presentation pdf
TRANSCRIPT
![Page 1: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/1.jpg)
Name: Fady Ibrahim Aziz
Course: Practical Training(CENG 497)
Instructor: Dr. Mohamed Salama
12 September 20161
Company: Orascom for Construction Industries (OCI)
Project: Grand Heights
Department: Quality Control and Technical Office
Duration: 5 Weeks
![Page 2: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/2.jpg)
Presentation Outline:
-Project Parties
-Project Information
-Managerial and Site Terms
12 September 20162
-Managerial and Site Terms
-Tasks Assigned in QC department
-Tasks Assigned in Technical Office Department
- Internship Benefits
![Page 3: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/3.jpg)
Project Main Parties:
- Client: KUWADICO ( Kuwait Wadi Al-Nile Development Company)
- Project Management: EGYCAN (Egyptian Canadian Project Managers)
- Consultant: IDG (Integrated Development Group)
12 September 20163
- Consultant: IDG (Integrated Development Group)
- Contractor: OCI (Orascom for Construction Industries)
![Page 4: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/4.jpg)
Project Information:
- Location: 6th October City-Giza
- Scope: Construction of 2-Floor Villas of around 15 Types
- Handover: Core and Shell
12 September 20164
- Handover: Core and Shell
- Project Capital Cost: +400M L.E
- Project Phases: 1) Infrastructure2) C1(Yellow)3) C2 (Green)4) C3
![Page 5: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/5.jpg)
Managerial and SiteTerms
- Material Submittal
- Project Quality Plan (PQP)
- Material Inspection Request (MIR)
12 September 20165
- Internal Inspection Request (IIR)
- External Inspection Request (EIR)
- Inspection and Testing Plan (ITP)
- Method Statement
- Non-Confirmance Report (NCR)
- Key Performance Indicator (KPI)
![Page 6: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/6.jpg)
Civil Work
12 September 20166
Shop Drawing for Slab Reinforcement Slab Reinforcement matching Shop Drawing
![Page 7: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/7.jpg)
Civil Work:
Formwork Structure
12 September 20167
Steel Formwork Wooden Formwork
![Page 8: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/8.jpg)
Civil Work:
Foundation Work Inspection
12 September 20168
PC Foundations RC Foundations
![Page 9: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/9.jpg)
Civil Work:
Column Work Inspection
12 September 20169
Column Formwork Column Reinforcement
![Page 10: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/10.jpg)
Civil Work:
Beam and Slab Work Inspection
12 September 201610
Slab and Beam Formwork Slab and Beam Reinforcement
![Page 11: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/11.jpg)
Civil Work:
Stairs Work Inspection
12 September 201611
Stairs Formwork Stairs Reinforcement
![Page 12: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/12.jpg)
Civil Work:
Slab On Grade (SOG) Work Inspection
12 September 201612
Slab On Grade Reinforcement Pouring Slab On Grade
![Page 13: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/13.jpg)
Architectural Work
12 September 201613
Concrete Masonary Units (CMU) Silty Clay Bricks
![Page 14: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/14.jpg)
Architectural Work:CMU First Course Inspection
12 September 201614
First Course on Edges and Door Opening First Course bonded with Mortar
![Page 15: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/15.jpg)
Architectural Work:Full Height Inspection
12 September 201615
Checking the Height of Window Sill Checking Window Dimensions and Level
![Page 16: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/16.jpg)
Architectural Work:Inspection of Verticality and Horizontality of Building Elements
12 September 201616
Thread Balance to Check Verticality Water Bubble Balance to Check Horizontality
![Page 17: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/17.jpg)
Architectural Work:Galvanized Steel Sheets
12 September 201617
Steel Sheets out of Masonry Units for Bond CMU First Course Bonded with Column
![Page 18: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/18.jpg)
Architectural Work:Unification of Surface Level Inspection
12 September 201618
Metal Bar to Check Equality of Surface Level
![Page 19: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/19.jpg)
Architectural Work:
Inspection of Angle Between Surfaces’ Edges
12 September 201619
Right-Angle Ruler
![Page 20: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/20.jpg)
Architectural Work:Botomine Isolation
12 September 201620
Isolation under SOG to protect from Humidity during Backfill
![Page 21: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/21.jpg)
Technical Office Experience
12 September 201621
Structural Shop Drawing Calculation Sheet
![Page 22: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/22.jpg)
Miscellaneous Work
12 September 201622
Concrete Compressive Strength Test Inspection Chamber and House Connections
![Page 23: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/23.jpg)
Miscellaneous Work:
- Project Planning and Scheduling
- Project Cost Control and Monitoring
- Reviewing Shop Drawings and Performing Bar List
12 September 201623
- Reviewing Shop Drawings and Performing Bar List
- Lab Testing Procedures for Concrete and Soil
- Water and Waste Water Pipes between Villas and Main Network System
![Page 24: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/24.jpg)
Internship Benefits:
- Proper Site Inspection
- Formwork Design
- Translating Design Drawings into Shop Drawings.
12 September 201624
- Translating Design Drawings into Shop Drawings.
- Identifying the importance of Coordination between Architect, Structural Engineer and MEP Engineer.
- Identifying some constructability problems that might arise from design.
- Having Brief ideas about Quality Assurance, Planning and Cost Control.
![Page 25: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/25.jpg)
Thanks OCI & AUC
12 September 201625
![Page 26: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/26.jpg)
SalamaStructural Engineers
12 September 201626
Engineers (SSE)
Duration: 4 -5 Weeks
Al Jawharah Tower
![Page 27: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/27.jpg)
Presentation Outline:
- Scope of Work
- Projects I have worked on
- Tasks Assigned
12 September 201627
- Tasks Assigned
- Internship Benefits
![Page 28: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/28.jpg)
Scope of Work:
- Assigning Structural Systems for Different Projects.
- Modeling of Reinforced Concrete Structures using Structural Softwares1- ETABS for 3D Model to study lateral loads2- SAFE and S-Concrete for 2D Model to analyze Slabs and Rafts
12 September 201628
2- SAFE and S-Concrete for 2D Model to analyze Slabs and Rafts3- CSICOL to design Columns and Walls4- SAP2000 to model Steel and Reinforced Concrete Structures
- Structural Design of Reinforced Concrete and Steel Structures.
- Producing Framing Plans and Structural Detailing Drawings.
![Page 29: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/29.jpg)
Projects I have Worked on:
- Qatar Industrial Manufacturing Center Tower (QIMC Tower)
- Gemstone Tower (UAE)
- Al Khail Cooling Building (UAE)
12 September 201629
- Al Khail Cooling Building (UAE)
- Mirdif Cooling Building (UAE)
- Saudi-German Hospital (UAE)
![Page 30: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/30.jpg)
Projects I have Worked on:
12 September 201630QIMC Tower Gemstone Tower
![Page 31: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/31.jpg)
Tasks Assigned:
Selection of Structure System
- Coordination with the Architect to Identify Slab Edge and Newly Proposed Columns.
- Identifying Wall Patricians of different Thicknesses.
12 September 201631
Saudi-German Hospital
Thicknesses.
- Using Steel Sections for Large Spans.
- Reasonable Balance between Design Safety, Functionality and Most Economic Solutions.
![Page 32: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/32.jpg)
Tasks Assigned:
Slabs Analysis and Design
- Serviceability Short-term deflection.
- Serviceability Long-term deflection.
- Punching Shear Analysis.
12 September 201632
QIMC Slab
- Punching Shear Analysis.
- Thermal Contraction and Expansion Analysis.
- Eccentric Section Analysis for the combination between Thermal Axial Loads and Moments.
![Page 33: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/33.jpg)
Tasks Assigned:Raft Analysis and Design
- Check Pile Capacity (End Bearing and Friction) against Compression.
- Check Pile Capacity (Friction) against Tension taking into consideration Uplift Forces.
12 September 201633
QIMC Raft
Tension taking into consideration Uplift Forces.
- Check Raft Capacity for Columns Punching Shear.
- Check Raft Settlement and Differential Settlement.
- Raft Structural Design
![Page 34: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/34.jpg)
Tasks Assigned:3D Model and Design
- Assigning RC Structural Members
- Assigning Gravity and Lateral Loads
- Serviceability Check for Inter-story Drift
12 September 201634
GEMSTONE Tower
- Serviceability Check for Inter-story Drift
- Performing Modal Analysis
- Checking the Performance of Outrigger Belts in MEP Floors.
![Page 35: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/35.jpg)
Tasks Assigned:Structure Design of RC & Composite
Sections
- Analyzing Composite Sections for P-M2-M3.
- Submitting Reports if Safe Sections.
12 September 201635
Composite Wall
- Initiating Engineering Solutions in case it is unsafe.
- Structure Design of RC Structure Walls.
- Structure Design of RC Columns
![Page 36: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/36.jpg)
Tasks Assigned:Producing AutoCAD Drawings
- Framing Plans.
- Loading Plans.
12 September 201636
Gemstone 10th Floor Framing Plan
- Columns, Walls and Beam Schedules.
- Slabs and Beams Reinforcement Detailing.
- Vertical Elements Reinforcement Detailing.
![Page 37: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/37.jpg)
Internship Benefits:
- Using Modern Structural Softwares.
- Being Able to Read Wind Tunnel Test Report and Understand it.
- Deal with ACI 318-14, UBC 97 and AISC 360-10.
12 September 201637
- Deal with ACI 318-14, UBC 97 and AISC 360-10.
- Being Able to Model and Design High-Rise Buildings.
- Being Able to Produce Construction Design Drawings.
- Being Able to Select Optimum Basement Construction Method.
![Page 38: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/38.jpg)
Geotechnical and Structural Engineering
Consultant (GSEC)
12 September 201638
Duration: 8 Weeks
Telecom Tower Profile
![Page 39: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/39.jpg)
Presentation Outline:
- Scope of Work
- Tasks Assigned
- Internship Benefits
12 September 201639
- Internship Benefits
![Page 40: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/40.jpg)
Scope of Work:
- Structural Analysis and Design of Green Field and Roof Top Telecom Towers using RISAtower and tnxtower.
- Structural Analysis and Design of Steel Grillage and Steel Masts using SAP2000.
12 September 201640
SAP2000.
- Structural and Geotechnical Analysis and Design of RC Buildings using ETABS.
![Page 41: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/41.jpg)
Tasks Assigned:Structure Design of GF and RF
Telecom Towers
- Receiving Surveying Documents for Tower Profile and existing devices.
12 September 201641
GF Telecom Tower
- Assigning Wind Speed, Tower Profile and devices.
- If Tower is safe, Structural Report is submitted with Future Loads.
- If Tower is unsafe, a Retrofitting Proposal is submitted.
![Page 42: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/42.jpg)
Tasks Assigned:Structure Design Steel Grillage
- Assigning Tower Base Reactions
- Applying all Wind Load Cases following TIA-
12 September 201642
Steel Grillage
- Applying all Wind Load Cases following TIA-222-G.
- If Tower is safe, Structural Report is submitted with Future Loads.
- If Tower is unsafe, a Retrofitting Proposal is submitted.
![Page 43: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/43.jpg)
Tasks Assigned:Structure Design Steel Masts
- Calculating Wind Loads on main pipe and devices manually.
- Drawing Mast Profile with Side arms on
12 September 201643
Steel Mast after Retrofit
- Drawing Mast Profile with Side arms on SAP2000.
- If Tower is safe, Structural Report is submitted with Future Loads.
- If Tower is unsafe, a Retrofitting Proposal is submitted.
![Page 44: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/44.jpg)
Tasks Assigned:Structure Design of RC
Mosque Minaret
- Assigning Wind Loads on Vertical Elements.
- Modeling of Stairs and Dome.
12 September 201644
Mosque Minaret
- Structure Design of Minaret and Support Columns.
![Page 45: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/45.jpg)
Tasks Assigned:Structure Design of RC
Mosque Minaret
- Assigning Structural Systems in coordination with the Architect.
- Full Structural Model with Gravity and Lateral
12 September 201645
Church Service Building
- Full Structural Model with Gravity and Lateral Loads.
- Structure Design of all Structural Elements.
- Foundation Structure Design for Raft on Piles.
- Producing Framing Plans and Design Drawings.
![Page 46: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/46.jpg)
Internship Benefits:
- Using Modern Structural Softwares.
- Dealing with New Category regarding Antenna Structures Industries.
- Being independently responsible for Designing a whole Structure.
12 September 201646
- Being independently responsible for Designing a whole Structure.
- Being Able to Produce Construction Design Drawings.
- Being Able to Develop my Skills in Steel Structures.
![Page 47: Presentation PDF](https://reader031.vdocumento.com/reader031/viewer/2022021813/5876c13f1a28ab6d5a8b4e9d/html5/thumbnails/47.jpg)
Thank You
12 September 201647
Thank You