precios unitarios - estructura , cimentacion, akabados, obra et.xls

Upload: eduardo-jimenez-salas

Post on 06-Mar-2016

17 views

Category:

Documents


0 download

TRANSCRIPT

  • EXCAVACIONES A MANO PARA CIMENTACIONES

    FRANCO CEBALLOS SALAS

    CONCEPTO UNIDAD CANTIDAD

    MATERIALES

    SUBTOTAL

    MANO DE OBRACUADRILLA: 2 PEONES + 1 SOBRESTANTE JOR 0.4237RENDIMIENTO 2.36 M3/JOR

    SUBTOTAL

    EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 0.06

    SUBTOTAL

    RELLENO COMPACTADO EN CIMENTACIN, CON MATERIAL PRODUCTO DE LA EXCAVACIN

    VALENZUELA ESCALANTE JULIETA

    CONCEPTO UNIDAD CANTIDAD

    MATERIALESAGUA M3 0.3

    SUBTOTAL

    MANO DE OBRA

    JOR 0.1428RENDIMIENTO: 7 M3/JOR

    SUBTOTAL

    EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 0.05

    CUADRILLA: 0.1 SOBRESTANTE + 1 OFICIAL ALBAIL + 2 AYUDANTES

  • SUBTOTAL

    ROSAS ACOSTA MIGUEL ROSARIO

    CONCEPTO UNIDAD CANTIDAD

    MATERIALESno aplica

    SUBTOTAL

    MANO DE OBRACUADRILLA: 1 ofic alb + 1 ayud gral + .1 sobres JOR 0.07RENDIMIENTO: 14M2/JOR

    SUBTOTAL

    EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 0.3

    SUBTOTAL

    COSTOS BASICOScimbra para plantilla PT 4.59317585concreto fc=100kg/cm2 M3 0.1

    SUBTOTAL

    ENRACE DE TABIQUE DE JAL X MT LINEAL DE 40 CM DE ALTURA

    LOPEZ ALGANDAR JESUS

    CONCEPTO UNIDAD CANTIDAD

    MATERIALESTABIQUE PZA 10

    SUBTOTAL

    MANO DE OBRACUADRILLA: 1 OF. ALBAIL + 1 AYUD. + 0.1 SOBRESTANTE JOR 0.02RENDIMIENTO 49.86 ML X JOR

    ANALISIS DE PRECIO UNITARIO DE PLANTILLA DE CONCRETO EN CIMENTACION CON ESPESOR DE 10 CM CON FC=100KG/CM2

  • SUBTOTAL

    EQUIPO Y HERRAMIENTA MENORPALA , CUCHARA , MARTILLO , CARRETIYA % 0.04

    SUBTOTAL

    BASICOSMORTERO , CAL-ARENA PRO. 1:6 M3 0.0132

    SUBTOTAL

    FULANITO DE LA MASCADA ROSA

    CONCEPTO UNIDAD CANTIDAD

    MATERIALESNO APLICA

    SUBTOTAL

    MANO DE OBRACUADRILLA JOR 0.002

    0.1 SOBREESTANTE, 1 OPERADOR, 1 AYUDANTERENDIMIENTO

    456 M3 / JORNADA SUBTOTAL

    EQUIPO Y HERRAMIENTA MENORMAQUINARIA: HR. 1

    retroexcabadoraSUBTOTAL

    BASICOSNO APLICA

    SUBTOTAL

    AXCABACION DE TERRENO A 2M DE PROFUNDIDAD AL AIRE LIBRE CON RETRO CON CAPASIDAD DE 0.76M3

    ESPECIFICACIN: Fabricacion de un enrace de 42cm de alto por 1mL de bock de 15x20x40 cms. En 2 hiladas Juntiado con mortero cal-arena. Prop. 1:6. incluye todo

  • LUNA DURAN KAREM ESTEPHANIA

    CONCEPTO UNIDAD CANTIDAD

    MATERIALEStabique de block PZA 5

    SUBTOTAL

    MANO DE OBRACuad: 0.1 sob + 1of.albil.+ayudante JOR 0.1rend: 10m2/jor

    SUBTOTAL

    EQUIPO Y HERRAMIENTA MENOR

    HERRAMIENTA MENOR % 4

    SUBTOTALBSICOS:mortero cal-arena 1:6 M2 $ 0.03

    SUBTOTAL

    TOTAL CD:

    ESPECIFICACIN: Fabricacion de un enrace de 42cm de alto por 1mL de bock de 15x20x40 cms. En 2 hiladas Juntiado con mortero cal-arena. Prop. 1:6. incluye todo

  • EXCAVACIONES A MANO PARA CIMENTACIONESUN:M3$293.50

    FRANCO CEBALLOS SALAS

    C.U. IMPORTE

    SUBTOTAL $0.00

    $653.50 $276.89

    SUBTOTAL $276.89

    $276.89 $16.61

    SUBTOTAL $16.61

    RELLENO COMPACTADO EN CIMENTACIN, CON MATERIAL PRODUCTO DE LA EXCAVACINUN:M3$175.29

    VALENZUELA ESCALANTE JULIETA

    C.U. IMPORTE

    $10.00 $3.00$0.00$0.00$0.00

    SUBTOTAL $3.00

    $1,149.07 $164.09

    SUBTOTAL $164.09

    $164.09 $8.20$0.00

  • SUBTOTAL $8.20TOTAL: $175.29

    UN:M3$231.62

    ROSAS ACOSTA MIGUEL ROSARIO

    C.U. IMPORTE

    SUBTOTAL

    $882.37 $61.77

    SUBTOTAL $61.77

    $61.77 $1.85SUBTOTAL $1.85

    $6.39 $29.35$1,386.52 $138.65

    SUBTOTAL $168.00

    ENRACE DE TABIQUE DE JAL X MT LINEAL DE 40 CM DE ALTURAUN:ML

    $59.32LOPEZ ALGANDAR JESUS

    C.U. IMPORTE

    $3.50 $35.00

    SUBTOTAL $35.00

    $882.37 $17.65

    ANALISIS DE PRECIO UNITARIO DE PLANTILLA DE CONCRETO EN CIMENTACION CON ESPESOR DE 10 CM

  • SUBTOTAL $17.65

    $17.65 $0.71

    SUBTOTAL $0.71

    $452.40 $5.97

    SUBTOTAL $5.97

    m3$7.94

    FULANITO DE LA MASCADA ROSA

    C.U. IMPORTE

    SUBTOTAL $0.00

    $842.63 $1.69

    SUBTOTAL $1.69

    $350.00 $6.25

    SUBTOTAL $6.25

    $0.00

    SUBTOTAL $0.00

    UN:M3$184.55

    AXCABACION DE TERRENO A 2M DE PROFUNDIDAD AL AIRE LIBRE CON RETRO CON CAPASIDAD DE

    ESPECIFICACIN: Fabricacion de un enrace de 42cm de alto por 1mL de bock de 15x20x40 cms. En 2 hiladas Juntiado con mortero cal-arena. Prop. 1:6. incluye todo

  • LUNA DURAN KAREM ESTEPHANIA

    C.U. IMPORTE

    $15.00 $75.00

    SUBTOTAL $75.00

    $882.37 $88.24

    SUBTOTAL $88.24

    $88.24 $3.53

    SUBTOTAL $3.53

    $ 452.40 $ 14.25

    SUBTOTAL $17.78

    TOTAL CD: $184.55

  • ENJARRE CON MORTERO CEMENTO-ARENA PROPORCIN 1:6

    SELMAR FABIAN ALVAREZ CARDENAS

    CONCEPTO UNIDAD CANTIDAD

    MATERIALES

    AGUA PARA HUMEDECER MURO Y CURADO DEL REPELLADO M3 0.05

    SUBTOTAL

    MANO DE OBRACUADRILLA: 1 OF. ALBAIL + 1 PEON + 0.1 SOBRESTANTE JOR 0.052RENDIMIENTO 19 M2/JOR

    SUBTOTAL

    EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 2

    SUBTOTAL

    BASICOSMORTERO CEMENTO-ARENA 1:6 M3 0.022DESPERDICIO % 3

    SUBTOTAL

  • ENJARRE CON MORTERO CEMENTO-ARENA PROPORCIN 1:6UN:M2$73.29

    SELMAR FABIAN ALVAREZ CARDENAS

    C.U. IMPORTE

    $100.00 $5.00

    SUBTOTAL $5.00

    $864.70 $44.96

    SUBTOTAL $44.96

    $44.96 $0.90

    SUBTOTAL $0.90

    $989.90 $21.78$21.78 $0.65

    SUBTOTAL $22.43

  • METRO LINEAL DE CONTRATRABE DE 15 X 30 CM

    PADILLA RAMIREZ CLAUDIA

    CONCEPTO UNIDAD

    MATERIALESN. A.

    SUBTOTALMANO DE OBRA

    JOR

    JOR

    SUBTOTAL

    EQUIPO Y HERRAMIENTA MENORPALA, MARTILLO, DOBLADOR, ETC. %

    SUBTOTALBASICOSCONCRETO F'C=150 KG/CM2 M3SUMINISTRO Y HABILITADO DE ACERO DE 3/8" TONSUMINISTRO Y HABILITADO DE ACERO DE 1/4" KG

    M2

    BOJORQUEZ ENRIQUEZ JOSE ALFONSO

    CONCEPTO UNIDAD

    MATERIALES////// 0

    0

    SUBTOTAL

    MANO DE OBRA

    CUADRILLA COLADO: 1 OF. ALBAIL; 2 AYUDANTES; 1 SOBRESTANTE. RENDIMIENTO: 2.25 M/3*JORCUADRILLA CIMBRA: 1 OF. CARPINTERO; 1 AYUDANTE; 1 SOBRESTANTE. RENDIMIENTO: 9.44 M/L*JOR

    SUMINISTRO Y HABILITADO DE MADERA PARA CIMBRA EN CONTRATRABE

    ELABORACION DE COLUMNA DE 20X30CM DE 3M DE ALTURA DE CONCRETO DE FC=250KG/CM2 CON ARMADO DE 6 VARILLAS DE 3/8 Y ESTRIBOS @ 20CM. INCLUYE TODOS LOS TRABAJOS NECESARIOS.

  • JORRENDIMIENTO 20PZAS./JOR

    SUBTOTAL

    EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR %

    SUBTOTAL

    BASICOSCONCRETO DE FC=200KG/CM2CIMBRA EN COLUMNA M2SUMINISTRO Y HABILITADO DE ACERO KG.

    SUBTOTAL

    REALIZ: VALLE GONZLEZ ANA KARELY

    CONCEPTO UNIDAD

    MATERIALESNO APLICA

    SUBTOTAL

    MANO DE OBRACuadrilla: 1 sobr, 1of alb, 1ayud gral JORRendimiento: 10ml/JOR-cuad

    SUBTOTAL

    EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR %

    SUBTOTAL

    BASICOSSuministro y habilitado de acero de 1/4" TONSuministro y habilitado de acero 3/8" TONFabricacin de concreto f'c=150kg/cm2 M3

    CUADRILLA: 1 OF. ALBAIL + 1 AYUDANTE GENERAL + 0.1 SOBRESTANTE

    M

    ESPECIFICACIN: Elaboracin de columna intermedia de 15 x 20 cms de concreto f'c= 150 kg/cm2, varilla 3/8" y aros de 1/4" a cada 20 cms; incluye materiales, mano de obra, equipo y herramienta y todos los

    trabajos necesarios.

  • Cimbra M2SUBTOTAL

    GARCA MEZA YAJAIRA BERENICE

    CONCEPTO UNIDAD

    MATERIALESBLOCK PZA

    SUBTOTAL

    MANO DE OBRACUAD: 0.1 SOB + 1 OF ALB + 1 AYUD JORREND: 10M2/JOR

    SUBTOTAL

    EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR %

    SUBTOTAL

    BSICOSMORTERO CAL-ARENA 1:6 M3

    SUBTOTALTOTAL

    KARINA NOHEMI MARTNEZ ESPINOZA

    CONCEPTO UNIDAD

    MATERIALESNO APLICA

    SUBTOTAL

    MANO DE OBRA

    CUADRILLA: 0.10 SOBRESTANTE, 1 OF. ALBAIL, 1 AYUD, GRAL. JOR

    Fabricacin de muro de block de 12 cm de espesor de 12x20x40 cms. Junteado de mortero cal-arena, prop 1:6, incluye todo

    FABRICACIN DE TRABE DE 20 x 40 CMS. ARMADA CON 4 VARILLAS DE ACERO DE 3/8" Y ALAMBRN DE 1/4" @ 2O CMS. CONCRETO F'C= 200 KG/CM2; INCLUYE MATERIALES, MANO DE OBRA, EQUIPO Y

    HERRAMIENTA Y TODOS LOS TRABAJOS NECESARIOS.

  • RENDIMIENTO: 10ML/JOR

    SUBTOTAL

    EQUIPO Y HERRAMIENTA:HERRAMIENTA MENOR %

    SUBTOTALBASICOS :SUMINISTRO Y HABILATADO DE ALAMBRN 1/4" TONSUMINISTRO Y HABILATADO DE ACERO 3/8" TONFABRICACIN DE CONCRETO 200 KG/CM2 M3CIMBRA DE TRABE M2

    SUBTOTAL

    REALIZ: yisvi graciela fierro lastras

    CONCEPTO UNIDAD

    MATERIALESclavo 2 1/2" kg

    SUBTOTAL

    MANO DE OBRACuadrilla: .1 sobr, 1of alb, 1ayud gral JORRendimiento: 10ml/JOR-cuad

    SUBTOTAL

    EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR %

    SUBTOTAL

    BASICOSSuministro y habilitado de acero de 1/4" TONSuministro y habilitado de acero 3/8" TON

    ESPECIFICACIN: Elaboracin de castillo final 3 caras, de 15 x 20 cms de concreto f'c= 150 kg/cm2, varilla 3/8" y aros de 1/4" a cada 20 cms; incluye materiales, mano de obra, equipo y herramienta y todos los

    trabajos necesarios.

  • Fabricacin de concreto f'c=150kg/cm2 M3Suministro y habilitado de alambre cal 18 kgCimbra castillo 3 caras pt

    SUBTOTAL

  • METRO LINEAL DE CONTRATRABE DE 15 X 30 CMUN:ML

    $1,189.88

    PADILLA RAMIREZ CLAUDIA

    CANTIDAD C.U. IMPORTE

    $0.00

    SUBTOTAL $0.00

    0.4444 $1,194.07 $530.64

    0.1006 $929.91 $93.55

    SUBTOTAL $624.19

    0.0400 $530.64 $21.23$0.00

    SUBTOTAL $21.23

    0.3000 $1,272.19 $381.660.0023 $19,413.51 $44.260.0011 $15,827.52 $16.62

    1.0000 $101.92 $101.92SUBTOTAL $544.46

    UN:PZA$721.46

    BOJORQUEZ ENRIQUEZ JOSE ALFONSO

    CANTIDAD C.U. IMPORTE

    0 $0.00 $0.000 $0.00 $0.00

    SUBTOTAL $0.00

    ELABORACION DE COLUMNA DE 20X30CM DE 3M DE ALTURA DE CONCRETO DE FC=250KG/CM2 CON ARMADO DE 6 VARILLAS DE 3/8 Y ESTRIBOS @ 20CM. INCLUYE TODOS LOS TRABAJOS NECESARIOS.

  • 0.05 $882.37 $44.12

    SUBTOTAL $44.12

    3 $44.12 $1.32

    SUBTOTAL $1.32

    0.18 $1,309.04 $235.631 $124.99 $124.991 $315.40 $315.40

    SUBTOTAL $676.02

    UN:PZA$545.41

    REALIZ: VALLE GONZLEZ ANA KARELY

    CANTIDAD C.U. IMPORTE

    SUBTOTAL $0.00

    0.1 $882.30 $88.23

    SUBTOTAL $88.23

    3 $88.23 $2.65

    SUBTOTAL $2.65

    0.0008715 $15,827.51 $13.790.00224 $19,278.68 $43.18

    0.3 $ 1,272.19 $381.66

    ESPECIFICACIN: Elaboracin de columna intermedia de 15 x 20 cms de concreto f'c= 150 kg/cm2, varilla 3/8" y aros de 1/4" a cada 20 cms; incluye materiales, mano de obra, equipo y herramienta y todos los

  • 1 $ 15.90 $15.90SUBTOTAL $454.53

    UN:M2$257.48

    GARCA MEZA YAJAIRA BERENICE

    CANTIDAD C.U. IMPORTE

    17 $9.00 $153.00SUBTOTAL $153.00

    0.1 $882.37 $88.24

    SUBTOTAL $88.24

    0.04 $88.24 $3.53SUBTOTAL $3.53

    0.0281 $452.40 $12.71SUBTOTAL $12.71

    TOTAL $257.48

    UN:ML$403.53

    KARINA NOHEMI MARTNEZ ESPINOZA

    CANTIDAD C.U. IMPORTE

    SUBTOTAL $0.00

    0.1 $882.37 $88.24

    Fabricacin de muro de block de 12 cm de espesor de 12x20x40 cms. Junteado de mortero cal-arena, prop

    FABRICACIN DE TRABE DE 20 x 40 CMS. ARMADA CON 4 VARILLAS DE ACERO DE 3/8" Y ALAMBRN DE 1/4" @ 2O CMS. CONCRETO F'C= 200 KG/CM2; INCLUYE MATERIALES, MANO DE OBRA, EQUIPO Y

    HERRAMIENTA Y TODOS LOS TRABAJOS NECESARIOS.

  • SUBTOTAL $88.24

    0.03 $88.24 $2.65

    SUBTOTAL $2.65

    0.00137 $18,046.60 $24.720.00239 $19,413.51 $46.40

    0.08 $1,309.04 $104.721 $134.15 $134.15

    SUBTOTAL $312.64

    UN:PZA$462.51

    CANTIDAD C.U. IMPORTE

    0.2 $0.00 $0.00

    $0.00

    0.1 $0.00 $0.00

    $0.00

    3 $0.00 $0.00

    $0.00

    0.0008715 $15,827.51 $13.790.002228 $19,278.68 $42.95

    ESPECIFICACIN: Elaboracin de castillo final 3 caras, de 15 x 20 cms de concreto f'c= 150 kg/cm2, varilla 3/8" y aros de 1/4" a cada 20 cms; incluye materiales, mano de obra, equipo y herramienta y todos los

  • 0.3 $ 1,272.19 $381.660.2 $ 16.92 $3.38

    $ 14.50 $20.72$462.51

  • ENTORTADO EN AZOTEAS

    CERVANTES CUADRAS CRISTIAN OMAR

    CONCEPTO UNIDAD CANTIDAD

    MATERIALESN. A.

    SUBTOTAL

    MANO DE OBRA

    CUADRILLA: 1 OF. ALBAIL + 1 AYUDANTE + 0.1 SOBRESTANTE JOR 0.0401RENDIMIENTO 24.93 M3 POR JORNADA

    SUBTOTAL

    EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 4

    SUBTOTAL

    BASICOSMORTERO CEMENTO-ARENA PROPORCION 1:5 M2 0.05

    SUBTOTAL

    SUMINISTRO Y HABILITADO DE IMPERMEABILIZANTE EN AZOTEA

    CONTRERAS LUQUE KARLA JANETH

    CONCEPTO UNIDAD CANTIDAD

    MATERIALESIMPERMEABILIZANTE COMEX TOP TOTAL SECADO RAPIDO 10 AOS GAL 0.375SELLADOR COMEX 5X1 REFORZADO LITRO 0.03

    SUBTOTAL

    MANO DE OBRACUADRILLA: AY GRAL + .1 SOB JOR 0.03RENDIMIENTO: 30M/JOR

  • SUBTOTAL

    EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 2

    SUBTOTAL

    BASICOS

    SUBTOTAL

    ENTORTADO EN AZOTEAS

    CERVANTES CUADRAS CRISTIAN OMAR

    CONCEPTO UNIDAD CANTIDAD

    MATERIALESNO HAY

    SUBTOTAL

    MANO DE OBRA

    CUADRILLA: 1 OF. ALBAIL + 1 AUDANTE + 0.1 SOBRESTANTE JOR 0.0401RENDIMIENTO 24.93 M3 POR JORNADA

    SUBTOTAL

    EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 4

    SUBTOTAL

    BASICOSMORTERO,CEMENTO AREPA PROPORCION 1-5 M2 0.05

    SUBTOTAL

    analisis de la boquilla del petril por metro lineal

  • MARIA DEL ROSARIO LERMA RUIZ

    CONCEPTO UNIDAD CANTIDADMATERIALESarena M3 0.3166grava de 1 1/2" M3 0.3166tubo de pvc de 6" PZA 1agua M3 0.0055MANO DE OBRA SUBTOTALCUADRILLA: 1 OF. ALBAIL + 1 PEON + 0.1 SOBRESTANTERENDIMIENTO 16M/JOR

    jor 0.0625

    EQUIPO Y HERRAMIENTA MENOR SUBTOTALHERRAMIENTA MENOR

    % 4

    BASICOS SUBTOTALconcreto de 200 saco 2.7777

    SUBTOTALTOTAL

  • ENTORTADO EN AZOTEASUN:M2$94.25

    CERVANTES CUADRAS CRISTIAN OMAR

    C.U. IMPORTE

    SUBTOTAL $0.00

    $882.36 $35.38

    SUBTOTAL $35.38

    $35.38 $1.42

    SUBTOTAL $1.42

    $1,149.00 $57.45

    SUBTOTAL $57.45

    SUMINISTRO Y HABILITADO DE IMPERMEABILIZANTE EN AZOTEA $140.71

    CONTRERAS LUQUE KARLA JANETH

    C.U. IMPORTE

    $349.50 $131.06$96.00 $2.88

    SUBTOTAL $133.94

    $221.30 $6.64

    UN: M

  • SUBTOTAL $6.64

    $6.64 $0.13

    SUBTOTAL $0.13

    SUBTOTAL $0.00

    ENTORTADO EN AZOTEASUN:M2$94.25

    CERVANTES CUADRAS CRISTIAN OMAR

    C.U. IMPORTE

    SUBTOTAL $0.00

    $882.36 $35.38

    SUBTOTAL $35.38

    $35.38 $1.42

    SUBTOTAL $1.42

    $1,149.00 $57.45

    SUBTOTAL $57.45

    analisis de la boquilla del petril por metro linealUN:M

    $4,964.41

  • MARIA DEL ROSARIO LERMA RUIZ

    C.U. IMPORTE

    $180.00 $56.99$125.00 $39.58$550.00 $550.00$100.00 $0.55

    SUBTOTAL $647.11

    $882.37 $55.15

    SUBTOTAL $55.15

    $55.15 $220.59

    SUBTOTAL $220.59$1,455.00 $4,041.55

    SUBTOTAL $4,041.55TOTAL $4,964.41

  • LUCIA KARELY PEREZ CASTRO

    CONCEPTO UNIDAD CANTIDAD

    MATERIALESPISO VITROMEX 30 X 30 CMS M2 1CEMENTO CREST TON 0.004AGUA POTABLE M3 0.0015

    SUBTOTAL

    MANO DE OBRAOFICIAL AZULEJERO JOR 1AYUDANTE GENERAL JOR 1SOBRESTANTE JOR 0.1RENDIMIENTO M2/JOR 0.076

    SUBTOTALEQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 4

    SUBTOTALBASICOSN. A.

    SUBTOTAL

    YAJAHIRA PIMIENTA PALMA

    CONCEPTO UNIDAD CANTIDADMATERIALESAzulejo ceramico 20x20 M2 1

    KG 0.069TON 0.004

    Agua Potable M3 0.04SUBTOTAL

    MANO DE OBRAAyudante General JOR 1Oficial Azulejero JOR 1Sobrestante JOR 0.1Rendimiento M2/JOR 0.9166

    SUBTOTAL

    COLOCACION DE PISO VITROMEX DE 30 X 30 CMS INCLUYE MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO

    ESPECIFICACIN: RECUBRIMIENTO DE AZULEJO CERAMICO PARA BAO 20 X 20, INCLUYE SUMINISTRO Y COLOCACIN.

    Adhesivoblancopremier antideslizamiento.Cementoblanco,marcaTolteca

  • EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 0.03

    SUBTOTAL

    CONSTRUCCION DE CASA CON LEGOS DE 4 X 1 CM

    FULANITO DE LA MASCADA ROSA

    CONCEPTO UNIDAD CANTIDAD

    MATERIALESPINTURA VINILICA LT 0.36

    SUBTOTAL

    MANO DE OBRA

    JOR 0.02RENDIMIENTO 50 M2/JOR

    SUBTOTAL

    EQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 0.33

    SUBTOTAL

    BASICOSANDAMIO PT 0.27

    SUBTOTALTOTAL

    CUADRILLA: 1 OF. PINTOR + 1 AYUDANTE GRAL + 0.1 SOBRESTANTE

  • UN: M2$142.21

    LUCIA KARELY PEREZ CASTRO

    C.U. IMPORTE

    $55.00 $55.00$3,910.00 $15.64

    $10.00 $0.02SUBTOTAL $70.66

    $527.86 $527.86$311.70 $311.70$657.36 $65.74$905.30 $68.80

    SUBTOTAL $68.80

    $68.80 $2.75

    SUBTOTAL $2.75

    SUBTOTAL $0.00

    UN:M3$1,024.97

    YAJAHIRA PIMIENTA PALMA

    C.U. IMPORTE

    $145.00 $145.00$94.61 $6.53

    $3,689.65 $14.76$100.00 $4.00

    SUBTOTAL $170.29

    $311.70 $311.70$527.86 $527.86$657.36 $65.74$905.30 $829.79

    SUBTOTAL $829.79

    COLOCACION DE PISO VITROMEX DE 30 X 30 CMS INCLUYE MATERIAL, MANO DE OBRA, HERRAMIENTA Y

    ESPECIFICACIN: RECUBRIMIENTO DE AZULEJO CERAMICO PARA BAO 20 X 20, INCLUYE SUMINISTRO Y

  • $829.79 $24.89SUBTOTAL $24.89

    TOTAL C.D. $1,024.97

    CONSTRUCCION DE CASA CON LEGOS DE 4 X 1 CMUN:PZA$41.38

    FULANITO DE LA MASCADA ROSA

    C.U. IMPORTE

    $75.00 $27.00

    SUBTOTAL $27.00

    $521.30 $10.43

    SUBTOTAL $10.43

    $10.43 $0.03

    SUBTOTAL $0.03

    $14.50 $3.92

    SUBTOTAL $3.92TOTAL $41.38

  • ROMERO MONTOYA EVELYN

    CONCEPTO UNIDAD CANTIDAD

    MATERIALESM2 1.05

    SUBTOTAL

    MANO DE OBRACUADRILLA: 1 OF. ALBAIL + 1 PEON + 0.1 SOBRESTANTE JOR 0.1RENDIMIENTO 10M2 /JOR

    SUBTOTALEQUIPO Y HERRAMIENTA MENORHERRAMIENTA MENOR % 4

    SUBTOTAL

    BASICOSCONCRETO F"C=200KG/CM2 M2 0.1

    SUBTOTAL

    FABRICACION DE FIRME DE CONCRETO DE FC 200 kg/cm2 DE 10CM DE ESPESOR ARMADO CON MALLA ELECTROSOLDADA 6x6/10-10, SIN CONSIDERAR CIMBRA EN FRONTERAS

    Mallaelectrosoldada66-10-10(1.02kg/m2).

  • UN:M2$238.54

    ROMERO MONTOYA EVELYN

    C.U. IMPORTE

    13.4 14.07

    SUBTOTAL $14.07

    $882.36 $88.24

    $88.24

    $88.24 $3.53

    $3.53

    $1,327.04 $132.70

    $132.70

    FABRICACION DE FIRME DE CONCRETO DE FC 200 kg/cm2 DE 10CM DE ESPESOR ARMADO CON MALLA ELECTROSOLDADA 6x6/10-10, SIN CONSIDERAR CIMBRA EN FRONTERAS

    CimentacionAcabadoEstructuraAzoteasRecubrimientosObra Exterior