reporte semanal 2
TRANSCRIPT
PROCEDIMIENTO:
DEBEN CONSERVAR EL FORMATO DE PORCENTAJE % (LOS PORCENTAJES ANOTADOS EN LA CELDA EN BLANCO, AUNQUE SON CERCANOS A LA REALIDAD, SON SOLO UN EJEMPLO)
RESUMEN GLOBAL
PARTIDASTOTAL PRESUPUESTO
I. TERRACERIAS Y OBRAS EXTERIORES 26.85% $9,147,751.30II. ESTRUCTURA METALICA 22.72% $7,740,066.71III. OBRA CIVIL 33.26% $11,332,262.40IV. INSTALACIONES 14.95% $5,091,807.01 PRELIMINARES 100.00% $219,829.89V. AIRE ACONDICIONADO 2.02% $688,113.02 TAPIALES 77.48% $170,331.53VI. REFRIGERACIÓN 0.20% $68,192.28 TRAZO Y NIEVELACION 22.52% $49,498.36
VII. AVANCE GLOBAL 100.00% $34,068,192.72 DEMOLICIONES 100.00% $201,819.67EXCAVACIONES PARA NIV., ACARREOS DE PRODUTOS DE EXCAVACIÓN 100.00% $201,819.67
PAVIMENTACION 100.00% $134,754.06DEBEN CONSERVAR EL FORMATO DE PORCENTAJE % RIEGO DE IMPREGNACION 100.00% $134,754.06
CONCEPTOS PROJECT
PRESUPUESTO
I. TERRACERIAS Y OBRAS EXTERIORES 100.00% $9,147,751.30 TERRACERIAS 100.00% $3,687,479.951. DEMOLICIONES 2.21% $201,819.67 EXCAVACIONES PARA NIVELACION DE TERRENO 7.93% $292,349.472. PRELIMINARES 2.40% $219,829.89 RELLENOS PARA TERREPLANES Y PLATAFORMA 76.88% $2,835,036.003. TERRACERIAS 40.31% $3,687,479.95 ACARREOS PRODUCTO DE EXCAVACION 6.75% $248,905.744. PAVIMENTOS 13.15% $1,202,791.10 FILTROS 8.44% $311,188.745.-TRABAJOS FUERA DEL PREDIO 16.09% $1,472,297.316.-INSTALACION HIDROSANITARIA EXTERIOR 0.97% $88,782.887.- INSTALACION ELECTRICA EXTERIOR 2.26% $206,630.71 TRABAJOS FUERA DEL PREDIO 100.00% $714,458.058.- ALBAÑILERIA EXTERIOR 8.83% $807,820.46 VIALIDADES FUERA DEL PREDIO 100.00% $714,458.059.- SEÑALIZACION 1.21% $110,869.0710.- COLECTORES Y DRENAJES 10.14% $927,944.97 INSTALACION HIDROSANITARIA EXTERIOR 100.00% $88,782.8811.- JARDINERIA 2.42% $221,485.29 RED DE RIEGO 79.15% $70,271.69
LINEA DE ALIMENTACION DE AGUA POTABLE 17.37% $15,419.79
II. ESTRUCTURA 100.00% $7,740,066.71 ACOMETIDA DE GAS 3.48% $3,091.401.- ESTRUCTURA METÁLICA 49.59% $3,838,065.832.- TECHUMBRE O CUBIERTA 46.84% $3,625,436.72 INSTALACION ELECTRICA EXTERIOR 100.00% $206,630.713.- LAMINA EN FACHADA 3.57% $276,564.16 INSTALACION ELECTRICA EXTERIOR TELEFONIA 4.53% $9,363.74
ALUMBRADO EXTERIOR 81.00% $167,376.21III. OBRA CIVIL 100.00% $11,332,262.41 ALTA TENSION MEDIA 14.47% $29,890.761.- PRELIMINARES 9.23% $1,045,569.822.- CIMENTACION 11.42% $1,294,333.64 ALBAÑILERIA EXTERIOR 100.00% $807,820.463.- PISOS 25.22% $2,858,108.20 BANQUETAS (INCLUYE PERIMETRALES A LA TIENDA) 40.98% $331,066.804.- PLAFONES 3.11% $352,833.32 GUARNICIONES Y TOPES 41.83% $337,903.475.- ALBAÑILERIA 23.20% $2,628,883.08 MUROS DE CONCRETO DE CONTENCION 3.28% $26,462.626.- ACABADOS 12.06% $1,366,470.74 BASES PARA POSTES DE ALUMBRADO 6.71% $54,172.507.- CISTERNA 12.89% $1,461,033.13 HERRERIA 3.88% $31,372.248.- DECORACION 2.87% $325,030.48 MALLA CICLON EN EXTEROR DE LA TIENDA 3.32% $26,842.83
IV. INSTALACIONES 100.00% $5,091,807.01 PAVIMENTACION 100.00% $1,068,037.041.- INSTALACIONES HIDROSANITARIAS 42.27% $2,152,063.13 PAVIMENTO ASFALTICO 78.63% $839,791.592.- INSTALACION HIDROSANITARIA EXTERIOR 2.75% $140,243.36 PAVIMENTO HIDRAULICO 21.37% $228,245.453.- CARGA DE GAS 0.74% $37,800.004.- INSTALACION DE RED VS CONTRA INCENDIO 9.61% $489,128.44 SEÑALIZACION 100.00% $110,869.075.- INSTALACION ELECTRICA INTERIOR 40.58% $2,066,015.96 SEÑALIZACION HORIZONTAL 77.73% $86,176.576.- INSTALACION ELECTRICA EXTERIOR 4.06% $206,556.12 SEÑALIZACION VERTICAL 22.27% $24,692.50
V. AIRE ACONDICIONADO 100.00% $688,113.02 COLECTORES Y DRENAJES 100.00% $927,944.9716.- AIRE ACONDICIONADO 100.00% $688,113.02 COLECTORES Y DRENAJES PLUVIALES 72.96% $676,995.01
COLECTORES Y DRENAJES SANITARIO 27.04% $250,949.96VI. REFRIGERACIÓN 100.00% $68,192.2818. REFRIGERACIÓN 0.00% $68,192.28 TRABAJOS FUERA DEL PREDIO 100.00% $758,139.26
PAVIMENTACION FUERA DEL PREDIO 99.22% $752,257.77PARADERO DE AUTOBUS 0.78% $5,881.49
DEBEN CONSERVAR EL FORMATO DE PORCENTAJE % JARDINERA 100.00% $221,485.29PASTO 42.36% $93,825.66PLANTAS, ARBOLES 43.91% $97,246.80TIERRA NEGRA 13.73% $30,412.83
PRELIMINARES OBRA CIVIL 100.00% $1,045,568.87TAPIALES 0.98% $10,210.87
DATOS TRAZO Y NIVELACION 99.02% $1,035,358.006) LOS SIGUIENTES DATOS SE LLENAN UNA VEZ, EXCEPTO No. REPORTE Y FECHA QUE SE CAMBIAN CADA SEMANA.
CIMENTACION 100.00% $1,294,333.64ZAPATAS 74.67% $966,425.27
BODEGA AURRERA PLANTILLA 3.33% $43,071.09EXCAVACIONES PARA CIMENTACION 8.51% $110,201.85RELLENOS PARA CIMENTACION 13.49% $174,635.43
BODEGA AURRERA "BORREGUERA"PISOS 100.00% $2,858,108.20FIRMES O LOSAS DE CONCRETO EN ENTRE PISO 73.89% $2,111,886.74
TAMPICO, TAMAULIPAS ACABADOS EN PISO(ASHFORD,EPOXICO) 19.50% $557,281.16PISO DE : MARMOL, TERRAZO, LOSETAS, ETC. 1.08% $30,892.93ZOCLOS VINILICO, MARMOL ETC. 5.53% $158,047.37
NUEVAPLAFONES 100.00% $352,833.32PLAFONES: TABLAROCA,MOLDURAS,STABILT,BDUROCK ETC. 46.86% $165,346.83
REPORTE DE OBRA No. 2 FALDONES: TABLAROCA,MOLDURAS,STABILT,BDUROCK ETC. 53.14% $187,486.49
ALBAÑILERIA 100.00% $2,628,883.09DEL 15 DE ENERO AL 21 DE DEL 2007 ALBAÑILERIA 12.55% $329,939.99
MUROS DE TABIQUE Y BLOCK 20.30% $533,590.53CADENAS 17.03% $447,795.33
20 DE ENERO DEL 2007 DALAS,CASTILLOS,CEPAS PARA INSTALACIONES 9.18% $241,456.96CANCELERIA DE ALUMINIO 12.39% $325,812.73HERRERIA 18.18% $477,827.56
ARQ. FILIBERTO RAMIREZ GUILLEN MALLA CICLON Y SUS POSTES 2.59% $68,192.28ESCALERAS MARINAS 1.85% $48,605.80LIMPIEZA DE OBRA 5.92% $155,661.91
01 (81) 15 22 22 81ACABADOS 100.00% $1,366,470.60
7) LOS SIGUIENTES DATOS CORRESPONDEN A LOS NOMBRES DE LAS CONSTRUCTORAS O CONTRATISTAS LAMBRINES DE MARMOL, LOSETA, TABLAROCA ETC 12.20% $166,755.33PLACAS DE MARMOL EN BAÑOS 2.47% $33,700.34MUROS DE TABLAROCA O DUROCK 27.11% $370,399.12
TEXTOR PINTURA 29.93% $408,995.12PUERTAS DE MADERA Y MARCOS 0.30% $4,107.91PUERTAS METALICAS 27.99% $382,512.78
TEXTORCISTERNA 100.00% $1,461,033.12OBRA CIVIL PARA CISTERNA 38.96% $569,279.04
TEXTOR EXCAVACIONES Y RELLENOS PARA CISTERNA 7.93% $115,879.44TANQUE DE TORMENTAS 53.10% $775,874.64
TEXTOR DECORACION 100.00% $325,030.48CARPINTERIA FINA 100.00% $325,030.48
TEXTOR ESTRUCTURA METALICA 100.00% $3,838,065.83ELEMENTOS ESTRUCTURALES,METALICOS TRABES, VIGAS ETC. 97.82% $3,754,389.07ELEMENTOS ESTRUCTURALES,METALICOS TRABES, VIGAS ETC.(TANQUE DE T) 0.06% $2,224.43
TEXTOR (D. BUEN) ELEMENTOS ESTRUCTURALES,METALICOS TRABES, VIGAS ETC.(B DE VENT) 1.08% $41,338.86ELEMENTOS ESTRUCTURALES,METALICOS TRABES, VIGAS ETC. (PARABUS) 0.61% $23,385.19LOSACERO Y SUS ACCESORIOS 0.44% $16,728.28
HUSSMANTECHUMBRE O CUBIERTA 100.00% $3,625,436.72LAMINA EN TECHUMBRE 39.15% $1,419,441.73
ACONSA Y ASOCIADOS CONSULTORES, S. DE R.L. DE C. V. AREA DE VENTAS 56.75% $2,057,349.62SUBESTACION ELECTRICA 0.35% $12,761.62CUARTO DE COMPRESORS 0.65% $23,584.90
BUFETE Y CONTROL DE CLAIDAD ANDEN DE CARGA 0.16% $5,873.26AREA DE CARRITOS 1.07% $38,833.01
7.9 RESPONSABLE DE OBRA CASETA DE VENTILACION 1.86% $67,592.58ING. EDGAR GALLARDO EXT 1506
LAMINA EN FACHADA 100.00% $276,564.16INSTALACIONES HIDROSANITARIAS 100.00% $2,152,063.14 LAMINA EN FACHADA 100.00% $276,564.16PLANO IH-01 PLANTA DE MERCANCIA INSTALACION 17.37% $373,750.85PLANO IH-02, IH-03 INST. HIDRAULICA 15.88% $341,834.52 INSTALACION ELECTRICA INTERIOR 100.00% $2,066,015.96PLANO IS-O1 Y IS-02 INST. SANITARIA 7.94% $170,772.45 IE-01 INST. ELECTRICA DE ALUMBRADO 8.61% $177,982.61PLANO IS-04 PLANTA DE AZOTEA DESAGUE DE CONDENSA 3.08% $66,366.11 PLANO IE-02 ALUMBRADO OF. Y ABARROTES 5.06% $104,618.54PLANO GHI, GHI02 Y GHI-03 INSTALACIONES 2.58% $55,622.01 PLANO IE-04 CONTACTOS Y FUERZA PISO DE VENTAS 9.45% $195,146.69PLANO GIS-01, GIS-02 Y GIS-03 INSTALACIONES 43.48% $935,671.17 PLANO IE-06 CONTACTOS Y FUERZA OFICINAS $0.02 $40,845.33PLANO HCM-01 CISTERNA Y CUARTO DE MAQUINAS 7.64% $164,387.79 PLANO IE-08 FUERZA Y CONTACTO ANDEN Y SUB-ESTACION 2.31% $47,630.28COLOCACION Y CONEXIÓN DE EQUIPOS 2.03% $43,658.24 PLANO IE-09 CONTACTOS Y FUERZA AZOTEA 4.78% $98,721.28
IE-10 ALIMENTACION GENERALES 33.48% $691,693.74INSTALACION HIDROSANITARIA EXTERIOR 679.93% $6,098,878.96 GIE-3 FUERZA Y CONTACTOS AMASIJO ROSTICERA PREPARACION FRUT 10.22% $211,159.87PLANO C-06 Y C-12 PLANO DE SERV. GRALES 2.30% $140,243.36 GIE-3a FUERZA Y CONTACTOS EN PREPARACION DE CARNES 4.40% $90,949.95
PLANO GIE-4 FUERZA Y CONTACTOS EN FRUTAS Y VERDURAS 2.79% $57,740.44CARGA DE GAS 424.13% $3,566,352.68 PLANO IE-28 SISTEMA DE TIERRAS PISO DE VENTA 2.59% $53,463.02CARGA DE GAS 1.06% $37,800.00 PLANO SE-03 ALUMBRADO Y CONTACTOS CUARTO DE CARTON 3.12% $64,357.40
SE-03 ALUMBRADOY CONTACTOS CUARTO DE BOMBAS 1.76% $36,350.57INSTALACION DE RED CONTRA INCENDIO 226.22% $1,865,354.48 EQ-IE COLOCACION DE LUMINARIAS Y EQUIPO 9.46% $195,356.24PLANO SCI-01,02,03 INSTALACION CONTRA INCENDIO 26.22% $489,128.44
INSTALACION ELECTRICA EXTERIOR 100.00% $206,556.12AIRE ACONDICIONADO 100.00% $688,113.02 PLANO C-06 SERVICIOS GENERALES ACOMETIDA 34.24% $70,728.27INSTALACION DE AIRE ACONDICIONADO 16.28% $112,042.14 PLANO C-010 ALUMBRADO DE ESTACIONAMIENTO 65.76% $135,827.85DUCTOS DE LAMINA 54.34% $373,914.60REJILLAS,CONTROLES 29.38% $202,156.28
1) OBTENER EL PORCENTAJE DE INCIDENCIA DE CADA PARTIDA EN EL RESUMEN GLOBAL Y ANOTARLO ENLA CELDA EN BLANCO CORRESPONDIENTE.
% INCIDENCIA EN AVANCE GLOBAL
2) DESPUES OBTENER EL PORCENTAJE DE INCIDENCIA DE CADA CONCEPTO PROJECT EN SU PARTIDA
CORRESPONDIENTE Y ANOTARLO EN LA CELDA EN BLANCO RESPECTIVA.
% INCIDENCIA EN CONCEPTOS DE
RESUMEN GLOBAL
3) UNA VEZ REALIZADOS LOS PASOS 1 Y 2, EN LA HOJA "AVANCES FISICOS" SE DEBERÁ ANOTAR DIRECTAMENTE LOS PORCENTAJES
DE AVANCE REAL Y PROGRAMADOS EN EL NIVEL ANALISIS PARTICULAR EN LA CELDA EN BLANCO RESPECTIVA.
4) AL MISMO TIEMPO QUE SE EFECTUA EL PASO 3, LOS CÁLCULOS SE REALIZAN AUTOMATICAMENTE YA QUE ESTAN VINCULADAS
LAS FORMULAS CON LOS VALORES OBTENIDOS Y ANOTADOS EN LOS PASOS 1, 2 Y 3. DESPUES DE COMPLETAR LOS PASOS 6 Y 7 ESTAMOS
LISTOS PARA IMPRIMIR LA TABLA DE AVANCE FÍSICO.
5) AHORA PASAMOS A LA HOJA "FECHAS DE INICIO Y FIN" COMPLETANDO LAS FECHAS QUE SE VAN PROGRAMANDO Y CUMPLIENDO, SE DEBEN
CAPTURAR DE LA FORMA: DIA/MES/AÑO. FINALMENTE DESPUES DE COMPLETAR LOS PASOS 6 Y 7 TAMBIÉN SE IMPRIME ESTA HOJA.
6.1 FORMATO
6.2 OBRA
6.3 UBICACIÓN
6.4 TIPO DE OBRA
6.5 No. DE REPORTE
6.5-A PERIODO DEL REPORTE
6.6 FECHA DEL REPORTE
6.7 NOMBRE DEL RESPONSABLE DE OBRA POR PARTE DE SUPERVISION:
6.8 TELEFONO DEL RESPONSABLE DE OBRA POR PARTE DE SUPERVISION:
7.1 EMPRESA ENCARGADA DE LAS TERRACERIAS TIENDA
7.2 EMPRESA DE EXTERIORES Y OBRA CIVIL
7.3 EMPRESA ENCARGADA DE LA ESTRUCTURA
7.4 EMPRESA ENCARGADA DE INSTALACION HIDROSANITARIA
7.5 EMPRESA ENCARGADA DE INSTALACION ELECTRICA
7.5 EMPRESA ENCARGADA DE INST. DE AIRE ACONDICIONADO
7.6 EMPRESA ENCARGADA DE REFRIGERACION
7.7 EMPRESA SUPERVISORA
7.8 LABORATORIO
BODEGA AURRERA
REPORTE DE OBRA No. 2 OBRA: BODEGA AURRERA "BORREGUERA"
20 DE ENERO DEL 2007 UBICACIÓN: TAMPICO, TAMAULIPAS
TIPO DE OBRA: NUEVA
RESUMEN GLOBAL CONCEPTOS PROJECT ANALISIS PARTICULAR
% AVANCE REAL
PARTIDAS CONCEPTO
CONCEPTO
26.85% 20.05% 22.73%
2.21% 100.00% 100.00% DEMOLICIONES 100.00% 100.00% 100.00% EXCAVACIONES PARA NIV., ACARREOS DE PRODUTOS DE EXCAVACIÓN
2.40% 27.50% 100.00% PRELIMINARES77.48% 10.00% 100.00% TAPIALES
22.52% 45.00% 100.00% TRAZO Y NIEVELACION
13.15% 0.00% 0.00%PAVIMENTACION 100.00% 0.00% 0.00% RIEGO DE IMPREGNACION
78.63% 0.00% 0.00% PAVIMENTO ASFALTICO
21.37% 0.00% 0.00% PAVIMENTO HIDRAULICO
40.31% 72.50% 50.00%
7.93% 100.00% 50.00% EXCAVACIONES PARA NIVELACION DE TERRENO
TERRACERIAS 76.88% 25.00% 50.00% RELLENOS PARA TERREPLANES Y PLATAFORMA
6.75% 80.00% 50.00% ACARREOS PRODUCTO DE EXCAVACION
8.44% 85.00% 50.00% FILTROS
16.09% 10.00% 0.00% 16.09% 10.00% 0.00% VIALIDADES FUERA DEL PREDIO
0.97% 0.00% 0.00%79.15% 0.00% 0.00% RED DE RIEGO
17.37% 0.00% 0.00% LINEA DE ALIMENTACION DE AGUA POTABLE
3.48% 0.00% 0.00% ACOMETIDA DE GAS
2.26% 0.00% 0.00%INSTALACION ELECTRICA EXTERIOR4.53% 0.00% 0.00% INSTALACION ELECTRICA EXTERIOR TELEFONIA
81.00% 0.00% 0.00% ALUMBRADO EXTERIOR
14.47% 0.00% 0.00% ALTA TENSION MEDIA
8.83% 5.50% 0.00% ALBAÑILERIA EXTERIOR
40.98% 0.00% 0.00% BANQUETAS (INCLUYE PERIMETRALES A LA TIENDA)
41.83% 0.00% 0.00% GUARNICIONES Y TOPES
3.28% 33.00% 0.00% MUROS DE CONCRETO DE CONTENCION
6.71% 0.00% 0.00% BASES PARA POSTES DE ALUMBRADO
3.88% 0.00% 0.00% HERRERIA
3.32% 0.00% 0.00% MALLA CICLON EN EXTEROR DE LA TIENDA
1.21% 0.00% 0.00% SEÑALIZACION77.73% 0.00% 0.00% SEÑALIZACION HORIZONTAL
21.37% 0.00% 0.00% SEÑALIZACION VERTICAL
10.14% 5.00% 0.00%COLECTORES Y DRENAJES
72.96% 5.00% 0.00% COLECTORES Y DRENAJES PLUVIALES
27.04% 0.00% 0.00% COLECTORES Y DRENAJES SANITARIO
2.42% 0.00% 0.00%JARDINERA
42.36% 0.00% 0.00% PASTO
43.91% 0.00% 0.00% PLANTAS, ARBOLES
13.73% 0.00% 0.00% TIERRA NEGRA
22.72% 5.00% 0.00% II. ESTRUCTURA METALICA 22.72% 5.00% 22.00%
ESTRUCTURA METALICA 49.59% 5.00% 22.00% ELEMENTOS ESTRUCTURALES,METALICOS TRABES, VIGAS ETC.
TECHUMBRE O CUBIERTA 46.84% 0.00% 0.00% LAMINA EN TECHUMBRE
LAMINA EN FACHADA 3.57% 0.00% 0.00% LAMINA EN FACHADA
33.26% 13.94% 18.94% III. OBRA CIVIL
11.42% 60.00% 50.00% CIMENTACION
78.00% 25.00% 25.00% ZAPATAS
8.51% 30.00% 25.00% EXCAVACIONES PARA CIMENTACION
13.49% 15.00% 0.00% RELLENOS PARA CIMENTACION
9.23% 25.00% 100.00% PRELIMINARES OBRA CIVIL 0.00% 25.00% 100.00% TAPIALEZ TRAZO Y NIVELACION
25.22% 0.00% 0.00% PISOS
93.39% 0.00% 0.00% FIRMES O LOSAS DE CONCRETO EN ENTRE PISO
1.08% 0.00% 0.00% PISO DE : MARMOL, TERRAZO, LOSETAS, ETC.
5.53% 0.00% 0.00% ZOCLOS VINILICO, MARMOL ETC.
3.11% 0.00% 0.00% PLAFONES46.86% 0.00% 0.00% PLAFONES: TABLAROCA,MOLDURAS,STABILT,BDUROCK ETC.
53.14% 0.00% 0.00% FALDONES: TABLAROCA,MOLDURAS,STABILT,BDUROCK ETC.
23.20% 1.48% 1.48% ALBAÑILERIA
12.55% 0.00% 0.00% ALBAÑILERIA
20.30% 0.00% 0.00% MUROS DE TABIQUE Y BLOCK
17.03% 0.00% 0.00% CADENAS
9.18% 0.00% 0.00% DALAS,CASTILLOS,CEPAS PARA INSTALACIONES
12.39% 0.00% 0.00% CANCELERIA DE ALUMINIO
18.18% 0.00% 0.00% HERRERIA
2.59% 0.00% 0.00% MALLA CICLON Y SUS POSTES
1.85% 0.00% 0.00% ESCALERAS MARINAS
5.92% 13.34% 13.34% LIMPIEZA DE OBRA
12.06% 0.00% 0.00% ACABADOS
14.67% 0.00% 0.00% LAMBRINES DE MARMOL, LOSETA, TABLAROCA ETC
27.11% 0.00% 0.00% MUROS DE TABLAROCA O DUROCK
29.93% 0.00% 0.00% PINTURA
0.30% 0.00% 0.00% PUERTAS DE MADERA Y MARCOS
27.99% 0.00% 0.00% PUERTAS METALICAS
12.89% 25.00% 0.00% CISTERNA 12.89% 25.00% 0.00% TANQUE DE ALMACENAMIENTO
2.87% 0.00% 0.00% DECORACION 2.87% 0.00% 0.00% CARPINTERIA FINA
14.95% 0.00% 0.00%
42.27% 0.00% 0.00%INSTALACIONES HIDROSANITARIAS 42.27% 0.00% 0.00% INSTALACIONES HIDROSANITARIAS
2.75% 0.00% 0.00% 2.75% 0.00% 0.00% INSTALACION HIDROSANITARIA EXTERIOR
40.58% 0.00% 0.00% 40.58% 0.00% 0.00% INSTALACION ELECTRICA INTERIOR
IV. INSTALACIONES 4.06% 0.00% 0.00%INSTALACION ELECTRICA EXTERIOR 4.06% 0.00% 0.00% INSTALACION ELECTRICA EXTERIOR
0.74% 0.00% 0.00% CARGA DE GAS 0.74% 0.00% 0.00% CARGA DE GAS
9.61% 0.00% 0.00%INSTALACION DE RED CONTRA INCENDIO9.61% 0.00% 0.00% INSTALACION DE RED CONTRA INCENDIO
2.02% 0.00% 0.00% AIRE ACONDICIONADO
16.28% 0.00% 0.00% INSTALACION DE AIRE ACONDICIONADO
2.02% 0.00% 0.00% V. AIRE ACONDICIONADO 54.34% 0.00% 0.00% DUCTOS DE LAMINA
29.38% 0.00% 0.00% REJILLAS,CONTROLES
0.00% 0.00% 0.00% VI. REFRIGERACIÓN
0.00% 0.00% 0.00%0.20% 0.00% 0.00% VI. REFRIGERACIÓN 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%0.00% 0.00% 0.00%
100.00% 6.50% 6.94% AVANCE GLOBAL
ARQ. FILIBERTO RAMIREZ GUILLEN
01 (81) 15 22 22 81
% INCIDENCIA EN
AVANCE GLOBAL
% AVANCE
PROGR.
% INCIDENCIA
EN RESUMEN
GLOBAL
% AVANCE
REAL
% AVANCE
PROGR.
% INCIDENCIA
EN
CONCEPTOS
PROJECT
% AVANCE
REAL
%
AVANCE
PRGR.
I. TERRACERIAS Y OBRAS EXTERIORES
TRABAJOS FUERA DEL PREDIO
INSTALACION
HIDROSANITARIA EXTERIOR
INSTALACION HIDROSANITARIA EXTERIOR
INSTALACION ELECTRICA INTERIOR
BODEGA AURRERA
REPORTE DE OBRA No. 220 DE ENERO DEL 2007
RESUMEN GLOBAL CONCEPTOS PROJECT
PSR
PARTIDAS
#VALUE! 1/2/2007SITE
1/2/2007EARTHWORK
3/5/2007
###
1/8/2007EARTHWORK
2/5/2007
1/29/2007
1/29/2007
2/5/2007
FECHA DE
INICIO
PROGRAMAD
A
FECHA DE
INICIO REAL
FECHA
FINAL
PROGRAM
ADA
FECHA
FINAL
REAL
FECHA DE INICIO
PROGRAMADA
I. TERRACERIAS Y OBRAS EXTERIORES
4/2/2007
1/15/2007
3/26/2007
#VALUE! II. ESTRUCTURA METALICA 1/1/2007
III. OBRA CIVIL
1/15/2007
### 1/1/2007
CIVILWORK
3/12/2007
3/12/2007
1/29/2007
3/12/2007
###
FINISHES 1/8/20073/26/2007
IV. INSTALACIONES
2/5/2007
I. TERRACERIAS Y OBRAS EXTERIORES
IV. INSTALACIONES
1/29/2007
2/5/2007
1/29/2007
1/29/2007V. AIRE ACONDICIONADO
VI. REFRIGERACIÓN
#REF! AVANCE GLOBAL
O-ALL CONST.
BODEGA AURRERA
OBRA:
UBICACIÓN:
TIPO DE OBRA:
CONCEPTOS PROJECT ANALISIS PARTICULAR
CONCEPTO
1/4/2007 1/2/2007 1/14/2007 DEMOLICIONES 1/2/2007 1/4/2007
02/01/2007 1/2/2007 PRELIMINARES1/2/2007 1/2/20071/2/2007 1/3/2007
3/18/2007PAVIMENTACION 3/5/2007
3/5/20073/5/2007
2/4/2007
1/9/2007 1/4/20071/4/2007 TERRACERIAS 1/9/2007 1/19/2007
1/8/2007 1/4/20071/15/2007 1/15/2007
3/18/2007 2/5/2007
3/11/20071/29/20071/29/20071/29/2007
3/18/2007 INSTALACION ELECTRICA EXTERIOR1/29/20071/29/20071/29/2007
3/11/2007 ALBAÑILERIA EXTERIOR
2/12/20072/12/20072/5/2007 1/17/2007
2/26/20073/12/20073/12/2007
FECHA DE INICIO
REAL
FECHA FINAL
PROGRAMADA
FECHA FINAL
REAL
FECHA DE
INICIO
PROGRAMAD
A
FECHA DE
INICIO REAL
TRABAJOS FUERA DEL PREDIO
INSTALACION
HIDROSANITARIA
EXTERIOR
4/15/2007 SEÑALIZACION4/2/20074/2/2007
3/18/2007COLECTORES Y DRENAJES
1/15/20071/15/2007
4/15/2007JARDINERA
3/26/20073/26/20073/26/2007
3/25/2007
1/1/2007
2/26/2007
2/12/20071/8/2007
2/11/2007 CIMENTACION
1/15/2007 1/16/20071/22/2007 1/8/20071/29/2007
1/16/2007 1/7/2007 1/1/2007 1/16/2007
4/8/2007 PISOS
2/19/20073/12/20073/12/2007
4/8/2007 PLAFONES3/12/20073/12/2007
4/16/2007 ALBAÑILERIA
3/2/20071/29/20072/5/20072/5/2007
3/19/20073/12/20073/12/20074/9/20071/2/2007
4/15/2007 ACABADOS
3/12/20073/26/20073/26/20073/26/20073/26/2007
1/11/2007 2/18/2007 CISTERNA 1/8/2007 1/11/2007
4/8/2007 DECORACION 3/26/2007
4/15/20072/5/2007
ESTRUCTURA METALICA
TECHUMBRE O CUBIERTA
LAMINA EN FACHADA
PRELIMINARES OBRA CIVIL
INSTALACIONES HIDROSANITARIAS
3/4/20071/29/2007
4/15/20072/5/2007
3/18/20071/29/2007
CARGA DE GAS
4/15/2007 AIRE ACONDICIONADO
3/5/20071/29/20073/26/2007
VI. REFRIGERACIÓN
INSTALACION HIDROSANITARIA EXTERIOR
INSTALACION ELECTRICA INTERIOR
INSTALACION ELECTRICA EXTERIOR
INSTALACION DE
RED CONTRA
INCENDIO
BODEGA AURRERA
BODEGA AURRERA "BORREGUERA"
TAMPICO, TAMAULIPAS
NUEVA
ANALISIS PARTICULAR
CONCEPTO
1/14/2007 1/14/2007 EXCAVACIONES PARA NIV., ACARREOS DE PRODUTOS DE EXCAVACIÓN
1/7/2007 TAPIALES
2/18/2007 TRAZO Y NIEVELACION
3/18/2007 RIEGO DE IMPREGNACION3/25/2007 PAVIMENTO ASFALTICO
3/18/2007 PAVIMENTO HIDRAULICO
2/4/2007 EXCAVACIONES PARA NIVELACION DE TERRENO
2/4/2007 RELLENOS PARA TERREPLANES Y PLATAFORMA
2/4/2007 ACARREOS PRODUCTO DE EXCAVACION
1/28/2007 FILTROS
3/18/2007VIALIDADES FUERA DEL PREDIO
3/11/2007 RED DE RIEGO
3/11/2007 LINEA DE ALIMENTACION DE AGUA POTABLE
3/11/2007 ACOMETIDA DE GAS
3/18/2007 INSTALACION ELECTRICA EXTERIOR TELEFONIA
3/18/2007 ALUMBRADO EXTERIOR
3/18/2007 ALTA TENSION MEDIA
3/11/2007 BANQUETAS (INCLUYE PERIMETRALES A LA TIENDA)
3/25/2007 GUARNICIONES Y TOPES
3/11/2007 MUROS DE CONCRETO DE CONTENCION
3/11/2007 BASES PARA POSTES DE ALUMBRADO
4/1/2007 HERRERIA
4/1/2007 MALLA CICLON EN EXTEROR DE LA TIENDA
FECHA FINAL
PROGRAMADA
FECHA
FINAL
REAL
4/15/2007 SEÑALIZACION HORIZONTAL
4/15/2007 SEÑALIZACION VERTICAL
3/18/2007 COLECTORES Y DRENAJES PLUVIALES
3/18/2007 COLECTORES Y DRENAJES SANITARIO
4/15/2007 PASTO
4/15/2007 PLANTAS, ARBOLES
4/15/2007 TIERRA NEGRA
3/4/2007 ELEMENTOS ESTRUCTURALES,METALICOS TRABES, VIGAS ETC.
3/25/2007 LAMINA EN TECHUMBRE
3/11/2007 LAMINA EN FACHADA
2/18/2007 ZAPATAS2/11/2007 EXCAVACIONES PARA CIMENTACION
2/18/2007 RELLENOS PARA CIMENTACION
1/7/2007 TAPIALEZ TRAZO Y NIVELACION
3/11/2007 FIRMES O LOSAS DE CONCRETO EN ENTRE PISO 4/8/2007 PISO DE : MARMOL, TERRAZO, LOSETAS, ETC.
4/8/2007 ZOCLOS VINILICO, MARMOL ETC.
4/8/2007 PLAFONES: TABLAROCA,MOLDURAS,STABILT,BDUROCK ETC.
4/8/2007 FALDONES: TABLAROCA,MOLDURAS,STABILT,BDUROCK ETC.
4/16/2007 ALBAÑILERIA3/11/2007 MUROS DE TABIQUE Y BLOCK3/11/2007 CADENAS3/11/2007 DALAS,CASTILLOS,CEPAS PARA INSTALACIONES4/8/2007 CANCELERIA DE ALUMINIO4/1/2007 HERRERIA4/1/2007 MALLA CICLON Y SUS POSTES
4/15/2007 ESCALERAS MARINAS
4/16/2007 LIMPIEZA DE OBRA
4/1/2007 LAMBRINES DE MARMOL, LOSETA, TABLAROCA ETC4/8/2007 MUROS DE TABLAROCA O DUROCK4/8/2007 PINTURA
4/15/2007 PUERTAS DE MADERA Y MARCOS
4/15/2007 PUERTAS METALICAS
2/18/2007 TANQUE DE ALMACENAMIENTO
4/8/2007 CARPINTERIA FINA
4/15/2007 INSTALACIONES HIDROSANITARIAS
3/4/2007 INSTALACION HIDROSANITARIA EXTERIOR
4/15/2007 INSTALACION ELECTRICA INTERIOR
3/18/2007 INSTALACION ELECTRICA EXTERIOR
CARGA DE GAS
INSTALACION DE RED CONTRA INCENDIO
4/15/2007 INSTALACION DE AIRE ACONDICIONADO
4/1/2007 DUCTOS DE LAMINA
4/15/2007 REJILLAS,CONTROLES
ARQ. FILIBERTO RAMIREZ GUILLEN
01 (81) 15 22 22 81
EXCAVACIONES PARA NIV., ACARREOS DE PRODUTOS DE EXCAVACIÓN
ELEMENTOS ESTRUCTURALES,METALICOS TRABES, VIGAS ETC.
PLAFONES: TABLAROCA,MOLDURAS,STABILT,BDUROCK ETC.
FALDONES: TABLAROCA,MOLDURAS,STABILT,BDUROCK ETC.
GLOBAL
OBRA NUEVA
REPORTE SEMANAL
DIRECCION DE CONSTRUCCIONES SUPERVISION:
ING. RODOLFO GERARDO NUÑEZ SALAZAR 01(618) 815 1880
GERENTE DE CONSTRUCCION: ING. EDGAR GALLARDO EXT 1506
REPORTE SEMANAL DE ACTIVIDADES No. REPORTE DE OBRA No. 2 CONTRATISTAS: TelefonoPERIODO : DEL 15 DE ENERO AL 21 DE DEL 2007 TERRACERIAS TEXTOR
O B R A : NUEVA ESTRUCTURA TEXTOR
UBICACIÓN : TAMPICO, TAMAULIPAS OBRA CIVIL TEXTOR
LABORATORIO : BUFETE Y CONTROL DE CLAIDAD
AVANCE POR ACTIVIDAD GRAFICA DE AVANCE GLOBALCONCEPTO FECHA FECHA AVANCE AVANCE DIF.
INICIO TERMI. PROG. REAL
TERRACERIAS Y OBRA EXT. Jan-02-07 0.00% 0.00% 0.00%
ESTRUCTURA 0.00% 0.00% 0.00%
OBRA CIVIL Jan-05-07 0.00% 0.00% 0.00%
INSTALACIONES 0.00% 0.00% 0.00%
AIRE ACONDICIONADO 0.00% 0.00% 0.00%
REFRIGERACION
COMENTARIOS DE OBRA
INFORMA LA CONTRATISTA EL SUMINISTRO DE LA FIBRA GEO TEXTIL. SE ESTA COLOCANDO EL FILTRO DE CAPILARIDAD
OBRA CIVIL :
SE TRABAJA EN CISTERNA Y TANQUE DE TORMENTAS
ACTUALMENTE SE REALIZAN MUROS DE CONTENCIÓN DEL EJE "D"
ESTRUCTURA:
SEMANA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
PERIODOINSTALACIONES: ACTIVIDADES QUE ESTÁN IMPACTANDO AL PROGRAMA SE SUMINISTRO TUBERIA DE INSTALACIONES EXTERIORES. SE PRESENTAN LLUVIAS
ESTRUCTURA:EN ESPERA DE PRUEBAS E INFORME FOTOGRAFICO
OBRA CIVIL: INSTALACIONES:
OTROS FACTORES:
AIRE ACONDICIONADO : PROGRAMA DE OBRA AVANCES ESTE PERIODO ACUM.
FECHA DE INICIO 2-Jan-07 AV. PROGRAMADO 4% % 5% % 9% %
FECHA DE TERMINACION 30-Apr-07 AVANCE REAL 6% % 1% % 7% %
REFRIGERACION: SEMANAS DE EJECUCION: 18 DIFERENCIA -2% % 5% % 3% %
SEMANAS TRANSCURRIDAS 3 DIAS DE RETRASO -2.16 4.86 2.70
SEMANAS RESTANTES 15
REPORTE FINANCIERO COMENTARIOS PROYECTOS
EN ESPERA DE QUE SE PRESENTE REPRESENTANTE DE CONSTRUCTORA FRISA
PEDIDO IMPORTE ANT ACTUAL ACUM SALDO
PEDIDO IMPORTE ANT ACTUAL ACUM SALDO
210 $201,820.00 201,820.00 0.00 201,820.00 $0.00
220 $1,265,400.00 503,529.20 0.00 503,529.20 $761,870.80 COMENTARIOS SUMINISTROS WALMART
230 $1,294,334.00 321965.6 128786.23 450751.8 843582.19 FECHAS VENCIDAS :
510 $3,687,480.00 917,260.65 183452.13 1,100,712.78 2586767.22
580 $927,945.00 184,661.06 0 184,661.06 743283.94
570 $1,461,033.00 0.0 72686.39 72686.4 1388346.61
$0.00 0.00 0.00 0.00 $0.00
TOTAL 2,129,236.49 384,924.75 2,514,161.24 6,323,850.76 COMENTARIOS AREA LEGALDIVERSOS CONTRATOS
LICENCIA ACOMETIDA CIA. DE LUZ Y FZA.BITACORA CONEXIÓN A COLECTOR PUBLICOTIRO AUTORIZ, CONEXIÓN DE AGUA INICIO O. IMSS CONVENIO SINDICALC/PAG. INFO. COMENTARIOS VARIOSA.T.O. IMSS
ACTA RECEP.
GARANTÍAS
SERVICIOS ADMINISTRATIVOS WAL MART , S. DE R.L. DE C. V.
TERRACERIAS Y EXTERIORES:
TERRACERIAS Y EXT.:
SEMANA ANTERIOR
LA CO
SE SOLICITA A LA CONTRATISTA COLOCAR TAPIAL SEGÚN ESPECIFICACIONES.
ADEMAS DE COLOCAR MANTA DE PROX. BODEGA AURRERA
2 A
L 5
DE
EN
E
6 A
L 1
2 D
E E
NE
13 A
L 1
9 D
E E
NE
20 A
L 2
6 D
E E
NE
27 D
E E
NE
AL
2 D
E F
EB
3 A
L 9
DE
FE
B
10 A
L 1
6 D
E F
EB
17 A
L 2
3 D
E F
EB
23 D
E F
EB
AL
2 D
E M
AR
3 A
L 9
DE
MA
R
10 A
L 1
6 D
E M
AR
17 A
L 2
3 D
E M
AR
24 A
L 3
0 D
E M
AR
31 D
E M
AR
AL
6 D
E A
BR
7 A
L 1
3 D
E A
BR
14 A
L 2
0 D
E A
BR
.
20 A
L 2
6 D
E A
BR
IL
27 A
L 3
0 D
E A
BR
IL
0.00%
20.00%
40.00%
60.00%
80.00%
100.00%
120.00%
ProgramadoReal
C. NO ADEUDO
PLS.AS BUILD
SE SOLICITA A LA CONTRATISTA COLOCAR TAPIAL SEGÚN ESPECIFICACIONES.
ADEMAS DE COLOCAR MANTA DE PROX. BODEGA AURRERA
REPORTE FOTOGRAFICO
OBRA: BODEGA AURRERA "BORREGUERA"
UBICACIÓN: TAMPICO, TAMAULIPAS
TIPO DE OBRA: NUEVA 20 DE ENERO DEL 2007
20 DE ENERO DEL 2007
REGISTROS DE DRENAJE PLUVIAL
CIMENTACION
GOLOCACION DE FILTRO DE CAPILARIDAD A TERRACERIAS
REPORTE FOTOGRAFICO
OBRA: BODEGA AURRERA "BORREGUERA"
UBICACIÓN: TAMPICO, TAMAULIPAS
TIPO DE OBRA: NUEVA 20 DE ENERO DEL 2007
20 DE ENERO DEL 2007
TRABAJOS DE CISTERNA COLADO DE MUROS DE CONTENCION
TRABAJOS DE TANQUE DE TORMENTAS
Fecha: 20 DE ENERO DEL 2007 # de Reporte 2
S U B D I R E CC I O N D E P R O Y E C T O S Obra: BODEGA AURRERA "BORREGUERA"
Supervisor: Grupo Aconsa
C O N T R O L D E R P I'S C O N T R O L D E O R D E N E S D E C A M B I O
# DE RPI EMITIDOS: 1 FECHAS PLANOS EMISION # 0 (ISSUE)
# RPI DESCRIPCION Emision Respuesta # OC DESCRIPCION FECHAS
1 1.- COLADO DE LOSA TAPA Y PROPUESTA DE LA CONTRATISTA 18/01/2007
2
C O N T R O L D E B O L E T I N E S
# B. DESCRIPCION FECHAS1
COMENTARIOS Y OBSERVACIONES
NO SE HA TENIDO RESPUESTA DE RPI 1
INCONSISTENCIAS ERRORES OMISIONES MEJORAS
Reporte Semanal de SeguridadSERVICIOS ADMINISTRATIVOS WAL-MART, S.A. DE C.V. 20 DE ENERO DEL 2007
ING. PEDRO LLANO DE LA TORRE
ING. RENE ALVARADO MORENO
ARQ. EDGAR GALLARDO
SUPERVISORA: ACONSA Y ASOCIADOS CONSULTORES, S. DE R.L. DE C. V.
TENSA
LIMPIEZA GENERAL DE OBRA 100%
USO DE CASCO DE SEGURIDAD 100%
CHALECO REFLEJANTE 100%
100%
BARANDALES EN TODOS SUS ANDAMIOS
100%
100%
PINTURA DE AMARILLO EN TABLEROS ELECTRICOS
MANTAS DE SEGURIDAD EN INTERIOR DE OBRA 100%
CUMPLIMIENTO 70%
NOTA:LISTA ENUNCIATIVA MAS NO LIMITATIVA
DIRECTOR DE CONSTRUCCIONES:
SUBDIRECTOR DE CONSTRUCCIONES:
GERENTE DE CONSTRUCCIONES:
USO ADECUADO DE EQUIPO DE SEGURIDAD
% Semanal de Cumplimiento
BOTAS DURANTE TRABAJOS EN CONCRETO, LODO, AGUA O EN CONTACTO CON SUELOS CONTAMINADOS.
MODULO DE ESCALERA CON BARANDAL PARA SUBIR A LA ESTRUCTURA O LA TECHUMBRE
SEÑALIZACION REFLEJANTE EN TODO EL PERIMETRO DE LAS CEPAS, EXCAVACIONES O VACIOS QUE REPRESENTEN PELIGRO DE CAIDAS
TROQUELADO DE EXCAVACIONES CON TALUDES EN LOS QUE SE RESPETE EL ANGULO DE REPOSO DEL MATERIAL
SEÑALIZACION DE ZONAS CON ACCESO PEATONAL PROHIBIDO
USO DE ALARMA INDICATIVA DE MOVIMIENTO DE MAQUINARIA PESADA
PROTECCION DE ELEMENTOS QUE PUEDAN DAÑAR PISOS
UTILZAR EXTENSIONES ELECTRICAS SOLO CON CABLE DE USO RUDO