presupuesto y metrados scotiabank avelino

32
ITEM ESPECIFICACION MEDIDAS PARCIAL LARGO ANCHO ALTURA 03.00.00 TRABAJOS PRELIMINARES 03.01.00 LIMPIEZA DE TERRENO MANUAL Columna 1.00 4.00 1.70 1.70 11.56 03.02.00 TRAZO Y REPLANTEO C/EQUIPO Columna 1.00 4.00 1.70 1.70 11.56 04.00.00 MOVIMIENTO DE TIERRAS 04.01.00 EXCAVACION PARA ZAPATAS Zapatas Z-1 1.00 4.00 1.70 1.70 1.10 12.72 menos columna -1.00 4.00 area cad 0.38 3.00 -4.59 04.03.00 RELLENO COMPACTADO C/EQUIPO MAT/PROPIO Excavacion de terreno 1.00 1.00 8.13 8.13 Restando Volumenes de Concreto Zapata -1.00 4.00 1.70 1.70 0.50 -5.78 Restando columnas C-1 columna reforzada -1.00 2.00 area cad 0.38 0.60 -0.46 04.04.00 ACARREO DE MATERIAL EXCEDENTE f. exj Metrado de Excavaciones 1.00 1.40 8.13 11.38 Metrado de Rellenos -1.00 1.40 1.89 -2.64 04.05.00 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA Metrado de Excavaciones 1.00 1.40 8.13 11.38 Metrado de Rellenos -1.00 1.40 1.89 -2.64 #REF! 1 1.40 #REF! #REF! 04.06.00 REFINE Y NIVELACION DE ZANJAS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 04.07.00 AFIRMADO Y COMPACTADO DE E=4" PARA PISO Area Total estructura 1.00 1.00 1.70 1.70 2.89 Restando columnas C-1 -1.00 #REF! 0.26 #REF! C-2 -1.00 2.00 0.33 -0.66 C-3 -1.00 0.00 0.31 0.00 C-4 -1.00 0.00 0.08 0.00 Restando muros de soga -1.00 1.00 0.83 0.15 -0.12 #REF! -1.00 2.00 2.88 0.15 -0.86 #REF! -1.00 2.00 2.93 0.15 -0.88 area externa (estacionamiento) 1.00 1.00 area cad 367.83 367.83 04.08.00 SUB BASE GRANULAR TRATADA DE E=0.20M PARA ESTACIONAMIENTO 1.00 area cad 367.83 0.20 73.57 04.09.00 BASE GRANULAR DE E=0.20M PARA ESTACIONAMIENTO 1.00 1.00 area cad 367.83 0.20 73.57 05.00.00 OBRAS DE CONCRETO SIMPLE 05.01.00 CONCRETO PARA CALZADURA 1:12 calzaduras CERCO (CALZADURA) 1.00 1.00 82.90 0.60 1.50 74.61 MOD. Nº DE VECES

Upload: rodolfo-jimenez-melquiades

Post on 29-Jan-2016

14 views

Category:

Documents


0 download

DESCRIPTION

ejemplo de presupuestos

TRANSCRIPT

Page 1: Presupuesto y Metrados Scotiabank Avelino

ITEM ESPECIFICACIONNº MOD.

MEDIDASPARCIAL TOTAL UND

LARGO ANCHO ALTURA

03.00.00 TRABAJOS PRELIMINARES

03.01.00 LIMPIEZA DE TERRENO MANUAL 11.56 M2

Columna 1.00 4.00 1.70 1.70 11.56

03.02.00 TRAZO Y REPLANTEO C/EQUIPO 11.56 M2

Columna 1.00 4.00 1.70 1.70 11.56

04.00.00 MOVIMIENTO DE TIERRAS

04.01.00 EXCAVACION PARA ZAPATAS 8.13 M3

Zapatas

Z-1 1.00 4.00 1.70 1.70 1.10 12.72

menos columna -1.00 4.00 area cad 0.38 3.00 -4.59

04.03.00 RELLENO COMPACTADO C/EQUIPO MAT/PROPIO 1.89 M3

Excavacion de terreno 1.00 1.00 8.13 8.13

Restando Volumenes de Concreto

Zapata -1.00 4.00 1.70 1.70 0.50 -5.78

Restando columnas

C-1

columna reforzada -1.00 2.00 area cad 0.38 0.60 -0.46

04.04.00 ACARREO DE MATERIAL EXCEDENTE f. exj 8.73 M3

Metrado de Excavaciones 1.00 1.40 8.13 11.38

Metrado de Rellenos -1.00 1.40 1.89 -2.64

04.05.00 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA #REF! M3

Metrado de Excavaciones 1.00 1.40 8.13 11.38

Metrado de Rellenos -1.00 1.40 1.89 -2.64

#REF! 1 1.40 #REF! #REF!

04.06.00 REFINE Y NIVELACION DE ZANJAS #REF! ML

#REF!

#REF! #REF! #REF! #REF! #REF!

#REF!

#REF! #REF! #REF! #REF! #REF!

04.07.00 AFIRMADO Y COMPACTADO DE E=4" PARA PISO #REF! M2

Area Total estructura 1.00 1.00 1.70 1.70 2.89

Restando columnas

C-1 -1.00 #REF! 0.26 #REF!

C-2 -1.00 2.00 0.33 -0.66

C-3 -1.00 0.00 0.31 0.00

C-4 -1.00 0.00 0.08 0.00

Restando muros de soga -1.00 1.00 0.83 0.15 -0.12

#REF! -1.00 2.00 2.88 0.15 -0.86

#REF! -1.00 2.00 2.93 0.15 -0.88

area externa (estacionamiento) 1.00 1.00 area cad 367.83 367.83

04.08.00 SUB BASE GRANULAR TRATADA DE E=0.20M PARA ESTACIONAMIENTO 73.57 M3

1.00 area cad 367.83 0.20 73.57

04.09.00 BASE GRANULAR DE E=0.20M PARA ESTACIONAMIENTO 73.57 M3

1.00 1.00 area cad 367.83 0.20 73.57

05.00.00 OBRAS DE CONCRETO SIMPLE

05.01.00 CONCRETO PARA CALZADURA 1:12 74.61 M3

calzaduras

CERCO (CALZADURA) 1.00 1.00 82.90 0.60 1.50 74.61

Nº DE VECES

Page 2: Presupuesto y Metrados Scotiabank Avelino

ITEM ESPECIFICACIONNº MOD.

MEDIDASPARCIAL TOTAL UND

LARGO ANCHO ALTURANº DE

VECES

05.02.00 CONCRETO PARA SUB ZAPATA 1:12 3.82 M3

Zapatas

Z-1 1.00 4.00 1.70 1.70 0.50 5.78

menos columna -1.00 4.00 0.29 1.00 1.70 -1.96

05.03.00 CIMIENTOS CORRIDOS F'C=175Kg/cm2 #REF! M3

CC-1

#REF! #REF! #REF! #REF! #REF! 0.60 #REF!

1.00 1.00 23.61 0.70 0.30 4.96

#REF! #REF! #REF! #REF! #REF! 0.60 #REF!

1.00 1.00 20.49 0.70 0.30 4.30

cerco #REF! 2.00 #REF! 0.70 1.20 #REF!

05.04.00 CONCRETO SOBRECIMIENTO DE F'C=175Kg/cm2 #REF! M3

Muros de Soga

#REF! #REF! 2.00 23.61 0.15 0.85 #REF!

#REF! #REF! 2.00 20.49 0.15 0.85 #REF!

#REF! #REF! 1.00 #REF! 0.15 0.80 #REF!

05.05.00 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO #REF! M2

Muros de Soga N° Caras

#REF! #REF! 2.00 23.61 2.00 0.85 #REF!

#REF! #REF! 2.00 20.49 2.00 0.85 #REF!

1.00 1.00 #REF! 2.00 0.80 #REF!

05.06.00 ENCOFRADO Y DESENCOFRADO PARA CALZADURA 124.35 M2

calzaduras

CERCO (CALZADURA) 1.00 1.00 82.90 1.50 124.35

05.07.00 ACERO ESTRUCTURAL DE SOBRECIMIENTO Resultado Hoja de Metrado en Acero 775.82 KG

05.08.00 FALSO PISO DE 4" DE CONCRETO #REF! M2

Falso piso de E=4" de concreto 1:8 C:H 1.00 1.00 #REF! #REF!

05.09.00 CONCRETO fc=210 KG/CM2 EN ESTACIONAMIENTOS E=.15 55.17 M3

estacionamiento 1.00 1.00 area cad 367.83 0.15 55.17

06.00.00 OBRAS DE CONCRETO ARMADO

06.01.00 ZAPATAS

06.01.01 ZAPATAS CONCRETO F'C=210 KG/CM2 #REF! M3

Z-1 1.00 4.00 1.70 1.70 0.60 6.94

menos columna -1.00 4.00 0.38 #REF! 0.60 #REF!

0 0.00 0.00 0.00 0.00 0.60 0.00

#REF! 0.00 0.00 0.00 0.00 0.60 0.00

#REF! #REF! #REF! #REF! #REF! 0.60 #REF!

#REF! 0.00 0.00 0.00 0.00 0.60 0.00

#REF! 0.00 0.00 0.00 0.00 0.60 0.00

#REF! #REF! #REF! #REF! #REF! 0.60 #REF!

06.01.02 ENCOFRADO Y DESENCOFRADO NORMAL DE ZAPATAS caras #REF! M2

Z-1 1.00 4.00 1.70 4.00 0.60 16.32

menos columna 1.00 4.00 #REF! 4.00 0.60 #REF!

0 1.00 0.00 0.00 4.00 0.60 0.00

#REF! 1.00 0.00 0.00 4.00 0.60 0.00

#REF! 1.00 0.00 #REF! 4.00 0.60 #REF!

#REF! 1.00 0.00 0.00 4.00 0.60 0.00

#REF! 1.00 0.00 0.00 4.00 0.60 0.00

06.01.03 ACERO ESTRUCTURAL Resultado Hoja de Metrado en Acero 953.23 KG

06.02.00 VIGAS DE CIMENTACION

06.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C=210 KG/CM2 #REF! M3

Eje B-B #REF! 1.00 9.87 0.30 0.60 #REF!

Eje C-C #REF! 1.00 4.98 0.30 0.60 #REF!

Eje D-D 1.00 1.00 7.39 0.30 0.60 1.33

Eje E-E 1.00 1.00 8.93 0.30 0.60 1.61

Eje G-G 1.00 1.00 9.87 0.30 0.60 1.78

Eje H-H 1.00 1.00 8.94 0.30 0.60 1.61

Page 3: Presupuesto y Metrados Scotiabank Avelino

ITEM ESPECIFICACIONNº MOD.

MEDIDASPARCIAL TOTAL UND

LARGO ANCHO ALTURANº DE

VECES

06.02.02 ENCOFRADO Y DESENCOFRADOEN VIGA DE CIMENTACION caras #REF! M2

Eje B-B #REF! 1.00 9.87 2.00 0.60 #REF!

Eje C-C #REF! 1.00 4.98 2.00 0.60 #REF!

Eje D-D 1.00 1.00 7.39 2.00 0.60 8.87

Eje E-E 1.00 1.00 8.93 2.00 0.60 10.72

Eje G-G 1.00 1.00 9.87 2.00 0.60 11.84

Eje H-H 1.00 1.00 8.94 2.00 0.60 10.73

06.02.03 ACERO ESTRUCTURAL Resultado Hoja de Metrado en Acero 1,246.91 KG

06.03.00 COLUMNAS

06.03.01 COLUMNAS CONCRETO F'C=210 KG/CM2 13.42 M3

Bloque A

C-1 1.00 8.00 0.25 0.40 7.65 6.12

C-2 1.00 2.00 0.30 0.30 7.65 1.38

C-3 1.00 6.00 0.25 0.25 7.65 2.87

Bloque B

C-1 1.00 6.00 0.25 0.40 4.20 2.52

C-2 1.00 1.00 0.30 0.30 4.20 0.38

C-4 1.00 1.00 0.15 0.25 4.20 0.16

06.03.02 ENCOFRADO Y DESENCOFRADO COLUMNA Caras 184.98 M2

Bloque A

C-1 1.00 8.00 0.65 2.00 7.65 79.56

C-2 1.00 2.00 0.60 2.00 7.65 18.36

C-3 1.00 6.00 0.50 2.00 7.65 45.90

Bloque B

C-1 1.00 6.00 0.65 2.00 4.20 32.76

C-2 1.00 1.00 0.60 2.00 4.20 5.04

C-4 1.00 1.00 0.40 2.00 4.20 3.36

06.03.03 ACERO ESTRUCTURAL Resultado Hoja de Metrado en Acero 2,581.99 KG

06.04.00 PLACA

06.04.01 PLACA DE CONCRETO F'C=210 KG/CM2 11.58 M3

Bloque A

P-1 1.00 1.00 0.20 1.90 7.65 2.91

P-2 1.00 1.00 0.30 1.23 7.65 2.82

P-3 1.00 1.00 0.30 1.20 7.65 2.75

Bloque B

P-2 2.00 1.00 0.30 1.23 4.20 3.10

06.04.02 ENCOFRADO Y DESENCOFRADO DE PLACA Caras 104.19 M2

Bloque A

P-1 1.00 1.00 2.10 2.00 7.65 32.13

P-2 1.00 1.00 1.53 2.00 7.65 23.41

P-3 1.00 1.00 1.50 2.00 7.65 22.95

Bloque B

P-2 2.00 1.00 1.53 2.00 4.20 25.70

06.04.03 ACERO ESTRUCTURAL Resultado Hoja de Metrado en Acero 1,726.45 KG

06.05.00 BOVEDA

06.05.01 PLACA DE CONCRETO F'C=210 KG/CM2 7.20 M3

A 1.00 1.00 área= 2.00 3.60 7.20

06.05.02 ENCOFRADO Y DESENCOFRADO DE PLACA Caras 76.46 M2

A 1.00 1.00 10.62 2.00 3.60 76.46

06.05.03 ACERO ESTRUCTURAL Resultado Hoja de Metrado en Acero 514.82 KG

06.06.00 VIGAS

06.06.01 VIGAS CONCRETO F'C=210 KG/CM2 29.99 M3

Bloque "A"

Page 4: Presupuesto y Metrados Scotiabank Avelino

ITEM ESPECIFICACIONNº MOD.

MEDIDASPARCIAL TOTAL UND

LARGO ANCHO ALTURANº DE

VECES

V-(.25x.30) - Zona de Lobby 1.00 1.00 10.60 0.25 0.30 0.80

1.00 1.00 1.90 0.25 0.10 0.05

V-101 1.00 1.00 9.90 0.30 0.60 1.78

V-102 1.00 1.00 8.31 0.30 0.60 1.50

1.00 1.00 1.90 0.10 0.60 0.11

V-103 1.00 1.00 9.00 0.30 0.60 1.62

v-104 1.00 1.00 8.94 0.30 0.60 1.61

V-S (.15x.60) 2.00 2.00 1.47 0.15 0.60 0.53

V-S (.15x.60) 2.00 2.00 12.69 0.15 0.60 4.57

V-1 (.25x.60) 1.00 2.00 13.60 0.25 0.60 4.08

Viga de costura 1.00 1.00 9.92 0.10 0.20 0.20

Bloque "B"

V-105 1.00 1.00 8.94 0.30 0.60 1.61

V-h 1.00 1.00 2.65 0.15 0.20 0.08

V-106 1.00 1.00 9.87 0.30 0.60 1.78

V-107 1.00 1.00 8.94 0.30 0.60 1.61

V-S 2.00 1.00 14.03 0.15 0.60 2.53

V-1 1.00 4.00 9.00 0.25 0.60 5.40

Viga de costura 1.00 1.00 7.39 0.10 0.20 0.15

06.06.02 ENCOFRADO Y DESENCOFRADO VIGAS 271.16 M2

Bloque "A" caras

V-(.25x.30) - Zona de Lobby 1.00 1.00 10.60 2.00 0.30 6.361.00 1.00 1.90 2.00 0.10 0.38

V-101 1.00 1.00 9.90 2.00 0.60 11.88

V-102 1.00 1.00 8.31 2.00 0.60 9.971.00 1.00 1.90 2.00 0.60 2.28

V-103 1.00 1.00 9.00 2.00 0.60 10.80

v-104 1.00 1.00 8.94 2.00 0.60 10.73

V-S (.15x.60) 2.00 2.00 1.47 2.00 0.60 7.06

V-S (.15x.60) 2.00 2.00 12.69 2.00 0.60 60.91

V-1 (.25x.60) 1.00 2.00 13.60 2.00 0.60 32.64

Viga de costura 1.00 1.00 9.92 2.00 0.20 3.97

Bloque "B"

V-105 1.00 1.00 8.94 2.00 0.60 10.73

V-h 1.00 1.00 2.65 2.00 0.20 1.06

V-106 1.00 1.00 9.87 2.00 0.60 11.84

V-107 1.00 1.00 8.94 2.00 0.60 10.73

V-S 2.00 1.00 14.03 2.00 0.60 33.67

V-1 1.00 4.00 9.00 2.00 0.60 43.20

Viga de costura 1.00 1.00 7.39 2.00 0.20 2.96

06.06.03 ACERO ESTRUCTURAL Resultado Hoja de Metrado en Acero 3212.07 KG

06.07.00 LOSA ALIGERADAS EN UNA DIRECCIÓN

06.07.01 LOSA ALIGERADA CONCRETO F´C = 210 KG/CM2 14.32 M3

1.00 1.00 163.66 0.0875 14.32

06.07.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA 163.66 M2

bloque "A" 1.00 1.00 2.65 3.75 9.94

1.00 1.00 7.50 3.75 28.13

1.00 1.00 7.50 5.25 39.38

1.00 1.00 2.65 2.70 7.16

1.00 1.00 7.50 2.70 20.25

1.00 1.00 2.65 4.90 12.99

1.00 1.00 4.90 7.50 36.75

volado 1.00 1.00 5.28 1.72 9.08

06.07.03 ACERO ESTRUCTURAL Resultado Hoja de Metrado en Acero 642.23 KG

06.07.04 LADRILLO HUECO PARA TECHO 1364.00 UND

1.00 1.00 163.66 8.33 1363.77

06.08.00 LOSA ALIGERADAS EN DOS DIRECCIONES

06.08.01 LOSA ALIGERADA CONCRETO F´C = 210 KG/CM2 13.64 M3

Page 5: Presupuesto y Metrados Scotiabank Avelino

ITEM ESPECIFICACIONNº MOD.

MEDIDASPARCIAL TOTAL UND

LARGO ANCHO ALTURANº DE

VECES

2.00 1.00 77.92 0.0875 13.64

06.08.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA 69.86 M2

bloque "A" 1.00 1.00 2.65 6.00 15.90

1.00 1.00 7.65 6.00 45.90

1.00 1.00 2.60 3.10 8.06

06.08.03 ACERO ESTRUCTURAL Resultado Hoja de Metrado en Acero 635.70 KG

06.08.04 LADRILLO HUECO PARA TECHO 436.63 UND

1.00 1.00 69.86 6.25 436.63

06.09.00 LOSA MACIZA

06.09.01 LOSA MACIZA F´C = 210 KG/CM2 3.26 M3

1.00 1.00 2.70 5.00 0.1200 1.62

1.00 1.00 3.15 2.60 0.2000 1.64

06.09.02 ENCOFRADO Y DESENCOFRADO 21.69 M2

1.00 1.00 2.70 5.00 13.50

1.00 1.00 3.15 2.60 8.19

06.09.03 ACERO ESTRUCTURAL Resultado Hoja de Metrado en Acero 250.59 KG

06.10.00 COLUMNETAS Y VIGUETAS DE AMARRE

06.10.01 CONCRETO F´C=175 KG/CM2 EN COLUMNETAS Y VIGUETAS 1.28 M3

Columnetas 1.00 8.00 0.25 0.15 3.60 1.08

Viguetas 1.00 1.00 0.15 0.15 9.00 0.20

06.10.02 ENCOFRADO Y DESENCOFRADO CARAVISTA DE COLUMNETAS Y VIGUETAS 17.10 M2

caras

Columnetas 1.00 8.00 0.25 2.00 3.60 14.40

Viguetas 1.00 1.00 0.15 2.00 9.00 2.70

06.10.03 ACERO ESTRUCTURAL Resultado Hoja de Metrado en Acero 171.73 KG

06.11.00 CISTERNA

06.11.01 CONCRETO 1.47 M3

lateral 1.00 1.00 4.80 0.10 2.50 1.20

base y tapa 1.00 2.00 area= 1.34 0.10 0.27

06.11.02 ENCOFRADO Y DESENCOFRADO 25.92 M2

caras

lateral 1.00 1.00 4.80 2.00 2.50 24.00

base y tapa 1.00 2.00 4.80 1.00 0.20 1.92

06.11.03 ACERO ESTRUCTURAL Resultado Hoja de Metrado en Acero 161.76 KG

06.12.00 CERCO PERIMETRICO

06.12.01 CONCRETO F´C=175 KG/CM2 EN COLUMNETAS Y VIGUETAS 10.62 M3

Columnetas 1.00 38.00 0.25 0.20 3.85 7.32

VIGUETAS 1 1.00 1.00 0.15 0.15 73.40 1.65

VIGUETAS 2 1.00 1.00 0.15 0.15 73.40 1.65

06.12.02 ENCOFRADO Y DESENCOFRADO CARAVISTA DE COLUMNETAS Y VIGUETAS 83.79 M2

caras

Columnetas 1.00 38.00 0.25 2.00 3.85 73.15

VIGUETAS 1 1.00 2.00 73.40 0.20 0.25 7.34

VIGUETAS 2 1.00 2.00 73.40 0.15 0.15 3.30

06.12.03 ACERO ESTRUCTURAL Resultado Hoja de Metrado en Acero 1128.88 KG

07.00.00 MUROS Y TABIQUES DE ALBAÑILERIA

07.01.00 MURO DE LADRILLO DE SOGA 465.19 M2

Page 6: Presupuesto y Metrados Scotiabank Avelino

ITEM ESPECIFICACIONNº MOD.

MEDIDASPARCIAL TOTAL UND

LARGO ANCHO ALTURANº DE

VECES

Bloque "A" 1.00 2.00 12.80 7.05 180.48

Bloque "B" 1.00 2.00 8.45 3.60 60.84

CERCO 1.00 22.00 2.75 3.05 184.52

CERCO 1.00 1.00 12.90 3.05 39.35

07.02.00 ALAMBRE #8 REFUERZO HORIZONTAL EN MUROS 1.00 115.90 0.25 18.00 521.55 521.55 KG

Page 7: Presupuesto y Metrados Scotiabank Avelino

PLANILLA DE METRADOS

PROYECTO AGENCIA SCOTIABANK AVELINOENTIDAD SCOTIABANKFECHA AGOSTO 2014

Item Descripcion Ø N° de N° de N° de Long. Longitud (m) por Ø

Peso modulo elem. pzas x Por 1/4" 3/8" 1/2" 5/8" 3/4" 1" iguales iguales elem. pieza 0.25 0.58 1.02 1.56 2.24 3.97 kg

05.07.00 ACERO ESTRUCTURAL DE SOBRECIMIENTO 775.82

eje 1-1 3/8" 1.00 2.00 6.00 26.50 - 318.0 - - - - 184.44

eje 2-2 1/4" 1.00 2.00 106.00 2.00 424.0 - - - - - 106.00

cerco 3/8" 1.00 1.00 6.00 82.90 - 497.4 - - - - 288.49

cerco 1/4" 1.00 1.00 414.50 1.90 787.6 - - - - - 196.89

06.01.01 ZAPATAS

06.01.03 ACERO ESTRUCTURAL 953.23

Z-1 1/2" 1.00 2.00 10.00 1.45 - - 29.0 - - - 29.58

1/2" 1.00 2.00 10.00 1.45 - - 29.0 - - - 29.58

Z-2 1/2" 1.00 8.00 7.00 1.15 - - 64.4 - - - 65.69

1/2" 1.00 8.00 8.00 0.95 - - 60.8 - - - 62.02

Z-3 1/2" 1.00 2.00 11.00 0.95 - - 20.9 - - - 21.32

1/2" 1.00 2.00 7.00 1.60 - - 22.4 - - - 22.85

Z-4 1/2" 2.00 1.00 67.00 1.05 - - 140.7 - - - 143.51

5/8" 1.00 1.00 6.00 6.60 - - - 39.6 - - 61.78

5/8" 1.00 1.00 6.00 3.90 - - - 23.4 - - 36.50

3/4" 1.00 1.00 11.00 6.60 - - - - 72.6 - 162.62

Z-5 1/2" 1.00 1.00 31.00 1.25 - - 38.8 - - - 39.53

1/2" 1.00 1.00 5.00 4.65 - - 23.3 - - - 23.72

5/8" 1.00 1.00 7.00 4.65 - - - 32.6 - - 50.78

5/8" 1.00 1.00 7.00 2.00 - - - 14.0 - - 21.84

Z-6 1/2" 1.00 1.00 18.00 1.65 - - 29.7 - - - 30.29

1/2" 1.00 1.00 11.00 2.65 - - 29.2 - - - 29.73

Z-7 1/2" 1.00 1.00 7.00 2.65 - - 18.6 - - - 18.92

1/2" 1.00 1.00 18.00 1.05 - - 18.9 - - - 19.28

Z-8 3/8" 2.00 1.00 11.00 3.25 - 71.5 - - - - 41.47

3/8" 2.00 1.00 13.00 2.80 - 72.8 - - - - 42.22

06.02.00 VIGAS DE CIMENTACION

06.02.03 ACERO ESTRUCTURAL 1246.91

Eje B-B 3/4" 1.00 1.00 5.00 10.70 - - - - 53.5 - 119.84

1/2" 1.00 1.00 2.00 10.70 - - 21.4 - - - 21.83

Diseño del fierro

Page 8: Presupuesto y Metrados Scotiabank Avelino

PLANILLA DE METRADOS

PROYECTO AGENCIA SCOTIABANK AVELINOENTIDAD SCOTIABANKFECHA AGOSTO 2014

Item Descripcion Ø N° de N° de N° de Long. Longitud (m) por Ø

Peso modulo elem. pzas x Por 1/4" 3/8" 1/2" 5/8" 3/4" 1" iguales iguales elem. pieza 0.25 0.58 1.02 1.56 2.24 3.97 kg

Diseño del fierro

3/8" 1.00 1.00 51.00 1.80 - 91.8 - - - - 53.24

3/8" 1.00 1.00 49.00 1.80 - 88.2 - - - - 51.16

Eje C-C 3/4" 1.00 1.00 5.00 5.53 - - - - 27.7 - 61.94

1/2" 1.00 1.00 2.00 5.53 - - 11.1 - - - 11.28

3/8" 1.00 1.00 55.00 1.80 - 99.0 - - - - 57.42

Eje D-D 3/4" 1.00 1.00 5.00 5.16 - - - - 25.8 - 57.79

1/2" 1.00 1.00 2.00 5.16 - - 10.3 - - - 10.53

3/8" 1.00 1.00 74.00 1.80 - 133.2 - - - - 77.26

Eje E-E 3/4" 1.00 1.00 5.00 10.70 - - - - 53.5 - 119.84

1/2" 1.00 1.00 2.00 10.70 - - 21.4 - - - 21.83

3/8" 1.00 1.00 54.00 1.80 - 97.2 - - - - 56.38

3/8" 1.00 1.00 41.00 1.80 - 73.8 - - - - 42.80

Eje G-G 3/4" 1.00 1.00 5.00 10.70 - - - - 53.5 - 119.84

1/2" 1.00 1.00 2.00 10.70 - - 21.4 - - - 21.83

3/8" 1.00 1.00 76.00 1.80 - 136.8 - - - - 79.34

3/8" 1.00 1.00 25.00 1.80 - 45.0 - - - - 26.10

Eje H-H 3/4" 1.00 1.00 5.00 10.70 - - - - 53.5 - 119.84

1/2" 1.00 1.00 2.00 10.70 - - 21.4 - - - 21.83

3/8" 1.00 1.00 52.00 1.80 - 93.6 - - - - 54.29

3/8" 1.00 1.00 39.00 1.80 - 70.2 - - - - 40.72

06.03.00 COLUMNAS

06.03.03 ACERO ESTRUCTURAL 2581.99

Bloque A

C-1 3/4" 1.00 8.00 2.00 8.25 - - - - 132.0 - 295.68

5/8" 1.00 8.00 4.00 8.25 - - - 264.0 - - 411.84

3/8" 1.00 8.00 36.00 1.30 - 374.4 - - - - 217.15

C-2 3/4" 1.00 2.00 4.00 8.25 - - - - 66.0 - 147.84

3/8" 1.00 2.00 36.00 1.20 - 86.4 - - - - 50.11

3/8" 1.00 2.00 36.00 1.20 - 86.4 - - - - 50.11

C-3 3/4" 1.00 6.00 4.00 8.25 - - - - 198.0 - 443.52

5/8" 1.00 6.00 4.00 8.25 - - - 198.0 - - 308.88

3/8" 1.00 6.00 36.00 1.00 - 216.0 - - - - 125.28

Bloque B

Page 9: Presupuesto y Metrados Scotiabank Avelino

PLANILLA DE METRADOS

PROYECTO AGENCIA SCOTIABANK AVELINOENTIDAD SCOTIABANKFECHA AGOSTO 2014

Item Descripcion Ø N° de N° de N° de Long. Longitud (m) por Ø

Peso modulo elem. pzas x Por 1/4" 3/8" 1/2" 5/8" 3/4" 1" iguales iguales elem. pieza 0.25 0.58 1.02 1.56 2.24 3.97 kg

Diseño del fierro

C-1 3/4" 1.00 6.00 2.00 4.80 - - - - 57.6 - 129.02

5/8" 1.00 6.00 4.00 4.80 - - - 115.2 - - 179.71

3/8" 1.00 6.00 22.00 1.40 - 184.8 - - - - 107.18

C-2 3/4" 1.00 1.00 4.00 4.80 - - - - 19.2 - 43.01

3/8" 1.00 1.00 22.00 1.20 - 26.4 - - - - 15.31

3/8" 1.00 1.00 22.00 1.20 - 26.4 - - - - 15.31

C-4 1/2" 1.00 1.00 6.00 4.80 - - 28.8 - - - 29.38

1/4" 1.00 1.00 22.00 2.30 50.6 - - - - - 12.65

06.04.00 PLACA

06.04.03 ACERO ESTRUCTURAL 1726.45

Bloque A

P-1 3/8" 1.00 2.00 35.00 1.90 - 133.0 - - - - 77.14

3/4" 1.00 2.00 6.00 8.25 - - - - 99.0 - 221.76

3/8" 1.00 1.00 10.00 8.25 - 82.5 - - - - 47.85

3/8" 1.00 4.00 56.00 0.80 - 179.2 - - - - 103.94

P-2 3/4" 1.00 1.00 8.00 8.25 - - - - 66.0 - 147.84

1/2" 1.00 1.00 8.00 8.25 - - 66.0 - - - 67.32

3/8" 1.00 3.00 56.00 1.70 - 285.6 - - - - 165.65

3/8" 1.00 1.00 2.00 0.30 - 0.6 - - - - 0.35

P-3 3/4" 1.00 1.00 8.00 8.25 - - - - 66.0 - 147.84

1/2" 1.00 1.00 8.00 8.25 - - 66.0 - - - 67.32

3/8" 1.00 3.00 56.00 1.70 - 285.6 - - - - 165.65

3/8" 1.00 1.00 2.00 0.30 - 0.6 - - - - 0.35

Bloque B 8.00 8.00 8.00 - - - - - - -

P-2 3/4" 2.00 1.00 8.00 4.80 - - - - 76.8 - 172.03

1/2" 2.00 1.00 8.00 4.80 - - 76.8 - - - 78.34

3/8" 2.00 3.00 42.00 1.70 - 428.4 - - - - 248.47

3/8" 2.00 1.00 42.00 0.30 - 25.2 - - - - 14.62

06.05.00 BOVEDA

06.06.03 ACERO ESTRUCTURAL 514.82

1/2" 1.00 1.00 10.00 3.80 - - 38.0 - - - 38.76

Page 10: Presupuesto y Metrados Scotiabank Avelino

PLANILLA DE METRADOS

PROYECTO AGENCIA SCOTIABANK AVELINOENTIDAD SCOTIABANKFECHA AGOSTO 2014

Item Descripcion Ø N° de N° de N° de Long. Longitud (m) por Ø

Peso modulo elem. pzas x Por 1/4" 3/8" 1/2" 5/8" 3/4" 1" iguales iguales elem. pieza 0.25 0.58 1.02 1.56 2.24 3.97 kg

Diseño del fierro

3/8" 1.00 1.00 100.00 3.80 - 380.0 - - - - 220.40

3/8" 1.00 2.00 19.00 1.90 - 72.2 - - - - 41.88

3/8" 1.00 2.00 19.00 2.85 - 108.3 - - - - 62.81

3/8" 1.00 2.00 19.00 3.00 - 114.0 - - - - 66.12

3/8" 1.00 2.00 19.00 2.85 - 108.3 - - - - 62.81

3/8" 1.00 2.00 19.00 1.00 - 38.0 - - - - 22.04

06.06.00 VIGAS

06.06.03 ACERO ESTRUCTURAL 3212.07

Bloque "A"

V-(.25x.30) - Zona de Lobby 5/8" 2.00 1.00 4.00 5.45 - - - 43.6 - - 68.02

5/8" 2.00 1.00 4.00 3.30 - - - 26.4 - - 41.18

3/8" 1.00 3.00 22.00 1.80 - 118.8 - - - - 68.90

3/8" 1.00 3.00 7.00 1.80 - 37.8 - - - - 21.92

V-101 5/8" 1.00 2.00 2.00 11.50 - - - 46.0 - - 71.76

3/8" 1.00 1.00 68.00 1.80 - 122.4 - - - - 70.99

V-102 5/8" 1.00 2.00 3.00 11.50 - - - 69.0 - - 107.64

5/8" 1.00 2.00 1.00 2.15 - - - 4.3 - - 6.71

3/8" 1.00 1.00 56.00 1.80 - 100.8 - - - - 58.46

V-103 1" 1.00 2.00 2.00 11.50 - - - - - 46.0 182.76

1" 1.00 1.00 2.00 5.53 - - - - - 11.1 43.94

1/2" 1.00 1.00 1.00 2.90 - - 2.9 - - - 2.96

1" 1.00 1.00 1.00 4.40 - - - - - 4.4 17.48

3/8" 1.00 1.00 77.00 1.80 - 138.6 - - - - 80.39

v-104 3/4" 1.00 2.00 2.00 11.50 - - - - 46.0 - 103.04

3/4" 1.00 1.00 2.00 4.65 - - - - 9.3 - 20.83

1/2" 1.00 1.00 1.00 2.30 - - 2.3 - - - 2.35

3/8" 1.00 1.00 65.00 1.80 - 117.0 - - - - 67.86

V-S (.15x.60) 3/8" 2.00 2.00 2.00 1.75 - 14.0 - - - - 8.12

1/2" 2.00 2.00 4.00 1.75 - - 28.0 - - - 28.56

3/8" 2.00 2.00 15.00 1.50 - 90.0 - - - - 52.20

V-S (.15x.60) 3/8" 2.00 2.00 2.00 15.40 - 123.2 - - - - 71.46

1/2" 2.00 2.00 4.00 15.40 - - 246.4 - - - 251.33

Page 11: Presupuesto y Metrados Scotiabank Avelino

PLANILLA DE METRADOS

PROYECTO AGENCIA SCOTIABANK AVELINOENTIDAD SCOTIABANKFECHA AGOSTO 2014

Item Descripcion Ø N° de N° de N° de Long. Longitud (m) por Ø

Peso modulo elem. pzas x Por 1/4" 3/8" 1/2" 5/8" 3/4" 1" iguales iguales elem. pieza 0.25 0.58 1.02 1.56 2.24 3.97 kg

Diseño del fierro

3/8" 2.00 2.00 90.00 1.50 - 540.0 - - - - 313.20

V-1 (.25x.60) 5/8" 1.00 2.00 3.00 15.60 - - - 93.6 - - 146.02

1/4" 1.00 1.00 73.00 1.70 124.1 - - - - - 31.03

Viga de costura 3/8" 1.00 1.00 2.00 10.70 - 21.4 - - - - 12.41

1/4" 1.00 1.00 54.00 0.35 18.9 - - - - - 4.73

Bloque "B"

V-105 5/8" 1.00 2.00 2.00 11.50 - - - 46.0 - - 71.76

1/2" 1.00 1.00 1.00 11.50 - - 11.5 - - - 11.73

3/4" 1.00 1.00 1.00 4.65 - - - - 4.7 - 10.42

3/8" 2.00 2.00 68.00 1.80 - 489.6 - - - - 283.97

V-h 1/2" 1.00 2.00 2.00 3.20 - - 12.8 - - - 13.06

1/4" 1.00 1.00 13.00 0.70 9.1 - - - - - 2.28

V-106 3/4" 1.00 2.00 2.00 11.50 - - - - 46.0 - 103.04

3/4" 1.00 1.00 2.00 3.30 - - - - 6.6 - 14.78

3/4" 1.00 1.00 1.00 2.20 - - - - 2.2 - 4.93

3/4" 1.00 1.00 1.00 7.80 - - - - 7.8 - 17.47

3/4" 1.00 1.00 2.00 4.25 - - - - 8.5 - 19.04

3/8" 1.00 1.00 59.00 1.80 - 106.2 - - - - 61.60

V-107 5/8" 1.00 2.00 2.00 11.50 - - - 46.0 - - 71.76

1/2" 1.00 1.00 1.00 11.50 - - 11.5 - - - 11.73

3/4" 1.00 1.00 1.00 4.65 - - - - 4.7 - 10.42

3/8" 1.00 1.00 68.00 1.80 - 122.4 - - - - 70.99

V-S 1/2" 1.00 2.00 2.00 10.50 - - 42.0 - - - 42.84

3/8" 1.00 1.00 2.00 11.50 - 23.0 - - - - 13.34

3/8" 1.00 1.00 42.00 1.50 - 63.0 - - - - 36.54

1/2" 1.00 2.00 2.00 6.50 - - 26.0 - - - 26.52

3/8" 1.00 1.00 2.00 6.50 - 13.0 - - - - 7.54

3/8" 1.00 1.00 28.00 1.50 - 42.0 - - - - 24.36

V-1 5/8" 1.00 2.00 3.00 10.60 - - - 63.6 - - 99.22

3/8" 1.00 1.00 39.00 1.80 - 70.2 - - - - 40.72

Viga de costura 1/2" 1.00 3.00 4.00 7.90 - - 94.8 - - - 96.70

1/4" 1.00 1.00 36.00 9.90 356.4 - - - - - 89.10

Page 12: Presupuesto y Metrados Scotiabank Avelino

PLANILLA DE METRADOS

PROYECTO AGENCIA SCOTIABANK AVELINOENTIDAD SCOTIABANKFECHA AGOSTO 2014

Item Descripcion Ø N° de N° de N° de Long. Longitud (m) por Ø

Peso modulo elem. pzas x Por 1/4" 3/8" 1/2" 5/8" 3/4" 1" iguales iguales elem. pieza 0.25 0.58 1.02 1.56 2.24 3.97 kg

Diseño del fierro

06.07.00 LOSA ALIGERADAS EN UNA DIRECCIÓN

06.07.03 ACERO ESTRUCTURAL 642.23

Bloque "A"

1/2" 2.00 25.00 1.00 2.90 - - 145.0 - - - 147.90

3/8" 1.00 25.00 1.00 1.30 - 32.5 - - - - 18.85

3/8" 1.00 25.00 1.00 1.10 - 27.5 - - - - 15.95

3/8" 1.00 25.00 1.00 1.10 - 27.5 - - - - 15.95

1/2" 1.00 25.00 1.00 1.90 - - 47.5 - - - 48.45

1/2" 2.00 12.00 1.00 1.27 - - 30.5 - - - 31.09

Bloque "B"

3/8" 1.00 19.00 1.00 9.91 - 188.3 - - - - 109.21

3/8" 1.00 19.00 1.00 3.75 - 71.3 - - - - 41.32

3/8" 2.00 19.00 1.00 1.10 - 41.8 - - - - 24.24

3/8" 1.00 19.00 1.00 3.35 - 63.7 - - - - 36.92

1/2" 1.00 19.00 1.00 2.00 - - 38.0 - - - 38.76

1/2" 1.00 6.00 1.00 4.35 - - 26.1 - - - 26.62

3/8" 2.00 6.00 1.00 1.10 - 13.2 - - - - 7.66

1/4" 1.00 37.00 1.00 7.50 277.5 - - - - - 69.38

1/4" 1.00 15.00 1.00 2.65 39.8 - - - - - 9.94

06.08.00 LOSA ALIGERADAS EN DOS DIRECCIONES

06.08.03 ACERO ESTRUCTURAL 635.70

Bloque "A"

1/2" 1.00 25.00 1.00 6.00 - - 150.0 - - - 153.00

3/8" 1.00 25.00 1.00 3.60 - 90.0 - - - - 52.20

1/2" 1.00 25.00 1.00 1.80 - - 45.0 - - - 45.90

3/8" 1.00 25.00 1.00 1.10 - 27.5 - - - - 15.95

1/2" 1.00 25.00 1.00 1.90 - - 47.5 - - - 48.45

3/8" 1.00 25.00 1.00 1.30 - 32.5 - - - - 18.85

1/2" 1.00 14.00 1.00 10.70 - - 149.8 - - - 152.80

3/8" 1.00 14.00 1.00 4.60 - 64.4 - - - - 37.35

1/2" 1.00 14.00 1.00 1.80 - - 25.2 - - - 25.70

3/8" 1.00 14.00 1.00 2.00 - 28.0 - - - - 16.24

Page 13: Presupuesto y Metrados Scotiabank Avelino

PLANILLA DE METRADOS

PROYECTO AGENCIA SCOTIABANK AVELINOENTIDAD SCOTIABANKFECHA AGOSTO 2014

Item Descripcion Ø N° de N° de N° de Long. Longitud (m) por Ø

Peso modulo elem. pzas x Por 1/4" 3/8" 1/2" 5/8" 3/4" 1" iguales iguales elem. pieza 0.25 0.58 1.02 1.56 2.24 3.97 kg

Diseño del fierro

1/2" 1.00 14.00 1.00 4.85 - - 67.9 - - - 69.26

06.09.00 LOSA MACIZA

06.09.03 ACERO ESTRUCTURAL 250.59

lobby

3/8" 1.00 13.00 1.00 3.30 - 42.9 - - - - 24.88

3/8" 1.00 25.00 1.00 3.30 - 82.5 - - - - 47.85

3/8" 1.00 14.00 1.00 5.45 - 76.3 - - - - 44.25

3/8" 1.00 7.00 1.00 5.45 - 38.2 - - - - 22.13

bloque "B"

3/8" 2.00 16.00 1.00 3.00 - 96.0 - - - - 55.68

3/8" 2.00 13.00 1.00 3.70 - 96.2 - - - - 55.80

06.10.00 COLUMNETAS Y VIGUETAS DE AMARRE

06.10.03 ACERO ESTRUCTURAL 171.73

Columnetas 1/2" 1.00 8.00 4.00 3.60 - - 115.2 - - - 117.50

1/4" 1.00 8.00 15.00 0.80 96.0 - - - - - 24.00

Viguetas 3/8" 1.00 1.00 4.00 10.70 - 42.8 - - - - 24.82

1/4" 1.00 1.00 36.00 0.60 21.6 - - - - - 5.40

06.11.00 CISTERNA

06.11.03 ACERO ESTRUCTURAL 161.76

base y tapa 3/8" 2.00 1.00 9.00 0.95 - 17.1 - - - - 9.92

3/8" 2.00 1.00 5.00 1.70 - 17.0 - - - - 9.86

lados 3/8" 2.00 1.00 24.00 2.50 - 120.0 - - - - 69.60

lados 3/8" 2.00 1.00 13.00 4.80 - 124.8 - - - - 72.38

06.12.00 COLUMNETAS Y VIGUETAS DE AMARRE

06.12.03 ACERO ESTRUCTURAL 1,128.88

Columnetas 1/2" 1.00 4.00 38.00 3.60 - - 547.2 - - - 558.14

1/4" 1.00 24.00 38.00 0.90 820.8 - - - - - 205.20

Viguetas 3/8" 1.00 1.00 4.00 73.40 - 293.6 - - - - 170.29

1/4" 1.00 1.00 489.33 0.90 440.4 - - - - - 110.10

Page 14: Presupuesto y Metrados Scotiabank Avelino

PLANILLA DE METRADOS

PROYECTO AGENCIA SCOTIABANK AVELINOENTIDAD SCOTIABANKFECHA AGOSTO 2014

Item Descripcion Ø N° de N° de N° de Long. Longitud (m) por Ø

Peso modulo elem. pzas x Por 1/4" 3/8" 1/2" 5/8" 3/4" 1" iguales iguales elem. pieza 0.25 0.58 1.02 1.56 2.24 3.97 kg

Diseño del fierro

Viguetas 3/8" 1.00 1.00 2.00 73.40 - 146.8 - - - - 85.14 1/4" 1.00 1.00 489.33 0.60 293.6 - - - - - -

Page 15: Presupuesto y Metrados Scotiabank Avelino

PRESUPUESTO

PROYECTO AGENCIA SCOTIABANK AVELINO DEPARTAMEN

ENTIDAD SCOTIABANK PROVINCIA

FECHA AGOSTO 2014 DISTRITO

ITEM PARTIDA UND METRADO03.00.00 TRABAJOS PRELIMINARES03.01.00 LIMPIEZA DE TERRENO MANUAL M2 11.5603.02.00 TRAZO Y REPLANTEO C/EQUIPO M2 11.5604.00.00 MOVIMIENTO DE TIERRAS04.01.00 EXCAVACION PARA ZAPATAS, CIMIENTOS CORRIDOS Y CAL M3 8.13

#REF! #REF! M3 #REF!04.03.00 RELLENO COMPACTADO C/EQUIPO MAT/PROPIO M3 1.8904.04.00 ACARREO DE MATERIAL EXCEDENTE M3 8.7304.05.00 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA M3 #REF!04.06.00 REFINE Y NIVELACION DE ZANJAS ML #REF!04.07.00 AFIRMADO Y COMPACTADO DE E=4" PARA PISO M2 #REF!04.08.00 SUB BASE GRANULAR TRATADA DE E=0.20M PARA ESTACI M3 73.5704.09.00 BASE GRANULAR DE E=0.20M PARA ESTACIONAMIENTO M3 73.5705.00.00 OBRAS DE CONCRETO SIMPLE05.01.00 CONCRETO PARA CALZADURA 1:12 M3 74.6105.02.00 CONCRETO PARA SUB ZAPATA 1:12 M3 3.8205.03.00 CIMIENTOS CORRIDOS F'C=175Kg/cm2 M3 #REF!05.04.00 CONCRETO SOBRECIMIENTO DE F'C=175Kg/cm2 M3 #REF!05.05.00 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO M2 #REF!05.06.00 ENCOFRADO Y DESENCOFRADO PARA CALZADURA M2 124.3505.07.00 ACERO ESTRUCTURAL DE SOBRECIMIENTO KG 775.8205.08.00 FALSO PISO DE 4" DE CONCRETO M2 #REF!05.09.00 CONCRETO fc=210 KG/CM2 EN ESTACIONAMIENTOS E=.15 M3 55.1706.00.00 OBRAS DE CONCRETO ARMADO06.01.00 ZAPATAS06.01.01 ZAPATAS CONCRETO F'C=210 KG/CM2 M3 #REF!06.01.02 ENCOFRADO Y DESENCOFRADO NORMAL DE ZAPATAS M2 #REF!06.01.03 ACERO ESTRUCTURAL KG 953.2306.02.00 VIGAS DE CIMENTACION06.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C=210 KG/CM2 M3 #REF!06.02.02 ENCOFRADO Y DESENCOFRADOEN VIGA DE CIMENTACION M2 #REF!06.02.03 ACERO ESTRUCTURAL KG 1246.9106.03.00 COLUMNAS06.03.01 COLUMNAS CONCRETO F'C=210 KG/CM2 M3 13.4206.03.02 ENCOFRADO Y DESENCOFRADO COLUMNA M2 184.9806.03.03 ACERO ESTRUCTURAL KG 2581.9906.04.00 PLACA06.04.01 PLACA DE CONCRETO F'C=210 KG/CM2 M3 11.5806.04.02 ENCOFRADO Y DESENCOFRADO DE PLACA M2 104.1906.04.03 ACERO ESTRUCTURAL KG 1726.4506.05.00 BOVEDA06.05.01 PLACA DE CONCRETO F'C=210 KG/CM2 M3 7.2006.05.02 ENCOFRADO Y DESENCOFRADO DE PLACA M2 76.4606.05.03 ACERO ESTRUCTURAL KG 514.8206.06.00 VIGAS06.06.01 VIGAS CONCRETO F'C=210 KG/CM2 M3 29.9906.06.02 ENCOFRADO Y DESENCOFRADO VIGAS M2 271.1606.06.03 ACERO ESTRUCTURAL KG 3212.07

Page 16: Presupuesto y Metrados Scotiabank Avelino

06.07.00 LOSA ALIGERADAS EN UNA DIRECCIÓN06.07.01 LOSA ALIGERADA CONCRETO F´C = 210 KG/CM2 M3 14.3206.07.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA M2 163.6606.07.03 ACERO ESTRUCTURAL KG 642.2306.07.04 LADRILLO HUECO PARA TECHO UND 1364.0006.08.00 LOSA ALIGERADAS EN DOS DIRECCIONES06.08.01 LOSA ALIGERADA CONCRETO F´C = 210 KG/CM2 M3 13.6406.08.02 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA M2 69.8606.08.03 ACERO ESTRUCTURAL KG 635.7006.08.04 LADRILLO HUECO PARA TECHO UND 436.6306.09.00 LOSA MACIZA06.09.01 LOSA MACIZA F´C = 210 KG/CM2 M3 3.2606.09.02 ENCOFRADO Y DESENCOFRADO M2 21.6906.09.03 ACERO ESTRUCTURAL KG 250.5906.10.00 COLUMNETAS Y VIGUETAS DE AMARRE06.10.01 CONCRETO F´C=175 KG/CM2 EN COLUMNETAS Y VIGUETAS M3 1.2806.10.02 ENCOFRADO Y DESENCOFRADO CARAVISTA DE COLUMNETAM2 17.1006.10.03 ACERO ESTRUCTURAL KG 171.7306.11.00 CISTERNA06.11.01 CONCRETO M3 1.4706.11.02 ENCOFRADO Y DESENCOFRADO M2 25.9206.12.03 ACERO ESTRUCTURAL KG 161.7606.11.00 CERCO PERIMETRICO06.11.01 CONCRETO F´C=175 KG/CM2 EN COLUMNETAS Y VIGUETAS M3 10.6206.11.02 ENCOFRADO Y DESENCOFRADO CARAVISTA DE COLUMNETAM2 83.7906.12.03 ACERO ESTRUCTURAL KG 1128.8807.00.00 MUROS Y TABIQUES DE ALBAÑILERIA07.01.00 MURO DE LADRILLO DE SOGA M2 465.1907.02.00 ALAMBRE #8 REFUERZO HORIZONTAL EN MUROS KG 521.55

COSTO DIRECTO

Page 17: Presupuesto y Metrados Scotiabank Avelino

AREQUIPA

P.U PARCIAL58.95

2.90 33.522.20 25.43

#REF!65.00 528.2730.00 #REF!30.00 56.6521.00 183.4219.00 #REF!12.00 #REF!20.00 #REF!68.00 5002.7676.00 5591.32

#REF!195.00 14548.95195.00 745.21370.00 #REF!370.00 #REF!

28.50 #REF!28.50 3543.98

4.35 3374.8132.00 #REF!

315.00 17378.55#REF!#REF!

330.00 #REF!28.50 #REF!

4.35 4146.53#REF!

330.00 #REF!34.70 #REF!

4.35 5424.0722549.24

365.00 4898.7634.70 6418.81

4.35 11231.6715353.53

365.00 4227.9634.70 3615.5

4.35 7510.077520.78

365.00 262834.70 2653.3

4.35 2239.4834327.22

365.00 10945.3334.70 9409.39

4.35 13972.5

Page 18: Presupuesto y Metrados Scotiabank Avelino

17450.55365.00 5226.86

34.70 5678.974.35 2793.722.75 3751

11367.3365.00 4977.14

34.70 2424.144.35 2765.32.75 1200.72

3031.87365.00 1189.17

34.70 752.644.35 1090.06

1808.5365.00 468.11

34.70 593.374.35 747.02

2138.9365.00 535.82

34.70 899.424.35 703.66

11693.8365.00 3875.57

34.70 2907.624.35 4910.61

39483.9480.00 37215.2

4.35 2268.74COSTO DIRECTO #REF!