portfolio ignasi hermida

Upload: rossonero777

Post on 09-Oct-2015

51 views

Category:

Documents


0 download

DESCRIPTION

Here it is my Portfolio, Projects of Ignasi Hermida

TRANSCRIPT

  • ROBIE HOUSE, CHICAGO In this render I wanted to recreate the living room of the Robbie House. I took one photo as a refference and then I started to modelate the entire scene and all the elements like the windows, the chair, the sofa and the roof. I draw the pattern of the carpet with photoshop and then I applied it to the scene..I used MentalRay engine in this scene.

    Arts center, BerlinThis is a render that I made as a request.

    The client gave me some documents like the floor plan, sections, and references of the materials and I had to modelate the scene..

    TRIPTYCHArchitectural triptych about the Reichstag Building.

    Outer surface Inner surface

    RENDERSFREELANCE

    Ignasi Hermida

    0 El Proyecto de Norman Foster consiste en una reforma interior y exterior del edificio, ms la construccin de una cpula que en un estado inicial del proyecto no estaba prevista

    Remodelacin de Norman Foster

    o 40m de Diametro por 23,5m de Alturao 800 Toneladas de pesoo 3000m2 de superficie acrisalada

    o El ascenso y el descenso de la cpula se realiza a traves de 2 rampas helicoidaleso El cono espejado refleja la luz en 360 hacia la camara, situada justo debajo.

    La Cpula

    o Performance realizada antes de la remodelacin El Reichstag Empaquetado, totalmente cubierto por una tela

    Compromiso con los ciudadanos

    o La gran sala parlamentaria a triple altura es iluminada por la luz natural que proviene de la cpula

    El Reichstag como un edificiodemocrtico

    o Grafitis de la URSS que fueron ocultados en la remodelacin de la postguerra y que han sido descubiertos en la ltima restauracin

    Respeto hacia la historia

    o La cpula cumple una funcin energtica

    Sensibilidad ambiental

  • Housing in Las GloriasProject of 120 apartments near the square Las Glorias, Barcelona.The project is developed in a linear block that follows the perimeter of the site. The block rises up at its end, reaching a hight of 11 floors. The geometry of the building generates two public spaces, which are accessible through three points in the ground floor. All the apartments are accessible trhough an external corridor, and they all have a private terrace..The terraces have a singular geometry on each floor, generating a caracteristic stile on the facade..

    PROJECTSrESIDENTIAL

    LAS GLORIAS

    Ignasi Hermida

  • PROJECTSrESIDENTIAL

    SIMPLEX DUPLEX

    Section / Elevation

    LAS GLORIAS

    Ignasi Hermida

  • Housing in GraciaProject of 60 apartments at the neighbourhood of Gracia Barcelona.The building is placed on the bound between two districts of Barcelona, and this was a basic input when I designed the project. On the one hand there is the neighbourhood of Eixample, and to the other there is the neighbourhood of Gracia. The project has to respond to both, so there is a big flat building facing Eixample and another two blocks placed on the side of Gracia.. The apartments of the flat building are bigger than the apartments of the two blocks of Gracia, consequently, we found two diferent types of apartments, each one according to the site where they are placed.

    PROJECTSrESIDENTIAL

    Gracia

    Ignasi Hermida

  • PROJECTSrESIDENTIAL

    Gracia

    Ignasi Hermida

  • Direccin

    Gestin

    Almacen

    Reunin

    Planta primera E:1/300

    PVII/T Entrega final enero 2010 Elena Fernandez ignasi hermida 02Planta 1:200Planta 1:200Planta 1:200Planta 1:200planta principalplanta principalplanta principalplanta principal

    Alzado 1:200Alzado 1:200Alzado 1:200Alzado 1:200sur, accesosur, accesosur, accesosur, accesoSports / Mulripurpose HALL

    A multipurpose hall that must allow the use of different activities: sport use, neighborhood market, exhibition and concert hall.The site of the project is placed above an urban tunnel so the project requires a big structure to cover the entire wide of the building.The volumetry of the building is compound with one wood cube that allows the multipurpose hall and another concrete cube destined to service uses.The roof of the wood cube it is solved with a three-dimensional wood mesh, visible from inside, and it constitute the most interesting point of the project

    PROJECTSEquipment

    Multipurpose room

    43

    5

    6

    7

    21

    1 2 3 4 5 6 7

    8

    1415

    9 8

    10

    11

    12

    13

    9765421 83 10

    11

    12

    13

    14

    15

    191817161413 15

    2120 22

    1

    2

    3

    5

    4

    6

    6

    7

    9

    8

    12

    12

    11

    10

    PVII/

    T3a

    ent

    rega

    _23D

    iciemb

    re0

    9El

    ena

    Fern

    ande

    zig

    nasi h

    ermi

    da04

    1 Capa de gravilla2 Lamina impermeable de solape3 2 laminas impermeables separadas por geotextil4 Aislamiento termico lana mineral 140 mm5 Barrera de vapor6 Hormigon de pendientes7 Forjado de hormigon 250 mm8 Chapa de acero inoxidable 1mm9 Acristalamiento aislante: vidrio templado 9mm

    + camara 15 mm + vidrio laminado 2x9 mm10 Pared de hormigon armado 400 mm11 Camara ventilada 50 mm12 Aislamiento termico lana mineral 50 mm13 Pladur

    1 2 laminas impermeables separadas por geotextil2 Aislamiento termico lana mineral 140 mm3 Barrera de vapor4 Tablero OSB 27 mm5 Rastreles madera para pendientes6 Aislamiento termico lana mineral 40 mm7 Tablon OSB 22 mm8 Cercha de madera con uniones invisibles

    cordon 200x500 mmmontantes y diagonales 200x200mm

    9 lamina impermeable de solape10 Remate de madera11 Lamas de madera 40x150 mm12 Rastreles/trasventilacion 40x150 mm13 Aislamiento termico lana mineral 140mm14 Tablero OSB 30mm15 Canalon de Zinc

    1 Lamas de madera 40x150 mm2 Rastreles/trasventilacion 40x150 mm3 2 laminas impermeables separadas por geotextil4 Aislamiento termico lana mineral 140 mm5 Barrera de vapor6 Tablero OSB 30 mm7 Perfil metalico en L 500x600x20 mm8 Cercha de madera con uniones invisibles

    cordon 200x500 mmmontantes y diagonales 200x200mm

    9 Union metalica empotrada entre pilar y cercha10 Pilar de madera laminada11 Acristalamiento aislante: vidrio templado 9mm

    + camara 15 mm + vidrio laminado 2x9 mm12 Perfil metalico en U 120x60x1013 Pavimento de madera 600x600x25 mm14 Tablero de virutas entre rastreles de 40x80mm15 Barrera de vapor16 Tablero de fibra mineral 35 mm17 Tablero aglomerado de madera 25mm18 Aislamiento termico lana mineral 140 mm19 Forjado de hormigon20 Pieza de hormigon 140x80021 Muro de contencion de hormigon22 Canalon de hormigon prefabricado

    Fachada

    Suelo

    Contencion

    Z1Z3

    Z4

    Z2

    1 Baldosa de granito2 Mortero de cemento3 Hormigon en masa4 Pieza de hormigon5 Perfil metalico en T 240x130x10 mm6 Perfil metalico en T 70x35x10 mm7 Canalon de hormigon prefabricado

    Z2 1:20

    Z1 1:20 Z3 1:20

    Z4 1:20

    Seccion constructiva 1:50

    La Polifuncionalidad del espacioLa Polifuncionalidad del espacioLa Polifuncionalidad del espacioLa Polifuncionalidad del espacio

    pista deportivapista deportivapista deportivapista deportiva conciertos y conferenciasconciertos y conferenciasconciertos y conferenciasconciertos y conferencias mercadomercadomercadomercado museomuseomuseomuseo

    Seccin fugada 1:100Seccin fugada 1:100Seccin fugada 1:100Seccin fugada 1:100zona de servicios y almacenzona de servicios y almacenzona de servicios y almacenzona de servicios y almacen

    PVII/T Entrega final enero 2010 Elena Fernandez ignasi hermida 04Seccin fugada 1:100 Seccin fugada 1:100 Seccin fugada 1:100 Seccin fugada 1:100 espacio polifuncionalespacio polifuncionalespacio polifuncionalespacio polifuncional

    esquema de montage de las cerchasesquema de montage de las cerchasesquema de montage de las cerchasesquema de montage de las cerchasCerchas Spike Tec de madera laminadaCerchas Spike Tec de madera laminadaCerchas Spike Tec de madera laminadaCerchas Spike Tec de madera laminaday placas de unin de acero que quedany placas de unin de acero que quedany placas de unin de acero que quedany placas de unin de acero que quedanocultas, con un canto de entre 1/10 yocultas, con un canto de entre 1/10 yocultas, con un canto de entre 1/10 yocultas, con un canto de entre 1/10 y1/15 de la luz.1/15 de la luz.1/15 de la luz.1/15 de la luz.

    Ignasi Hermida

  • III

    IV

    V

    VI

    III

    IV

    V

    VI

    PROJECTES X Biblioteca Nacional de CatalunyaIGNASI HERMIDA TELL -EDUARD CALAFELL-MAMEN DOMINGO1

    22/06/2011Professors:

    Emplaament1:1000

    Hall a

    trip

    le a

    lad

    a

    vista de la biblioteca desde elcentre de la plaa

    La nova Plaa Catalunya

    Alat Principal1:300

    Esquema estructuraldel forjat tipus

    Library at Catalonia PlazaProject of the National Library of Catalonia, placed at Catalonia PlazaThe building becomes a balcony with the primary function to watch the entire Catalonia plaza. Consequently, the structure of the building works in one direction, generating big spaces faced to the big square.The diferent floors of the library are destinated to different uses, and the path to get the top floor shows diiferent visuals of the Catalonia Plaza

    PROJECTSEquipment

    Library

    PROJECTES X Biblioteca Nacional de CatalunyaIGNASI HERMIDA TELL -EDUARD CALAFELL-MAMEN DOMINGO2

    22/06/2011Professors:

    Planta Baixa 1:300 Planta Primera 1:300 Planta Segona 1:300

    Axonometria de l'edifici1:100

    Secci Longitudinal 1:250

    Zona

    Gen

    eral

    Volumetria

    PROJECTES X Biblioteca Nacional de CatalunyaIGNASI HERMIDA TELL -EDUARD CALAFELL-MAMEN DOMINGO2

    22/06/2011Professors:

    Planta Baixa 1:300 Planta Primera 1:300 Planta Segona 1:300

    Axonometria de l'edifici1:100

    Secci Longitudinal 1:250

    Zona

    Gen

    eral

    Volumetria

    PROJECTES X Biblioteca Nacional de CatalunyaIGNASI HERMIDA TELL -EDUARD CALAFELL-MAMEN DOMINGO3

    22/06/2011Professors:

    Planta Tercera 1:300 Planta Quarta 1:300

    Secci transversal 1:100Detall de la faana 1:20

    PROJECTES X Biblioteca Nacional de CatalunyaIGNASI HERMIDA TELL -EDUARD CALAFELL-MAMEN DOMINGO3

    22/06/2011Professors:

    Planta Tercera 1:300 Planta Quarta 1:300

    Secci transversal 1:100Detall de la faana 1:20

    Ignasi Hermida

  • Office & Shopping at Via LaietanaThe project involves the creation of two large volumes, one for office and one for shopping.The office is resolved with a tower of twenty-seven floors, attached to an existing building, El Palau de la Musica Catalana. The tower is slightly retired from the facade line of the street, so the building doesnt suppose a big visual impact from the street view. The shopping center has a circular distribution, and the scale of the building is similar to the nearest constructions.Both buildings have the same constructive solution, based in precast concrete elements

    PROJECTSEquipment

    Office & shopping

    10,9

    12,5

    10,00

    10,10

    10,0

    11,5

    12

    10,00

    1908

    -200

    8

    Urquinaona Urquinaona Urquinaona Urquinaona Urquinaona UrquinaonaM M M M M M M M M M M MUrquinaonaUrquinaonaUrquinaonaUrquinaonaUrquinaona

    12,5 12

    11

    HA

    LL d

    e le

    s O

    ficin

    es

    Planta Baixa 1:250

    12

    Sal

    a de

    REU

    NIO

    NS

    Foto

    mon

    tatg

    e

    EsquemaESTRUCTURAL

    Planta Tipus 1:250

    secc

    i d

    e la

    FA

    ANA

    PROJECTES IX Oficines a Via Laietana IGNASI HERMIDA TELL MAMEN DOMINGOEDUARD CALAFELL 3a entrega, 19/01/2011 7

    Ignasi Hermida

  • Bus station in BarcelonaThe new bus station of Barcelona. Buses arrive to the station through a ramp, than allows the pedrestians getting into the building without crossing the path of the buses. The waiting zone is linked to shops, and on the top there is a restaurant that permit to look the entire station.

    PROJECTSEquipment

    BUS STATION

    Ignasi Hermida

  • PROJECTSEquipment

    BUS STATION

    Ignasi Hermida