3.76356 7.1500 1.44144 1.836 3.27744 9.9000 1.63176 1.8258 3.45756 9.9000 1.63176 0.5865 2.21826 7.150

0 2.62574 1.02 3.64574 7.950

PISO 4 PISO 3 PISO 2 PISO 1 Ϭ ( TN/ m2 )4.45902 7.07791 9.6968 12.31569 61.12005.561635 8.788835 12.016035 15.243235 88.4948

7.069836002 11.864512 16.65918801 21.45386401 86.8577

( TN ) : Pg = PD + 0.25 PLas acumuladas Pg y esfuerzo axial en Piso 1

ISOS TIPICOS

Page 26: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 26/180

6.78523 10.54827 14.31131 18.07435 79.44777.08373 10.99977 14.91581 18.83185 82.77744.50468 7.05792 9.61116 12.1644 62.38153.35207 5.30635 7.26063 9.21491 48.88556.16118 8.86742 11.57366 14.2799 73.23036.64652 9.36741 12.0883 14.80919 73.49475.984015 8.647895 11.311775 13.975655 62.32186.784375 10.261925 13.739475 17.217025 55.763618.1362 29.62557 41.11494 52.60431 36.954212.33364 20.10537 27.8771 35.64883 51.256411.15499 18.30497 25.45495 32.60493 46.87989.19874 14.93309 20.66744 26.40179 50.145810.02876 15.93646 21.84416 27.75186 45.42046.76846 10.53202 14.29558 18.05914 77.17585.82372 9.10116 12.3786 15.65604 66.90626.0776 9.53516 12.99272 16.45028 60.2574

3.69855 5.91681 8.13507 10.35333 37.92435.7879 9.43364 13.07938 16.72512 37.8396

Page 27: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 27/180

ANALISIS ESTRUCTURAL

PARA EDIFICACIONES DE MUROS PORTANTESNORMA DE DISEÑO SISMORESISTENTE E-030METODO ESTATICO

DATOS GENERALESFactor de zona Z =0.4Factor de Uso U =1

% s/c =0.25 De acuerdo al tipo de edificacionFactor de Suelo S =1.2 Suelo intermedio

Tp(s) =0.6Reduccion de fuerza sísmica R =6

GEOMETRIADimension horizontal en XX Dxx1 =9.350 m De cada planta, en cada dirección

Dxx2 =9.350 mDxx3 =9.350 mDxx4 =9.350 mDxx5 =9.350 m

Dimension horizontal en YY Dyy1 =10.950 mDyy2 =10.950 mDyy3 =10.950 mDyy4 =10.950 mDyy5 =10.950 m

Altura EntrePiso 1 He1 =2.600 m Altura entre ejes de techoAltura EntrePiso 2 He2 =2.600 mAltura Entrepiso 3 He3 =2.600 mAltura Entrepiso 4 He4 =2.600 mAltura Entrepiso 5 He5 =2.600 m

Altura de la edificacion Ht =13.000 m

PERIODO FUNDAMENTAL DE VIBRACIONCoeficiente Ct =60Direccion XX Tx =0.217Direccion YY Ty =0.217

FACTOR DE AMPLIFICACION SISMICADireccion XX Cx =8.914 Cx =2.5

Page 28: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 28/180

Direccion YY Cy =8.914 Cy =2.5

LOSAS Valores en peso por unidad de area Kg/m2NIVEL Ni : N 1 N 2 N 3 N 4Peso Propio PP = 300 295 290 285Piso terminado Pt = 100 100 100 100Tabiquería Tab = 80 80 80 80Otros carga permanente otro D = 0 0 0 0Sobre carga s/c = 200 200 200 200Otros carga móvil otro L = 0 0 0 0Peso cargas permanentes Pwd = 480 475 470 465Peso por sobre carga Ps/c = 200 200 200 200Peso por % sobre carga P%s/c = 50 50 50 50

MUROSResistencia a la compresión f'm =6.50E+05 Kg/m2Peso especifico ladrillo PE =1 800 Kg/m3Factor de forma k =1.2

Modulo de elasticidad Em =3.250E+08 Kg/m2Módulo de corte Gm =1.30E+08 Kg/m2

DIRECCION XX

Nivel 1Area de Peso propio

Longitud Espesor X - X Y - Y Influencia Murol t Xg Yg A i Pmi

( m ) ( m ) ( m ) ( m ) ( m2 ) ( Kg )

Altura libre 2.600M X 1 1.550 0.25 4.475 0.000 14.285 1813.500M X 2 1.325 0.25 8.675 1.500 10.000 1550.250

M X 3 1.900 0.25 1.825 3.550 14.190 2223.000M X 4 1.750 0.13 6.050 3.550 9.353 1064.700M X 5 1.750 0.13 2.700 6.500 7.876 1064.700M X 6 1.500 0.13 6.900 6.500 14.533 912.600M X 7 1.450 0.13 6.900 9.950 12.281 882.180M X 8 1.500 0.13 912.600M X 9 1.550 0.25 1813.500M X 10 1.725 0.25 2018.250

Centro

Page 29: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 29/180

M X 11 2.375 0.25 2778.750TOTALES 9510.930

Nivel 2Area de Peso propio

Longitud Espesor X - X Y - Y Influencia Murol t Xg Yg A i Pmi

( m ) ( m ) ( m ) ( m ) ( m2 ) ( Kg )

Altura libre 2.600M X 1 1.550 0.250 4.475 0.000 14.285 1813.500M X 2 1.325 0.250 8.675 1.500 0.000 1550.250M X 3 1.900 0.250 1.825 3.550 14.190 2223.000M X 4 1.750 0.130 6.050 3.550 9.353 1064.700M X 5 1.750 0.130 2.700 6.500 7.876 1064.700M X 6 1.500 0.130 6.900 6.500 14.533 912.600M X 7 1.450 0.130 6.900 9.950 12.281 882.180M X 8 1.500 0.130 912.600M X 9 1.550 0.250 1813.500M X 10 1.725 0.250 2018.250M X 11 2.375 0.250 2778.750

TOTALES 17034.030

Nivel 3Area de Peso propio

Longitud Espesor X - X Y - Y Influencia Murol t Xg Yg A i Pmi

( m ) ( m ) ( m ) ( m ) ( m2 ) ( Kg )

Altura libre 2.600M X 1 1.550 0.250 4.475 0.000 14.285 1813.500M X 2 1.325 0.250 8.675 1.500 0.000 1550.250M X 3 1.900 0.250 1.825 3.550 14.190 2223.000M X 4 1.750 0.130 6.050 3.550 9.353 1064.700

Centro

Centro

Page 30: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 30/180

M X 5 1.750 0.130 2.700 6.500 7.876 1064.700M X 6 1.500 0.130 6.900 6.500 14.533 912.600M X 7 1.450 0.130 6.900 9.950 12.281 882.180M X 8 1.500 0.130 912.600M X 9 1.550 0.250 1813.500M X 10 1.725 0.250 2018.250M X 11 2.375 0.250 2778.750

TOTALES . 17034.030

Nivel 4Area de Peso propio

Longitud Espesor X - X Y - Y Influencia Muro

l t Xg Yg A i Pmi( m ) ( m ) ( m ) ( m ) ( m2 ) ( Kg )

Altura libre 2.600M X 1 1.550 0.25 4.475 0.000 14.285 1813.500M X 2 1.325 0.25 8.675 1.500 0.000 1550.250M X 3 1.900 0.25 1.825 3.550 14.190 2223.000M X 4 1.750 0.13 6.050 3.550 9.353 1064.700M X 5 1.750 0.13 2.700 6.500 7.876 1064.700M X 6 1.500 0.13 6.900 6.500 14.533 912.600M X 7 1.450 0.13 6.900 9.950 12.281 882.180M X 8 1.500 0.13 912.600M X 9 1.550 0.25 1813.500M X 10 1.725 0.25 2018.250M X 11 2.375 0.25 2778.750

TOTALES 17034.030

Nivel 5Area de Peso propio

Longitud Espesor X - X Y - Y Influencia Murol t Xg Yg A i Pmi

( m ) ( m ) ( m ) ( m ) ( m2 ) ( Kg )

Altura libre 2.600M X 1 1.550 0.25 4.475 0.000 14.285 1813.500

Centro

Centro

Page 31: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 31/180

M X 2 1.325 0.25 8.675 1.500 0.000 1550.250M X 3 1.900 0.25 1.825 3.550 14.190 2223.000M X 4 1.750 0.87 6.050 3.550 9.353 7125.300M X 5 1.750 0.87 2.700 6.500 7.876 7125.300M X 6 1.500 0.87 6.900 6.500 14.533 6107.400M X 7 1.450 0.13 6.900 9.950 12.281 882.180M X 8 1.500 0.13 912.600M X 9 1.550 0.25 1813.500M X 10 1.725 0.25 2018.250M X 11 2.375 0.25 2778.750

TOTALES 27739.530

DIRECCION YY

Nivel 1Area de Peso propio

Longitud Espesor X - X Y - Y Influencia Murol t Xg Yg A i Pmi

( m ) ( m ) ( m ) ( m ) ( m2 ) ( Kg )

Altura libre 2.600M Y 1 10.950 0.13 0.000 3.225 0.000 6661.980

M Y 2 5.350 0.13 3.700 1.175 0.000 3254.940M Y 3 5.350 0.13 3.700 6.100 0.000 3254.940M Y 4 4.050 0.13 4.850 5.600 0.000 2464.020M Y 5 4.700 0.13 7.250 4.000 7.250 2859.480M Y 6 1.800 0.13 10.050 5.850 7.750 1095.120M Y 7 1.800 0.13 1095.120M Y 8 2.100 0.13 1277.640M Y 9 2.100 0.13 1277.640M Y 10 3.400 0.13 2068.560

TOTALES 25309.440

Nivel 2Area de Peso propio

Longitud Espesor X - X Y - Y Influencia Murol t Xg Yg A i Pmi

Centro

Centro

Page 32: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 32/180

( m ) ( m ) ( m ) ( m ) ( m2 ) ( Kg )

Altura libre 2.600M Y 1 10.950 0.13 0.000 3.225 0.000 6661.980M Y 2 5.350 0.13 3.700 1.175 0.000 3254.940M Y 3 5.350 0.13 3.700 6.100 0.000 3254.940M Y 4 4.050 0.13 4.850 5.600 0.000 2464.020M Y 5 4.700 0.13 7.250 4.000 7.250 2859.480M Y 6 1.800 0.13 10.050 5.850 7.750 1095.120M Y 7 1.800 0.13 1095.120M Y 8 2.100 0.13 1277.640M Y 9 2.100 0.13 1277.640M Y 10 3.400 0.13 2068.560

TOTALES 25309.440

Nivel 3Area de Peso propio

Longitud Espesor X - X Y - Y Influencia Murol t Xg Yg A i Pmi

( m ) ( m ) ( m ) ( m ) ( m2 ) ( Kg )

Altura libre 2.600M Y 1 10.950 0.13 0.000 3.225 0.000 6661.980M Y 2 5.350 0.13 3.700 1.175 0.000 3254.940M Y 3 5.350 0.13 3.700 6.100 0.000 3254.940M Y 4 4.050 0.13 4.850 5.600 0.000 2464.020M Y 5 4.700 0.13 7.250 4.000 7.250 2859.480M Y 6 1.800 0.13 10.050 5.850 7.750 1095.120M Y 7 1.800 0.13 1095.120M Y 8 2.100 0.13 1277.640M Y 9 2.100 0.13 1277.640M Y 10 3.400 0.13 2068.560

TOTALES . 25309.440

Nivel 4Area de Peso propio

Longitud Espesor X - X Y - Y Influencia Murol t Xg Yg A i Pmi

( m ) ( m ) ( m ) ( m ) ( m2 ) ( Kg )

Centro

Centro

Page 33: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 33/180

Altura libre 2.600M Y 1 10.950 0.13 0.000 3.225 0.000 6661.980M Y 2 5.350 0.13 3.700 1.175 0.000 3254.940M Y 3 5.350 0.13 3.700 6.100 0.000 3254.940M Y 4 4.050 0.13 4.850 5.600 0.000 2464.020M Y 5 4.700 0.13 7.250 4.000 7.250 2859.480M Y 6 1.800 0.13 10.050 5.850 7.750 1095.120M Y 7 1.800 0.13 1095.120M Y 8 2.100 0.13 1277.640M Y 9 2.100 0.13 1277.640M Y 10 3.400 0.13 2068.560

TOTALES 25309.440

Nivel 5 Area de Peso propioLongitud Espesor X - X Y - Y Influencia Muro

l t Xg Yg A i Pmi( m ) ( m ) ( m ) ( m ) ( m2 ) ( Kg )

Altura libre 2.600M Y 1 10.950 0.13 0.000 3.225 0.000 6661.980M Y 2 5.350 0.13 3.700 1.175 0.000 3254.940M Y 3 5.350 0.13 3.700 6.100 0.000 3254.940M Y 4 4.050 0.13 4.850 5.600 0.000 2464.020M Y 5 4.700 0.13 7.250 4.000 7.250 2859.480M Y 6 1.800 0.13 10.050 5.850 7.750 1095.120M Y 7 1.800 0.13 1095.120M Y 8 2.100 0.13 1277.640M Y 9 2.100 0.13 1277.640M Y 10 3.400 0.13 2068.560

TOTALES 25309.440

PREDIMENSIONAMIENTODireccion Nivel A Losa A muro Am/Al

( m2 ) ( cm2 )

1 82.518 20322.5 45 AUMENTAR MUROS

ecomendación C. Laterale

Centro

Page 34: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 34/180

2 72.518 20322.5 58 AUMENTAR MUROSX - X 3 72.518 20322.5 77 AUMENTAR MUROS

4 72.518 20322.5 116 AUMENTAR MUROS5 72.518 57322.5 655 DISMINUIR MUROS1 15 46930 105 AUMENTAR MUROS2 15 46930 134 MINIMO

Y - Y 3 15 46930 179 DISMINUIR MUROS4 15 46930 268 DISMINUIR MUROS5 15 46930 536 DISMINUIR MUROS

CENTRO DE MASAS

Nivel ∑Pi Xi ∑Pix ∑Pi Yi ∑Piy Xm Ym1 1260234.166 252916.010 571367.791 147616.200 4.983 3.8712 980010.278 199670.540 455161.457 117702.960 4.908 3.8673 747527.338 152087.660 339326.813 87864.720 4.915 3.8624 516807.846 104867.370 223863.854 58101.480 4.928 3.8535 287851.802 58009.670 108772.584 28413.240 4.962 3.828

FUERZAS CORTANTES Y MOMENTOS EN MUROS

MUROSModulo de elasticidad Em =3.25E+08 Kg/m2 Kg/cm2 = 10,00Módulo de corte Gm =1.30E+08 Kg/m2 ó Kg/cm2 = 10^Peso especifico tarrajeado PE =1800 Kg/m3Factor de forma k =1.2

PESOS TOTALES EN CADA NIVEL Pi

Nivel X-X Y-Y total X-X Y-Y total( Kg ) ( Kg ) ( Kg ) ( Kg ) ( Kg ) ( Kg )

1 9,510.930 25,309.440 34,820.370 43,734.540 7,950.000 51,684.5402 17,034.030 25,309.440 42,343.470 38,071.950 7,875.000 45,946.9503 17,034.030 25,309.440 42,343.470 37,709.360 7,800.000 45,509.3604 17,034.030 25,309.440 42,343.470 37,346.770 7,725.000 45,071.7705 27,739.530 25,309.440 53,048.970 31,182.740 6,450.000 37,632.740

Peso muro Peso losa

Page 35: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 35/180

CORTANTE BASAL V

Direccion C/R (>0,1) ZUSC/R Peso VX - X 0.417 0.200 423334.9 84667.0 KgY - Y 0.417 0.200 423334.9 84667.0 Kg

FUERZAS HORIZONTALES EN CADA NIVEL FiFUERZAS CORTANTES EN CADA NIVEL Vi

DIRECCION X - XCálculo de Fuerza en el piso superior "Fa"

Período de la estructura T =0.217Cortante basal Vxx =84,667.00 Kg Fa = 0.00

Peso Altura Fuerza Fuerza CortanteNivel Pi Hei Pi Hei Fi Piso Sup. Vi

( Kg ) ( m ) ( Kg - m ) ( Kg ) ( Kg ) ( Kg )1 90,266.500 2.600 234,692.900 18,053.3 84,667.02 88,290.400 2.600 229,555.040 17,658.1 66,613.73 87,852.800 2.600 228,417.280 17,570.6 48,955.64 92,768.000 2.600 241,196.800 18,553.6 31,385.0

5 64,157.200 2.600 166,808.720 12,831.4 0.0 12,831.4SUMA :1,100,670.740 84,667.0

DIRECCION Y - YCálculo de Fuerza en el piso superior "Fa"Período de la estructura T =0.217Cortante basal Vxx =84,667.00 Kg Fa = 0.00

Nivel Peso Altura Fuerza Fuerza CortantePi Hei Pi Hei Fi Piso Sup. Vi

Kg m Kg - m Kg Kg Kg1 90266.500 2.600 234692.900 18,053.3 84,667.02 88290.400 2.600 229555.040 17,658.1 66,613.73 87852.800 2.600 228417.280 17,570.6 48,955.64 92768.000 2.600 241196.800 18,553.6 31,385.05 64157.200 2.600 166808.720 12,831.4 0.0 12,831.4

SUMA :1100670.740 84,667.0

Page 36: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 36/180

CENTRO DE RIGIDECES

Nivel ∑kYi Xi ∑kYi ∑KXi Yi ∑KXi Xr Yr ( m ) ( m )

1 388749256 154460581 72959459 19224626 2.517 3.7952 388749256 154460581 72959459 38228238 2.517 1.9093 388749256 154460581 72959459 38228238 2.517 1.9094 388749256 154460581 72959459 38228238 2.517 1.9095 388749256 154460581 270538901 57455034 2.517 4.709

MOMENTOS TORSORES

Nivel C. Masas C. Rigidez Fuerza Longitud ExcentricidadYm Yr Fixx Ly ey Mtx1( m ) ( m ) ( Kg ) ( m ) ( m ) ( Kg-m )

1 3.871 3.795 18,053.3 10.950 0.076 21,140.4102 3.867 1.909 17,658.1 10.950 1.958 53,910.1803 3.862 1.909 17,570.6 10.950 1.953 53,555.1904 3.853 1.909 18,553.6 10.950 1.944 56,384.3905 3.828 4.709 12,831.4 10.950 -0.881 2,745.920

Nivel C. Masas C. Rigidez Fuerza Longitud ExcentricidadXm Xr Fiyy Lx ex Mtx1( m ) ( m ) ( Kg ) ( m ) ( m ) ( Kg-m )

1 4.983 2.517 18,053.300 9.350 2.466 61,399.2702 4.908 2.517 17,658.100 9.350 2.391 58,730.8403 4.915 2.517 17,570.600 9.350 2.398 58,562.8104 4.928 2.517 18,553.600 9.350 2.411 62,080.3505 4.962 2.517 12,831.400 9.350 2.445 43,370.130

CONTROL DE DESPLAZAMIENTOS

Desplazamientos laterales

Nivel Altura entrep. Cortante Rigidez Entr. Desplazam. Corrección Relaciónhei V K Relativo Delta R*Delta R*Delta/hei( m ) ( Kg ) ( Kg/m ) ( m ) ( m )

1 2.600 84,667.0 19,224,626 0.00440 0.0264 0.01015

Dirección x - x

Dirección x - xMomentos t

Dirección y - yMomentos t

Page 37: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 37/180

2 2.600 66,613.7 38,228,238 0.00174 0.01044 0.004023 2.600 48,955.6 38,228,238 0.00128 0.00768 0.002954 2.600 31,385.0 38,228,238 0.00082 0.00492 0.001895 2.600 12,831.4 57,455,034 0.00022 0.00132 0.00051

0.01952

Nivel Altura entrep. Cortante Rigidez Entr. Desplazam. Corrección Relaciónhei V K Relativo Delta R*Delta R*Delta/hei( m ) ( Kg ) ( Kg/m ) ( m ) ( m )

1 2.600 84,667.0 154,460,581 0.00055 0.0033 0.001272 2.600 66,613.7 154,460,581 0.00043 0.00258 0.000993 2.600 48,955.6 154,460,581 0.00032 0.00192 0.000744 2.600 31,385.0 154,460,581 0.00020 0.0012 0.000465 2.600 12,831.4 154,460,581 0.00008 0.00048 0.00018

0.004

Junta de separacion sísmicaCalculo de S formula final

S =3.320 3.320

Dirección Desplaz. Max. /3 Despl.Max S/2 unta Sísmica( cm ) ( cm ) ( cm ) ( cm )

X - X 1.952 1.3 1.7 1.7Y - Y 0.364 0.2 1.7 1.7

Control de giros en planta

Desplazam. Centro masas Desplaz, rela. 1.75Despl CM VerificaciónNivel Relativo Delta Xm centro masas CUMPLE

( m ) ( m ) ( m ) ( m )1 0.02640 4.983 0.075 0.13100 SI2 0.01044 4.908 0.075 0.13100 SI3 0.00768 4.915 0.007 0.01200 SI4 0.00492 4.928 0.013 0.02300 SI5 0.00132 4.962 0.034 0.05900 SI

Desplazam. Centro masas Desplaz, rela. 1.75Despl CM VerificaciónNivel Relativo Delta Ym centro masas CUMPLE

( m ) ( m ) ( m ) ( m )

Dirección y - y

Dirección x - x

Dirección y - y

Page 38: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 38/180

1 0.00330 3.871 0.004 0.00700 SI2 0.00258 3.867 0.004 0.00700 SI3 0.00192 3.862 0.005 0.00900 SI4 0.00120 3.853 0.009 0.01600 SI5 0.00048 3.828 0.025 0.04400 SI

VERIFICACION POR ESTABILIDAD

Efectos de segundo orden (P-delta)

Peso nivel Pesos sobre Desplaz, rela. Cortante Altura entrep.dice estabilidaNivel Pi Ni Delta Vi hei Q

( Kg ) ( Kg ) ( m ) ( Kg ) ( m )1 90,266.5 423,334.9 0.02640 84,667.0 2.600 0.0512 88,290.4 333,068.4 0.01044 66,613.7 2.600 0.0203 87,852.8 244,778.0 0.00768 48,955.6 2.600 0.0154 92,768.0 156,925.2 0.00492 31,385.0 2.600 0.0095 64,157.2 64,157.2 0.00132 12,831.4 2.600 0.003

Nivel Peso nivel Pesos sobre Desplaz, rela. Cortante Altura entrep.dice estabilidaPi Ni Delta Vi hei Q

( Kg ) ( Kg ) ( m ) ( Kg ) ( m )1 90,266.5 423,334.9 0.00330 84,667.0 2.600 0.0062 88,290.4 333,068.4 0.00258 66,613.7 2.600 0.0053 87,852.8 244,778.0 0.00192 48,955.6 2.600 0.0044 92,768.0 156,925.2 0.00120 31,385.0 2.600 0.0025 64,157.2 64,157.2 0.00048 12,831.4 2.600 0.001

VolteoDirección Nivel Fi Hi Fi Hi

1 18,053.300 2.600 46,938.580 P = 423,334.9002 17,658.100 5.200 91,822.120 L = 9.350

X - X 3 17,570.600 7.800 137,050.680 Mr =###########4 18,553.600 10.400 192,957.440Mr/Mv =3.1105 12,831.400 13.000 166,808.200

M v =635,577.020 Resultado :CUMPLE

Dirección Nivel Fi Hi Fi Hi 1 18,053.300 2.600 46,938.580 P =423,334.9002 17,658.100 5.200 91,822.120 L =10.950

Dirección y - y

Dirección x - x

Page 39: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 39/180

Y - Y 3 17,570.600 7.800 137,050.680 Mr =###########4 18,553.600 10.400 192,957.440Mr/Mv =3.6505 12,831.400 13.000 166,808.200

M v =635,577.020 Resultado :CUMPLE

Page 40: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 40/180

Page 41: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 41/180

Page 42: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 42/180

Page 43: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 43/180

Page 44: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 44/180

Page 45: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 45/180

Page 46: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 46/180

Page 47: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 47/180

Page 48: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 48/180

N 528010000

2000

38020050

DIRECCION XX

Nivel 1

C. Permanente Sobre Carga % Sobre car. Total Por unid Lon TotalWdi Wli %Wli Pd wd Pl( Kg ) ( Kg ) ( Kg ) ( Kg ) ( Kg/m ) ( Kg )

Altura libre 2.6006856.800 2857.000 714.250 M X 1 41494.450 26770.613 14285.0004800.000 2000.000 500.000 M X 2 12551.250 9472.642 2000.000

6811.200 2838.000 709.500 M X 3 43326.300 22803.316 14190.0004489.440 1870.600 467.650 M X 4 32615.410 18637.377 9353.0003780.480 1575.200 393.800 M X 5 29262.620 16721.497 7876.0006975.840 2906.600 726.650 M X 6 42747.710 28498.473 14533.0005894.880 2456.200 614.050 M X 7 32288.770 22268.117 12281.000

0.000 0.000 0.000 M X 8 912.600 608.400 0.0000.000 0.000 0.000 M X 9 1813.500 1170.000 0.0000.000 0.000 0.000 M X 10 2018.250 1170.000 0.000

Carga muerta en base muro Carga viva ePeso losa apoyada sobre el muro

Page 49: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 49/180

0.000 0.000 0.000 M X 11 2778.750 1170.000 0.00039608.640 16503.600 4125.900 TOTALES

Nivel 2

C. Perman. Sobre Carga % Sobre car. Total Por unid Long TotalWdi Wli %Wli Pd wd Pl( Kg ) ( Kg ) ( Kg ) ( Kg ) ( Kg/m ) ( Kg )

Altura libre6785.375 2857.000 714.250 M X 1 32824.150 21176.871 11428.000

0.000 0.000 0.000 M X 2 6201.000 4680.000 0.0006740.250 2838.000 709.500 M X 3 34292.100 18048.474 11352.0004442.675 1870.600 467.650 M X 4 27061.270 15463.583 7482.4003741.100 1575.200 393.800 M X 5 24417.440 13952.823 6300.8006903.175 2906.600 726.650 M X 6 34859.270 23239.513 11626.4005833.475 2456.200 614.050 M X 7 25511.710 17594.283 9824.800

0.000 0.000 0.000 M X 8 3650.400 2433.600 0.0000.000 0.000 0.000 M X 9 7254.000 4680.000 0.0000.000 0.000 0.000 M X 10 8073.000 4680.000 0.0000.000 0.000 0.000 M X 11 11115.000 4680.000 0.000

34446.050 14503.600 3625.900 TOTALES

Nivel 3

C. Perman. Sobre Carga % Sobre car. Total Por unid Lon TotalWdi Wli %Wli Pd wd Pl( Kg ) ( Kg ) ( Kg ) ( Kg ) ( Kg/m ) ( Kg )

Altura libre 2.6006713.950 2857.000 714.250 M X 1 24225.275 15629.210 8571.000

0.000 0.000 0.000 M X 2 4650.750 3510.000 0.0006669.300 2838.000 709.500 M X 3 25328.850 13330.974 8514.0004395.910 1870.600 467.650 M X 4 21553.895 12316.511 5611.800

Peso losa apoyada sobre el muro Carga muerta en base muro Carga viva e

Peso losa apoyada sobre el muro Carga muerta en base muro Carga viva e

Page 50: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 50/180

3701.720 1575.200 393.800 M X 5 19611.640 11206.651 4725.6006830.510 2906.600 726.650 M X 6 27043.495 18028.997 8719.8005772.070 2456.200 614.050 M X 7 18796.055 12962.797 7368.600

0.000 0.000 0.000 M X 8 2737.800 1825.200 0.0000.000 0.000 0.000 M X 9 5440.500 3510.000 0.0000.000 0.000 0.000 M X 10 6054.750 3510.000 0.0000.000 0.000 0.000 M X 11 8336.250 3510.000 0.000

34083.460 14503.600 3625.900 TOTALES

Nivel 4

C. Perman. Sobre Carga % Sobre car. Total Por unid Lon Total

Wdi Wli %Wli Pd wd Pl( Kg ) ( Kg ) ( Kg ) ( Kg ) ( Kg/m ) ( Kg )

Altura libre 2.6006642.525 2857.000 714.250 M X 1 15697.825 10127.629 5714.000

0.000 0.000 0.000 M X 2 3100.500 2340.000 0.0006598.350 2838.000 709.500 M X 3 16436.550 8650.816 5676.0004349.145 1870.600 467.650 M X 4 16093.285 9196.163 3741.2003662.340 1575.200 393.800 M X 5 14845.220 8482.983 3150.4006757.845 2906.600 726.650 M X 6 19300.385 12866.923 5813.2005710.665 2456.200 614.050 M X 7 12141.805 8373.659 4912.400

0.000 0.000 0.000 M X 8 1825.200 1216.800 0.0000.000 0.000 0.000 M X 9 3627.000 2340.000 0.0000.000 0.000 0.000 M X 10 4036.500 2340.000 0.0000.000 0.000 0.000 M X 11 5557.500 2340.000 0.000

33720.870 14503.600 3625.900 TOTALES

Nivel 5

C. Perman. Sobre Carga % Sobre car. Total Por unid Lon TotalWdi Wli %Wli Pd wd Pl( Kg ) ( Kg ) ( Kg ) ( Kg ) ( Kg/m ) ( Kg )

Altura libre 2.6005428.300 2857.000 714.250 M X 1 7241.800 4672.129 2857.000

Peso losa apoyada sobre el muro Carga muerta en base muro Carga viva e

Peso losa apoyada sobre el muro Carga muerta en base muro Carga viva e

Page 51: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 51/180

0.000 0.000 0.000 M X 2 1550.250 1170.000 0.0005392.200 2838.000 709.500 M X 3 7615.200 4008.000 2838.0003554.140 1870.600 467.650 M X 4 10679.440 6102.537 1870.6002992.880 1575.200 393.800 M X 5 10118.180 5781.817 1575.2005522.540 2906.600 726.650 M X 6 11629.940 7753.293 2906.6004666.780 2456.200 614.050 M X 7 5548.960 3826.869 2456.200

0.000 0.000 0.000 M X 8 912.600 608.400 0.0000.000 0.000 0.000 M X 9 1813.500 1170.000 0.0000.000 0.000 0.000 M X 10 2018.250 1170.000 0.0000.000 0.000 0.000 M X 11 2778.750 1170.000 0.000

27556.840 14503.600 3625.900 TOTALES

DIRECCION YY

Nivel 1

C. Perman. Sobre Carga % Sobre car. Total Por unid Lon TotalWdi Wli %Wli Pd wd Pl( Kg ) ( Kg ) ( Kg ) ( Kg ) ( Kg/m ) ( Kg )

Altura libre 2.6000.000 0.000 0.000 M Y 1 33309.900 3042.000 0.000

0.000 0.000 0.000 M Y 2 16274.700 3042.000 0.0000.000 0.000 0.000 M Y 3 16274.700 3042.000 0.0000.000 0.000 0.000 M Y 4 12320.100 3042.000 0.000

3480.000 1450.000 362.500 M Y 5 30754.900 6543.596 7250.0003720.000 1550.000 387.500 M Y 6 23068.100 12815.611 7750.000

0.000 0.000 0.000 M Y 7 5475.600 3042.000 0.0000.000 0.000 0.000 M Y 8 6388.200 3042.000 0.000

M Y 9M Y 10

7200.000 3000.000 750.000 TOTALES

Nivel 2

C. Perman. Sobre Carga % Sobre car. Total Por unid Lon TotalWdi Wli %Wli Pd wd Pl

Peso losa apoyada sobre el muro Carga muerta en base muro Carga viva e

Peso losa apoyada sobre el muro Carga muerta en base muro Carga viva e

Page 52: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 52/180

( Kg ) ( Kg ) ( Kg ) ( Kg ) ( Kg/m ) ( Kg )

Altura libre 2.6000.000 0.000 0.000 M Y 1 26647.920 2433.600 0.0000.000 0.000 0.000 M Y 2 13019.760 2433.600 0.0000.000 0.000 0.000 M Y 3 13019.760 2433.600 0.0000.000 0.000 0.000 M Y 4 9856.080 2433.600 0.000

3443.750 1450.000 362.500 M Y 5 24415.420 5194.770 5800.0003681.250 1550.000 387.500 M Y 6 18252.980 10140.544 6200.000

0.000 0.000 0.000 M Y 7 4380.480 2433.600 0.0000.000 0.000 0.000 M Y 8 5110.560 2433.600 0.000

M Y 9M Y 10

7125.000 3000.000 750.000 TOTALES

Nivel 3

C. Perman. Sobre Carga % Sobre car. Total Por unid Lon TotalWdi Wli %Wli Pd wd Pl( Kg ) ( Kg ) ( Kg ) ( Kg ) ( Kg/m ) ( Kg )

Altura libre 2.6000.000 0.000 0.000 M Y 1 19985.940 1825.200 0.0000.000 0.000 0.000 M Y 2 9764.820 1825.200 0.0000.000 0.000 0.000 M Y 3 9764.820 1825.200 0.0000.000 0.000 0.000 M Y 4 7392.060 1825.200 0.000

3407.500 1450.000 362.500 M Y 5 18112.190 3853.657 4350.0003642.500 1550.000 387.500 M Y 6 13476.610 7487.006 4650.000

0.000 0.000 0.000 M Y 7 3285.360 1825.200 0.0000.000 0.000 0.000 M Y 8 3832.920 1825.200 0.000

M Y 9M Y 10

7050.000 3000.000 750.000 TOTALES

Nivel 4

C. Perman. Sobre Carga % Sobre car. Total Por unid Lon TotalWdi Wli %Wli Pd wd Pl( Kg ) ( Kg ) ( Kg ) ( Kg ) ( Kg/m ) ( Kg )

Peso losa apoyada sobre el muro Carga muerta en base muro Carga viva e

Peso losa apoyada sobre el muro Carga muerta en base muro Carga viva e

Page 53: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 53/180

Altura libre 2.6000.000 0.000 0.000 M Y 1 13323.960 1216.800 0.0000.000 0.000 0.000 M Y 2 6509.880 1216.800 0.0000.000 0.000 0.000 M Y 3 6509.880 1216.800 0.0000.000 0.000 0.000 M Y 4 4928.040 1216.800 0.000

3371.250 1450.000 362.500 M Y 5 11845.210 2520.257 2900.0003603.750 1550.000 387.500 M Y 6 8738.990 4854.994 3100.000

0.000 0.000 0.000 M Y 7 2190.240 1216.800 0.0000.000 0.000 0.000 M Y 8 2555.280 1216.800 0.000

M Y 9M Y 10

6975.000 3000.000 750.000 TOTALES

Nivel 5

C. Perman. Sobre Carga % Sobre car. Total Por unid Lon TotalWdi Wli %Wli Pd wd Pl( Kg ) ( Kg ) ( Kg ) ( Kg ) ( Kg/m ) ( Kg )

Altura libre 2.6000.000 0.000 0.000 M Y 1 6661.980 608.400 0.0000.000 0.000 0.000 M Y 2 3254.940 608.400 0.0000.000 0.000 0.000 M Y 3 3254.940 608.400 0.0000.000 0.000 0.000 M Y 4 2464.020 608.400 0.000

2755.000 1450.000 362.500 M Y 5 5614.480 1194.570 1450.0002945.000 1550.000 387.500 M Y 6 4040.120 2244.511 1550.000

0.000 0.000 0.000 M Y 7 1095.120 608.400 0.0000.000 0.000 0.000 M Y 8 1277.640 608.400 0.000

M Y 9M Y 10

5700.000 3000.000 750.000 TOTALES

Peso losa apoyada sobre el muro Carga muerta en base muro Carga viva e

Page 54: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 54/180

0 Kg/m2 4 Kg/m2

Peso Peso totalpor nivel Edificación

( Kg ) ( Kg )90,266.588,290.487,852.8 423,334.992,768.064,157.2

Page 55: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 55/180

Page 56: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 56/180

Mtx2( Kg-m )

-18,396.31015,238.94015,075.57015,752.010-25,354.850

Mtx2( Kg-m )

27,639.60025,710.19025,705.79027,385.11019,375.410

VerificaciónCUMPLE

NO

rsores RNC

rsores RNC

Page 57: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 57/180

SISISISI

VerificaciónCUMPLE

SISISISISI

Page 58: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 58/180

Efectos P-DeltaCONSIDERAR

NONONONONO

Efectos P-DeltaCONSIDERAR

NONONONONO

Page 59: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 59/180

Page 60: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 60/180

Page 61: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 61/180

Page 62: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 62/180

Page 63: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 63/180

Page 64: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 64/180

Page 65: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 65/180

Page 66: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 66/180

Page 67: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 67/180

Page 68: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 68/180

Carga total Area MuroPor UND Lon para sismo Predimensio. a Flexión a Corte total

Wl Pi Pi Xi Am Kfl Fcl Kl( Kg/m ) ( Kg ) ( m2 ) ( Kg/m ) ( Kg/m ) ( Kg/m )

1843.226 45065.700 201669.008 0.388 4,303,665 16,145,833 3,397,9441509.434 13051.250 113219.594 0.331 2,688,382 13,802,083 2,250,105

1493.684 46873.800 85544.685 0.475 7,926,914 19,791,667 5,659,9881068.914 34953.660 211469.643 0.228 3,220,778 9,479,167 2,403,970900.114 31231.620 84325.374 0.228 3,220,778 9,479,167 2,403,9701937.733 46380.960 320028.624 0.195 2,028,245 8,125,000 1,623,0761693.931 35359.020 243977.238 0.189 1,832,106 7,854,167 1,485,573

0.000 912.600 0.000 0.195 2,028,245 8,125,000 1,623,0760.000 1813.500 0.000 0.388 4,303,665 16,145,833 3,397,9440.000 2018.250 0.000 0.431 5,932,130 17,968,750 4,459,792

Datos para XmRigidez lateral n base muro

Page 69: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 69/180

0.000 2778.750 0.000 0.594 15,482,254 24,739,583 9,522,800252916.010 1260234.166 19,224,626

Carga total Area MuroPor unid Lon para sismo Predimensio. a Flexión a Corte total

Wl Pi Pi Xi Am Kfl Fcl Kl( Kg/m ) ( Kg ) ( m2 ) ( Kg/m ) ( Kg/m ) ( Kg/m )

1843.226 35681.150 159673.146 0.388 4,303,665 16,145,833 3,397,9440.000 6201.000 53793.675 0.331 2,688,382 13,802,083 2,250,105

1493.684 37130.100 67762.433 0.475 7,926,914 19,791,667 5,659,9881068.914 28931.870 175037.814 0.228 3,220,778 9,479,167 2,403,970900.114 25992.640 70180.128 0.228 3,220,778 9,479,167 2,403,9701937.733 37765.870 260584.503 0.195 2,028,245 8,125,000 1,623,0761693.931 27967.910 192978.579 0.189 1,832,106 7,854,167 1,485,573

0.000 3650.400 0.000 0.195 2,028,245 8,125,000 1,623,0760.000 7254.000 0.000 0.388 4,303,665 16,145,833 3,397,9440.000 8073.000 0.000 0.431 5,932,130 17,968,750 4,459,7920.000 11115.000 0.000 0.594 15,482,254 24,739,583 9,522,800

199670.540 980010.278 38,228,238

Carga total Area MuroPor unid Lon para sismo Predimensio. a Flexión a Corte total

Wl Pi Pi Xi Am Kfl Fcl Kl( Kg/m ) ( Kg ) ( m2 ) ( Kg/m ) ( Kg/m ) ( Kg/m )

1843.226 26368.025 117996.912 0.388 4,303,665 16,145,833 3,397,9440.000 4650.750 40345.256 0.331 2,688,382 13,802,083 2,250,105

1493.684 27457.350 50109.664 0.475 7,926,914 19,791,667 5,659,9881068.914 22956.845 138888.912 0.228 3,220,778 9,479,167 2,403,970

Rigidez lateral

Rigidez lateralDatos para Xm

Datos para Xmn base muro

n base muro

Page 70: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 70/180

900.114 20793.040 56141.208 0.228 3,220,778 9,479,167 2,403,9701937.733 29223.445 201641.771 0.195 2,028,245 8,125,000 1,623,0761693.931 20638.205 142403.615 0.189 1,832,106 7,854,167 1,485,573

0.000 2737.800 0.000 0.195 2,028,245 8,125,000 1,623,0760.000 5440.500 0.000 0.388 4,303,665 16,145,833 3,397,9440.000 6054.750 0.000 0.431 5,932,130 17,968,750 4,459,7920.000 8336.250 0.000 0.594 15,482,254 24,739,583 9,522,800

152087.660 747527.338 38,228,238

Carga total Area MuroPor unid Lon para sismo Predimensio. a Flexión a Corte total

Wl Pi Pi Xi Am Kfl Fcl Kl( Kg/m ) ( Kg ) ( m2 ) ( Kg/m ) ( Kg/m ) ( Kg/m )

1843.226 17126.325 76640.304 0.388 4,303,665 16,145,833 3,397,9440.000 3100.500 26896.838 0.331 2,688,382 13,802,083 2,250,105

1493.684 17855.550 32586.379 0.475 7,926,914 19,791,667 5,659,9881068.914 17028.585 103022.939 0.228 3,220,778 9,479,167 2,403,970900.114 15632.820 42208.614 0.228 3,220,778 9,479,167 2,403,9701937.733 20753.685 143200.427 0.195 2,028,245 8,125,000 1,623,0761693.931 13369.905 92252.345 0.189 1,832,106 7,854,167 1,485,573

0.000 1825.200 0.000 0.195 2,028,245 8,125,000 1,623,0760.000 3627.000 0.000 0.388 4,303,665 16,145,833 3,397,9440.000 4036.500 0.000 0.431 5,932,130 17,968,750 4,459,7920.000 5557.500 0.000 0.594 15,482,254 24,739,583 9,522,800

104867.370 516807.846 38,228,238

Carga total Area MuroPor unid Lon para sismo Predimensio. a Flexión a Corte total

Wl Pi Pi Xi Am Kfl Fcl Kl( Kg/m ) ( Kg ) ( m2 ) ( Kg/m ) ( Kg/m ) ( Kg/m )

1843.226 7956.050 35603.324 0.388 4,303,665 16,145,833 3,397,944

Rigidez lateral

Rigidez lateralDatos para Xm

Datos para Xmn base muro

n base muro

Page 71: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 71/180

0.000 1550.250 13448.419 0.331 2,688,382 13,802,083 2,250,1051493.684 8324.700 15192.578 0.475 7,926,914 19,791,667 5,659,9881068.914 11147.090 67439.895 1.523 21,554,439 63,437,500 16,088,111900.114 10511.980 28382.346 1.523 21,554,439 63,437,500 16,088,1111937.733 12356.590 85260.471 1.305 13,573,641 54,375,000 10,862,1261693.931 6163.010 42524.769 0.189 1,832,106 7,854,167 1,485,573

0.000 912.600 0.000 0.195 2,028,245 8,125,000 1,623,0760.000 1813.500 0.000 0.388 4,303,665 16,145,833 3,397,9440.000 2018.250 0.000 0.431 5,932,130 17,968,750 4,459,7920.000 2778.750 0.000 0.594 15,482,254 24,739,583 9,522,800

58009.670 287851.802 57,455,034

Carga total Area MuroPor unid Lon para sismo Predimensio. a Flexión a Corte total

Wl Pi Pi Xi Am Kfl Fcl Kl( Kg/m ) ( Kg ) ( m2 ) ( Kg/m ) ( Kg/m ) ( Kg/m )

0.000 33309.900 107424.428 1.424 789,021,860 59,312,500 55,165,582

0.000 16274.700 19122.773 0.696 92,025,466 28,979,167 22,039,0020.000 16274.700 99275.670 0.696 92,025,466 28,979,167 22,039,0020.000 12320.100 68992.560 0.527 39,921,950 21,937,500 14,157,704

308.511 32567.400 130269.600 0.611 62,393,630 25,458,333 18,080,846861.111 25005.600 146282.760 0.234 3,504,808 9,750,000 2,578,0740.000 5475.600 0.000 0.234 3,504,808 9,750,000 2,578,0740.000 6388.200 0.000 0.273 5,565,505 11,375,000 3,737,056

0.273 5,565,505 11,375,000 3,737,0560.442 23,620,192 18,416,667 10,348,185

147616.200 571367.791 154,460,581

Carga total Area MuroPor unid Lon para sismo Predimensio. a Flexión a Corte total

Wl Pi Pi Xi Am Kfl Fcl Kl

Rigidez lateral

Rigidez lateralDatos para Xm

n base muroDatos para Xm

n base muro

Page 72: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 72/180

( Kg/m ) ( Kg ) ( m2 ) ( Kg/m ) ( Kg/m ) ( Kg/m )

0.000 26647.920 85939.542 1.424 789,021,860 59,312,500 55,165,5820.000 13019.760 15298.218 0.696 92,025,466 28,979,167 22,039,0020.000 13019.760 79420.536 0.696 92,025,466 28,979,167 22,039,0020.000 9856.080 55194.048 0.527 39,921,950 21,937,500 14,157,704

308.511 25865.420 103461.680 0.611 62,393,630 25,458,333 18,080,846861.111 19802.980 115847.433 0.234 3,504,808 9,750,000 2,578,0740.000 4380.480 0.000 0.234 3,504,808 9,750,000 2,578,0740.000 5110.560 0.000 0.273 5,565,505 11,375,000 3,737,056

0.273 5,565,505 11,375,000 3,737,0560.442 23,620,192 18,416,667 10,348,185

117702.960 455161.457 154,460,581

Carga total Area MuroPor unid Lon para sismo Predimensio. a Flexión a Corte total

Wl Pi Pi Xi Am Kfl Fcl Kl( Kg/m ) ( Kg ) ( m2 ) ( Kg/m ) ( Kg/m ) ( Kg/m )

0.000 19985.940 64454.657 1.424 789,021,860 59,312,500 55,165,5820.000 9764.820 11473.664 0.696 92,025,466 28,979,167 22,039,0020.000 9764.820 59565.402 0.696 92,025,466 28,979,167 22,039,0020.000 7392.060 41395.536 0.527 39,921,950 21,937,500 14,157,704

308.511 19199.690 76798.760 0.611 62,393,630 25,458,333 18,080,846861.111 14639.110 85638.794 0.234 3,504,808 9,750,000 2,578,0740.000 3285.360 0.000 0.234 3,504,808 9,750,000 2,578,0740.000 3832.920 0.000 0.273 5,565,505 11,375,000 3,737,056

0.273 5,565,505 11,375,000 3,737,0560.442 23,620,192 18,416,667 10,348,185

87864.720 339326.813 154,460,581

Carga total Area MuroPor unid Lon para sismo Predimensio. a Flexión a Corte total

Wl Pi Pi Xi Am Kfl Fcl Kl( Kg/m ) ( Kg ) ( m2 ) ( Kg/m ) ( Kg/m ) ( Kg/m )

n base muro

Rigidez lateral

Rigidez lateral

n base muroDatos para Xm

Datos para Xm

Page 73: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 73/180

0.000 13323.960 42969.771 1.424 789,021,860 59,312,500 55,165,5820.000 6509.880 7649.109 0.696 92,025,466 28,979,167 22,039,0020.000 6509.880 39710.268 0.696 92,025,466 28,979,167 22,039,0020.000 4928.040 27597.024 0.527 39,921,950 21,937,500 14,157,704

308.511 12570.210 50280.840 0.611 62,393,630 25,458,333 18,080,846861.111 9513.990 55656.842 0.234 3,504,808 9,750,000 2,578,0740.000 2190.240 0.000 0.234 3,504,808 9,750,000 2,578,0740.000 2555.280 0.000 0.273 5,565,505 11,375,000 3,737,056

0.273 5,565,505 11,375,000 3,737,0560.442 23,620,192 18,416,667 10,348,185

58101.480 223863.854 154,460,581

Carga total Area MuroPor unid Lon para sismo Predimensio. a Flexión a Corte total

Wl Pi Pi Xi Am Kfl Fcl Kl( Kg/m ) ( Kg ) ( m2 ) ( Kg/m ) ( Kg/m ) ( Kg/m )

0.000 6661.980 21484.886 1.424 789,021,860 59,312,500 55,165,5820.000 3254.940 3824.555 0.696 92,025,466 28,979,167 22,039,0020.000 3254.940 19855.134 0.696 92,025,466 28,979,167 22,039,0020.000 2464.020 13798.512 0.527 39,921,950 21,937,500 14,157,704

308.511 5976.980 23907.920 0.611 62,393,630 25,458,333 18,080,846861.111 4427.620 25901.577 0.234 3,504,808 9,750,000 2,578,0740.000 1095.120 0.000 0.234 3,504,808 9,750,000 2,578,0740.000 1277.640 0.000 0.273 5,565,505 11,375,000 3,737,056

0.273 5,565,505 11,375,000 3,737,0560.442 23,620,192 18,416,667 10,348,185

28413.240 108772.584 154,460,581

Rigidez lateral n base muro Datos para Xm

Page 74: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 74/180

Page 75: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 75/180

Page 76: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 76/180

Page 77: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 77/180

Page 78: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 78/180

Page 79: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 79/180

Page 80: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 80/180

Page 81: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 81/180

Page 82: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 82/180

Page 83: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 83/180

Page 84: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 84/180

Page 85: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 85/180

Page 86: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 86/180

Page 87: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 87/180

Page 88: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 88/180

DIRECCION XX

Nivel 1Cortante ato para cenDirecto Rigideces

Vd Kxi Yi Yi - Yr Kl(Yi - Yr)^2 Vt1 + Vt2 +( Kg ) ( m ) ( Kg ) ( Kg )

V piso = 84,667.00M X 1 14,964.85 0 -3.795 48,937,274 -1,854.26 1,613.57M X 2 9,909.67 3,375,158 -2.295 11,851,359 -742.55 646.17

M X 3 24,927.10 20,092,957 -0.245 339,741 -199.40 173.52M X 4 10,587.30 8,534,094 -0.245 144,298 -84.69 73.70M X 5 10,587.30 15,625,805 2.705 17,589,909 935.06 -813.68M X 6 7,148.17 10,549,994 2.705 11,876,088 631.32 -549.37M X 7 6,542.60 14,781,451 6.155 56,279,485 1,314.81 -1,144.15M X 8 7,148.17 0 -3.795 23,375,581 -885.71 770.74M X 9 14,964.85 0 -3.795 48,937,274 -1,854.26 1,613.57M X 10 19,641.33 0 -3.795 64,230,036 -2,433.71 2,117.81

Datos para fuerza cortantepor Momento torsor

Cortantes por Mt del RNC

Page 89: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 89/180

M X 11 41,939.28 0 -3.795 137,147,604 -5,196.60 4,522.06TOTALES 72,959,459 147,018,154

Nivel 2Cortante ato para cenDirecto Rigideces

Vd Kxi Yi Yi - Yr Kl(Yi - Yr)^2 Vt1 + Vt2 +( Kg ) ( m ) ( Kg ) ( Kg )

V piso = 66,613.70M X 1 5,921.01 0 -1.909 12,383,063 -1,623.42 -458.90M X 2 3,920.87 3,375,158 -0.409 376,400 -230.32 -65.11M X 3 9,862.68 20,092,957 1.641 15,241,674 2,324.52 657.08M X 4 4,188.98 8,534,094 1.641 6,473,605 987.30 279.08M X 5 4,188.98 15,625,805 4.591 50,669,151 2,762.14 780.78M X 6 2,828.25 10,549,994 4.591 34,210,029 1,864.90 527.16M X 7 2,588.65 14,781,451 8.041 96,053,705 2,989.60 845.08M X 8 2,828.25 0 -1.909 5,914,945 -775.45 -219.20M X 9 5,921.01 0 -1.909 12,383,063 -1,623.42 -458.90M X 10 7,771.30 0 -1.909 16,252,735 -2,130.74 -602.30M X 11 16,593.73 0 -1.909 34,703,759 -4,549.67 -1,286.07

TOTALES 72,959,459 215,407,627

Nivel 3Cortante ato para cenDirecto Rigideces

Vd Kxi Yi Yi - Yr Kl(Yi - Yr)^2 Vt1 + Vt2 +(Kg) (m) (Kg) (Kg)

V piso = 48,955.60M X 1 4,351.45 0 -1.909 12,383,063 -1,612.73 -453.98M X 2 2,881.51 3,375,158 -0.409 376,400 -228.81 -64.41M X 3 7,248.26 20,092,957 1.641 15,241,674 2,309.22 650.04M X 4 3,078.56 8,534,094 1.641 6,473,605 980.79 276.09

Cortantes por Mt del RNCDatos para fuerza cortantepor Momento torsor

Cortantes por Mt del RNCDatos para fuerza cortantepor Momento torsor

Page 90: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 90/180

M X 5 3,078.56 15,625,805 4.591 50,669,151 2,743.95 772.41M X 6 2,078.53 10,549,994 4.591 34,210,029 1,852.62 521.51M X 7 1,902.44 14,781,451 8.041 96,053,705 2,969.92 836.02M X 8 2,078.53 0 -1.909 5,914,945 -770.35 -216.85M X 9 4,351.45 0 -1.909 12,383,063 -1,612.73 -453.98M X 10 5,711.27 0 -1.909 16,252,735 -2,116.71 -595.84M X 11 12,195.03 0 -1.909 34,703,759 -4,519.72 -1,272.28

TOTALES 72,959,459 215,407,627

Nivel 4Cortante ato para cenDirecto Rigideces

Vd Kxi Yi Yi - Yr Kl(Yi - Yr)^2 Vt1 + Vt2 +(Kg) (m) (Kg) (Kg)

V piso = 31,385.00M X 1 2,789.68 0 -1.909 12,383,063 -1,697.93 -474.35M X 2 1,847.31 3,375,158 -0.409 376,400 -240.89 -67.30M X 3 4,646.79 20,092,957 1.641 15,241,674 2,431.21 679.20M X 4 1,973.64 8,534,094 1.641 6,473,605 1,032.61 288.48M X 5 1,973.64 15,625,805 4.591 50,669,151 2,888.91 807.07M X 6 1,332.53 10,549,994 4.591 34,210,029 1,950.49 544.91M X 7 1,219.64 14,781,451 8.041 96,053,705 3,126.81 873.53M X 8 1,332.53 0 -1.909 5,914,945 -811.04 -226.58M X 9 2,789.68 0 -1.909 12,383,063 -1,697.93 -474.35M X 10 3,661.44 0 -1.909 16,252,735 -2,228.53 -622.58M X 11 7,818.12 0 -1.909 34,703,759 -4,758.48 -1,329.37

TOTALES 72,959,459 215,407,627

Nivel 5Cortante ato para cenDirecto Rigideces

Vd Kxi Yi Yi - Yr Kl(Yi - Yr)^2 Vt1 + Vt2 +(Kg) (m) (Kg) (Kg)

V piso = 12,831.40M X 1 758.86 0 -4.709 75,348,324 -172.31 1,591.07

por Momento torsor

Cortantes por Mt del RNCDatos para fuerza cortantepor Momento torsor

Cortantes por Mt del RNCDatos para fuerza cortante

Page 91: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 91/180

M X 2 502.51 3,375,158 -3.209 23,170,864 -77.76 717.99M X 3 1,264.04 20,092,957 -1.159 7,602,954 -70.64 652.29M X 4 3,592.95 57,112,794 -1.159 21,610,854 -200.80 1,854.10M X 5 3,592.95 104,572,722 1.791 51,605,528 310.29 -2,865.13M X 6 2,425.83 70,603,819 1.791 34,842,235 209.50 -1,934.43M X 7 331.77 14,781,451 5.241 40,805,839 83.85 -774.20M X 8 362.48 0 -4.709 35,991,193 -82.31 760.00M X 9 758.86 0 -4.709 75,348,324 -172.31 1,591.07M X 10 996.00 0 -4.709 98,894,465 -226.16 2,088.27M X 11 2,126.72 0 -4.709 211,165,052 -482.91 4,459.00

TOTALES 270,538,901 254,986,598

DIRECCION YY

Nivel 1Cortante ato para centDirecto Rigideces

Vd Kyi Xi Xi - Xr Kl(Xi - Xr)^2 Vt1 + Vt2 +( Kg ) ( m ) ( Kg ) ( Kg )

V piso = 84,667.00M Y 1 30,238.81 0 -2.517 349,489,905 -7,294.10 -3,283.52

M Y 2 12,080.60 81,544,307 1.183 30,843,341 1,369.61 616.55M Y 3 12,080.60 81,544,307 1.183 30,843,341 1,369.61 616.55M Y 4 7,760.49 68,664,864 2.333 77,058,811 1,735.11 781.08M Y 5 9,910.95 131,086,134 4.733 405,034,257 4,495.47 2,023.69M Y 6 1,413.16 25,909,644 7.533 146,295,617 1,020.20 459.25M Y 7 1,413.16 0 -2.517 16,332,844 -340.88 -153.45M Y 8 2,048.45 0 -2.517 23,675,330 -494.12 -222.43

2,048.45 0 -2.517 23,675,330 -494.12 -222.435,672.32 0 -2.517 65,558,743 -1,368.26 -615.94

TOTALES 388,749,256 ###########

Nivel 2Cortante ato para cenDirecto Rigideces

Vd Kyi Xi Xi - Xr Kl(Xi - Xr)^2 Vt1 + Vt2 +por Momento torsor

Datos para fuerza cortantepor Momento torsor

Cortantes por Mt del RNC

Datos para fuerza cortante Cortantes por Mt del RNC

Page 92: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 92/180

( Kg ) ( m ) ( Kg ) ( Kg )

V piso = 66,613.70M Y 1 23,791.08 0 -2.517 349,489,905 -6,977.09 -3,054.31M Y 2 9,504.69 81,544,307 1.183 30,843,341 1,310.09 573.51M Y 3 9,504.69 81,544,307 1.183 30,843,341 1,310.09 573.51M Y 4 6,105.75 68,664,864 2.333 77,058,811 1,659.70 726.56M Y 5 7,797.67 131,086,134 4.733 405,034,257 4,300.10 1,882.42M Y 6 1,111.84 25,909,644 7.533 146,295,617 975.86 427.19M Y 7 1,111.84 0 -2.517 16,332,844 -326.06 -142.74M Y 8 1,611.67 0 -2.517 23,675,330 -472.65 -206.91

1,611.67 0 -2.517 23,675,330 -472.65 -206.914,462.83 0 -2.517 65,558,743 -1,308.79 -572.94

TOTALES 388,749,256 ###########

Nivel 3Cortante Dato para centDirecto Rigideces

Vd Kyi Xi Xi - Xr Kl(Xi - Xr)^2 Vt1 + Vt2 +(Kg) (m) (Kg) (Kg)

V piso = 48,955.60M Y 1 17,484.49 0 -2.517 349,489,905 -6,957.13 -3,053.79M Y 2 6,985.16 81,544,307 1.183 30,843,341 1,306.34 573.41M Y 3 6,985.16 81,544,307 1.183 30,843,341 1,306.34 573.41M Y 4 4,487.22 68,664,864 2.333 77,058,811 1,654.96 726.43M Y 5 5,730.64 131,086,134 4.733 405,034,257 4,287.80 1,882.10M Y 6 817.11 25,909,644 7.533 146,295,617 973.07 427.12M Y 7 817.11 0 -2.517 16,332,844 -325.13 -142.71M Y 8 1,184.44 0 -2.517 23,675,330 -471.29 -206.87

1,184.44 0 -2.517 23,675,330 -471.29 -206.873,279.81 0 -2.517 65,558,743 -1,305.05 -572.84

TOTALES 388,749,256 ###########

Nivel 4Cortante Dato para centDirecto Rigideces

Vd Kyi Xi Xi - Xr Kl(Xi - Xr)^2 Vt1 + Vt2 +( Kg ) ( m ) ( Kg ) ( Kg )

Datos para fuerza cortantepor Momento torsor

Datos para fuerza cortantepor Momento torsor

Cortantes por Mt del RNC

Cortantes por Mt del RNC

Page 93: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 93/180

V piso = 31,385.00M Y 1 11,209.15 0 -2.517 349,489,905 -7,375.01 -3,253.29M Y 2 4,478.13 81,544,307 1.183 30,843,341 1,384.80 610.87M Y 3 4,478.13 81,544,307 1.183 30,843,341 1,384.80 610.87M Y 4 2,876.72 68,664,864 2.333 77,058,811 1,754.36 773.89M Y 5 3,673.87 131,086,134 4.733 405,034,257 4,545.34 2,005.06M Y 6 523.84 25,909,644 7.533 146,295,617 1,031.51 455.02M Y 7 523.84 0 -2.517 16,332,844 -344.66 -152.04M Y 8 759.34 0 -2.517 23,675,330 -499.60 -220.39

759.34 0 -2.517 23,675,330 -499.60 -220.392,102.66 0 -2.517 65,558,743 -1,383.43 -610.27

TOTALES 388,749,256 ###########

Nivel 5 Cortante Dato para centDirecto Rigideces

Vd Kyi Xi Xi - Xr Kl(Xi - Xr)^2 Vt1 + Vt2 +( Kg ) ( m ) ( Kg ) ( Kg )

V piso = 12,831.40M Y 1 4,582.73 0 -2.517 349,489,905 -5,152.28 -2,301.76M Y 2 1,830.83 81,544,307 1.183 30,843,341 967.44 432.20M Y 3 1,830.83 81,544,307 1.183 30,843,341 967.44 432.20M Y 4 1,176.11 68,664,864 2.333 77,058,811 1,225.62 547.54M Y 5 1,502.02 131,086,134 4.733 405,034,257 3,175.43 1,418.61M Y 6 214.17 25,909,644 7.533 146,295,617 720.63 321.94M Y 7 214.17 0 -2.517 16,332,844 -240.78 -107.57M Y 8 310.45 0 -2.517 23,675,330 -349.03 -155.93

310.45 0 -2.517 23,675,330 -349.03 -155.93859.65 0 -2.517 65,558,743 -966.49 -431.77

TOTALES 388,749,256 ###########

por Momento torsor Cortantes por Mt del RNCDatos para fuerza cortante

Page 94: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 94/180

Page 95: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 95/180

Page 96: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 96/180

Page 97: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 97/180

Page 98: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 98/180

Page 99: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 99/180

Page 100: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 100/180

Page 101: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 101/180

Page 102: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 102/180

Page 103: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 103/180

Page 104: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 104/180

Page 105: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 105/180

Page 106: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 106/180

Page 107: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 107/180

Page 108: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 108/180

Cortante por Cortante Fuerza Momentotorsion total horizontal muro

Vt Vmi Fmi Mm( Kg ) ( Kg ) ( Kg ) ( Kg-m )

1,854.26 16,819.11 9,274.68 96,629.68742.55 10,652.22 6,501.03 55,178.32

199.40 25,126.50 12,939.30 145,250.3384.69 10,671.99 5,495.71 73,738.39935.06 11,522.36 4,571.24 92,603.21631.32 7,779.49 3,086.34 62,522.38

1,314.81 7,857.41 2,279.16 61,777.14885.71 8,033.88 8,033.88 20,888.09

1,854.26 16,819.11 16,819.11 43,729.692,433.71 22,075.04 22,075.04 57,395.10

Page 109: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 109/180

5,196.60 47,135.88 47,135.88 122,553.29

Cortante por Cortante Fuerza Momentotorsion total horizontal muro

Vt Vmi Fmi Mm( Kg ) ( Kg ) ( Kg ) ( Kg-m )

1,623.42 7,544.43 1,580.25 52,899.99230.32 4,151.19 1,040.87 27,482.55

2,324.52 12,187.20 2,629.72 79,921.43987.30 5,176.28 1,116.93 45,991.22

2,762.14 6,951.12 1,128.61 62,645.081,864.90 4,693.15 762.00 42,295.712,989.60 5,578.25 705.89 41,347.88775.45 3,603.70 754.82 25,268.44

1,623.42 7,544.43 1,580.25 52,899.992,130.74 9,902.04 2,074.06 69,431.084,549.67 21,143.40 4,428.65 148,253.22

Cortante por Cortante Fuerza Momentotorsion total horizontal muro

Vt Vmi Fmi Mm(Kg) (Kg) (Kg) (Kg-m)

1,612.73 5,964.18 1,476.57 33,284.47228.81 3,110.32 1,022.12 16,689.45

2,309.22 9,557.48 2,479.48 48,234.71980.79 4,059.35 1,053.10 32,532.89

Page 110: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 110/180

2,743.95 5,822.51 959.96 44,572.161,852.62 3,931.15 648.13 30,093.522,969.92 4,872.36 525.91 26,844.43770.35 2,848.88 705.31 15,898.82

1,612.73 5,964.18 1,476.57 33,284.472,116.71 7,827.98 1,938.01 43,685.774,519.72 16,714.75 4,138.15 93,280.38

Cortante por Cortante Fuerza Momentotorsion total horizontal muro

Vt Vmi Fmi Mm(Kg) (Kg) (Kg) (Kg-m)

1,697.93 4,487.61 2,137.68 17,777.60240.89 2,088.20 867.70 8,602.62

2,431.21 7,078.00 5,161.67 23,385.261,032.61 3,006.25 -2,440.80 21,978.582,888.91 4,862.55 -1,595.53 29,433.641,950.49 3,283.02 -1,077.24 19,872.533,126.81 4,346.45 3,240.48 14,176.29811.04 2,143.57 1,021.09 8,491.73

1,697.93 4,487.61 2,137.68 17,777.602,228.53 5,889.97 2,805.70 23,333.024,758.48 12,576.60 5,990.88 49,822.03

Cortante por Cortante Fuerza Momentotorsion total horizontal muro

Vt Vmi Fmi Mm(Kg) (Kg) (Kg) (Kg-m)

1,591.07 2,349.93 2,349.93 6,109.82

Page 111: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 111/180

717.99 1,220.50 1,220.50 3,173.30652.29 1,916.33 1,916.33 4,982.46

1,854.10 5,447.05 5,447.05 14,162.332,865.13 6,458.08 6,458.08 16,791.011,934.43 4,360.26 4,360.26 11,336.68774.20 1,105.97 1,105.97 2,875.52760.00 1,122.48 1,122.48 2,918.45

1,591.07 2,349.93 2,349.93 6,109.822,088.27 3,084.27 3,084.27 8,019.104,459.00 6,585.72 6,585.72 17,122.87

Cortante por Cortante Fuerza Momentotorsion total horizontal muro

Vt Vmi Fmi Mm( Kg ) ( Kg ) ( Kg ) ( Kg-m )

7,294.10 37,532.91 6,764.74 314,760.86

1,369.61 13,450.21 2,635.43 107,165.991,369.61 13,450.21 2,635.43 107,165.991,735.11 9,495.60 1,730.15 79,133.704,495.47 14,406.42 2,308.65 128,490.151,020.20 2,433.36 345.66 22,883.61340.88 1,754.04 316.14 14,709.84494.12 2,542.57 458.25 21,322.70494.12 2,542.57

1,368.26 7,040.58

Cortante por Cortante Fuerza Momentotorsion total horizontal muro

Vt Vmi Fmi Mm

Page 112: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 112/180

( Kg ) ( Kg ) ( Kg ) ( Kg-m )

6,977.09 30,768.17 6,326.55 217,175.301,310.09 10,814.78 2,523.28 72,195.451,310.09 10,814.78 2,523.28 72,195.451,659.70 7,765.45 1,623.27 54,445.144,300.10 12,097.77 2,079.33 91,033.46975.86 2,087.70 297.52 16,556.88326.06 1,437.90 295.66 10,149.33472.65 2,084.32 428.59 14,712.02472.65 2,084.32

1,308.79 5,771.62

Cortante por Cortante Fuerza Momentotorsion total horizontal muro

Vt Vmi Fmi Mm(Kg) (Kg) (Kg) (Kg-m)

6,957.13 24,441.62 5,857.46 137,178.051,306.34 8,291.50 2,428.57 44,077.021,306.34 8,291.50 2,428.57 44,077.021,654.96 6,142.18 1,511.10 34,254.974,287.80 10,018.44 1,799.23 59,579.26973.07 1,790.18 234.83 11,128.86325.13 1,142.24 273.74 6,410.79471.29 1,655.73 396.79 9,292.79471.29 1,655.73

1,305.05 4,584.86

Cortante por Cortante Fuerza Momentotorsion total horizontal muro

Vt Vmi Fmi Mm( Kg ) ( Kg ) ( Kg ) ( Kg-m )

Page 113: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 113/180

7,375.01 18,584.16 8,849.15 73,629.841,384.80 5,862.93 3,064.66 22,519.121,384.80 5,862.93 3,064.66 22,519.121,754.36 4,631.08 2,229.35 18,285.314,545.34 8,219.21 3,541.76 33,531.321,031.51 1,555.35 620.55 6,474.39344.66 868.50 413.55 3,440.97499.60 1,258.94 599.46 4,987.89499.60 1,258.94

1,383.43 3,486.09

Cortante por Cortante Fuerza Momentotorsion total horizontal muro

Vt Vmi Fmi Mm( Kg ) ( Kg ) ( Kg ) ( Kg-m )

5,152.28 9,735.01 9,735.01 25,311.03967.44 2,798.27 2,798.27 7,275.50967.44 2,798.27 2,798.27 7,275.50

1,225.62 2,401.73 2,401.73 6,244.503,175.43 4,677.45 4,677.45 12,161.37720.63 934.80 934.80 2,430.48240.78 454.95 454.95 1,182.87349.03 659.48 659.48 1,714.65349.03 659.48 659.48 1,714.65966.49 1,826.14 1,826.14 4,747.96

Page 114: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 114/180

DISEÑO DE MUROS EN ALBAÑILERIA CONFINADA

NORMA DE ALBAÑILERIA E-070

DATOS GENERALESResistencia muro f'm =65 Kg/cm2Resistencia Acero fy =4 200 Kg/cm2Resistencia concreto f'c = 210 Kg/cm2Pred. Largo columnas b=15 cmMortero con/sin cal (c/s) Tipo =SRecubrimiento + As/2 Tipo =3.5 cmAs Estribos Av =1.56 cm2

% sobre carga % s/c =0.25

Modulo de elasticidadConcreto Ec =217,370.65 Kg/cm2Albañilería Em =32,500.00 Kg/cm2Relacion modular Ec/Em n =6.69

ESFUERZOS ADMISIBLES "CONSTANTES"Compresión por flexión Fm =26.00 Kg/cm2Tracción por flexión Ft =1.00 Kg/cm2

DIRECCION X - X

Nivel 1

Longitud Espesor Carga muerta Carga viva Cortante Cortantel t wd wl Vmi Paño Vi

( m ) ( m ) ( kg/m ) ( kg/m ) ( Kg ) ( Kg )

Mínimo :Altura libre 2.600 0.13M X 1 1.550 0.250 26,770.613 1,843.226 16,819.11 16,819.11M X 2 1.325 0.250 9,472.642 1,509.434 10,652.22 10,652.22M X 3 1.900 0.250 22,803.316 1,493.684 25,126.50 25,126.50M X 4 1.750 0.130 18,637.377 1,068.914 10,671.99 10,671.99M X 5 1.750 0.130 16,721.497 900.114 11,522.36 11,522.36M X 6 1.500 0.130 28,498.473 1,937.733 7,779.49 7,779.49M X 7 1.450 0.130 22,268.117 1,693.931 7,857.41 7,857.41

Page 115: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 115/180

M X 8 1.500 0.130 608.400 0.000 8,033.88 8,033.88M X 9 1.550 0.250 1,170.000 0.000 16,819.11 16,819.11M X 10 1.725 0.250 1,170.000 0.000 22,075.04 22,075.04M X 11 2.375 0.250 1,170.000 0.000 47,135.88 47,135.88

TOTALES

Nivel 2

Longitud Espesor Carga muerta Carga viva Cortante Cortantel t wd wl Vmi Paño Vi

( m ) ( m ) ( kg/m ) ( kg/m ) ( Kg ) ( Kg )

Altura libre 2.600M X 1 1.550 0.250 21,176.871 1,843.226 7,544.43 7,544.43M X 2 1.325 0.250 4,680.000 0.000 4,151.19 4,151.19M X 3 1.900 0.250 18,048.474 1,493.684 12,187.20 12,187.20M X 4 1.750 0.130 15,463.583 1,068.914 5,176.28 5,176.28M X 5 1.750 0.130 13,952.823 900.114 6,951.12 6,951.12M X 6 1.500 0.130 23,239.513 1,937.733 4,693.15 4,693.15M X 7 1.450 0.130 17,594.283 1,693.931 5,578.25 5,578.25M X 8 1.500 0.130 2,433.600 0.000 3,603.70 3,603.70M X 9 1.550 0.250 4,680.000 0.000 7,544.43 7,544.43M X 10 1.725 0.250 4,680.000 0.000 9,902.04 9,902.04M X 11 2.375 0.250 4,680.000 0.000 21,143.40 21,143.40

TOTALES

Nivel 3

Longitud Espesor Carga muerta Carga viva Cortante Cortantel t wd wl Vmi Paño Vi(m) (m) (kg/m) (kg/m) (Kg) (Kg)

Altura libre 2.600M X 2 1.550 0.250 15,629.210 1,843.226 5,964.18 5,964.18M X 2 1.325 0.250 3,510.000 0.000 3,110.32 3,110.32M X 3 1.900 0.250 13,330.974 1,493.684 9,557.48 9,557.48

Page 116: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 116/180

M X 4 1.750 0.130 12,316.511 1,068.914 4,059.35 4,059.35M X 5 1.750 0.130 11,206.651 900.114 5,822.51 5,822.51M X 6 1.500 0.130 18,028.997 1,937.733 3,931.15 3,931.15M X 7 1.450 0.130 12,962.797 1,693.931 4,872.36 4,872.36M X 8 1.500 0.130 1,825.200 0.000 2,848.88 2,848.88M X 9 1.550 0.250 3,510.000 0.000 5,964.18 5,964.18M X 10 1.725 0.250 3,510.000 0.000 7,827.98 7,827.98M X 11 2.375 0.250 3,510.000 0.000 16,714.75 16,714.75

TOTALES

Nivel 4

Longitud Espesor Carga muerta Carga viva Cortante Cortantel t wd wl Vmi Paño Vi

(m) (m) (kg/m) (kg/m) (Kg) (Kg)

Altura libre 2.600M X 2 1.550 0.250 10,127.629 1,843.226 4,487.61 4,487.61M X 2 1.325 0.250 2,340.000 0.000 2,088.20 2,088.20M X 3 1.900 0.250 8,650.816 1,493.684 7,078.00 7,078.00M X 4 1.750 0.130 9,196.163 1,068.914 3,006.25 3,006.25M X 5 1.750 0.130 8,482.983 900.114 4,862.55 4,862.55M X 6 1.500 0.130 12,866.923 1,937.733 3,283.02 3,283.02M X 7 1.450 0.130 8,373.659 1,693.931 4,346.45 4,346.45M X 8 1.500 0.130 1,216.800 0.000 2,143.57 2,143.57M X 9 1.550 0.250 2,340.000 0.000 4,487.61 4,487.61M X 10 1.725 0.250 2,340.000 0.000 5,889.97 5,889.97M X 11 2.375 0.250 2,340.000 0.000 12,576.60 12,576.60

TOTALES

Nivel 5

Longitud Espesor Carga muerta Carga viva Cortante Cortantel t wd wl Vmi Paño Vi

(m) (m) (kg/m) (kg/m) (Kg) (Kg)

Page 117: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 117/180

Page 118: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 118/180

Nivel 2

Longitud Espesor Carga muerta Carga viva Cortante Cortantel t wd wl Vmi Paño Vi

(m) (m) (kg/m) (kg/m) (Kg) (Kg)

Altura libre 2.600M Y 1 10.950 0.130 2,433.600 0.000 30,768.17 10,256.06M Y 2 5.350 0.130 2,433.600 0.000 10,814.78 5,407.39M Y 3 5.350 0.130 2,433.600 0.000 10,814.78 5,407.39M Y 4 4.050 0.130 2,433.600 0.000 7,765.45 7,765.45M Y 5 4.700 0.130 5,194.770 308.511 12,097.77 12,097.77M Y 6 1.800 0.130 10,140.544 861.111 2,087.70 2,087.70M Y 7 1.800 0.130 2,433.600 0.000 1,437.90 1,437.90M Y 8 2.100 0.130 2,433.600 0.000 2,084.32 2,084.32

M Y 9 2.100 0.130 0.000 0.000 2,084.32 2,084.32M Y 10 3.400 0.130 0.000 0.000 5,771.62 5,771.62TOTALES

Nivel 3

Longitud Espesor Carga muerta Carga viva Cortante Cortantel t wd wl Vmi Paño Vi

(m) (m) (kg/m) (kg/m) (Kg) (Kg)

Altura libre 2.600M Y 1 10.950 0.130 1,825.200 0.000 24,441.62 8,147.21M Y 2 5.350 0.130 1,825.200 0.000 8,291.50 4,145.75M Y 3 5.350 0.130 1,825.200 0.000 8,291.50 4,145.75M Y 4 4.050 0.130 1,825.200 0.000 6,142.18 6,142.18M Y 5 4.700 0.130 3,853.657 308.511 10,018.44 10,018.44M Y 6 1.800 0.130 7,487.006 861.111 1,790.18 1,790.18M Y 7 1.800 0.130 1,825.200 0.000 1,142.24 1,142.24M Y 8 2.100 0.130 1,825.200 0.000 1,655.73 1,655.73M Y 9 2.100 0.130 0.000 0.000 1,655.73 1,655.73M Y 10 3.400 0.130 0.000 0.000 4,584.86 4,584.86TOTALES

Page 119: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 119/180

Nivel 4

Longitud Espesor Carga muerta Carga viva Cortante Cortantel t wd wl Vmi Paño Vi

(m) (m) (kg/m) (kg/m) (Kg) (Kg)

Altura libre 2.600M Y 1 10.950 0.130 1,216.800 0.000 18,584.16 6,194.72M Y 2 5.350 0.130 1,216.800 0.000 5,862.93 2,931.47M Y 3 5.350 0.130 1,216.800 0.000 5,862.93 2,931.47M Y 4 4.050 0.130 1,216.800 0.000 4,631.08 4,631.08M Y 5 4.700 0.130 2,520.257 308.511 8,219.21 8,219.21

M Y 6 1.800 0.130 4,854.994 861.111 1,555.35 1,555.35M Y 7 1.800 0.130 1,216.800 0.000 868.50 868.50M Y 8 2.100 0.130 1,216.800 0.000 1,258.94 1,258.94M Y 9 2.100 0.130 0.000 0.000 1,258.94 1,258.94M Y 10 3.400 0.130 0.000 0.000 3,486.09 3,486.09TOTALES

Nivel 5

Longitud Espesor Carga muerta Carga viva Cortante Cortantel t wd wl Vmi Paño Vi

(m) (m) (kg/m) (kg/m) (Kg) (Kg)

Altura libre 2.600M Y 1 10.950 0.130 608.400 0.000 9,735.01 3,245.00M Y 2 5.350 0.130 608.400 0.000 2,798.27 1,399.14M Y 3 5.350 0.130 608.400 0.000 2,798.27 1,399.14M Y 4 4.050 0.130 608.400 0.000 2,401.73 2,401.73M Y 5 4.700 0.130 1,194.570 308.511 4,677.45 4,677.45M Y 6 1.800 0.130 2,244.511 861.111 934.80 934.80M Y 7 1.800 0.130 608.400 0.000 454.95 454.95M Y 8 2.100 0.130 608.400 0.000 659.48 659.48M Y 9 2.100 0.130 0.000 0.000 659.48 659.48

Page 120: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 120/180

M Y 10 3.400 0.130 0.000 0.000 1,826.14 1,826.14TOTALES

COSTO MUROS

Nivel Concreto Encofrado Acero Muros( m3 ) ( m2 ) ( m3 ) ( m3 )

X - 1 3.852 42.07 0.05181856 2.37

En Nuevos soles

RESUMEN METRADOS

Page 121: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 121/180

X - 2 2.149 26.78 0.03543091 3.65X - 3 1.892 24.22 0.03049889 3.84X - 4 1.764 22.99 0.02845244 3.94X - 5 4.776 34.05 0.05892663 11.27Y - 1 4.743 57.05 0.05620357 9.54Y - 2 3.988 49.21 0.04684599 9.97Y - 3 3.287 41.95 0.04064958 10.34Y - 4 2.830 37.34 0.03723310 10.57Y - 5 2.322 32.21 0.03472449 10.83

TOTAL 31.603 367.87 0.42078416 76.32

Unidad C. Unitario Metrado C. Parcial C. Totalm3 200 31.603 S/6,320.60m3 15700 0.42078416 S/6,606.31m2 12 367.87 S/4,414.44m3 200 76.32 S/15,264.00

S/32,605.35Acero : 7850 Kg/m3

ConcretoAceroEncofrado/desencofradoMuro e = 0.15 m.

Partida

Page 122: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 122/180

DIRECCIO

Nivel 1

Momento Long. confin. Area InerciaMm l Espesor Longitud A I

( Kg-m ) ( m ) # Paños ( cm2 ) ( cm4 )

Altura libre96,629.68 1.400 SI 1 7,767.50 ########### M X 155,178.32 1.175 SI 1 7,205.00 ########### M X 2145,250.33 1.750 SI 1 8,642.50 ########### M X 373,738.39 1.600 CAMBIAR 1 4,299.10 ########### M X 492,603.21 1.600 CAMBIAR 1 4,299.10 ########### M X 562,522.38 1.350 CAMBIAR 1 3,974.10 ########### M X 661,777.14 1.300 CAMBIAR 1 3,909.10 9,758,590.83 M X 7

VerificaciónSECCION TRANSFORMAD

Page 123: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 123/180

20,888.09 1.350 CAMBIAR 1 3,974.10 ########### M X 843,729.69 1.400 SI 1 7,767.50 ########### M X 957,395.10 1.575 SI 1 8,205.00 ########### M X 10122,553.29 2.225 SI 1 9,830.00 ########### M X 11

TOTALES

Nivel 2

Momento Long. confin. Area InerciaMm l Espesor Longitud A I

( Kg-m ) ( m ) # Paños (cm2) (cm4)

Altura libre52,899.99 1.400 SI 1 7,767.50 ########### M X 127,482.55 1.175 SI 1 7,205.00 ########### M X 279,921.43 1.750 SI 1 8,642.50 ########### M X 345,991.22 1.600 CAMBIAR 1 4,299.10 ########### M X 462,645.08 1.600 CAMBIAR 1 4,299.10 ########### M X 542,295.71 1.350 CAMBIAR 1 3,974.10 ########### M X 641,347.88 1.300 CAMBIAR 1 3,909.10 9,758,590.83 M X 725,268.44 1.350 CAMBIAR 1 3,974.10 ########### M X 852,899.99 1.400 SI 1 7,767.50 ########### M X 969,431.08 1.575 SI 1 8,205.00 ########### M X 10148,253.22 2.225 SI 1 9,830.00 ########### M X 11

TOTALES

Nivel 3

Momento Long. confin. Area InerciaMm l Espesor Longitud A I(Kg-m) (m) # Paños (cm2) (cm4)

Altura libre33,284.47 1.400 SI 1 7,767.50 ########### M X 216,689.45 1.175 SI 1 7,205.00 ########### M X 248,234.71 1.750 SI 1 8,642.50 ########### M X 3

SECCION TRANSFORMAD

SECCION TRANSFORMAD

Verificación

Verificación

Page 124: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 124/180

32,532.89 1.600 CAMBIAR 1 4,299.10 ########### M X 444,572.16 1.600 CAMBIAR 1 4,299.10 ########### M X 530,093.52 1.350 CAMBIAR 1 3,974.10 ########### M X 626,844.43 1.300 CAMBIAR 1 3,909.10 9,758,590.83 M X 715,898.82 1.350 CAMBIAR 1 3,974.10 ########### M X 833,284.47 1.400 SI 1 7,767.50 ########### M X 943,685.77 1.575 SI 1 8,205.00 ########### M X 1093,280.38 2.225 SI 1 9,830.00 ########### M X 11

TOTALES

Nivel 4

Momento Long. confin. Area InerciaMm l Espesor Longitud A I

(Kg-m) (m) # Paños (cm2) (cm4)

Altura libre17,777.60 1.400 SI 1 7,767.50 ########### M X 28,602.62 1.175 SI 1 7,205.00 ########### M X 223,385.26 1.750 SI 1 8,642.50 ########### M X 321,978.58 1.600 CAMBIAR 1 4,299.10 ########### M X 429,433.64 1.600 CAMBIAR 1 4,299.10 ########### M X 519,872.53 1.350 CAMBIAR 1 3,974.10 ########### M X 614,176.29 1.300 CAMBIAR 1 3,909.10 9,758,590.83 M X 78,491.73 1.350 CAMBIAR 1 3,974.10 ########### M X 817,777.60 1.400 SI 1 7,767.50 ########### M X 923,333.02 1.575 SI 1 8,205.00 ########### M X 1049,822.03 2.225 SI 1 9,830.00 ########### M X 11

TOTALES

Nivel 5

Momento Long. confin. Area InerciaMm l Espesor Longitud A I

(Kg-m) (m) # Paños (cm2) (cm4)

Verificación

VerificaciónSECCION TRANSFORMAD

SECCION TRANSFORMAD

Page 125: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 125/180

Altura libre6,109.82 1.400 SI 1 7,767.50 ########### M X 23,173.30 1.175 SI 1 7,205.00 ########### M X 24,982.46 1.750 SI 1 8,642.50 ########### M X 314,162.33 1.600 SI 1 28,770.90 ########### M X 4

16,791.01 1.600 SI 1 28,770.90 ########### M X 511,336.68 1.350 SI 1 26,595.90 ########### M X 62,875.52 1.300 CAMBIAR 1 3,909.10 9,758,590.83 M X 72,918.45 1.350 CAMBIAR 1 3,974.10 ########### M X 86,109.82 1.400 SI 1 7,767.50 ########### M X 98,019.10 1.575 SI 1 8,205.00 ########### M X 1017,122.87 2.225 SI 1 9,830.00 ########### M X 11

TOTALES

DIRECCIO

Nivel 1

Momento Long. confin. Area InerciaMm l Espesor Longitud A I

(Kg-m) (m) # Paños (cm2) (cm4)Altura libre

314,760.86 10.800 CAMBIAR 3 16,259.10 ########### M Y 1107,165.99 5.200 CAMBIAR 2 8,979.10 ########### M Y 2107,165.99 5.200 CAMBIAR 2 8,979.10 ########### M Y 379,133.70 3.900 CAMBIAR 1 7,289.10 ########### M Y 4128,490.15 4.550 CAMBIAR 1 8,134.10 ########### M Y 522,883.61 1.650 CAMBIAR 1 4,364.10 ########### M Y 614,709.84 1.650 CAMBIAR 1 4,364.10 ########### M Y 7

21,322.70 1.950 CAMBIAR 1 4,754.10 ########### M Y 80.00 1.950 CAMBIAR 1 4,754.10 ########### M Y 90.00 3.250 CAMBIAR 1 6,444.10 ########### M Y 10

TOTALES

VerificaciónSECCION TRANSFORMAD

Page 126: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 126/180

Nivel 2

Momento Long. confin. Area InerciaMm l Espesor Longitud A I

(Kg-m) (m) # Paños (cm2) (cm4)

Altura libre217,175.30 10.800 CAMBIAR 3 16,259.10 ########### M Y 172,195.45 5.200 CAMBIAR 2 8,979.10 ########### M Y 272,195.45 5.200 CAMBIAR 2 8,979.10 ########### M Y 354,445.14 3.900 CAMBIAR 1 7,289.10 ########### M Y 491,033.46 4.550 CAMBIAR 1 8,134.10 ########### M Y 516,556.88 1.650 CAMBIAR 1 4,364.10 ########### M Y 610,149.33 1.650 CAMBIAR 1 4,364.10 ########### M Y 714,712.02 1.950 CAMBIAR 1 4,754.10 ########### M Y 8

0.00 1.950 CAMBIAR 1 4,754.10 ########### M Y 90.00 3.250 CAMBIAR 1 6,444.10 ########### M Y 10TOTALES

Nivel 3

Momento Long. confin. Area InerciaMm l Espesor Longitud A I

(Kg-m) (m) # Paños (cm2) (cm4)

Altura libre137,178.05 10.800 CAMBIAR 3 16,259.10 ########### M Y 144,077.02 5.200 CAMBIAR 2 8,979.10 ########### M Y 244,077.02 5.200 CAMBIAR 2 8,979.10 ########### M Y 334,254.97 3.900 CAMBIAR 1 7,289.10 ########### M Y 459,579.26 4.550 CAMBIAR 1 8,134.10 ########### M Y 511,128.86 1.650 CAMBIAR 1 4,364.10 ########### M Y 66,410.79 1.650 CAMBIAR 1 4,364.10 ########### M Y 79,292.79 1.950 CAMBIAR 1 4,754.10 ########### M Y 8

0.00 1.950 CAMBIAR 1 4,754.10 ########### M Y 90.00 3.250 CAMBIAR 1 6,444.10 ########### M Y 10

TOTALES

Verificación

SECCION TRANSFORMAD

SECCION TRANSFORMAD

Verificación

Page 127: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 127/180

Nivel 4

Momento Long. confin. Area InerciaMm l Espesor Longitud A I

(Kg-m) (m) # Paños (cm2) (cm4)

Altura libre73,629.84 10.800 CAMBIAR 3 16,259.10 ########### M Y 122,519.12 5.200 CAMBIAR 2 8,979.10 ########### M Y 222,519.12 5.200 CAMBIAR 2 8,979.10 ########### M Y 318,285.31 3.900 CAMBIAR 1 7,289.10 ########### M Y 433,531.32 4.550 CAMBIAR 1 8,134.10 ########### M Y 5

6,474.39 1.650 CAMBIAR 1 4,364.10 ########### M Y 63,440.97 1.650 CAMBIAR 1 4,364.10 ########### M Y 74,987.89 1.950 CAMBIAR 1 4,754.10 ########### M Y 8

0.00 1.950 CAMBIAR 1 4,754.10 ########### M Y 90.00 3.250 CAMBIAR 1 6,444.10 ########### M Y 10

TOTALES

Nivel 5

Momento Long. confin. Area InerciaMm l Espesor Longitud A I

(Kg-m) (m) # Paños (cm2) (cm4)

Altura libre25,311.03 10.800 CAMBIAR 3 16,259.10 ########### M Y 17,275.50 5.200 CAMBIAR 2 8,979.10 ########### M Y 27,275.50 5.200 CAMBIAR 2 8,979.10 ########### M Y 36,244.50 3.900 CAMBIAR 1 7,289.10 ########### M Y 412,161.37 4.550 CAMBIAR 1 8,134.10 ########### M Y 52,430.48 1.650 CAMBIAR 1 4,364.10 ########### M Y 61,182.87 1.650 CAMBIAR 1 4,364.10 ########### M Y 71,714.65 1.950 CAMBIAR 1 4,754.10 ########### M Y 81,714.65 1.950 CAMBIAR 1 4,754.10 ########### M Y 9

Verificación

VerificaciónSECCION TRANSFORMAD

SECCION TRANSFORMAD

Page 128: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 128/180

4,747.96 3.250 CAMBIAR 1 6,444.10 ########### M Y 10TOTALES

COSTO APROXIMADOMUROS

Page 129: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 129/180

COSTOSConcreto (m3) 200 En nuevos solesAcero (Kg) 2Encofrado/desencofrado (M2) 12Muro e = 0.15 m. (M2) 30

S/32,605.35

Page 130: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 130/180

X - X

Compresión Cortante Compresión Cortante TracciónAxial Axial por flexión Axial Flexión

Fa Vm fa vm ft fas fm( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2

2.60011.85 2.07 5.16 2.17 25.20 4.91 30.1111.85 1.48 1.79 1.48 20.49 1.61 22.1011.85 2.03 4.92 2.91 28.27 4.69 32.968.76 2.45 7.33 2.48 29.50 7.04 36.548.76 2.32 6.56 2.68 39.58 6.31 45.898.76 2.94 10.34 1.96 29.61 9.85 39.468.76 2.53 7.97 2.01 33.60 7.55 41.15

ESFUERZOS ADMISIBLESFlexocompresión

ESFUERZOS ACTUANTES

Page 131: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 131/180

Page 132: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 132/180

8.76 2.03 4.98 0.94 11.44 4.68 16.128.76 1.95 4.51 1.35 17.84 4.25 22.098.76 2.30 6.78 0.99 12.70 6.29 18.998.76 1.98 4.87 1.25 13.43 4.45 17.888.76 1.31 0.62 0.72 9.41 0.62 10.0311.85 1.31 0.63 0.77 9.74 0.63 10.3711.85 1.32 0.67 0.95 10.84 0.67 11.5111.85 1.34 0.79 1.70 14.26 0.79 15.05

Compresión Cortante Compresión Cortante TracciónAxial Axial por flexión Axial FlexiónFa Vm fa vm ft fas fm

( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2

2.6011.85 1.53 2.16 0.58 3.63 1.91 5.5411.85 1.27 0.38 0.29 3.07 0.38 3.4511.85 1.52 2.05 0.82 3.48 1.83 5.318.76 1.82 3.82 0.70 7.37 3.52 10.898.76 1.77 3.49 1.13 11.35 3.24 14.598.76 1.99 5.03 0.83 8.00 4.54 12.548.76 1.70 3.35 1.11 6.51 2.93 9.448.76 1.27 0.41 0.54 4.95 0.41 5.3611.85 1.28 0.42 0.58 5.12 0.42 5.5411.85 1.28 0.45 0.72 5.70 0.45 6.1511.85 1.30 0.53 1.28 7.51 0.53 8.04

Compresión Cortante Compresión Cortante TracciónAxial Axial por flexión Axial FlexiónFa Vm fa vm ft fas fm

( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2

Flexocompresión

ESFUERZOS ADMISIBLES

ESFUERZOS ADMISIBLES ESFUERZOS ACTUANTES

ESFUERZOS ACTUANTESFlexocompresión

Page 133: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 133/180

2.6011.85 1.35 1.17 0.30 0.97 0.93 1.9011.85 1.23 0.19 0.17 1.08 0.19 1.2711.85 1.35 1.11 0.22 0.24 0.89 1.1312.91 1.26 0.40 0.19 0.70 0.35 1.05

12.91 1.26 0.37 0.22 0.91 0.33 1.2412.91 1.27 0.49 0.16 0.65 0.42 1.078.76 1.43 1.84 0.28 0.51 1.41 1.928.76 1.24 0.21 0.28 1.63 0.21 1.8411.85 1.24 0.21 0.30 1.69 0.21 1.9011.85 1.24 0.22 0.38 1.89 0.22 2.1111.85 1.25 0.26 0.67 2.50 0.26 2.76

Y - Y

Compresión Cortante Compresión Cortante TracciónAxial Axial por flexión Axial FlexiónFa Vm fa vm ft fas fm

( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm22.608.76 1.56 2.02 0.77 6.50 2.02 8.528.76 1.52 1.76 0.75 7.72 1.76 9.488.76 1.52 1.76 0.75 7.72 1.76 9.488.76 1.49 1.63 1.30 9.21 1.63 10.848.76 1.86 3.83 1.77 10.25 3.70 13.958.76 2.07 5.17 0.56 5.93 4.93 10.868.76 1.41 1.15 0.40 5.83 1.15 6.98

8.76 1.42 1.25 0.53 6.73 1.25 7.988.76 1.20 0.00 0.53 0.00 0.00 0.008.76 1.20 0.00 1.09 0.00 0.00 0.00

ESFUERZOS ADMISIBLES ESFUERZOS ACTUANTESFlexocompresión

Page 134: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 134/180

Compresión Cortante Compresión Cortante TracciónAxial Axial por flexión Axial FlexiónFa Vm fa vm ft fas fm

( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2

2.608.76 1.49 1.62 0.63 4.26 1.62 5.888.76 1.45 1.41 0.60 4.98 1.41 6.398.76 1.45 1.41 0.60 4.98 1.41 6.398.76 1.43 1.30 1.07 6.16 1.30 7.468.76 1.72 3.08 1.49 6.94 2.95 9.898.76 1.89 4.16 0.48 3.93 3.92 7.858.76 1.37 0.92 0.33 3.89 0.92 4.818.76 1.38 1.00 0.44 4.51 1.00 5.51

8.76 1.20 0.00 0.44 0.00 0.00 0.008.76 1.20 0.00 0.90 0.00 0.00 0.00

Compresión Cortante Compresión Cortante Tracción

Axial Axial por flexión Axial FlexiónFa Vm fa vm ft fas fm

( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2

2.608.76 1.42 1.21 0.50 2.51 1.21 3.728.76 1.39 1.06 0.46 2.84 1.06 3.908.76 1.39 1.06 0.46 2.84 1.06 3.908.76 1.38 0.98 0.84 3.71 0.98 4.698.76 1.59 2.33 1.23 4.27 2.20 6.478.76 1.71 3.16 0.41 2.37 2.91 5.288.76 1.32 0.69 0.26 2.35 0.69 3.048.76 1.33 0.75 0.35 2.73 0.75 3.488.76 1.20 0.00 0.35 0.00 0.00 0.008.76 1.20 0.00 0.71 0.00 0.00 0.00

ESFUERZOS ADMISIBLES ESFUERZOS ACTUANTES

Flexocompresión

ESFUERZOS ADMISIBLES ESFUERZOS ACTUANTESFlexocompresión

Page 135: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 135/180

Compresión Cortante Compresión Cortante TracciónAxial Axial por flexión Axial FlexiónFa Vm fa vm ft fas fm

( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2

8.76 1.35 0.81 0.38 1.18 0.81 1.998.76 1.33 0.70 0.33 1.29 0.70 1.998.76 1.33 0.70 0.33 1.29 0.70 1.998.76 1.32 0.65 0.64 1.86 0.65 2.518.76 1.45 1.58 1.01 2.19 1.45 3.64

8.76 1.53 2.16 0.36 1.15 1.92 3.078.76 1.28 0.46 0.20 1.17 0.46 1.638.76 1.29 0.50 0.26 1.37 0.50 1.878.76 1.20 0.00 0.26 0.00 0.00 0.008.76 1.20 0.00 0.54 0.00 0.00 0.00

Compresión Cortante Compresión Cortante TracciónAxial Axial por flexión Axial Flexión

Fa Vm fa vm ft fas fm( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2 ) ( Kg/cm2

2.6008.76 1.27 0.40 0.20 0.29 0.40 0.698.76 1.26 0.35 0.16 0.29 0.35 0.648.76 1.26 0.35 0.16 0.29 0.35 0.648.76 1.26 0.33 0.33 0.53 0.33 0.868.76 1.32 0.84 0.58 0.61 0.71 1.328.76 1.35 1.17 0.21 0.22 0.93 1.158.76 1.24 0.23 0.10 0.33 0.23 0.568.76 1.24 0.25 0.14 0.39 0.25 0.648.76 1.20 0.00 0.14 0.64 0.00 0.64

ESFUERZOS ADMISIBLES ESFUERZOS ACTUANTESFlexocompresión

ESFUERZOS ADMISIBLES ESFUERZOS ACTUANTESFlexocompresión

Page 136: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 136/180

8.76 1.20 0.00 0.28 0.85 0.00 0.85

Page 137: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 137/180

Page 138: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 138/180

Fa - fa cumple Vm - vm cumple Ft - ft cumplefas/Fa+fm/Fm

2.66.69 Si -0.10 CAMBIAR -24.20 REFORZAR 1.57210.06 Si 0.00 CAMBIAR -19.49 REFORZAR 0.9866.93 Si -0.88 CAMBIAR -27.27 REFORZAR 1.6631.43 Si -0.03 CAMBIAR -28.50 REFORZAR 2.2092.20 Si -0.36 CAMBIAR -38.58 REFORZAR 2.485-1.58 #NAME? 0.98 Si -28.61 REFORZAR 2.6420.79 Si 0.52 Si -32.60 REFORZAR 2.445

VERIFICACIONESCompresión Axial Fuerza Cortante Tracción por flexión Flexo- Co

Page 139: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 139/180

8.55 Si -0.78 CAMBIAR -11.97 REFORZAR 0.53111.64 Si -0.93 CAMBIAR -12.42 REFORZAR 0.54211.63 Si -1.45 CAMBIAR -13.90 REFORZAR 0.60011.59 Si -3.55 CAMBIAR -18.51 REFORZAR 0.782

Fa - fa cumple Vm - vm cumple Ft - ft cumplefas/Fa+fm/Fm

2.607.70 Si 0.92 Si -11.58 REFORZAR 0.96311.09 Si 0.76 Si -9.25 REFORZAR 0.4887.89 Si 0.45 Si -13.41 REFORZAR 1.0122.61 Si 1.04 Si -15.94 REFORZAR 1.5443.23 Si 0.51 Si -24.76 REFORZAR 1.7970.21 Si 1.44 Si -17.63 REFORZAR 1.9472.35 Si 0.82 Si -20.55 REFORZAR 1.7437.93 Si 0.44 Si -14.12 REFORZAR 0.70811.01 Si 0.38 Si -14.64 REFORZAR 0.70510.95 Si 0.15 Si -16.40 REFORZAR 0.78010.79 Si -0.76 CAMBIAR -21.86 REFORZAR 1.009

Fa - fa cumple Vm - vm cumple Ft - ft cumplefas/Fa+fm/Fm

2.608.70 Si 0.94 Si -6.47 REFORZAR 0.64411.28 Si 0.87 Si -5.11 REFORZAR 0.3058.85 Si 0.58 Si -7.18 REFORZAR 0.655

Compresión Axial Fuerza Cortante

VERIFICACIONESFuerza Cortante

Tracción por flexión

Compresión Axial

VERIFICACIONES

Tracción por flexión Flexo- Co

Flexo- Co

Page 140: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 140/180

3.78 Si 1.09 Si -10.44 REFORZAR 1.1544.25 Si 0.60 Si -16.84 REFORZAR 1.3351.98 Si 1.31 Si -11.70 REFORZAR 1.4483.89 Si 0.73 Si -12.43 REFORZAR 1.1968.14 Si 0.59 Si -8.41 REFORZAR 0.45711.22 Si 0.54 Si -8.74 REFORZAR 0.45211.18 Si 0.37 Si -9.84 REFORZAR 0.49911.06 Si -0.36 CAMBIAR -13.26 REFORZAR 0.646

Fa - fa cumple Vm - vm cumple Ft - ft cumplefas/Fa+fm/Fm

2.609.69 Si 0.95 Si -2.63 REFORZAR 0.37411.47 Si 0.98 Si -2.07 REFORZAR 0.1659.80 Si 0.70 Si -2.48 REFORZAR 0.3594.94 Si 1.12 Si -6.37 REFORZAR 0.8215.27 Si 0.64 Si -10.35 REFORZAR 0.9313.73 Si 1.16 Si -7.00 REFORZAR 1.0015.41 Si 0.59 Si -5.51 REFORZAR 0.6988.35 Si 0.73 Si -3.95 REFORZAR 0.25311.43 Si 0.70 Si -4.12 REFORZAR 0.24911.40 Si 0.56 Si -4.70 REFORZAR 0.27511.32 Si 0.02 Si -6.51 REFORZAR 0.354

Fa - fa cumple Vm - vm cumple Ft - ft cumple fas/Fa+fm/FmCompresión Axial Fuerza Cortante Tracción por flexión Flexo- Co

VERIFICACIONES

Compresión Axial Fuerza Cortante Tracción por flexión Flexo- CoVERIFICACIONES

Page 141: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 141/180

2.6010.68 Si 1.05 Si 0.03 Si 0.15211.66 Si 1.06 Si -0.08 REFORZAR 0.06510.74 Si 1.13 Si 0.76 Si 0.11912.51 Si 1.07 Si 0.30 Si 0.067

12.54 Si 1.04 Si 0.09 Si 0.07312.42 Si 1.11 Si 0.35 Si 0.0746.92 Si 1.15 Si 0.49 Si 0.2358.55 Si 0.96 Si -0.63 REFORZAR 0.09511.64 Si 0.94 Si -0.69 REFORZAR 0.09111.63 Si 0.86 Si -0.89 REFORZAR 0.10011.59 Si 0.58 Si -1.50 REFORZAR 0.128

Fa - fa cumple Vm - vm cumple Ft - ft cumple fas/Fa+fm/Fm

2.606.74 Si 0.79 Si -5.50 REFORZAR 0.5587.00 Si 0.77 Si -6.72 REFORZAR 0.5667.00 Si 0.77 Si -6.72 REFORZAR 0.5667.13 Si 0.19 Si -8.21 REFORZAR 0.6034.93 Si 0.09 Si -9.25 REFORZAR 0.9593.59 Si 1.51 Si -4.93 REFORZAR 0.9807.61 Si 1.01 Si -4.83 REFORZAR 0.400

7.51 Si 0.89 Si -5.73 REFORZAR 0.4508.76 Si 0.67 Si 1.00 Si 0.0008.76 Si 0.11 Si 1.00 Si 0.000

VERIFICACIONESCompresión Axial Fuerza Cortante Tracción por flexión Flexo- Co

Page 142: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 142/180

Fa - fa cumple Vm - vm cumple Ft - ft cumplefas/Fa+fm/Fm

2.607.14 Si 0.86 Si -3.26 REFORZAR 0.4117.35 Si 0.85 Si -3.98 REFORZAR 0.4077.35 Si 0.85 Si -3.98 REFORZAR 0.4077.46 Si 0.36 Si -5.16 REFORZAR 0.4355.68 Si 0.23 Si -5.94 REFORZAR 0.7174.60 Si 1.41 Si -2.93 REFORZAR 0.7497.84 Si 1.04 Si -2.89 REFORZAR 0.2907.76 Si 0.94 Si -3.51 REFORZAR 0.326

8.76 Si 0.76 Si 1.00 Si 0.0008.76 Si 0.30 Si 1.00 Si 0.000

Fa - fa cumple Vm - vm cumple Ft - ft cumplefas/Fa+fm/Fm

2.607.55 Si 0.92 Si -1.51 REFORZAR 0.2817.70 Si 0.93 Si -1.84 REFORZAR 0.2717.70 Si 0.93 Si -1.84 REFORZAR 0.2717.78 Si 0.54 Si -2.71 REFORZAR 0.2926.43 Si 0.36 Si -3.27 REFORZAR 0.5005.60 Si 1.30 Si -1.37 REFORZAR 0.5358.07 Si 1.06 Si -1.35 REFORZAR 0.1968.01 Si 0.98 Si -1.73 REFORZAR 0.2198.76 Si 0.85 Si 1.00 Si 0.0008.76 Si 0.49 Si 1.00 Si 0.000

VERIFICACIONES

Fuerza Cortante Tracción por flexión Flexo- Co

Compresión Axial Fuerza Cortante Tracción por flexión

VERIFICACIONES

Flexo- Co

Compresión Axial

Page 143: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 143/180

Fa - fa cumple Vm - vm cumple Ft - ft cumplefas/Fa+fm/Fm

2.607.95 Si 0.97 Si -0.18 REFORZAR 0.1698.06 Si 1.00 Si -0.29 REFORZAR 0.1568.06 Si 1.00 Si -0.29 REFORZAR 0.1568.11 Si 0.68 Si -0.86 REFORZAR 0.1717.18 Si 0.44 Si -1.19 REFORZAR 0.306

6.60 Si 1.17 Si -0.15 REFORZAR 0.3378.30 Si 1.08 Si -0.17 REFORZAR 0.1158.26 Si 1.03 Si -0.37 REFORZAR 0.1298.76 Si 0.94 Si 1.00 Si 0.0008.76 Si 0.66 Si 1.00 Si 0.000

Fa - fa cumple Vm - vm cumple Ft - ft cumplefas/Fa+fm/Fm

2.608.36 Si 1.07 Si 0.71 Si 0.0728.41 Si 1.10 Si 0.71 Si 0.0658.41 Si 1.10 Si 0.71 Si 0.0658.43 Si 0.93 Si 0.47 Si 0.0717.92 Si 0.74 Si 0.39 Si 0.1327.59 Si 1.14 Si 0.78 Si 0.1508.53 Si 1.14 Si 0.67 Si 0.0488.51 Si 1.10 Si 0.61 Si 0.0538.76 Si 1.06 Si 0.36 Si 0.025

Flexo- Co

Flexo- Co

Compresión Axial

Compresión Axial

Fuerza Cortante Tracción por flexión

VERIFICACIONES

VERIFICACIONES

Fuerza Cortante Tracción por flexión

Page 144: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 144/180

8.76 Si 0.92 Si 0.15 Si 0.033

Page 145: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 145/180

Page 146: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 146/180

DIRECCION X - X

Nivel 1

Tracción Area peralte Acero en Acero encumple por flexión Elementos b vigas columnas

( cm2 ) ( cm2 ) ( cm ) ( cm2 ) ( cm2 )

CAMBIAR M X 1 8.79 1,044.57 41.78 5.61 10.41Si M X 2 6.64 661.57 26.46 3.55 4.68

CAMBIAR M X 3 12.63 1,560.50 62.42 8.38 7.80CAMBIAR M X 4 5.90 662.79 50.98 3.56 4.22CAMBIAR M X 5 8.45 715.61 55.05 3.84 4.20CAMBIAR M X 6 4.64 483.15 37.17 2.59 3.36CAMBIAR M X 7 5.52 487.99 37.54 2.62 3.02

REFUERZO mpresión

Page 147: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 147/180

Si M X 8 2.67 498.95 38.38 2.68 2.88Si M X 9 5.51 1,044.57 41.78 5.61 6.01Si M X 10 6.88 1,370.99 54.84 7.36 7.24Si M X 11 12.75 2,927.42 117.10 15.71 14.64

TOTALES

Nivel 2

Tracción Area peralte Acero en Acero encumple por flexión Elementos b vigas columnas

(cm2) (cm2) (cm) (cm2) (cm2)

Si M X 1 4.00 500.00 20.00 2.51 4.67Si M X 2 3.34 500.00 20.00 2.50 2.50

CAMBIAR M X 3 5.96 756.90 30.28 4.06 3.78CAMBIAR M X 4 3.12 321.48 24.73 1.73 2.05CAMBIAR M X 5 5.29 431.71 33.21 2.32 2.53CAMBIAR M X 6 2.72 291.47 22.42 1.56 2.03CAMBIAR M X 7 3.39 346.44 26.65 1.86 2.15

Si M X 8 2.99 260.00 20.00 1.30 1.30Si M X 9 6.18 500.00 20.00 2.51 2.69Si M X 10 7.76 614.98 24.60 3.30 3.25

CAMBIAR M X 11 14.47 1,313.13 52.53 7.05 6.57TOTALES

Nivel 3

Tracción Area peralte Acero en Acero encumple por flexión Elementos b vigas columnas(cm2) (cm2) (cm) (cm2) (cm2)

Si M X 1 2.24 500.00 20.00 2.50 3.69Si M X 2 1.95 500.00 20.00 2.50 2.50Si M X 3 3.18 593.58 23.74 3.19 2.97

REFUERZO

REFUERZO

mpresión

mpresión

Page 148: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 148/180

CAMBIAR M X 4 2.01 260.00 20.00 1.35 1.61CAMBIAR M X 5 3.57 361.61 27.82 1.94 2.12CAMBIAR M X 6 1.77 260.00 20.00 1.31 1.70CAMBIAR M X 7 2.03 302.60 23.28 1.62 1.87

Si M X 8 1.84 260.00 20.00 1.30 1.30Si M X 9 3.81 500.00 20.00 2.50 2.50Si M X 10 4.79 500.00 20.00 2.61 2.57Si M X 11 8.95 1,038.08 41.52 5.57 5.19

TOTALES

Nivel 4

Tracción Area peralte Acero en Acero encumple por flexión Elementos b vigas columnas

( cm2 ) ( cm2 ) ( cm ) ( cm2 ) ( cm2 )

Si M X 1 0.99 500.00 20.00 2.50 2.78Si M X 2 0.96 500.00 20.00 2.50 2.50Si M X 3 1.19 500.00 20.00 2.50 2.50Si M X 4 1.24 260.00 20.00 1.30 1.30Si M X 5 2.19 301.99 23.23 1.62 1.77

CAMBIAR M X 6 1.07 260.00 20.00 1.30 1.42Si M X 7 0.90 269.94 20.76 1.45 1.67Si M X 8 0.96 260.00 20.00 1.30 1.30Si M X 9 1.97 500.00 20.00 2.50 2.50Si M X 10 2.48 500.00 20.00 2.50 2.50Si M X 11 4.65 781.08 31.24 4.19 3.91

TOTALES

Nivel 5

Tracción Area peralte Acero en Acero encumple por flexión Elementos b vigas columnas

(cm2) (cm2) (cm) (cm2) (cm2)

REFUERZO mpresión

REFUERZO mpresión

Page 149: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 149/180

Si M X 1 0.00 500.00 20.00 2.50 2.50Si M X 2 0.32 500.00 20.00 2.50 2.50Si M X 3 0.00 500.00 20.00 2.50 2.50Si M X 4 0.00 1,740.00 20.00 8.70 8.70

Si M X 5 0.00 1,740.00 20.00 8.70 8.70Si M X 6 0.00 1,740.00 20.00 8.70 8.70Si M X 7 0.00 260.00 20.00 1.30 1.30Si 0.30 260.00 20.00 1.30 1.30Si 0.63 500.00 20.00 2.50 2.50Si 0.79 500.00 20.00 2.50 2.50Si 1.50 500.00 20.00 2.50 2.50

TOTALES

DIRECCION Y - Y

Nivel 1

Tracción Area peralte Acero en Acero encumple por flexión Elementos b vigas columnas

(cm2) (cm2) (cm) (cm2) (cm2)

Si M X 1 8.29 777.01 59.77 4.17 3.89Si M X 2 5.06 417.67 32.13 2.24 4.72Si M X 3 5.06 417.67 32.13 2.24 2.31Si M X 4 4.72 589.73 45.36 3.17 4.34Si M X 5 5.30 894.72 68.82 4.80 4.47Si M X 6 0.83 260.00 20.00 1.30 2.31Si M X 7 1.24 260.00 20.00 1.30 1.30

Si M X 8 1.71 260.00 20.00 1.30 1.30Si M X 9 0.00 260.00 20.00 1.30 1.30Si M X 10 0.00 437.26 33.64 2.35 2.19

TOTALES

REFUERZO mpresión

Page 150: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 150/180

Nivel 2

Tracción Area peralte Acero en Acero encumple por flexión Elementos b vigas columnas

(cm2) (cm2) (cm) (cm2) (cm2)

Si M X 1 5.16 636.96 49.00 3.42 3.18Si M X 2 3.12 335.83 25.83 1.80 3.80Si M X 3 3.12 335.83 25.83 1.80 1.85Si M X 4 3.07 482.28 37.10 2.59 3.55Si M X 5 3.43 751.34 57.80 4.03 3.76Si M X 6 0.50 260.00 20.00 1.30 1.98Si M X 7 0.80 260.00 20.00 1.30 1.30Si M X 8 1.11 260.00 20.00 1.30 1.30

Si M X 9 0.00 260.00 20.00 1.30 1.30Si M X 10 0.00 358.45 27.57 1.92 1.79TOTALES

Nivel 3

Tracción Area peralte Acero en Acero encumple por flexión Elementos b vigas columnas

(cm2) (cm2) (cm) (cm2) (cm2)

Si M Y 1 2.83 505.99 38.92 2.72 2.53Si M Y 2 1.66 260.00 20.00 1.38 2.91Si M Y 3 1.66 260.00 20.00 1.38 1.42Si M Y 4 1.77 381.47 29.34 2.05 2.81Si M Y 5 1.98 622.20 47.86 3.34 3.11Si M Y 6 0.27 260.00 20.00 1.30 1.70Si M Y 7 0.46 260.00 20.00 1.30 1.30Si M Y 8 0.65 260.00 20.00 1.30 1.30Si M Y 9 0.00 260.00 20.00 1.30 1.30Si M Y 10 0.00 284.75 21.90 1.53 1.42

TOTALES

mpresión

REFUERZO

REFUERZO mpresión

Page 151: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 151/180

Nivel 4

Tracción Area peralte Acero en Acero encumple por flexión Elementos b vigas columnas

(cm2) (cm2) (cm) (cm2) (cm2)

Si M X 1 1.17 384.73 29.59 2.06 1.92Si M X 2 0.67 260.00 20.00 1.30 2.06Si M X 3 0.67 260.00 20.00 1.30 1.30Si M X 4 0.83 287.62 22.12 1.54 2.12Si M X 5 0.93 510.46 39.27 2.74 2.55

Si M X 6 0.11 260.00 20.00 1.30 1.48Si M X 7 0.21 260.00 20.00 1.30 1.30Si M X 8 0.30 260.00 20.00 1.30 1.30Si M X 9 0.00 260.00 20.00 1.30 1.30Si M X 10 0.00 260.00 20.00 1.30 1.30

TOTALES

Nivel 5

Tracción Area peralte Acero en Acero encumple por flexión Elementos b vigas columnas

(cm2) (cm2) (cm) (cm2) (cm2)

Si M X 1 0.00 260.00 20.00 1.30 1.30Si M X 2 0.00 260.00 20.00 1.30 1.30Si M X 3 0.00 260.00 20.00 1.30 1.30Si M X 4 0.00 260.00 20.00 1.30 1.30Si M X 5 0.00 290.50 22.35 1.56 1.45Si M X 6 0.00 260.00 20.00 1.30 1.30Si M X 7 0.00 260.00 20.00 1.30 1.30Si M X 8 0.00 260.00 20.00 1.30 1.30Si M X 9 0.00 260.00 20.00 1.30 1.30

mpresión

REFUERZO

REFUERZO

mpresión

Page 152: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 152/180

Si M X 10 0.00 260.00 20.00 1.30 1.30TOTALES

Page 153: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 153/180

Page 154: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 154/180

Acero final Estribos Concreto Encofrado Acero vigas Acero Col. Acero estrib.en columnas S Vc e/d V Asv V Asc V Ase

( cm2 ) ( cm ) ( m3 ) ( m2 ) ( m3 ) ( m3 ) ( m3 )

10.41 9.94 0.705 6.03 0.00086955 0.0054132 0.003611696.64 9.41 0.432 4.26 0.00047038 0.0034528 0.0030940612.63 10.24 1.108 8.5 0.0015922 0.0065676 0.004443255.90 19.43 0.461 6.51 0.000623 0.003068 0.001927728.45 19.54 0.497 6.98 0.000672 0.004394 0.002010714.64 16.84 0.324 4.88 0.0003885 0.0024128 0.001783815.52 17.02 0.325 4.91 0.0003799 0.0028704 0.00177299

METRADOS

Page 155: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 155/180

2.88 17.44 0.334 5.01 0.000402 0.0014976 0.001765136.01 9.94 0.705 6.03 0.00086955 0.0031252 0.003611697.24 10.16 0.949 7.57 0.0012696 0.0037648 0.0041233814.64 10.53 2.218 15.15 0.00373113 0.0076128 0.00674859

3.852 42.07

Acero final Estribos Concreto Encofrado Acero vigas Acero Col. Acero estriben columnas S Vc e/d V Asv V Asc V Ase

(cm2) (cm) (m3) (m2) (m3) (m3) (m3)

4.67 8.25 0.338 3.57 0.00038905 0.0024284 0.003210853.34 8.25 0.326 3.54 0.00033125 0.0017368 0.003171365.96 9.60 0.537 4.79 0.0007714 0.0030992 0.003278743.12 10.62 0.223 3.51 0.00030275 0.0016224 0.002132745.29 14.86 0.3 4.48 0.000406 0.0027508 0.001884042.72 9.46 0.195 3.21 0.000234 0.0014144 0.002208223.39 11.58 0.23 3.68 0.0002697 0.0017628 0.002026012.99 8.25 0.174 2.94 0.000195 0.0015548 0.002348196.18 8.25 0.338 3.57 0.00038905 0.0032136 0.003210857.76 9.31 0.426 4.11 0.00056925 0.0040352 0.003110614.47 10.13 0.995 7.51 0.00167438 0.0075244 0.00410852

2.149 26.78

Acero final Estribos Concreto Encofrado Acero vigas Acero Col. Acero estriben columnas S Vc e/d V Asv V Asc V Ase(cm2) (cm) (m3) (m2) (m3) (m3) (m3)

3.69 8.25 0.338 3.57 0.0003875 0.0019188 0.003210852.50 8.25 0.326 3.54 0.00033125 0.0013 0.003171363.18 9.25 0.421 4.04 0.0006061 0.0016536 0.00312255

METRADOS

METRADOS

Page 156: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 156/180

Page 157: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 157/180

2.50 8.25 0.338 3.57 0.0003875 0.0013 0.003210852.50 8.25 0.326 3.54 0.00033125 0.0013 0.003171362.50 8.25 0.355 3.61 0.000475 0.0013 0.003272288.70 8.25 1.209 6.81 0.0015225 0.004524 0.00771815

8.70 8.25 1.209 6.81 0.0015225 0.004524 0.007718158.70 8.25 1.166 6.78 0.001305 0.004524 0.007613831.30 8.25 0.173 2.93 0.0001885 0.000676 0.002341761.30 8.25 0.174 2.94 0.000195 0.000676 0.002348192.50 8.25 0.338 3.57 0.0003875 0.0013 0.003210852.50 8.25 0.346 3.59 0.00043125 0.0013 0.003241562.50 8.25 0.379 3.67 0.00059375 0.0013 0.00335564

4.776 34.05

Acero final Estribos Concreto Encofrado Acero vigas Acero Col. Acero estriben columnas S Vc e/d V Asv V Asc V Ase

(cm2) (cm) (m3) (m2) (m3) (m3) (m3)

8.29 19.65 1.659 17.71 0.00456615 0.0086216 0.003475765.06 14.32 0.549 7.06 0.0011984 0.0039468 0.002586955.06 14.32 0.549 7.06 0.0011984 0.0039468 0.002586954.72 19.26 0.546 6.5 0.00128385 0.0024544 0.002045315.30 19.80 0.886 9.77 0.002256 0.002756 0.002573792.31 8.25 0.182 2.97 0.000234 0.0012012 0.00238681.30 8.25 0.182 2.97 0.000234 0.000676 0.0023868

1.71 8.25 0.19 3.01 0.000273 0.0008892 0.002425411.30 8.25 0.19 3.01 0.000273 0.000676 0.002425412.19 15.07 0.376 4.86 0.000799 0.0011388 0.00205401

4.743 57.05

METRADOS

Page 158: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 158/180

Page 159: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 159/180

Acero final Estribos Concreto Encofrado Acero vigas Acero Col. Acero estriben columnas S Vc e/d V Asv V Asc V Ase

(cm2) (cm) (m3) (m2) (m3) (m3) (m3)

1.92 13.05 0.821 9.45 0.0022557 0.0019968 0.003587492.06 8.25 0.342 4.78 0.0006955 0.0016068 0.003178311.30 8.25 0.342 4.78 0.0006955 0.001014 0.003178312.12 9.31 0.266 3.51 0.0006237 0.0011024 0.002539442.55 17.89 0.505 5.87 0.0012878 0.001326 0.00208374

1.48 8.25 0.182 2.97 0.000234 0.0007696 0.00238681.30 8.25 0.182 2.97 0.000234 0.000676 0.00238681.30 8.25 0.19 3.01 0.000273 0.000676 0.002425411.30 8.25 0.19 3.01 0.000273 0.000676 0.002425411.30 8.25 0.224 3.16 0.000442 0.000676 0.00259272

2.83 37.34

Acero final Estribos Concreto Encofrado Acero vigas Acero Col. Acero estriben columnas S Vc e/d V Asv V Asc V Ase

(cm2) (cm) (m3) (m2) (m3) (m3) (m3)

1.30 8.25 0.555 6.83 0.0014235 0.001352 0.004233651.30 8.25 0.342 4.78 0.0006955 0.001014 0.003178311.30 8.25 0.342 4.78 0.0006955 0.001014 0.003178311.30 8.25 0.241 3.24 0.0005265 0.000676 0.002676381.45 9.43 0.288 3.63 0.0007332 0.000754 0.002605631.30 8.25 0.182 2.97 0.000234 0.000676 0.00238681.30 8.25 0.182 2.97 0.000234 0.000676 0.00238681.30 8.25 0.19 3.01 0.000273 0.000676 0.002425411.30 8.25 0.19 3.01 0.000273 0.000676 0.00242541

METRADOS

METRADOS

Page 160: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 160/180

1.30 8.25 0.224 3.16 0.000442 0.000676 0.002592722.322 32.21

Page 161: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 161/180

Page 162: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 162/180

Acero total Vol MuroV As V muro( m3 ) ( m3 )

0.00989444 0.460.00701724 0.520.01260305 0.420.00561872 0.250.00707671 0.220.00458511 0.260.00502329 0.24

Page 163: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 163/180

0.00366473 0.250.00760644 0.460.00915778 0.410.01809252 0.020.05181856 2.37

Acero total Vol MuroV As V muro(m3) (m3)

0.0060283 0.750.00523941 0.60.00714934 0.840.00405789 0.420.00504084 0.370.00385662 0.360.00405851 0.310.00409799 0.370.0068135 0.750.00771505 0.80.0133073 0.860.03543091 3.65

Acero total Vol MuroV As V muro(m3) (m3)

0.00551715 0.750.00480261 0.60.00538225 0.93

Page 164: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 164/180

0.00366182 0.460.004219 0.4

0.00346509 0.370.00345097 0.330.00349999 0.370.00557955 0.750.00618259 0.860.00968052 10.03049889 3.84

Acero total Vol MuroV As V muro( m3 ) ( m3 )

0.00504395 0.750.00480261 0.60.00504728 0.980.00328387 0.460.00362072 0.430.00328159 0.370.00337242 0.350.00321919 0.370.00489835 0.750.00497281 0.860.00678871 1.140.02845244 3.94

Acero total Vol MuroV As V muro(m3) (m3)

Page 165: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 165/180

0.00489835 0.750.00480261 0.60.00504728 0.980.01376465 3.05

0.01376465 3.050.01344283 2.490.00320626 0.350.00321919 0.370.00489835 0.750.00497281 0.860.00524939 1.280.05892663 11.27

Acero total Vol MuroV As V muro

(m3) (m3)

0.01666351 2.890.00773215 1.480.00773215 1.480.00578356 1.060.00758579 1.120.003822 0.470.0032968 0.47

0.00358761 0.570.00337441 0.570.00399181 0.920.05620357 9.54

Page 166: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 166/180

Acero total Vol MuroV As V muro(m3) (m3)

0.01241955 3.040.00674405 1.550.00621365 1.550.00494891 1.120.00619822 1.20.0036504 0.470.0032968 0.470.00337441 0.57

0.00337441 0.570.00380334 0.960.04684599 9.97

Acero total Vol MuroV As V muro(m3) (m3)

0.00920301 3.170.00618641 1.610.00521141 1.610.00452863 1.170.00534411 1.270.0035048 0.470.0032968 0.470.00337441 0.570.00337441 0.570.00373004 10.04064958 10.34

Page 167: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 167/180

Acero total Vol MuroV As V muro(m3) (m3)

0.00783999 3.30.00548061 1.610.00488781 1.610.00426554 1.220.00469754 1.32

0.0033904 0.470.0032968 0.470.00337441 0.570.00337441 0.570.00371072 1.010.0372331 10.57

Acero total Vol MuroV As V muro(m3) (m3)

0.00700915 3.430.00488781 1.610.00488781 1.610.00387888 1.230.00409283 1.440.0032968 0.470.0032968 0.470.00337441 0.570.00337441 0.57

Page 168: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 168/180

0.00371072 1.010.03472449 10.83

Page 169: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 169/180

CENTRO MASAS

MUROS EN EL EJE X -X

MURO L ( m ) t ( m ) H ( m ) ɣa ( TN/m³) P ( TN )

MX1 2.10 0.13 2.60 1.8 1.2776PX2 2.10 0.15 2.60 2.4 1.9656MX3 2.85 0.13 2.60 1.8 1.7339PX4 1.75 0.15 2.60 2.4 1.638PX5 2.85 0.15 2.60 1.8 2.0007PX6 2.05 0.15 2.60 1.8 1.4391MX7 2.70 0.13 2.60 1.8 1.6427

Σ P = 11.6977

x = Σ P * x X =

Σ P

MUROS EN EL EJE Y -Y

MURO L ( m ) t ( m ) H ( m ) ɣa ( TN/m³) P ( TN )MY1 5.35 0.13 2.60 1.8 3.2549MY2 5.35 0.13 2.60 2.4 4.3399MY3 5.35 0.13 2.60 1.8 3.2549MY4 10.95 0.13 2.60 1.8 6.6620MY5 4.7 0.13 2.60 1.8 2.8595

MY6 1.8 0.13 2.60 1.8 1.0951MY7 4.7 0.13 2.60 1.8 2.8595MY8 2.1 0.13 2.60 1.8 1.2776

Σ P = 25.6035

y = Σ P * y Y =Σ P

PISO 1

CENTRO RIGIDEZ

MURO Area Ar T J f KMX1 0.4625 0.7889 0.3604 1.705729735535.3511MX2 0.4125 0.7326 0.2612 1.776 4409.5124MX3 0.5625 0.775 0.4586 1.3777777787746.8417MX4 0.2730 0.7602 0.4819 2.7846153852867.4679MX5 0.2730 0.8638 0.5191 3.1641025642599.8617

SECCION TRANSFORMADA

Page 170: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 170/180

MX6 0.2340 0.6978 0.3830 2.9820512822292.5005MX7 0.2275 0.5899 0.2808 2.5929670332363.0949MX8 0.2600 0.7992 0.4449 3.0738461542500.2142MX9 0.4625 0.8279 0.3813 1.7900540545500.7991MX10 0.5000 0.9341 0.5535 1.86826412.1326MX11 0.6750 0.9951 0.9054 1.47422222210814.9067

Σ K = 53042.6828

Xcr = 0

MURO Area Ar T J f KMY1 1.4235 2.2237 0.2027 1.5621355816080.1519MY2 0.6955 1.1754 0.0886 1.6900071892674.0940

MY3 0.6955 1.1754 0.0886 1.6900071892674.0940MY4 0.3575 0.8985 0.0381 2.5132867131099.8365MY5 0.6110 1.1793 0.1388 1.9301145663510.4386MY6 0.2340 0.6913 0.1258 2.9542735041734.0834MY7 0.2340 0.5899 0.0755 2.5209401711500.9370MY8 0.2730 0.6224 0.0756 2.279853481677.1582MY9 0.2730 0.6224 0.0756 2.279853481677.1582MY10 0.4420 0.7947 0.0758 1.7979638012117.0926

Σ K = 24745.0444

Ycr = 0

PISO 2

CENTRO RIGIDEZ

MURO Area Ar T J f KMX1 0.4625 0.7889 0.3604 1.70575535.3511MX2 0.4125 0.7326 0.2612 1.77604409.5124MX3 0.5625 0.7750 0.4586 1.37787746.8417MX4 0.2730 0.7602 0.4819 2.78462867.4679MX5 0.2730 0.8638 0.5191 3.16412599.8617MX6 0.2340 0.6978 0.3830 2.98212292.5005MX7 0.2275 0.5899 0.2808 2.59302363.0949MX8 0.2600 0.7992 0.4449 3.07382500.2142MX9 0.4625 0.8279 0.3813 1.79015500.7991MX10 0.5000 0.9341 0.5535 1.86826412.1326

SECCION TRANSFORMADA

SECCION TRANSFORMADA

Page 171: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 171/180

MX11 0.6750 0.9951 0.9054 1.474210814.9067Σ K = 53042.6828

Xcr = 0

MURO Area Ar T J f KMY1 1.4235 2.2237 0.2027 1.56216080.1519MY2 0.6955 1.1754 0.0886 1.69002674.0940MY3 0.6955 1.1754 0.0886 1.69002674.0940MY4 0.3575 0.8985 0.0381 2.51331099.8365MY5 0.6110 1.1793 0.1388 1.93013510.4386MY6 0.2340 0.6913 0.1258 2.95431734.0834MY7 0.2340 0.5899 0.0755 2.52091500.9370

MY8 0.2730 0.6224 0.0756 2.27991677.1582MY9 0.2730 0.6224 0.0756 2.27991677.1582MY10 0.4420 0.7947 0.0758 1.79802117.0926

Σ K = 24745.0444

Ycr = 0

PISO 3

CENTRO RIGIDEZ

MURO Area Ar T J f KMX1 0.4625 0.7889 0.3604 1.70575535.3511MX2 0.4125 0.7326 0.2612 1.77604409.5124MX3 0.5625 0.7750 0.4586 1.37787746.8417MX4 0.2730 0.7602 0.4819 2.78462867.4679MX5 0.2730 0.8638 0.5191 3.16412599.8617MX6 0.2340 0.6978 0.3830 2.98212292.5005MX7 0.2275 0.5899 0.2808 2.59302363.0949MX8 0.2600 0.7992 0.4449 3.07382500.2142MX9 0.4625 0.8279 0.3813 1.79015500.7991MX10 0.5000 0.9341 0.5535 1.86826412.1326MX11 0.6750 0.9951 0.9054 1.474210814.9067

Σ K = 53042.6828

Xcr = 0

SECCION TRANSFORMADA

SECCION TRANSFORMADA

Page 172: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 172/180

MURO Area Ar T J f KMY1 1.4235 2.2237 0.2027 1.56216080.1519MY2 0.6955 1.1754 0.0886 1.69002674.0940

MY3 0.6955 1.1754 0.0886 1.69002674.0940MY4 0.3575 0.8985 0.0381 2.51331099.8365MY5 0.6110 1.1793 0.1388 1.93013510.4386MY6 0.2340 0.6913 0.1258 2.95431734.0834MY7 0.2340 0.5899 0.0755 2.52091500.9370MY8 0.2730 0.6224 0.0756 2.27991677.1582MY9 0.2730 0.6224 0.0756 2.27991677.1582MY10 0.4420 0.7947 0.0758 1.79802117.0926

Σ K = 24745.0444

Ycr = 0

PISO 4

CENTRO RIGIDEZ

MURO Area Ar T J f KMX1 0.4625 0.7889 0.3604 1.70575535.3511MX2 0.4125 0.7326 0.2612 1.77604409.5124MX3 0.5625 0.7750 0.4586 1.37787746.8417MX4 0.2730 0.7602 0.4819 2.78462867.4679MX5 0.2730 0.8638 0.5191 3.16412599.8617MX6 0.2340 0.6978 0.3830 2.98212292.5005MX7 0.2275 0.5899 0.2808 2.59302363.0949MX8 0.2600 0.7992 0.4449 3.07382500.2142MX9 0.4625 0.8279 0.3813 1.79015500.7991MX10 0.5000 0.9341 0.5535 1.86826412.1326MX11 0.6750 0.9951 0.9054 1.474210814.9067

Σ K = 53042.6828

Xcr = 0

MURO Area Ar T J f KMY1 1.4235 2.2237 0.2027 1.56216080.1519

SECCION TRANSFORMADA

SECCION TRANSFORMADA

SECCION TRANSFORMADA

Page 173: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 173/180

MY2 0.6955 1.1754 0.0886 1.69002674.0940MY3 0.6955 1.1754 0.0886 1.69002674.0940MY4 0.3575 0.8985 0.0381 2.51331099.8365MY5 0.6110 1.1793 0.1388 1.93013510.4386MY6 0.2340 0.6913 0.1258 2.95431734.0834MY7 0.2340 0.5899 0.0755 2.52091500.9370

MY8 0.2730 0.6224 0.0756 2.27991677.1582MY9 0.2730 0.6224 0.0756 2.27991677.1582MY10 0.4420 0.7947 0.0758 1.79802117.0926

Σ K = 24745.0444

Ycr = 0

PISO 5

CENTRO RIGIDEZMURO Area Ar T J f KMX1 0.4625 0.7889 0.3604 1.70575535.3511MX2 0.4125 0.7326 0.2612 1.77604409.5124MX3 0.5625 0.7750 0.4586 1.37787746.8417MX4 0.2730 0.7602 0.4819 2.78462867.4679MX5 0.2730 0.8638 0.5191 3.16412599.8617MX6 0.2340 0.6978 0.3830 2.98212292.5005MX7 0.2275 0.5899 0.2808 2.59302363.0949

MX8 0.2600 0.7992 0.4449 3.07382500.2142MX9 0.4625 0.8279 0.3813 1.79015500.7991MX10 0.5000 0.9341 0.5535 1.86826412.1326MX11 0.6750 0.9951 0.9054 1.474210814.9067

Σ K = 53042.6828

Xcr = 0

MURO Area Ar T J f KMY1 1.4235 2.2237 0.2027 1.56216080.1519MY2 0.6955 1.1754 0.0886 1.69002674.0940MY3 0.6955 1.1754 0.0886 1.69002674.0940MY4 0.3575 0.8985 0.0381 2.51331099.8365MY5 0.6110 1.1793 0.1388 1.93013510.4386MY6 0.2340 0.6913 0.1258 2.95431734.0834MY7 0.2340 0.5899 0.0755 2.52091500.9370

SECCION TRANSFORMADA

SECCION TRANSFORMADA

Page 174: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 174/180

MY8 0.2730 0.6224 0.0756 2.27991677.1582MY9 0.2730 0.6224 0.0756 2.27991677.1582MY10 0.4420 0.7947 0.0758 1.79802117.0926

Σ K = 24745.0444

Ycr = 0

Page 175: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 175/180

x ( m ) P * x ( TN-m )

8.1 10.34898.1 15.92143.45 5.98210.875 1.43335.25 10.50375.25 7.55531.35 2.2176Σ P * x = 53.962155

4.6131 m

y ( m ) P * y ( TN-m )2.675 8.70702.675 11.60932.675 8.70705.475 36.47438.600 24.5915

7.125 7.80278.600 24.59159.850 12.5848Σ P * y = 135.0681

5.2754 m

x K x0.00000.00000.00000.00000.0000

Page 176: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 176/180

Page 177: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 177/180

0.0000Σ K * x = 0

y K y0.00000.00000.00000.00000.00000.00000.0000

0.00000.00000.0000

Σ K * y = 0

x K x0.00000.00000.00000.00000.00000.00000.00000.00000.00000.00000.0000

Σ K * x = 0

Page 178: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 178/180

y K y0.00000.0000

0.00000.00000.00000.00000.00000.00000.00000.0000

Σ K * y = 0

x K x0.00000.00000.00000.00000.00000.00000.00000.00000.00000.00000.0000

Σ K * x = 0

y K y0.0000

Page 179: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 179/180

0.00000.00000.00000.00000.00000.00000.00000.00000.0000

Σ K * y = 0

x K x0.00000.00000.00000.00000.00000.00000.0000

0.00000.00000.00000.0000

Σ K * x = 0

y K y0.00000.00000.00000.00000.00000.00000.0000

Page 180: tesis albañileria confinada

8/13/2019 tesis albañileria confinada

http://slidepdf.com/reader/full/tesis-albanileria-confinada 180/180

0.00000.00000.0000

Σ K * y = 0