pending mdl siemens
TRANSCRIPT
-
8/10/2019 Pending MDL Siemens
1/14
Sl. No. Description Drawing No.
4Single Line Diagram - Overall Electrical System (Only
EeBOP Scope)SIEM-JITPL.5404A-EL-3-0004
5 Design Basic Report - EBOP SIEM-JITPL.5404A-EL-3-0005
6 Design Basic Report - Illumination EBOP SIEM-JITPL.5404A-EL-3-0006
8 Specification & Datasheet for Station Aux. Transformer SIEM-JITPL.5404A-EL-4-0102
9 Transformer soak pit sizing calculation SIEM-JITPL.5404A-EL-3-0103
11 Transformer Protection Scheme SIEM-JITPL.5404A-EL-3-0105
13 Operation & Maintenance Manual SIEM-JITPL.5404A-EL-3-0107
14 Vendor Drawings SIEM-JITPL.5404A-EL-3-0108
15 Bill of Material (BOM) SIEM-JITPL.5404A-EL-3-0109
16 Type Test Reports SIEM-JITPL.5404A-EL-3-0110
18Specification & Datasheet for all type of distribution
transformersSIEM-JITPL.5404A-EL-4-0202
19GA, Schematic, Termination Details and BOM for SAT-1
& 2SIEM-JITPL.5404A-EL-3-0203
20 Transformer Protection Scheme SIEM-JITPL.5404A-EL-3-0204
21 Distribution Transformer - Manufacturing Quality Plan SIEM-JITPL.5404A-EL-3-0205
22 Operation & Maintenance Manual SIEM-JITPL.5404A-EL-3-0206
23 Vendor Drawings SIEM-JITPL.5404A-EL-3-0207
24 Bill of Material (BOM) SIEM-JITPL.5404A-EL-3-0208
25 Specification & Datasheet for 11kV Switchgear SIEM-JITPL.5404A-EL-4-0301
29 CT/PT Burden Sizing Calculations SIEM-JITPL.5404A-EL-3-0305
32 MV Switchgear - Manufacturing Quality Plan SIEM-JITPL.5404A-EL-3-0308
32 Control Phylosophy for FBT Panel MV Switchgear SIEM-JITPL.5404A-EL-3-0309
33 Specification & Datasheet for 6.6kV Switchgear SIEM-JITPL.5404A-EL-4-0401
34 SLD for MV Switchgears, SA # 1A & SA # 1B SIEM-JITPL.5404A-EL-3-0402
36GA, Schematics, termination detail & BOM - 6.6kV
Switchgear
SIEM-JITPL.5404A-EL-3-0404
37 CT/PT Burden Sizing Calculations SIEM-JITPL.5404A-EL-3-0405
39 Operation & Maintenance Manual SIEM-JITPL.5404A-EL-3-0407
40 Manufacturing Quality Plan- MV Switchgear SIEM-JITPL.5404A-EL-3-0408
46 LV SLD for WRDBs SIEM-JITPL.5404A-EL-3-0506
50 GA & Foundation, Schematic & BoM Drawings of MLDB SIEM-JITPL.5404A-EL-3-0510
51 GA & Foundation, Schematic & BoM Drawings of EMCC SIEM-JITPL.5404A-EL-3-0511
60 Schematic, Termination & BOM Drawings of DG Set SIEM-JITPL.5404A-EL-3-0604
61GA, Foundation, Schematic & BOM Drawings of AMF
Control PanelSIEM-JITPL.5404A-EL-3-0605
64 Operation & Maintenance Manual SIEM-JITPL.5404A-EL-3-0608
66 Cable Schedule for AMF Control Panel SIEM-JITPL.5404A-EL-3-0610
67 Earthing Pad Drawings for DG Set SIEM-JITPL.5404A-EL-3-0611
69 Erection and Pre-Commissioing Checks SIEM-JITPL.5404A-EL-3-0613
70 Exhuast Piping Structure Calculation SIEM-JITPL.5404A-EL-3-0614
71 Exhuast Piping Structure Drawing SIEM-JITPL.5404A-EL-3-0615
73Manufacturing Quality Plan- Emergency DG Switchgear
Board and NGR PanelSIEM-JITPL.5404A-EL-3-0618
74 GA, Schematic and BOQ of NGR Panel SIEM-JITPL.5404A-EL-3-0619
EBOP-Angul TPP(2 X 600 MW)
-
8/10/2019 Pending MDL Siemens
2/14
76Single Line Diagram of Emergency DG Switchgear
BoardSIEM-JITPL.5404A-EL-3-0621
79Specification & Technical Data Sheet - SPBD &
AccessoriesSIEM-JITPL.5404A-EL-4-0701
80Busduct Layout for 11 kV SPBD From STs to Station
SwitchgearSIEM-JITPL.5404A-EL-3-0702
81Busduct Routing for 6.6 kV SPBD from SAT to Station
Aux. BoardSIEM-JITPL.5404A-EL-3-0703
83 Sizing Calculation of SPBD's SIEM-JITPL.5404A-EL-3-070584 Design Calculation of Support Structures for SPBDs SIEM-JITPL.5404A-EL-3-0706
85 Supporting Structure Arrangement for SPBDs SIEM-JITPL.5404A-EL-3-0707
86 Insert Plate Location For Layout of SPBDs SIEM-JITPL.5404A-EL-3-0708
88 Operation & Maintenance Manual SIEM-JITPL.5404A-EL-3-0710
89 Manufacturing Quality Plan- SPBD SIEM-JITPL.5404A-EL-3-0711
101Single Line Diagram - 220 V DC Distribution Board
(Station Loads Only)SIEM-JITPL.5404A-EL-3-0901
102 Specification & Datasheets for 220V DC System SIEM-JITPL.5404A-EL-4-0902
103GA Schematic, Termination Details and BOM for 220V
DC Distribution BoardSIEM-JITPL.5404A-EL-3-0903
104 GA , Schematic, BOM for 220 V Battery Charger SIEM-JITPL.5404A-EL-3-0904
108 Operation & Maintenance Manual SIEM-JITPL.5404A-EL-3-0908
109Manufacturing Quality Plan - Battery Bank & Battery
ChargerSIEM-JITPL.5404A-EL-3-0909
111 Cable Sizing Calculations SIEM-JITPL.5404A-EL-3-1002
112 HT Power Cable Schedule SIEM-JITPL.5404A-EL-3-1003
114 Control Cable Schedule SIEM-JITPL.5404A-EL-3-1005
120 MV Power Cables Interconnection Schedule SIEM-JITPL.5404A-EL-3-1011
122 Control Cables Interconnection Schedule SIEM-JITPL.5404A-EL-3-1013
124 General Notes and Typicals for Cable Carrier system SIEM-JITPL.5404A-EL-3-1015
125 Details of Cable trays & Accessories SIEM-JITPL.5404A-EL-3-1016
126 MV Power Cable BOQ SIEM-JITPL.5404A-EL-3-1017
129 GA layout for Switchgear Room SIEM-JITPL.5404A-EL-3-1101
130 Inputs for Fuel Oil Transformer SIEM-JITPL.5404A-EL-3-1102
131 Station Battery Room Layout SIEM-JITPL.5404A-EL-3-1103
132 GA Layout for DG Room SIEM-JITPL.5404A-EL-3-1104
135 Plant Outdoor Earthing Layout SIEM-JITPL.5404A-EL-3-1203
136 Plant Indoor Earthing Layout SIEM-JITPL.5404A-EL-3-1204
137 FQP- Earthing SIEM-JITPL.5404A-EL-3-1207
138 Lightning Protection System Design Calcualtions SIEM-JITPL.5404A-EL-3-1301
139General Notes and Typicals for Lightning Protection
SystemSIEM-JITPL.5404A-EL-4-1302
140 Lightning Protection System Layout - TG Building SIEM-JITPL.5404A-EL-3-1303
148 Erection Specifciation for Cable Carrier System SIEM-JITPL.5404A-EL-4-1402
149 Erection Specifciation for Illumination System SIEM-JITPL.5404A-EL-4-1403
153 Specification & Datasheets SIEM-JITPL.5404A-EL-4-1602
154 GA and Civil Input SIEM-JITPL.5404A-EL-3-1603
155 GA, Schematics, Termination Details and BOM of NGR SIEM-JITPL.5404A-EL-3-1604
156 Operation & Maintenance Manual SIEM-JITPL.5404A-EL-3-1605
157 Manufacturing Quality Plan - NGR SIEM-JITPL.5404A-EL-3-1606
158 Specification & Datasheets for PA system SIEM-JITPL.5404A-EL-4-1701
161 Bill of Materials & Make SIEM-JITPL.5404A-EL-3-1801
162 Technical Details of Electrical Workshop Equipment SIEM-JITPL.5404A-EL-3-1802
-
8/10/2019 Pending MDL Siemens
3/14
To submit by
Siemens on
-
8/10/2019 Pending MDL Siemens
4/14
-
8/10/2019 Pending MDL Siemens
5/14
Sl. No. Description Drawing No.
2 ACDB SLD SIEM-JITPL.5404A-EL-3-2002
5 Complete BOQ of 400kV Switchyard SIEM-JITPL.5404A-EL-3-2008
14 Relay Setting & co-ordination SIEM-JITPL.5404A-EL-3-2017
20Erection key diagram- Plan & Section & Al. Cutting
ScheduleSIEM-JITPL.5404A-EL-3-2023
23 Busbar & Busbar Sizing Calculations SIEM-JITPL.5404A-EL-3-2026
26 Strung Bus design calculation for 400kV switchyard SIEM-JITPL.5404A-EL-3-2029
33 Cable schedule & Interconnection Chart SIEM-JITPL.5404A-EL-3-2036
34ABT (Availability Based Tariff) meters data sheet and
specificationSIEM-JITPL.5404A-EL-3-2037
38
UPS system for SCADA (including
batteries,chargers,inverters,distribution boards,etc) data
sheet and specification
SIEM-JITPL.5404A-EL-3-2041
42Specification and Data sheet for Fire alarm and detection
systemSIEM-JITPL.5404A-EL-3-2045
43 Fire alarm and detection layout SIEM-JITPL.5404A-EL-3-2046
44
Specification and Data sheet for Fire protection system
for Switchyard and Reactors SIEM-JITPL.5404A-EL-3-2047
45Fire protection system for Switchyard and Reactors
layoutSIEM-JITPL.5404A-EL-3-2048
46 Conceptual Draft Copy for Outdoor Kiosk SIEM-JITPL.5404A-EL-3-2049
49 Data sheet & Specification - 400kV CT SIEM-JITPL.5404A-EL-4-2052
51 Data sheet & Specification - 400kV EMVT SIEM-JITPL.5404A-EL-4-2054
54 Data sheet & Specification - 400kV HCB Isolators SIEM-JITPL.5404A-EL-4-2057
56 Data sheet & Specification - 400kV BPI SIEM-JITPL.5404A-EL-4-2059
66GA, Schematics, Termination Details and BOM of 400kV
BPISIEM-JITPL.5404A-EL-3-2069
67GA, Schematics, Termination Details and BOM of Disc
InsulatorsSIEM-JITPL.5404A-EL-3-2070
71 Schematics for 400kV Reactor protection panel SIEM-JITPL.5404A-EL-3-207472 Equipment List for 400kV Reactor protection panel SIEM-JITPL.5404A-EL-3-2075
73 GA for 400kV Reactor protection panel SIEM-JITPL.5404A-EL-3-2076
77 Design Instruction sheet. SIEM-JITPL.5404A-EL-3-2080
81 Schematic for Control Panel for DIA-2 SIEM-JITPL.5404A-EL-3-2084
82 Equipment List for Control Panel for DIA-2 SIEM-JITPL.5404A-EL-3-2085
83 GA for 400kV Control Panel for DIA-2 SIEM-JITPL.5404A-EL-3-2086
84 Functional Design Specification ( FDS) SIEM-JITPL.5404A-EL-3-2087
85 SCADA System Configuration SIEM-JITPL.5404A-EL-3-2088
86 Bill for Material (BOM) SIEM-JITPL.5404A-EL-3-2089
90 Signal List SIEM-JITPL.5404A-EL-3-2093
94 SAT Procedure SIEM-JITPL.5404A-EL-3-2097
96 MQP for 400kV HCB Isolators SIEM-JITPL.5404A-EL-3-2099
99 MQP for 400kV Bus post insulator SIEM-JITPL.5404A-EL-3-2102
100 MQP for 11kV Disc insulator SIEM-JITPL.5404A-EL-3-2103
101 QAP for 420 kV CT SIEM-JITPL.5404A-EL-3-2104
103GA, Termination Details & BoM for 400kV Switchyard
HardwaresSIEM-JITPL.5404A-EL-3-2106
106 Specification & Data sheet of 4.5" & 2.5" Aluminum Tube SIEM-JITPL.5404A-EL-4-2109
400 KV Switchyard -Angul TPP(2 X 600 MW)
-
8/10/2019 Pending MDL Siemens
6/14
108Specification & Datasheet for Tarantula Conductor &
Earth WireSIEM-JITPL.5404A-EL-3-2111
110Datasheet & Drawings of Clamps & Connectors for
400kV SwitchyardSIEM-JITPL.5404A-EL-3-2113
111 Internal Cable Trench Layout for Control Room Building SIEM-JITPL.5404A-EL-3-2114
1 LLD for 400kV Switch yard SIEM-JITPL.5404A-EL-3-2131
2 LLD for Control Room SIEM-JITPL.5404A-EL-3-2132
4 Type Test Report - 400kV Electromagnetic VoltageTransformer
SIEM-JITPL.5404A-EL-3-2154
15 Type Test Report of Earth Wire SIEM-JITPL.5404A-EL-3-2165
114 Design Sketch for Tower MKD. T2 SIEM-JITPL.5404A-EL-3-2315
126 Foundation Design of 50MVAr Bus Reactor SIEM-JITPL.5404A-EL-3-2327
162 Design of Internal Cable trench for Control room Building SIEM-JITPL.5404A-EL-3-2363
163 Detail of Outdoor Cable Trench SIEM-JITPL.5404A-EL-3-2515
180Layout & Details of Internal Cable trench for Control
roomSIEM-JITPL.5404A-EL-3-2655
-
8/10/2019 Pending MDL Siemens
7/14
To submit by
Siemens on
-
8/10/2019 Pending MDL Siemens
8/14
-
8/10/2019 Pending MDL Siemens
9/14
Sl. No. Description Drawing No.
1LLD CALCULATION OF MACHINE HALL AT EL+0.000M
LVL B'N GRID 1 to 11a SIEM-JITPL.5404A-EL-3-3001
2LLD CALCULATION OF MACHINE HALL AT EL+0.000M
LVL B'N GRID 15a to 25 SIEM-JITPL.5404A-EL-3-3002
3LLD CALCULATION OF CONTROL FLUID ROOM(UNIT#1) AT EL+0.000M LVL. SIEM-JITPL.5404A-EL-3-3003
4LLD CALCULATION OF CONTROL FLUID ROOM
(UNIT#2) AT EL+0.000M LVL. SIEM-JITPL.5404A-EL-3-3004
5LLD CALCULATION OF GAS CYLINDER ROOM
(UNIT#1) AT EL+0.000M LVL. SIEM-JITPL.5404A-EL-3-3005
6LLD CALCULATION OF GAS CYLINDER ROOM
(UNIT#2) AT EL+0.000M LVL. SIEM-JITPL.5404A-EL-3-3006
9LLD CALCULATION OF CABLE VAULT ROOM
(UNIT#1) AT EL+0.000M LVL. SIEM-JITPL.5404A-EL-3-3009
10LLD CALCULATION OF CABLE VAULT ROOM
(UNIT#2) AT EL+0.000M LVL. SIEM-JITPL.5404A-EL-3-3010
11 LLD CALCULATION OF SWAS ROOM (UNIT#1) ATEL+0.000M LVL. SIEM-JITPL.5404A-EL-3-3011
12LLD CALCULATION OF SWAS ROOM (UNIT#2) AT
EL+0.000M LVL. SIEM-JITPL.5404A-EL-3-3012
13LLD CALCULATION OF A/C ROOM FOR DRY
PANEL(UNIT#1) AT EL+0.000M LVL. SIEM-JITPL.5404A-EL-3-3013
14LLD CALCULATION OF A/C ROOM FOR DRY
PANEL(UNIT#2) AT EL+0.000M LVL. SIEM-JITPL.5404A-EL-3-3014
15LLD CALCULATION OF MCC ROOM (COMMON) AT
EL+0.000M LVL. SIEM-JITPL.5404A-EL-3-3015
16LLD CALCULATION OF CONTROL ROOM (COMMON)
AT EL+0.000M LVL. SIEM-JITPL.5404A-EL-3-3016
17 LLD CALCULATION OF A/C EQUIPMENT ROOM(COMMON) AT EL+0.000M LVL. SIEM-JITPL.5404A-EL-3-3017
18LLD CALCULATION OF INERT GAS ROOM (COMMON)
AT EL+0.000M LVL. SIEM-JITPL.5404A-EL-3-3018
19LLD CALCULATION OF HT SWITCH GEAR ROOM
(UNIT#1) AT EL+3.500M LVL. SIEM-JITPL.5404A-EL-3-3019
20LLD CALCULATION OF HT SWITCH GEAR ROOM
(UNIT#2) AT EL+3.500M LVL. SIEM-JITPL.5404A-EL-3-3020
21LLD CALCULATION OF MACHINE HALL AT EL+8.500M
LVL B'N GRID 1 to 11a SIEM-JITPL.5404A-EL-3-3021
22LLD CALCULATION OF MACHINE HALL AT EL+8.500M
LVL B'N GRID 15a to 25 SIEM-JITPL.5404A-EL-3-3022
23 LLD CALCULATION OF OIL ROOM (UNIT#1) ATEL+8.500M LVL. SIEM-JITPL.5404A-EL-3-3023
24LLD CALCULATION OF OIL ROOM (UNIT#2) AT
EL+8.500M LVL. SIEM-JITPL.5404A-EL-3-3024
25LLD CALCULATION OF CABLE VAULT ROOM
(UNIT#1) AT EL+8.500M LVL. SIEM-JITPL.5404A-EL-3-3025
26LLD CALCULATION OF CABLE VAULT ROOM
(UNIT#2) AT EL+8.500M LVL. SIEM-JITPL.5404A-EL-3-3026
27LLD CALCULATION OF 220V BATTERY ROOM
(UNIT#1) AT EL+8.500M LVL. SIEM-JITPL.5404A-EL-3-3027
Illumination-Angul TPP(2 X 600 MW)
-
8/10/2019 Pending MDL Siemens
10/14
28LLD CALCULATION OF 220V BATTERY ROOM
(UNIT#2) AT EL+8.500M LVL. SIEM-JITPL.5404A-EL-3-3028
29LLD CALCULATION OF UPS/24V DC BATTERY
(UNIT#1) AT EL+8.500M LVL. SIEM-JITPL.5404A-EL-3-3029
30LLD CALCULATION OF UPS/24V DC BATTERY
(UNIT#2) AT EL+8.500M LVL. SIEM-JITPL.5404A-EL-3-3030
31LLD CALCULATION OF UPS & CHARGER ROOM
(COMMON) AT EL+8.500M LVL. SIEM-JITPL.5404A-EL-3-3031
32LLD CALCULATION OF SPACE FOR AHU ROOM
(COMMON) AT EL+8.500M LVL. SIEM-JITPL.5404A-EL-3-3032
33LLD CALCULATION OF LT SWITCH GEAR ROOM
(UNIT#1) AT EL+12.000M LVL. SIEM-JITPL.5404A-EL-3-3033
34LLD CALCULATION OF LT SWITCH GEAR ROOM
(UNIT#2) AT EL+12.000M LVL. SIEM-JITPL.5404A-EL-3-3034
35LLD CALCULATION OF CABLE VAULT ROOM B'N
GRID BF AT EL+12.000M LVL. SIEM-JITPL.5404A-EL-3-3035
36LLD CALCULATION OF MACHINE HALL AT
EL+17.000M LVL SIEM-JITPL.5404A-EL-3-3036
37LLD CALCULATION OF LAYDOWN AREA (UNIT#1) AT
EL+17.000M LVLSIEM-JITPL.5404A-EL-3-3037
38LLD CALCULATION OF LAYDOWN AREA (UNIT#2) AT
EL+17.000M LVL SIEM-JITPL.5404A-EL-3-3038
39LLD CALCULATION OF CENTRAL CONTROL ROOM
(UNIT#1) AT EL+17.000M LVL SIEM-JITPL.5404A-EL-3-3039
40LLD CALCULATION OF CENTRAL CONTROL ROOM
(UNIT#2) AT EL+17.000M LVL SIEM-JITPL.5404A-EL-3-3040
41LLD CALCULATION OF CONTROL EQUIPMENT
ROOM (UNIT#1) AT EL+17.000M LVL SIEM-JITPL.5404A-EL-3-3041
42LLD CALCULATION OF CONTROL EQUIPMENT
ROOM (UNIT#2) AT EL+17.000M LVL SIEM-JITPL.5404A-EL-3-3042
43LLD CALCULATION OF COMPUTER ROOM (UNIT#1)
AT EL+17.000M LVL SIEM-JITPL.5404A-EL-3-3043
44LLD CALCULATION OF COMPUTER ROOM (UNIT#2)
AT EL+17.000M LVL SIEM-JITPL.5404A-EL-3-3044
45LLD CALCULATION OF CONFERENCE ROOM AT
EL+17.000M LVL SIEM-JITPL.5404A-EL-3-3045
46LLD CALCULATION OF C&I ENGINEER ROOM AT
EL+17.000M LVL SIEM-JITPL.5404A-EL-3-3046
47LLD CALCULATION OF SHIFT INCHARGE ROOM AT
EL+17.000M LVL SIEM-JITPL.5404A-EL-3-3047
48LLD CALCULATION OF MAINTENANCE & UNLOADING
BAY (UNIT#1) SIEM-JITPL.5404A-EL-3-3048
49LLD CALCULATION OF MAINTENANCE & UNLOADING
BAY (UNIT#2) SIEM-JITPL.5404A-EL-3-3049
50LLD CALCULATION OF CABLE VAULT FOR BOILER
MCC (UNIT#1) SIEM-JITPL.5404A-EL-3-3050
51 LLD CALCULATION OF AIR WASHER ROOM (UNIT#1) SIEM-JITPL.5404A-EL-3-3051
52 LLD CALCULATION OF AHU ROOM (COMMON) SIEM-JITPL.5404A-EL-3-3052
53LLD CALCULATION OF CABLE VAULT FOR BOILER
MCC (UNIT#2) SIEM-JITPL.5404A-EL-3-3053
54 LLD CALCULATION FOR BOILER MCC (UNIT#1) SIEM-JITPL.5404A-EL-3-3054
55 LLD CALCULATION FOR BOILER MCC (UNIT#2) SIEM-JITPL.5404A-EL-3-3055
-
8/10/2019 Pending MDL Siemens
11/14
-
8/10/2019 Pending MDL Siemens
12/14
To submit by
Siemens on
-
8/10/2019 Pending MDL Siemens
13/14
-
8/10/2019 Pending MDL Siemens
14/14