Jornadas Técnicas
AIPM Villahermosa
Exitosa corrida de
Liner ranurado 7 en el
pozo horizontal Terra
11 Proyecto
Mesozoico, Región
Sur.
Autores: 1. Ing. Roberto Solano 2. Ing. Edgar Lucien Ortega 3. Ing. Freddy Iturrizaga Co-Autores 1. Linda Lucia Toribio 2. Alejandro Del Angel 3. Didier Beltran 4. Misael Gamboa 5. Ana Carballo 6. Emilio Bastidas.
Ubicación geográfica del campo
El Campo Terra está ubicado geográficamente en el Estado de Tabasco, dentro del área que cubre el Activo Integral Samaria Luna. Se ubica a 2.45 km al N del pozo Pomposu-1A y a 6.54 km al NW del Kali-1.
4H
12
3
11H
Terra 1
23
114
121 143
123
112
145
1DL_2AG
113
Macropera Terra 1
Macropera Terra 1DL
Macropera Terra 114
Macropera Terra 145
Kali-1
CRETÁCICO MEDIO
21
2H
111
El pozo Terra 11 se ubica en el bloque de Terra 1
Pozo en perforación Localización Pozo productor Pozo cerrado
Pozo en Terminación o RMA
Objetivo
Obtener producción de 3000 bpd de aceite y 12.5 mmpcd gas
para drenar la reserva del Cretácico Medio perforando un pozo
Horizontal con un desplazamiento de 987m a la PT
Producción Esperada
Aceite 3,500 bpd, f=½”
Gas 12.5 mmpcd
Tipo Fluido Aceite Volátil 40º API
Pozo Qo bpd
Qg mmpcd
Fw %
Np mmb
Gp mmmpc
Observaciones
Terra-1 4,000 20.6 8.2 5.5 18.5 Inició Prod Jul-10
5/8”, 300x87
Terra-23 3,183 10.3 5.0 2.0 7.1 Inició Prod Ago-
09 1/2”, 280x90
Terra-3 7,869 14.1 0.9 0.4 0.9
Inició Prod Dic-11
5/8”, 175x90
Diseño de Pozo
Tipo de Pozo Horizontal
Profundidad 5,500 md (4,972 mv)
Coord. Conductor X = 500 851.85 Y = 2 017 942.75
Coord. Objetivo X = 500 755.00 Y = 2 017 045.00
Desplazamiento 987m ( 500 m navegando en KM)
Rumbo S 11º45” E (Azimut 167.84°)
Formato Universal Terra 11
INICIO DE PERFORACIÓN: 11–FEBRERO-2012
DIAS PROG. PERFORACIÓN: 290 DIAS
FECHA PROG. FIN DE PERFORACIÓN: 27-NOVIEMB-2012
DIAS PROG. TERMINACIÓN: 30
FECHA PROG. FIN DE TERMINACIÓN: 12-DICIEMB-2012
FECHA ACTUALIZACIÓN: 21 OCTUBRE 2012
DIAS REALES: 230 DIAS- PERF + 40 DIAS TERM.= 270 DIAS.
PROYECCION FIN DE PERFORACIÓN: 10-SEPTIEMB-2012
PROYECCION FIN DE TERMINACIÓN: 21-OCTUBRE-2012
INICIO DE PERFORACIÓN: 11–FEBRERO-2012
DIAS PROG. PERFORACIÓN: 290 DIAS
FECHA PROG. FIN DE PERFORACIÓN: 27-NOVIEMB-2012
DIAS PROG. TERMINACIÓN: 30
FECHA PROG. FIN DE TERMINACIÓN: 12-DICIEMB-2012
FECHA ACTUALIZACIÓN: 21 OCTUBRE 2012
DIAS REALES: 230 DIAS PERF + 40 DIAS TERM.= 270 DIAS.
PROYECCION FIN DE PERFORACIÓN: 10-SEPTIEMB-2012
PROYECCION FIN DE TERMINACIÓN: 21-OCTUBRE-2012
• Horizontal Well
• KOP: 4300 m
• Planned DLS: 2.5/30m
• Target: KM
• TD: 5800m
TERRA 11
Introducción/Resumen
7
1. Este trabajo describe las operaciones y la ingeniería realizada para correr exitosamente el liner de 7” parcialmente ranurado en el pozo horizontal Terra 11 en el proyecto Mesozoico en Región Sur.
2. El pozo Terra 11 se perforó hasta 5800 m dentro de la formación Cretácico medio (KM) con 90° de inclinación alcanzando una máxima severidad de 4.89°/30m (DLS). Después de 132 días y 15 barrenas (03 pdcs + 12 tricónicas) usadas para perforar el agujero de 8 ½” (1180m), la profundidad total del pozo fue alcanzada y un total de 1380m de liner de 7”fue aterrizado exitosamente.
3. El plan direccional para la sección de 8-½” fue construir desde 19° hasta 90° de inclinación con severidad de 3.2°/30m (empezando a 5001m) y mantener el horizontal hasta el fin de la sección a 5800md. Esta es la primera vez en el proyecto que se alcanzó severidades mayores a 3°/30m en una formación cretácica con pedernal, para lo cual fue necesario el uso de la herramienta Powerdrive Xceed para perforar exitosamente la sección de 8 ½”
8
PSTM Canela
KSM
KM
JSK
SAL
TERRA-23 TERRA-11 A A’ A’’
A
A’
A’’
Prof. actual 5800md/4976mv
Prof. programada 5800md/4972mv
Sección sísmica de amarre con el pozo Terra 23. se interpretaron los horizontes de KS, KM y JSK
WELL FIELD STRUCTURE
Magnetic ParametersModel: Dip:
Mag Dec:Date:FS:
Surface LocationLat:Lon:
Northing:Easting:
Grid Conv:Scale Fact:
MiscellaneousSlot:Plan:
TVD Ref:Srvy Date:
Pemex
Terra 11H Terra Terra 1 Site Pemex
BGGM 2011 46.893°2.647°
January 30, 201240316.8nT
Universal Transverse Mercator, Zone 15 North, MetersN 18 15 8.178W 92 59 30.778
2017974.79 m500858.10 m
0.00254234°0.99960001
Terra 11HTerra 11H_DM_300112_GPIT+MWD
Rotary Table(10.8m above MSL)January 30, 2012
Quality Control
Date Drawn: July 16, 2012 04:43:56
AM
Drawn by: Current User
Checked by:
Client OK:
0
750
1500
2250
3000
3750
4500
-750 0 750 1500
Vertical Section (m) Azim = 169.23° Scale = 1:233.549170128843(m) Origin = 0 N/-S, 0 E/-W
TV
D S
cale
= 1
:233.5
49170128843(m
)
Tie-In
KM
Tie-In
EOC PT
New Target
Terra 11H_KM_v23
Ultimo Survey
5698 MD 4976 TVD
88.34° 170.19°az
935 departure Terra 11H_DM_300112_GPIT+MWD
Terra 11H_v26_290612_DM
True North
Tot Corr (M->T 2.6470°)
Mag Dec (2.647°)
Grid Conv (0.00254234°)
True
Grid
Mag
-1000
-800
-600
-400
-200
0
-200 0 200 400
<<< W Scale = 1:78.3433009214354(m) E >>>
<<
<
S
Scale
= 1
:78.3
433009214354(m
)
N
>>
>
Tie-In
Tie-In
EOC
PT
Terra 11H_KM_v23
New Target
Terra 11H_v26_290612_DM
Terra 11H_DM_300112_GPIT+MWDUltimo Survey
5698 MD 4976 TVD
88.34° 170.19°az
N=-928 E=127
Legend
Terra 11H_DM_300112_GPIT+MWDTerra 11H_v26_290612_DM
New TargetTerra 11H_KM_v23
10
Trayectoria Direccional - Terra 11
WELL FIELD STRUCTURE
Magnetic Parameters
Model: Dip:
Mag Dec:
Date:
FS:
Surface Location
Lat:
Lon:
Northing:
Easting:
Grid Conv:
Scale Fact:
Miscellaneous
Slot:
Plan:
TVD Ref:
Srvy Date:
Pemex
Terra 11H Terra Terra 1 Site Pemex
BGGM 2011 46.893°
2.647°
January 30, 2012
40316.8nT
Universal Transverse Mercator, Zone 15 North, Meters
N 18 15 8.178
W 92 59 30.778
2017974.79 m
500858.10 m
0.00254234°
0.99960001
Terra 11H
Terra 11H_DM_300112_GPIT+MWD
Rotary Table(10.8m above MSL)
January 30, 2012
Quality Control
Date Drawn: July 21, 2012 02:09:15
AM
Drawn by: Current User
Checked by:
Client OK:
4950
450 600 750 900 1050
Vertical Section (m) Azim = 169.23° Scale = 1:42.8552839096614(m) Origin = 0 N/-S, 0 E/-W
TV
D S
cale
= 1
:42.8
552839096614(m
)
KM
Tie-In EOC
PT
Ultimo Survey
5750 MD 4976 TVD
90.23° 168.84°az
987 departure
Terra 11H_v26_290612_DM
Terra 11H_DM_300112_GPIT+MWD
Terra 11H_DM_300112_GPIT+MWD
New Target
Terra 11H_KM_v23
True North
Tot Corr (M->T 2.6470°)
Mag Dec (2.647°)
Grid Conv (0.00254234°)
True
Grid
Mag
-1050
-900
-750
-600
-450
0 150 300
<<< W Scale = 1:58.0296446192105(m) E >>>
<<
<
S
Scale
= 1
:58.0
296446192105(m
)
N
>>
>
Tie-In
EOC
PT
Terra 11H_DM_300112_GPIT+MWD
Terra 11H_DM_300112_GPIT+MWD
Terra 11H_v26_290612_DM
New Target
Terra 11H_KM_v23
Ultimo Survey
5750 MD 4976 TVD
90.23° 168.84°az
N=-979 E=137
Legend
Terra 11H_DM_300112_GPIT+MWDTerra 11H_v26_290612_DM
New TargetTerra 11H_KM_v23
WELL FIELD STRUCTURE
Magnetic Parameters
Model: Dip:
Mag Dec:
Date:
FS:
Surface Location
Lat:
Lon:
Northing:
Easting:
Grid Conv:
Scale Fact:
Miscellaneous
Slot:
Plan:
TVD Ref:
Srvy Date:
Pemex
Terra 11H Terra Terra 1 Site Pemex
BGGM 2011 46.893°
2.647°
January 30, 2012
40316.8nT
Universal Transverse Mercator, Zone 15 North, Meters
N 18 15 8.178
W 92 59 30.778
2017974.79 m
500858.10 m
0.00254234°
0.99960001
Terra 11H
Terra 11H_DM_300112_GPIT+MWD
Rotary Table(10.8m above MSL)
January 30, 2012
Quality Control
Date Drawn: July 21, 2012 02:09:15
AM
Drawn by: Current User
Checked by:
Client OK:
4950
450 600 750 900 1050
Vertical Section (m) Azim = 169.23° Scale = 1:42.8552839096614(m) Origin = 0 N/-S, 0 E/-W
TV
D S
cale
= 1
:42.8
552839096614(m
)
KM
Tie-In EOC
PT
Ultimo Survey
5750 MD 4976 TVD
90.23° 168.84°az
987 departure
Terra 11H_v26_290612_DM
Terra 11H_DM_300112_GPIT+MWD
Terra 11H_DM_300112_GPIT+MWD
New Target
Terra 11H_KM_v23
True North
Tot Corr (M->T 2.6470°)
Mag Dec (2.647°)
Grid Conv (0.00254234°)
True
Grid
Mag
-1050
-900
-750
-600
-450
0 150 300
<<< W Scale = 1:58.0296446192105(m) E >>>
<<
<
S
Scale
= 1
:58.0
296446192105(m
)
N
>>
>
Tie-In
EOC
PT
Terra 11H_DM_300112_GPIT+MWD
Terra 11H_DM_300112_GPIT+MWD
Terra 11H_v26_290612_DM
New Target
Terra 11H_KM_v23
Ultimo Survey
5750 MD 4976 TVD
90.23° 168.84°az
N=-979 E=137
Legend
Terra 11H_DM_300112_GPIT+MWDTerra 11H_v26_290612_DM
New TargetTerra 11H_KM_v23
MD
(m)
Incl
(°)
Azim
True
(°)
TVD
(m)
VSEC
(m)
NS
(m)
EW
(m)
Closure
(m)
Closure
Azimuth
(°)
DLS
(°/30m)
5524.83 87.30 172.36 4974.08 762.25 -756.90 99.99 763.48 172.47 0.99
5552.92 89.00 172.77 4974.98 790.28 -784.74 103.62 791.55 172.48 1.87
5583.18 89.02 171.21 4975.51 820.50 -814.70 107.84 821.81 172.46 1.55
5611.30 90.06 170.65 4975.73 848.61 -842.47 112.27 849.92 172.41 1.26
5639.38 91.29 169.55 4975.40 876.68 -870.13 117.10 877.97 172.34 1.76
5669.53 89.80 169.62 4975.11 906.83 -899.78 122.55 908.08 172.24 1.48
5697.85 88.34 170.19 4975.57 935.14 -927.65 127.51 936.38 172.17 1.66
5720.94 88.77 170.00 4976.16 958.22 -950.39 131.48 959.44 172.12 0.61
5750.00 90.23 168.84 4976.41 987.28 -978.96 136.82 988.47 172.04 1.92
5779.81 90.00 168.35 4976.35 1017.09 -1008.18 142.71 1018.23 171.94 0.54
Programa de Operaciones Terra 11
11
1. Terminar de perforar hasta 5800m. 2. Hacer viaje corto a la zapata 4620m. Y Sacar BHA Direccional a
superficie 3. Correr Registros Eléctricos. 4. Evaluar viaje de calibración antes de bajar liner 5. Bajar Liner Ranurado y Liso 7” 6. Aislar agujero abierto con TXC o Tapón mecánico 7. Reconocer y probar BL 7”. Bajar sarta con rima y acondicionar BL 7” 8. Bajar Stub 7” 9. Cementar Stub 7”. Con rima acondicionar y pulir receptáculo de
colgador 7” x 9 5/8” 10.Bajar complemento de 7” y 7 5/8” 11.Cementar Complemento 12.Operaciones de cierre de etapa. 13.Reconocer PI 14.Terminación
1.- Registros Eléctricos: Opciones
13
Información de Registros - Terra 11
Manifestaciones y pérdidas
INTERVALO (MD) OBSERVACIONES
1 4855-4870 4868m / 3714 UG
Bajo densidad de 1.73 a 1.64 en 5 min
2 4900-4965
4917m / 2748 UG
4935m / 2812 UG
4952m / 3345 UG
3 4990-5045
5003m / 2461 UG
5025m / Pérdida parcial 4m3
5041m / 4333 ug
4 5105-5135 5124m / 2421 UG
5130-5132m / Pérdida parcial 4.9m3
5 5200-5230 5209m / Perdida parcial 38.5m3
5209-5220m / Perdida parcial 28.3m3
6 5340-5360 5355m / 4671 UG
7 5775-5785 5768m / 3306 UG
KSM 4606m
KSSF 4780m
KSAN 4898m
5300-5800m/90°
KM 5021m
1 2
3 4 5 6 7
GT C3 C4 C5 A B C
Evaluación petrofísica
INTERVALO
(MD)
Ф SW K Vsh
A 5170-5410 4.6 12.6 0.75 6
B 5460-5610 3 10 0.29 5
C 5710-5800 4.3 15 0.79 4.2
BL 4420m
5384-5393 348m 182m
5422m 5771m 5159m 5354m
Información de Registros - Terra 11
Analisis de Buckling Bajando Liner 7”
Bajando Liner hasta 5800m, libre, sarta con 30 HWDP, 12.5 ton apoyo en zapata No hay Buckling FF= 0.20 Csg y 0.35 OH MW=1.78 gr/cc KOP @ +/- 4320 md Nota: 12.5 ton es considerado el máximo apoyo en la barrena para esta configuración
Sarta recomendada para bajar el Liner de 7”
Máximo Overpull al 90% = 51 ton
Sistema colgador expandible TIW
Proceso de Expansión
31
32
33
Análisis de Torque y Arrastre con Reductores de Fricción durante la bajada del Liner 7”
Apriete TP 5.5”= 43,000 lb-ft
Apriete TP 5”= 32,000 lb-ft
Apriete Liner 7” 21,000 lb-ft
Se proposieron 114 LoTORQ mod 7000-8375 espaciados cada 12 m sobre el liner de 7” Con esta configuración permite reducir el arrastre en 11 Ton Al bajar el Liner con LoTORQs existe ganancia de 2 Ton de peso con esto se obtiene un mayor margen sobre problemas relacionados con Buckling. El torque en fondo se reduce hasta en 37.8% al rotar con LoTORQs en el fondo
Análisis de Torque con Reductores de Fricción durante la bajada del Liner 7”
Bajada del Liner de 7” Terra 11
Análisis de cargas de viaje versus profundidad. A nivel de la Zapata de 9 5/8” el peso al gancho fue de 200tons y cuando se alcanzó la PT alrededor de 70tons (35%) fueron perdidas debido al recostamiento del liner dentro del agujero horizontal, confirmando los arrastres teóricos esperados.
Bajada del Liner de 7” Terra 11
Análisis Tiempo vs OD de los hinchables durante la bajada del Liner 7”
Nota: Estos tiempos son considerando los tiempos vistos en la bajada de Liner de7” del pozo Terra 3- Equipo Gray Wolf 91
44
Análisis de Surgencia para la bajada del Liner 7” (simulación Hidráulica)
Cálculos de Surgencia bajada del Liner 7” de 1380 a 4620m
Nota: Aun bajando las tubería a 5 min/lingada estaríamos por encima de los ECD de perforación actuales de 1.78 gr/cc y los ECD para desplazar lodo de 1.65 x 1.80 de 1.84 gr/cc
Nota: Aun bajando las tubería a 5 min/lingada estaríamos por encima de los ECD de perforación actuales de 1.78 gr/cc y los ECD para desplazar lodo de 1.65 x 1.80 de 1.84 gr/cc
Cálculos de Surgencia bajada del Liner 7” en agujero abierto (4620-5800)
1. La planeación de la bajada del liner de 7 incluyó el análisis de todas las contingencias
como: torque y arrastre, surgencia, circulación, tiempo de exposición y aislamiento de
intervalos con los hinchables y colgador apropiado.
2. El pozo Terra 11 terminó su perforación y terminación dentro del tiempo planificado,
alcanzando los 5800 md /4976 mv, de los cuales navegó 500m dentro de la formación
KM con ángulo 90° de inclinación y 299 m con alto ángulo de 58 a 89°, alcanzando una
máxima severidad de 4.89°/30m (DLS) y un desplazamiento de 1020m. Después de
132 días y continuos análisis multidisciplinarios para poder navegar exitosamente y
alcanzar la profundidad total del pozo en el yacimiento, se pudo concluir con una
Terminación exitosa, dando una producción inicial de 3000 bpd promedio.
3. El éxito de la operación de la introducción del liner fue posible gracias a la excelente
planeación y al trabajo en conjunto, hecho durante la etapa de perforación y con la
participación de cada uno de los representantes de las diferentes áreas comprometidas.
Conclusiones