PEOPLE DEVELOPMENT
WTAP _ 2015 SVR FINAL REPORT OUT
2
Introductio
n
s
Michael Lentz
Fun/Interesting Fact About You:
Current Assignment:• TCF Maintenance
1st Shift• Supervisor: Christopher Atkins
Education:• Lawrence Technological University
Electrical Engineering (May 2017)
ACTIVITY RESULTS
# CLOSED KAIZENS(SK, MK) 2
AMOUNT OF SAVINGS #1 Safety: JSRA reduction of 98#2 B/C ratio: 94.47
# OF SA POCKET CARDS 7
TOTAL RESULTS
I am a drone/quadcopter enthusiast
3
The Kaizen
4
The Tank Farm Storage Project
• Cleaned up the old abandoned pump room outside D-70.
• Applied paint to give it a fresh new look.
• Adding new shelving and cabinets to make the space usable as a storage
room for tank farm pumps, and a workshop to fix the pumps.
5
The Mess of an Abandoned Pump Room
6
The Tank Leaking Everywhere
7
The Hard Part is Over…
8
Final Look When Racking Arrives
9
Other Projects
• MAHLE Leak Tester – QM Project
• Turnover NEW Lock Out Tag Out – To meet OSHA requirements
• Wrote a Kaizen for this Project
• F-22 Lubrication Mapping – Mapped for AM and PM specialists
• Seat Conveyor Roller Chain Analysis
• TCF Breakdown Map
10
MAHLE Leak Tester – QM Project
• Since starting the project we have seen a major decrease in overall failures.
11
Turnover LOTO To Meet OSHA Standards
12
F-22 Lubrication Mapping
• Created a lubrication map for F-22 conveyor to better accommodate AM and PM maintenance.
13
Seat Conveyor Roller Chain Analysis
• Created a PowerPoint to explain the benefits of O-ring roller chain over standard roller chain.
14
TCF Breakdown Mapping
• Mapped breakdowns in TCF for a clearer analysis of issues throughout TCF.
15
Other Responsibilities
• Filled in for supervisors when they needed time off.
• Inventory the TCF Maintenance storage area.