www.pro-sim.com engineering your designs1
Survive or Succeed???
Dr S ShamasundarManaging Director, ProSIM
GDC-TECH 27th-28th Oct 2015 Pune
www.pro-sim.com engineering your designs2
Simulated. Designed. Delivered.
www.pro-sim.com engineering your designs3
Emerging Opportunity for GDC• Shifting from Sand casting to GDC
• Increasing emphasis on environmental issues becoming key in India
• Cost of sand reclamation increasing
• Increasing demand for engineered castings
• Increased acceptance of India as a major player in casting Industry ( India 3rd largest casting player, globally!!)
www.pro-sim.com engineering your designs4
ProSIM- a Technology Collaborator• ProSIM has supported GDC companies to convert from Sand to
GDC.
• To develop gating systems in a faster and economical manner.
• To increase yield and reduce rejections
• To assimilate casting simulation technology in their design and development practice
• To develop process control maps by sensitivity analysis.
www.pro-sim.com engineering your designs5
Air Entrapment in a brass gravity die castingcompared with ADSTEFAN simulation predicted results.
www.pro-sim.com engineering your designs6
Fluid flow Analysis (Result Observation)
Pouring Temp- 1150Deg CLiquidus temp- 905 Deg CSolidus temp- 899 Deg C
Observation- when the die cavity filling is complete, there are regions with temperature well below the solidus temperature, hence hindering the melt flow.
In order to have uniform temperature distribution all around the cavity die preheat temperature should be increased. Intermediate connections are to be made such that molten metal flows to all the locations without temperature drop below the solidus temperature.
870°C
www.pro-sim.com engineering your designs7
Analysis of melt flow in die cavity
Blue color - air in the componentTransparent color -complete liquid metal Green color - mixture of liquid metal and air
Observation - All the highlighted regions in the image are the potential locations for air entrapment. Which may lead to gas porosity defects.
www.pro-sim.com engineering your designs8
Solidification Analysis of casting
Observation- The picture shows the final stage of solidification. The image shows the last regions of solidification embedded in the interior of casting.
Due to drop in temperature below solidus temperature, few regions have already solidified.
Shrinkage porosity will be formed in these regions.
Result interpretation-Fraction solid (Fs = 0) - Represents complete liquid metal Fraction solid (Fs = 1) - Represents complete solid metalBetween Fs= 0 and Fs=1, the color gradation shows a mixture of solid and liquid metal
www.pro-sim.com engineering your designs9
Shrinkage porosity regions
The image shows the shrinkage present in the component. These shrinkages are due to lack of proper air vents.
The shrinkages are present all along the component surface as shown. Shrinkages present are of considerable volume.
In the physical casting, hundreds of sites of shrinkage porosity of various sizes were observed, as has been simulated using ADSTEFAN.
www.pro-sim.com engineering your designs10
Summary• Existing gating design of gravity die casting of brass was
simulated using ADSTEFAN.• Key defects observed in trial casting – mainly air entrapment and
shrinkage were seen in the simulations as well.• Die preheat temperature should be increased establish uniform
temperature in melt within die cavity• Vents have to be provided at the suitable locations such that the
entrapped air escapes out to the maximum extent• Due to improper temperature distribution, few locations have
solidified even before the cavity fills up. Hence temperature equilibration is essential to attain directional solidification
• Surface porosities are present all over due to the above reasons.
www.pro-sim.com engineering your designs11
MODIFIED DIE DESIGN
Several dozen of gating designs were explored using ADSTEFAN simulation.
What is indicated here is only an indicative change. Due to high speed
solvers present in ADSTEFAN, the design optimization was achieved in a
span one week.
www.pro-sim.com engineering your designs12
Die details (with modifications)
Modified Die Cavity with Vent pins and connections
Vent Pins
Additional Connection (3 no’s)
Ø15mm Vent Pins (4 no’s)
Ø30mm Vent Pins (7 no’s)
www.pro-sim.com engineering your designs13
Fluid flow Analysis (Result Observation)
Points to note-Pouring Temp- 1150Deg CLiquidus temp- 905 Deg CSolidus temp- 899 Deg C
Observation- at the end of die cavity filling, near uniform temperature distribution is observed throughout the component. Temperature is above solidus temperature.
902°C
www.pro-sim.com engineering your designs14
Fluid flow Analysis (Result Observation)
Observation - All the highlighted regions in the Fig. are the potential locations for air entrapment.
Based on air entrapment locations & flow simulations, vent pin locations are finalized.
The entrapped air is expected to escape out through the vent pins.
Blue color - air in the componentTransparent color -complete liquid metal Green color - mixture of liquid metal and air
www.pro-sim.com engineering your designs15
Solidification Analysis (Progressive solidification)
Observation-
The highlighted shrinkage locations are the locations of vent pins thereby taking care of shrinkage defects.
Result interpretation-Fraction solid (Fs = 0) - Represents complete liquid metal Fraction solid (Fs = 1) - Represents complete solid metalBetween Fs= 0 and Fs=1, the color gradation shows a mixture of solid and liquid metal
www.pro-sim.com engineering your designs16
Shrinkage
• Shrinkage porosities are present but few mm (around 7.5-10mm) below the surface
Min depth is 7.5mm from this surface & 17mm from other surface
Min depth is 10mm from this surface and 15mm from other
www.pro-sim.com engineering your designs17
Summary
• Pouring temperature and die preheat temp optimized using ADSTEFAN
• Vent pins location, size, and number were optimized using ADSTEFAN for air evacuation.
• Porosities were restricted internal locations at internal locations, 7.5mm below the surface. (which was acceptable to end customer in this case)
www.pro-sim.com engineering your designs18
COMPARISON
www.pro-sim.com engineering your designs19
902°C870°C
Temperature Distribution
Current Design Modified Design
www.pro-sim.com engineering your designs20
Air Entrapment
Current Design Modified Design
www.pro-sim.com engineering your designs21
Shrinkage
Current Design Modified Design
www.pro-sim.com engineering your designs22
To Succeed
• Knowledge of material bahaviour• Casting Process• Gating design• Understanding of casting simulation technology• Background to SOLVE PROBLEM
www.pro-sim.com engineering your designs23
ProSIM Can Help
You to succeed
www.pro-sim.com engineering your designs24
High End Casting Simulation Software
Affordable. Usable. Profitable.
www.pro-sim.com engineering your designs25
Die Temperature Analysis
Temperature distribution of die surface
More accurate fluid flow analysis is available by using the temperature distribution of the die, which is acquired from continuous casting.
Enable to acquire how many shots are required to be a steady state.
High pressure die casting simulation.
Die temperature analysis
Temperature Distribution inside of the Die
After 1st shot
Tem
pera
ture
(d
egC)
Unsteady State Steady State (from 4th shot)
Fluid flow analysis using this
temperature distribution
1 Cycle Elapsed Time (s)
After 10th shot
www.pro-sim.com engineering your designs26
HPDC : Temperature in Molten Metal in shot sleeve
(1) Time from pouring start: 0.67s (Filled ratio: 50.5%)
(2) Time from pouring start: 1.47s (Filled ratio: 77.4%)
(3) Time from pouring start: 1.6383s (Filled ratio: 83.0%)
(4) Time from pouring start: 1.6763s (Filled ratio: 86.0%)
(5) Time from pouring start: 1.7024s (Filled ratio: 94.8%)
(6) Time from pouring start: 1.7176s (Filled ratio: 100%)
[Condition 1] Pouring time: 1.7176s(Metal rising speed: 0.2&2m/s)
www.pro-sim.com engineering your designs27
(1) Time from pouring start: 8.3s (Filled ratio:
43.8%)
Red: liquidus line temp. or overBlue: cessation of flow temp. or lower
(2) Time from pouring start:
9.0s (Filled ratio: 67.2%)
(3) Time from pouring start:
9.3s (Filled ratio: 80.6%)
(4) Time from pouring start: 10.1s(Filled ratio:
100%)
(Animation Display)
[Condition 1] Pouring time: 10s(Metal rising speed: 7cm/s)
LPDC : Temperature in Molten Metal in a wheel casting
www.pro-sim.com engineering your designs28
Tilt Casting
Start from puddle filled with molten metal
Start from filling molten metal to puddle
Solidification analysis after tilt casting
Shrinkage Porosities
Total Elements: approx 0.75 millionPercentage of Casting Parts: approx 16%
Types of Analysis(1) Filling Analysis
(2) Solidification
Analysis Time: approx. 50min (Flow) approx. 5min (Solidification)
(Used PC: Xeon 3.6GHz)
Used Memory: 24MB (Flow) 25MB (Solidification)
・ Tilt Analysis・ Back-Pressure
Unsolidified
Solidified
High
Low
www.pro-sim.com engineering your designs29
Centrifugal CastingAnimation Display Static Display
300rpm
100rpm
This model shows that timing to be filled of each part is changed by speed of rotation.
Total Elements: about 1.2 millionPercentage of Casting Parts: about 8%
Contents of Analysis
・ Filling Analysis (Centrifugal Analysis)
・ Thermal Analysis (Temp. Drop)
Analysis Time: about 2.8h
(Used PC: Xeon 3.6 GHz)
Used Memory : 290MB
www.pro-sim.com engineering your designs30
THANK YOU