Page 1: Ppi Tubería Encamisada

7/17/2019 Ppi Tubería Encamisada

http://slidepdf.com/reader/full/ppi-tuberia-encamisada 1/1

PROJECT: CCGT

 Lichterfelde

TYPE % I.P. DATE SIGNATURE I.P. DATE SIGNATURE I.P. DATE SIGNATURE

1

1.1 R D C

1.2   UNE‐EN ISO 15614 R D C

1.3 UNE‐EN 287‐1 R D C

1.4 A/PROCEDURE NoBo R D C

1.5 A/PROCEDURE NoBo R D C

1.6 PI‐107 R D C

2

2.1 EN 10204  3.1 VISUAL 100 M R C

2.2 EN 10204  2.2 VISUAL 100 M R C

3

3.1 PO‐215 VISUAL 100 M M

3.2  PI‐101/UNE‐EN 970/ EN 

12062  VISUAL 100 M M C

3.3  A/PROCEDURE NoBo 

/EN 571‐1  MT 100 M R C

3.4

A/PROCEDURE NoBo 

/EN 1435/

 EN

 1714/EN

 

1713

RT 100 M R C

3.5  A/DRAWING/ISO 2768‐1 

UNE‐EN 13445‐4  DIMENSIONAL 100 M R

4

4.1  A/DRAWING/ISO 2768‐1 

UNE‐EN 13445‐4  DIMENSIONAL 100 H H C

4.2 HIDRAULIC TEST PED 97/23/CE 100 H H

4.3 A/DRAWING 100 R

4.4 PED 97/23/CE R C

4.5   1A5Y‐A1‐YM_‐IP‐IICEM‐9235   VISUAL 100 M C

4.6   1A5Y‐A1‐YM_‐IP‐IICEM‐9235   VISUAL 100 M

4.7 PO‐203 H C

5   1A5Y‐A1‐YM_‐IP‐IICEM‐9235   H H C

CLIENT

DATE: 

SIGNATURE

EQUIPMENTS or COMPONENTS KKS AFFECTED BY THIS ITP:

DIMENSIONAL CONTROL AND LIMITS OF SUPPLY

IDENTIFICATION MARKING CONTROL

CE STAMP/ APPLICABLE REGULATION CONTROL

BLASTING AND PAINTING CONTROL

ITP DOCUMENT IDENTIFICATION (KKS):

SUPPLY DESCRIPTION: CONDENSER 

REV. 00

Nº ITP: 15/346‐01

CONTROL OF PACKING FOR SHIPMENT

DOCUMENTATION CONTROL

MANUFACTURER SPECIFIC IPP

WELDERS AND NDT PERSONNEL QUALIFICATION

WELDING PROCEDURE QUALIFICATIONS

PROCEDURE FOR RT

FINAL INSPECTION

PROCEDURE FOR HYDRAULIC TEST

RECEPTION 

OF 

MATERIALS

BASE MATERIALS

FILLER AND OTHER MATERIALS

MANUFACTURING

CONTROL OF MATERIAL IDENTIFICATION

VISUAL INSPECTION OF WELDS

PT/MT WELDS INSPECTION

RT/UT WELDS

 INSPECTION

DIMENSIONAL CONTROL OF TUBESHEET AND SUPPORT PLATES

CLIENT  CERTIFICATE / 

REPORT

INSPECTION POINT SIGNATURE

DESCRIPTION

BEFORE MANUFACTURING

Inspection 

Points 

keys 

(I.P.):

D: DOC. FOR APPROVAL  W: WITNESS POINT

 PRIOR

 TO

 MANUFACT.

 M:

 

RANDOM INSPECTION

R: DOCUMENT REVIEW  H: HOLD POINT

Criterio aceptación s/ EN ISO 5817B

CAT. IV / MOD. G 

NOTES

INSPECTION AND TEST PROGRAM (ITP)

GENERAL NOTES:

(1) Samples will cover all the welders involved

MANUF./SUPPLIER

DATE: 

SIGNATURE

SHIPPING RELEASE

C: CERTIFICATE REQUIRED

ITEM 

STANDARD / NORM / 

PROCEDURE

INSPECTIONMANUF./SUPPLIER IBERDROLA IC

PROCEDURE FOR PT/MT

IBERDROLA IC

DATE: 

SIGNATURE