obra reporte diario

1
CMC N° DE CONTRATO : ENCOTEC SUPERVISIÓN / SUPERVISION: CAUDALOSA A) B) H. Anterior / Previous H. Actual / Actual H. Acum. / Accumulated H. Anterior Acum. / Previous H. Actual / Actual H. Acum. Actual / Accumulated 1 Luminaria 00 0.0 0.0 0.0 1 0 0.0 0.0 0.0 2 01 0.0 0.0 0.0 2 2 0.0 0.0 0.0 3 01 0.0 0.0 0.0 3 1 0.0 0.0 0.0 4 02 0.0 0.0 0.0 3 0.0 0.0 0.0 5 Contenedor 00 0.0 0.0 0.0 Total / Total: 04 1 Supervisor / Supervisor 0 0.0 0.0 0.0 1 01 0.0 0.0 0.0 2 Técnico / Technician 0 0.0 0.0 0.0 2 01 0.0 0.0 0.0 3 0 0.0 0.0 0.0 3 01 0.0 0.0 0.0 0 0.0 0.0 0.0 4 01 0.0 0.0 0.0 Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 5 01 0.0 0.0 0.0 1 6 01 0.0 0.0 0.0 2 7 01 0.0 0.0 0.0 3 8 01 0.0 0.0 0.0 4 9 01 0.0 0.0 0.0 5 10 Cuponera 01 0.0 0.0 0.0 Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 0.0 0.0 0.0 1 14 2 Item 3 1 2 Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 3 1 4 2 5 Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 1 Unid. o Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 1 1 Lluvia 0.0 0.0 0.0 2 2 Nevada 0.0 0.0 0.0 3 3 Tormenta Eléctrica 0.0 0.0 0.0 4 Total 0.0 0.0 0.0 5 6 7 8 9 Directa / Direct: 3 0.0 0.0 0.0 10 Indirecta / Indirect: 0 0.0 0.0 0.0 11 G) 1.- 2.- 3.- 4.- 5.- H) 1.- 2.- 3.- 4.- 5.- J) 1.- 2.- 3.- K) 1.- 2.- 3.- L) CONTRATISTA / CONTRACTOR: HORARIO / WORKING HOURS 17:00 REPORTE DIARIO DE OBRA PROYECTO / PROJECT: REPARACIONES EN EL DEPOSITO DE RELAVES C FECHA / DATE: 16-04-15 PROPIETARIO / OWNER: TURNO / SHIFT: Día MANO DE OBRA: EQUIPOS / MACHINES: Item Descripción / Descripción Cantidad / Quantity Horas Hombre / Man hours Item Descripción / Descripción Cantidad / Quantity Total / Total: Indirecta / Indirect: Soldadora de Extrusión Soldadora de Fusión Operador de Equipos Tensiómetro Horas Máquina / Machine Hours Directa / Direct: Supervisor Camioneta / Día Técnico Geosintéticos Operador de Equipos Motobomba / Dia Generador / Dia Tubería HDPE Corrugada de 6" Perf. Equipo de Prueba de Vacío Tubería HDPE Corrugada de 6" No Perf. Equipo de Prueba de Chispa Tubería HDPE Corrugada de 4" Perf. Herramientas Manuales, Cables Total / Total: Leister Sistema de Control de Sub Drenaje Amoladora Geotextil NT 200 GR/M2 Equipo de Prueba de Aire Geotextil NT 300 GR/M3 H. Equipos / H. Machines: H. Inicio / Previous H. Termino / Previous Geomalla Uniaxial de 45 KN/M2 Luminaria 21 Tubería HDPE Corrugada de 4" No Perf. Total / Total: Dique Principal Cota 4357 msnm Total Ind. / Total Ind. : Geotextil NT 200 GR/M2 Total Equipos: Geomembrana LLPE 2.0 mm Luminaria 24 Geocompuesto con Bentonita GCL Luminaria 25 Total / Total: Luminaria 22 Sistema de Impermeabilización Luminaria 23 H. Acum. / Accumulated Trabajos Adicionales Cordón de Extrusión (Ml) Reparación con Extrusión (BEAD) Parches Menores a 60X60 Parches Mayores a 60X60 Total / Total: REPORTE DE CLIMA ADVERSO QUE HAYA IMPEDIDO LOS TRABAJOS / ADVERSE WEATHER THAT PREVENTED PLANNED WORK TO BE DONE Vertedero de Demasías 2° Etapa Inserto de Geomembrana Delta Lock Item Descripción / Description Horas / Hours Total / Total: H. Anterior / Previous H. Actual / Actual H. Acum. / Accumulated PRINCIPALES ACTIVIDADES REALIZADAS EN EL TURNO: TOTAL MANO DE OBRA / MANPOWER: Item Descripción / Descripción Cantidad / Quantity Horas / Hours H. Anterior / Previous H. Actual / Actual PRINCIPALES ACTIVIDADES DE CONTROL DE CALIDAD (QC) / MAIN ACTIVITIES OF QUALITY CONTROL (QC): Se llego a mina a las 17:00 horas, se descargaron nuestros equipos en un contenedor designado por el Ing. Raúl Aliaga y se coordino nuestro alojamiento. FIRMA SUPERVISION / SUPERVISION'S SIGNATURE: CARGO / POSITION RESPUESTA DE LA SUPERVISIÓN / SUPERVISION'S ANSWER: SEGURIDAD Y MEDIO AMBIENTE FIRMA CONTRATISTA / CONTRACTOR'S SIGNATURE CARGO / POSITION NOTAS POR EL CONTRATISTA: Aspectos relevantes y/o críticos / NOTES BY THE CONTRACTOR: Relevant and/or critical aspects

Upload: ronald-valle

Post on 06-Nov-2015

84 views

Category:

Documents


2 download

DESCRIPTION

obra reporte diario de instalacion

TRANSCRIPT

  • CMC N DE CONTRATO :

    ENCOTEC SUPERVISIN / SUPERVISION: CAUDALOSA

    A) B)

    H. Anterior /

    Previous

    H. Actual /

    Actual

    H. Acum. /

    Accumulated

    H. Anterior

    Acum. /

    Previous

    H. Actual /

    Actual

    H. Acum.

    Actual /

    Accumulated

    1 Luminaria 00 0.0 0.0 0.0

    1 0 0.0 0.0 0.0 2 01 0.0 0.0 0.0

    2 2 0.0 0.0 0.0 3 01 0.0 0.0 0.0

    3 1 0.0 0.0 0.0 4 02 0.0 0.0 0.0

    3 0.0 0.0 0.0 5 Contenedor 00 0.0 0.0 0.0

    Total / Total: 04

    1 Supervisor / Supervisor 0 0.0 0.0 0.0 1 01 0.0 0.0 0.0

    2 Tcnico / Technician 0 0.0 0.0 0.0 2 01 0.0 0.0 0.0

    3 0 0.0 0.0 0.0 3 01 0.0 0.0 0.0

    0 0.0 0.0 0.0 4 01 0.0 0.0 0.0

    Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 5 01 0.0 0.0 0.0

    1 6 01 0.0 0.0 0.0

    2 7 01 0.0 0.0 0.0

    3 8 01 0.0 0.0 0.0

    4 9 01 0.0 0.0 0.0

    5 10 Cuponera 01 0.0 0.0 0.0

    Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 0.0 0.0 0.0

    1 14

    2 Item

    3 1

    2

    Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu. 3

    1 4

    2 5

    Unid. de Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu.

    1

    Unid. o Med. C.Ant./Q.Prev. C.Act./Q.Act. C.Acum./Q.Accu.

    1 1 Lluvia 0.0 0.0 0.0

    2 2 Nevada 0.0 0.0 0.0

    3 3 Tormenta Elctrica 0.0 0.0 0.0

    4 Total 0.0 0.0 0.0

    5

    6

    7

    8

    9 Directa / Direct: 3 0.0 0.0 0.0

    10 Indirecta / Indirect: 0 0.0 0.0 0.0

    11

    G)

    1.-

    2.-

    3.-

    4.-

    5.-

    H)

    1.-

    2.-

    3.-

    4.-

    5.-

    J)

    1.-

    2.-

    3.-

    K)

    1.-

    2.-

    3.-

    L)

    CONTRATISTA / CONTRACTOR: HORARIO /

    WORKING

    HOURS

    17:00

    REPORTE DIARIO DE OBRA

    PROYECTO / PROJECT: REPARACIONES EN EL DEPOSITO DE RELAVES C FECHA / DATE: 16-04-15

    PROPIETARIO / OWNER:TURNO / SHIFT: Da

    MANO DE OBRA: EQUIPOS / MACHINES:

    Item Descripcin / DescripcinCantidad /

    Quantity

    Horas Hombre / Man hours

    Item Descripcin / DescripcinCantidad /

    Quantity

    Total / Total:

    Indirecta / Indirect:

    Soldadora de Extrusin

    Soldadora de Fusin

    Operador de Equipos Tensimetro

    Horas Mquina / Machine Hours

    Directa / Direct:

    Supervisor Camioneta / Da

    Tcnico Geosintticos

    Operador de Equipos Motobomba / Dia

    Generador / Dia

    Tubera HDPE Corrugada de 6" Perf. Equipo de Prueba de Vaco

    Tubera HDPE Corrugada de 6" No Perf. Equipo de Prueba de Chispa

    Tubera HDPE Corrugada de 4" Perf. Herramientas Manuales, Cables

    Total / Total: Leister

    Sistema de Control de Sub Drenaje Amoladora

    Geotextil NT 200 GR/M2 Equipo de Prueba de Aire

    Geotextil NT 300 GR/M3 H. Equipos / H. Machines: H. Inicio / Previous H. Termino / Previous

    Geomalla Uniaxial de 45 KN/M2 Luminaria 21

    Tubera HDPE Corrugada de 4" No Perf.

    Total / Total:

    Dique Principal Cota 4357 msnm Total Ind. / Total Ind. :

    Geotextil NT 200 GR/M2 Total Equipos:

    Geomembrana LLPE 2.0 mm Luminaria 24

    Geocompuesto con Bentonita GCL Luminaria 25

    Total / Total: Luminaria 22

    Sistema de Impermeabilizacin Luminaria 23

    H. Acum. /

    AccumulatedTrabajos Adicionales

    Cordn de Extrusin (Ml)

    Reparacin con Extrusin (BEAD)

    Parches Menores a 60X60

    Parches Mayores a 60X60

    Total / Total: REPORTE DE CLIMA ADVERSO QUE HAYA IMPEDIDO LOS TRABAJOS / ADVERSE

    WEATHER THAT PREVENTED PLANNED WORK TO BE DONEVertedero de Demasas 2 Etapa

    Inserto de Geomembrana Delta Lock

    Item Descripcin / Description

    Horas / Hours

    Total / Total: H. Anterior / Previous

    H. Actual /

    Actual

    H. Acum. /

    Accumulated

    PRINCIPALES ACTIVIDADES REALIZADAS EN EL TURNO:

    TOTAL MANO DE OBRA / MANPOWER:

    Item Descripcin / DescripcinCantidad /

    Quantity

    Horas / Hours

    H. Anterior /

    Previous

    H. Actual /

    Actual

    PRINCIPALES ACTIVIDADES DE CONTROL DE CALIDAD (QC) / MAIN ACTIVITIES OF QUALITY CONTROL (QC):

    Se llego a mina a las 17:00 horas, se descargaron nuestros equipos en un contenedor designado por el Ing. Ral Aliaga y se coordino nuestro alojamiento.

    FIRMA SUPERVISION / SUPERVISION'S SIGNATURE: CARGO / POSITION

    RESPUESTA DE LA SUPERVISIN / SUPERVISION'S ANSWER:

    SEGURIDAD Y MEDIO AMBIENTE

    FIRMA CONTRATISTA / CONTRACTOR'S SIGNATURE CARGO / POSITION

    NOTAS POR EL CONTRATISTA: Aspectos relevantes y/o crticos / NOTES BY THE CONTRACTOR: Relevant and/or critical aspects