Página 1 de 52 METRADO DE ALMACENES Y OFICINAS DE INVERNADERO ITEM DESCRIPCION UND CANT. MEDIDAS SUB TOTAL LARGO ANCHO ALTURA METRADO DE ESTRUCTURA 02.04 TRAZO Y REPLANTEO 02.04.01 TRAZO Y REPLANTEO PRELIMINAR m2 m2 1.00 Area CAD 209.41 209.41 03 MOVIMIENTO DE TIERRAS 03.01 CORTE MANUAL PARA TERRACERIA H= 0.40 m3 Volumen CAD CORTE MANUAL PARA TERRACERIA H= 0.40 m3 0.40 AREA CAD 106.64 42.66 PARA VEREDAS (H=0.35) 0.35 AREA CAD 8.18 2.86 03.03 EXCAVACION PARA CIMIENTOS, ZAPATAS Y VIGAS DE CIMENTACION m3 PARA ZAPATAS ZAPATAS DE 1.20 x 1.20 x 1.00 m m3 12.00 1.20 1.20 1.00 17.28 PARA CIMIENTOS CORRIDOS EJE 1-1, EJE 2-2, EJE 3-3, EJE 4-4/ EJE A-C m3 4.00 7.20 0.80 1.00 23.04 EJE 5-5/EJE B-C m3 1.00 3.18 0.80 1.00 2.54 EJE 6-6/EJE A-B m3 1.00 2.95 0.80 1.00 2.36 EJE A-A/ EJE 1-2 m3 1.00 2.80 0.80 1.00 2.24 EJE A-A/ EJE 2-3, EJE 3-4 m3 2.00 2.95 0.80 1.00 4.72 EJE A-A/ EJE 4-5 m3 1.00 3.15 0.80 1.00 2.52 EJE A-A/ EJE 5-6 m3 1.00 0.30 0.80 1.00 0.24 EJE B-B/ EJE 4-6 m3 1.00 4.53 0.80 1.00 3.62 EJE C-C/ EJE 1-2 m3 1.00 2.80 0.80 1.00 2.24 EJE C-C/ EJE 2-3,EJE3-4 m3 2.00 2.95 0.80 1.00 4.72 EJE C-C/ EJE 4-5 m3 1.00 3.15 0.80 1.00 2.52 m3 1.00 0.68 0.80 1.00 0.54 CIMIENTOS DE MURO DE H=0.60 m EJE D-D/ EJE 1-6 m3 1.00 18.85 0.50 1.00 9.43 m3 1.00 1.35 0.50 1.00 0.68 m3 1.00 0.55 0.50 1.00 0.28 03.05 BASE DE AFIRMADO PARA PISOS e=25cm m2 Área ALMACEN DE PESTICIDAS Y QUIMICOS m2 1.00 33.83 33.83 ALMACEN DE INSUMOS Y SUSTRATOS m2 1.00 33.92 33.92 ALMACEN DE HERRAMIENTAS Y EQUIPOS m2 1.00 34.92 34.92 OFICINA 1 m2 1.00 23.77 23.77 OFICINA 2 m2 1.00 17.54 17.54 VEREDA m2 1.00 17.80 17.80 03.08 ACARREO DE MATERIAL EXCEDENTE HASTA 40m m3 Idem Partida Elimacion Material Exdente m3 1.00 155.60 03.09 ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA m3 Volumen Coef. Esp. - Idem Partida Excavación de terracería m3 - 45.52 - - Idem Partida Excavación Cimientos, zapataz y vigas de cimentación m3 - 78.96 - - TOTAL DE EXCAVACION m3 124.48 1.25 155.60 04 CONCRETO SIMPLE 04.02 CIMIENTOS Y SUB CIMIENTOS 04.02.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PG m3 EJE 1-1, EJE 2-2, EJE 3-3, EJE 4-4/ EJE A-C m3 4.00 7.20 0.80 0.60 13.82 EJE 5-5/EJE B-C m3 1.00 3.18 0.80 0.60 1.52 EJE 6-6/EJE A-B m3 1.00 2.95 0.80 0.60 1.42 EJE A-A/ EJE 1-2 m3 1.00 2.80 0.80 0.60 1.34 EJE A-A/ EJE 2-3, EJE 3-4 m3 2.00 2.95 0.80 0.60 2.83 EJE A-A/ EJE 4-5 m3 1.00 3.15 0.80 0.60 1.51

Upload: tom-dc

Post on 24-Dec-2015

74 views

Category:

Documents


9 download

DESCRIPTION

Hoja de METRADOS EDIFICACIONES

TRANSCRIPT

Page 1: METRADOS EDIFICACIONES

Página 1 de 50

METRADO DE ALMACENES Y OFICINAS DE INVERNADERO

ITEM DESCRIPCION UND CANT. MEDIDAS

SUB TOTAL TOTAL LARGO ANCHO ALTURA

METRADO DE ESTRUCTURA

02.04 TRAZO Y REPLANTEO

02.04.01 TRAZO Y REPLANTEO PRELIMINAR m2 209.41

m2 1.00 Area CAD 209.41 209.41

03 MOVIMIENTO DE TIERRAS

03.01 CORTE MANUAL PARA TERRACERIA H= 0.40 m3 Volumen CAD 45.52

CORTE MANUAL PARA TERRACERIA H= 0.40 m3 0.40 AREA CAD 106.64 42.66

PARA VEREDAS (H=0.35) 0.35 AREA CAD 8.18 2.86

03.03 EXCAVACION PARA CIMIENTOS, ZAPATAS Y VIGAS DE CIMENTACION m3 78.96

PARA ZAPATAS

ZAPATAS DE 1.20 x 1.20 x 1.00 m m3 12.00 1.20 1.20 1.00 17.28

PARA CIMIENTOS CORRIDOS

EJE 1-1, EJE 2-2, EJE 3-3, EJE 4-4/ EJE A-C m3 4.00 7.20 0.80 1.00 23.04

EJE 5-5/EJE B-C m3 1.00 3.18 0.80 1.00 2.54

EJE 6-6/EJE A-B m3 1.00 2.95 0.80 1.00 2.36

EJE A-A/ EJE 1-2 m3 1.00 2.80 0.80 1.00 2.24

EJE A-A/ EJE 2-3, EJE 3-4 m3 2.00 2.95 0.80 1.00 4.72

EJE A-A/ EJE 4-5 m3 1.00 3.15 0.80 1.00 2.52

EJE A-A/ EJE 5-6 m3 1.00 0.30 0.80 1.00 0.24

EJE B-B/ EJE 4-6 m3 1.00 4.53 0.80 1.00 3.62

EJE C-C/ EJE 1-2 m3 1.00 2.80 0.80 1.00 2.24

EJE C-C/ EJE 2-3,EJE3-4 m3 2.00 2.95 0.80 1.00 4.72

EJE C-C/ EJE 4-5 m3 1.00 3.15 0.80 1.00 2.52

m3 1.00 0.68 0.80 1.00 0.54

CIMIENTOS DE MURO DE H=0.60 m

EJE D-D/ EJE 1-6 m3 1.00 18.85 0.50 1.00 9.43

m3 1.00 1.35 0.50 1.00 0.68

m3 1.00 0.55 0.50 1.00 0.28

03.05 BASE DE AFIRMADO PARA PISOS e=25cm m2 161.75

Área

ALMACEN DE PESTICIDAS Y QUIMICOS m2 1.00 33.83 33.83

ALMACEN DE INSUMOS Y SUSTRATOS m2 1.00 33.92 33.92

ALMACEN DE HERRAMIENTAS Y EQUIPOS m2 1.00 34.92 34.92

OFICINA 1 m2 1.00 23.77 23.77

OFICINA 2 m2 1.00 17.54 17.54

VEREDA m2 1.00 17.80 17.80

03.08 ACARREO DE MATERIAL EXCEDENTE HASTA 40m m3 155.60

Idem Partida Elimacion Material Exdente m3 1.00 155.60

03.09 ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA m3 155.60

Volumen Coef. Esp. -

Idem Partida Excavación de terracería m3 - 45.52 - -

Idem Partida Excavación Cimientos, zapataz y vigas de cimentación m3 - 78.96 - -

TOTAL DE EXCAVACION m3 124.48 1.25 155.60

04 CONCRETO SIMPLE

04.02 CIMIENTOS Y SUB CIMIENTOS

04.02.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PG m3 34.93

EJE 1-1, EJE 2-2, EJE 3-3, EJE 4-4/ EJE A-C m3 4.00 7.20 0.80 0.60 13.82

EJE 5-5/EJE B-C m3 1.00 3.18 0.80 0.60 1.52

EJE 6-6/EJE A-B m3 1.00 2.95 0.80 0.60 1.42

EJE A-A/ EJE 1-2 m3 1.00 2.80 0.80 0.60 1.34

EJE A-A/ EJE 2-3, EJE 3-4 m3 2.00 2.95 0.80 0.60 2.83

EJE A-A/ EJE 4-5 m3 1.00 3.15 0.80 0.60 1.51

EJE A-A/ EJE 5-6 m3 1.00 0.30 0.80 0.60 0.14

Page 2: METRADOS EDIFICACIONES

Página 2 de 50

METRADO DE ALMACENES Y OFICINAS DE INVERNADERO

ITEM DESCRIPCION UND CANT. MEDIDAS

SUB TOTAL TOTAL LARGO ANCHO ALTURA

EJE B-B/ EJE 4-6 m3 1.00 4.53 0.80 0.60 2.17

EJE C-C/ EJE 1-2 m3 1.00 2.80 0.80 0.60 1.34

EJE C-C/ EJE 2-3,EJE3-4 m3 2.00 2.95 0.80 0.60 2.83

EJE C-C/ EJE 4-5 m3 1.00 3.15 0.80 0.60 1.51

m3 1.00 0.68 0.80 0.60 0.32

CIMIENTOS DE MURO DE H=0.60 m

EJE D-D/ EJE 1-6 m3 1.00 18.85 0.50 0.40 3.77

1.00 1.35 0.50 0.40 0.27

1.00 0.55 0.50 0.40 0.11

04.02.02 SOLADOS DE e=4" m2 78.95

ZAPATAS m2 12.00 1.20 1.20 17.28

CIMIENTOS m2 1.00 64.12 0.80 51.30

CIMIENTOS DE MURO DE H=0.60 m m2 1.00 20.75 0.50 10.38

04.03 SOBRECIMIENTO

04.03.01 CONCRETO CICLOPEO f'c= 100 kg/cm2 PARA SOBRECIMIENTOS e=0.24m m3 5.14

EJE 1-1/ EJE A-C m3 1.00 7.90 0.15 0.35 0.41

EJE 2-2/EJE A-C m3 1.00 7.90 0.15 0.35 0.41

EJE 3-3/EJE A-C m3 1.00 7.90 0.15 0.35 0.41

EJE 4-4/EJE A-C m3 1.00 7.90 0.15 0.35 0.41

EJE 5-5/EJE B-C m3 1.00 2.90 0.15 0.35 0.15

EJE 6-6/EJE A-B m3 1.00 3.85 0.15 0.35 0.20

EJE A-A/ EJE 1-2 m3 1.00 2.50 0.15 0.35 0.13

EJE A-A/ EJE 2-3, EJE 3-4 m3 2.00 2.50 0.15 0.35 0.26

EJE A-A/ EJE 4-5 m3 1.00 3.90 0.15 0.35 0.20

EJE A-A/ EJE 5-6 m3 1.00 1.20 0.15 0.35 0.06

EJE B-B/ EJE 4-6 m3 1.00 3.30 0.15 0.35 0.17

EJE C-C/ EJE 1-2 m3 1.00 2.50 0.15 0.35 0.13

EJE C-C/ EJE 2-3,EJE3-4 m3 2.00 2.50 0.15 0.35 0.26

EJE C-C/ EJE 4-5 m3 1.00 3.00 0.15 0.35 0.16

m3 1.00 1.15 0.15 0.35 0.06

P1 m3 6.00 1.20 0.15 0.30 0.32

P2 m3 3.00 0.90 0.15 0.30 0.12

MURO DE H=0.60 m

EJE D-D/ EJE 1-6 m3 1.00 14.55 0.15 0.50 1.09

1.00 1.35 0.15 0.50 0.10

1.00 0.55 0.15 0.50 0.04

04.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO m2 68.52

EJE 1-1/ EJE A-C m2 2.00 7.90 0.35 5.53

EJE 2-2/EJE A-C m2 2.00 7.90 0.35 5.53

EJE 3-3/EJE A-C m2 2.00 7.90 0.35 5.53

EJE 4-4/EJE A-C m2 2.00 7.90 0.35 5.53

EJE 5-5/EJE B-C m2 2.00 2.90 0.35 2.03

EJE 6-6/EJE A-B m2 2.00 3.85 0.35 2.70

EJE A-A/ EJE 1-2 m2 2.00 2.50 0.35 1.75

EJE A-A/ EJE 2-3, EJE 3-4 m2 4.00 2.50 0.35 3.50

EJE A-A/ EJE 4-5 m2 2.00 3.90 0.35 2.73

EJE A-A/ EJE 5-6 m2 2.00 1.20 0.35 0.84

EJE B-B/ EJE 4-6 m2 2.00 3.30 0.35 2.31

EJE C-C/ EJE 1-2 m2 2.00 2.50 0.35 1.75

EJE C-C/ EJE 2-3,EJE3-4 m2 4.00 2.50 0.35 3.50

EJE C-C/ EJE 4-5 m2 2.00 3.00 0.35 2.10

m2 2.00 1.15 0.35 0.80

P1 m2 12.00 1.20 0.30 4.32

P2 m2 6.00 0.90 0.30 1.62

CIMIENTOS DE MURO DE H=0.60 m

EJE D-D/ EJE 1-6 m2 2.00 14.55 0.50 14.55

m2 2.00 1.35 0.50 1.35

Page 3: METRADOS EDIFICACIONES

Página 3 de 50

METRADO DE ALMACENES Y OFICINAS DE INVERNADERO

ITEM DESCRIPCION UND CANT. MEDIDAS

SUB TOTAL TOTAL LARGO ANCHO ALTURA

m2 2.00 0.55 0.50 0.55

04.04 FALSO PISO

04.04.01 FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E=4" m2 161.75

Área

ALMACEN DE PESTICIDAS Y QUIMICOS m2 1.00 33.83 33.83

ALMACEN DE INSUMOS Y SUSTRATOS m2 1.00 33.92 33.92

ALMACEN DE HERRAMIENTAS Y EQUIPOS m2 1.00 34.92 34.92

OFICINA 1 m2 1.00 23.77 23.77

OFICINA 2 m2 1.00 17.54 17.54

VEREDA m2 1.00 17.80 17.80

05 CONCRETO ARMADO

05.02 ZAPATAS

05.02.01 CONCRETO PARA ZAPATAS f'c=210kg/cm2 m3 10.37

m3 12.00 1.20 1.20 0.60 10.37

05.02.02 ACERO fy=4200 kg/cm2 GRADO 60 en ZAPATAS kg 210.25

Ver Formato de Acero AC A-1 kg 210.25

05.05 COLUMNAS

05.05.01 CONCRETO EN COLUMNAS Y PLACAS f'c=210 kg/cm2 m3 3.66

C-1 m3 12.00 0.30 0.30 3.05 3.29

C-2 m3 4.00 0.20 0.15 3.05 0.37

05.05.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS Y PLACAS m2 104.92

Perímetro

C-1 m3 24.00 1.20 3.05 87.84

C-2 m3 8.00 0.70 3.05 17.08

05.05.04 ACERO fy=4200 kg/cm2 GRADO 60 EN COLUMNAS Y PLACAS kg 725.16

Ver Formato de Acero AC A-1 kg 725.16

05.06 VIGAS

05.06.01 CONCRETO EN VIGAS DE AMARRE f'c=210 kg/cm2 m3 4.52

PRIMER TECHO

V-A

EJE A-A m3 1.00 18.15 0.30 0.25 1.36

EJE C-C m3 1.00 16.95 0.30 0.25 1.27

EJE 6-6 m3 1.00 4.15 0.25 0.65 0.67

V-A1

EJE 1-1 m3 1.00 8.10 0.15 0.25 0.30

EJE 2-2 m3 1.00 8.10 0.15 0.25 0.30

EJE 3-3 m3 1.00 8.10 0.15 0.25 0.30

EJE 4-4 m3 1.00 8.10 0.15 0.25 0.30

05.06.04 ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS kg 593.51

Ver Formato de Acero AC A-1 kg 593.51

05.07 COLUMNAS DE CONFINAMIENTO

05.07.01 CONCRETO EN COLUMNAS DE CONFINAMIENTO f'c=175 kg/cm2 m3 0.81

PRIMER NIVEL

C-a

EJE A-A m3 4.00 0.15 0.15 2.75 0.25

EJE B-B m3 3.00 0.15 0.15 2.75 0.19

EJE 5-5 m3 1.00 0.15 0.15 2.75 0.06

EJE C-C m3 4.00 0.15 0.15 2.75 0.25

EJE D-D m3 1.00 0.15 0.15 3.00 0.07

Page 4: METRADOS EDIFICACIONES

Página 4 de 50

METRADO DE ALMACENES Y OFICINAS DE INVERNADERO

ITEM DESCRIPCION UND CANT. MEDIDAS

SUB TOTAL TOTAL LARGO ANCHO ALTURA

05.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS DE CONFINAMIE m2 44.10

PRIMER NIVEL

C-a

EJE A-A m2 8.00 0.60 2.75 13.20

EJE B-B m2 6.00 0.60 3.00 10.80

EJE 5-5 m2 2.00 0.60 2.75 3.30

EJE C-C m2 8.00 0.60 2.75 13.20

EJE D-D m2 2.00 0.60 3.00 3.60

05.07.03 ACERO fy=4200 kg/cm2 GRADO 60 en COLUMNAS DE CONFINAMIENTO kg 117.58

Ver Formato de Acero AC C-1 kg 117.58

06 MUROS Y TABIQUES DE ALBAÑILERIA

06.01 MURO DE LADRILLLO KK 18 HUECOS SOGA m2 155.44

PRIMER NIVEL

EJE 1-1/ EJE A-C m2 1.00 7.90 2.75 21.73

EJE 2-2/EJE A-C m2 1.00 7.90 2.75 21.73

EJE 3-3/EJE A-C m2 1.00 7.90 2.75 21.73

EJE 4-4/EJE A-C m2 1.00 7.90 2.75 21.73

EJE 5-5/EJE B-C m2 1.00 2.90 2.75 7.98

EJE 6-6/EJE A-B m2 1.00 3.85 2.75 10.59

EJE A-A/ EJE 1-2 m2 1.00 2.35 1.85 4.35

EJE A-A/ EJE 2-3, EJE 3-4 m2 2.00 2.50 1.85 9.25

EJE A-A/ EJE 4-5 m2 1.00 3.00 1.00 3.00

m2 1.00 0.90 2.75 2.48

EJE A-A/ EJE 5-6 m2 1.00 1.20 1.85 2.22

EJE B-B/ EJE 4-6 m2 1.00 3.15 1.85 5.83

m2 1.00 0.15 2.75 0.41

EJE C-C/ EJE 1-2 m2 1.00 2.35 1.85 4.35

EJE C-C/ EJE 2-3,EJE3-4 m2 2.00 2.50 1.85 9.25

EJE C-C/ EJE 4-5 m2 1.00 2.85 1.85 5.27

m2 1.00 0.15 2.75 0.41

m2 1.00 1.15 2.75 3.16

06.02 MURO DE LADRILLLO KK 18 HUECOS CANTO m2 9.87

EJE D-D/ EJE 1-6 m3 1.00 14.55 0.60 8.73

1.00 1.35 0.60 0.81

1.00 0.55 0.60 0.33

06.03 ACERO DE REFUERZO kg 70.80

Ver Formato de Acero AC A kg 70.80

Page 5: METRADOS EDIFICACIONES

Página 5 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"

05.02.03. ZAPATAS

Z-1 1.05

(As Transversal) 1/2" 1 8 1.05 8.40

1/2" 1 38 0.00 0.00

5/8" 1 32 0.00 0.00

5/8" 1 32 0.00 0.00

con traslape (As Longitudinal) 5/8" 1 9 0.00 0.00

con traslape 5/8" 1 12 0.00 0.00

5/8" 1 4 0.00 0.00

Peso en Kilogramos por metro 0.25 0.20 0.40 0.56 0.99 1.55 2.24 3.97 TOTAL

Longitud Total por Ø en metros 0.00 0.00 0.00 0.00 8.40 0.00 0.00 0.00 EN KG

Total en Kilogramos por Ø 0.00 0.00 0.00 0.00 8.32 0.00 0.00 0.00 8.32

05.03.03. VIGA DE CIMENTACION

VC-101A, 102A, 103A, VC-104A

(As Longitudinal) 0.30 14.57 0.30 3/4" 1 2 15.17 30.34

(As Longitudinal) 0.30 14.57 0.30 3/4" 1 2 15.17 30.34

5.55 5/8" 1 6 5.55 33.30

0.30 15.07 0.30 8mm 1 2 15.67 31.34

N° ELEM.

Page 6: METRADOS EDIFICACIONES

Página 6 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

3.00 5/8" 1 3 3.00 9.00

3.10 5/8" 1 3 3.10 9.30

3.00 5/8" 1 3 3.00 9.00

(As Transversal)

1.70 3/8" 16 79 1.70 2148.80

VC-105A, 106A, 107A, VC-1084A

con traslape (As Longitudinal) 0.30 16.90 0.30 3/4" 1 2 17.50 35.00

(As Longitudinal) 0.30 16.90 0.30 8mm 1 2 17.50 35.00

5.55 5/8" 1 6 5.55 33.30

0.30 16.90 0.30 3/4" 1 2 17.50 35.00

3.00 5/8" 1 3 3.00 9.00

3.10 5/8" 1 3 3.10 9.30

3.00 5/8" 1 3 3.00 9.00

(As Transversal)

1.70 3/8" 1 90 1.70 153.00

VC-109A

con traslape (As Longitudinal) 0.30 10.63 0.30 3/4" 1 2 11.23 22.46

Page 7: METRADOS EDIFICACIONES

Página 7 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

(As Longitudinal) 0.30 10.63 0.30 8mm 1 2 11.23 22.46

2.95 3/4" 1 6 2.95 17.70

0.30 10.63 0.30 3/4" 1 2 11.23 22.46

(As Transversal)

2.50 3/8" 1 41 2.50 102.50

VC-101e, VC-102e

con traslape (As Longitudinal) 0.30 9.90 0.30 3/4" 1 2 10.50 21.00

5.70 3/4" 1 4 5.70 22.80

0.30 9.90 0.30 3/4" 1 2 10.50 21.00

(As Transversal)

2.50 3/8" 1 38 2.50 95.00

VC-103e

con traslape (As Longitudinal) 0.30 3.53 0.30 3/4" 1 4 4.13 16.52

0.30 3.53 0.30 3/4" 1 2 4.13 8.26

(As Transversal)

2.50 3/8" 1 15 2.50 37.50

VC-104e

con traslape (As Longitudinal) 0.30 3.53 0.30 5/8" 1 4 4.13 16.52

Page 8: METRADOS EDIFICACIONES

Página 8 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

0.30 3.53 0.30 5/8" 1 2 4.13 8.26

(As Transversal)

2.50 3/8" 1 18 2.50 45.00

VC-105e

con traslape (As Longitudinal) 0.30 3.53 0.30 3/4" 3 4 4.13 49.56

0.30 3.53 0.30 3/4" 3 2 4.13 24.78

(As Transversal)

2.50 3/8" 3 16 2.50 120.00

SCR-101A

con traslape (As Longitudinal) 0.30 7.35 0.30 5/8" 3 2 7.95 47.70

0.30 7.35 0.30 5/8" 3 2 7.95 47.70

(As Transversal)

1.65 3/8" 3 33 1.65 163.35

Peso en Kilogramos por metro 0.25 0.20 0.40 0.56 0.99 1.55 2.24 3.97 TOTAL

Longitud Total por Ø en metros 0.00 0.00 88.80 2865.15 0.00 241.38 357.22 0.00 EN KG

Total en Kilogramos por Ø 0.00 0.00 35.52 1604.48 0.00 374.14 800.17 0.00 2,814.32

05.04.03. SOBRECIMIENTO ARMADO

Eje B

Page 9: METRADOS EDIFICACIONES

Página 9 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

(As Longitudinal) 0.15 7.44 0.15 5/8" 1 4 7.74 30.96

(As Transversal) 1.43 8mm 1 38 1.43 54.34

Eje C

(As Longitudinal) 0.15 7.44 0.15 5/8" 1 4 7.74 30.96

(As Transversal) 1.43 8mm 1 38 1.43 54.34

Eje D

(As Longitudinal) 0.15 7.44 0.15 5/8" 1 4 7.74 30.96

(As Transversal) 1.43 8mm 1 38 1.43 54.34

Entre eje 20 y 21

(As Longitudinal) 0.15 3.71 0.15 5/8" 1 4 4.01 16.04

(As Transversal) 1.43 8mm 1 19 1.43 27.17

(As Longitudinal) 0.15 3.87 0.15 5/8" 1 4 4.17 16.68

(As Transversal) 1.43 8mm 1 19 1.43 27.17Eje 20

(As Longitudinal) 0.15 2.34 0.15 5/8" 1 4 2.64 10.56

(As Transversal) 1.43 8mm 1 15 1.43 21.45Eje 21

(As Longitudinal) 0.15 3.74 0.15 5/8" 1 4 4.04 16.16

Page 10: METRADOS EDIFICACIONES

Página 10 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

(As Transversal) 1.43 8mm 1 19 1.43 27.17Entre eje 20 y 21

(As Longitudinal) 0.15 1.54 0.15 5/8" 2 4 1.84 14.72

(As Transversal) 1.43 8mm 2 9 1.43 25.74

Peso en Kilogramos por metro 0.25 0.20 0.20 0.56 0.99 1.55 2.24 3.97 TOTAL

Longitud Total por Ø en metros 0.00 0.00 291.72 0.00 0.00 167.04 0.00 0.00 EN KG

Total en Kilogramos por Ø 0.00 0.00 58.34 0.00 0.00 258.91 0.00 0.00 317.26

05.05.04 COLUMNAS

C-01A 0.30

10.92 3/4" 4 8 11.52 368.64

0.30

1.25 3/8" 4 71 1.25 355.00

0.45 3/8" 4 142 0.45 255.60

C-02 A0.30

10.92 3/4" 6 10 11.52 691.20

0.30

1.10 3/8" 6 71 1.10 468.60

Page 11: METRADOS EDIFICACIONES

Página 11 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

1.25 3/8" 6 71 1.25 532.50

C-03A0.30

10.92 5/8" 4 4 11.52 184.32

0.30

0.85 3/8" 8 71 0.85 482.80

Peso en Kilogramos por metro li 0.25 0.20 0.40 0.56 0.99 1.55 2.24 3.97 TOTAL

Longitud Total por Ø en metros 0.00 0.00 0.00 2094.50 0.00 184.32 1059.84 0.00 EN KG

Total en Kilogramos por Ø 0.00 0.00 0.00 1172.92 0.00 285.70 2374.04 0.00 3,832.66

05.06.04 VIGAS

V-101A, 201A, 301A

0.25 7.4 0.25 1/2" 3 2 7.90 47.40

0.25 7.4 0.25 1/2" 3 2 7.90 47.40

1.15 3/8" 3 38 1.15 131.10

Page 12: METRADOS EDIFICACIONES

Página 12 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

V-102A, V-103A, V-202A, V-203A

0.25 9.35 0.25 3/4" 2 2 9.85 39.40

0.25 9.35 0.25 3/4" 2 2 9.85 39.40

9.40 8mm 2 2 9.40 37.60

1.70 3/8" 2 52 1.70 176.80

V-302A, V-303A

0.25 9.35 0.25 3/4" 1 2 9.85 19.70

0.25 9.35 0.25 3/4" 1 2 9.85 19.70

9.40 8mm 1 2 9.40 18.80

1.70 3/8" 1 52 1.70 88.40

V-104A, V-105A

0.25 9.35 0.25 3/4" 1 2 9.85

0.25 9.35 0.25 5/8" 1 1 9.85 9.85

0.25 9.35 0.25 5/8" 1 2 9.85 19.70

9.40 8mm 1 2 9.40 18.80

1.70 3/8" 1 52 1.70 88.40

Page 13: METRADOS EDIFICACIONES

Página 13 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

V-204A, V-205A

0.25 9.35 0.25 3/4" 1 2 9.85

0.25 9.35 0.25 5/8" 1 1 9.85 9.85

0.25 9.35 0.25 5/8" 1 2 9.85 19.70

9.35 8mm 1 2 9.35 18.70

0.25 2.17 0.25 5/8" 1 2 2.67 5.34

1.70 3/8" 1 56 1.70 95.20

V-304A, V-305A

0.25 9.35 0.25 5/8" 1 2 9.85 19.70

0.25 9.35 0.25 1/2" 1 1 9.85 9.85

0.25 9.35 0.25 1/2" 1 2 9.85 19.70

0.25 2.17 0.25 5/8" 1 2 2.67 5.34

1.70 3/8" 1 56 1.70 95.20

V-106A, V-107A, V-206A, V-207A

0.25 9.35 0.25 3/4" 1 2 9.85 19.70

5 3/4" 1 1 5.00 5.00

Page 14: METRADOS EDIFICACIONES

Página 14 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

2.45 3/4" 1 1 2.45 2.45

0.25 9.35 0.25 3/4" 1 2 9.85 19.70

9.40 8mm 1 2 9.40 18.80

1.70 3/8" 1 52 1.70 88.40

V-106A, V-107A, V-206A, V-207A

0.25 9.35 0.25 3/4" 2 2 9.85 39.40

5 3/4" 2 1 5.00 10.00

0.25 9.35 0.25 3/4" 2 2 9.85 39.40

9.40 8mm 2 2 9.40 37.60

1.70 3/8" 2 52 1.70 176.80

V-306A, V-307A

0.25 9.35 0.25 3/4" 1 2 9.85 19.70

5 3/4" 1 1 5.00 5.00

0.25 9.35 0.25 3/4" 1 2 9.85 19.70

9.40 8mm 1 2 9.40 18.80

Page 15: METRADOS EDIFICACIONES

Página 15 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

1.70 3/8" 1 52 1.70 88.40

V-108A, V-109A

0.25 9.35 0.25 5/8" 1 2 9.85 19.70

5 5/8" 1 1 5.00 5.00

0.25 9.6 0.25 1/2" 1 2 10.10 20.20

0.25 2.17 0.25 5/8" 1 2 2.67 5.34

1.70 3/8" 1 56 1.70 95.20

V-308A, V-309A

0.25 9.35 0.25 5/8" 1 2 9.85 19.70

5 5/8" 1 1 5.00 5.00

0.25 9.6 0.25 1/2" 1 2 10.10 20.20

0.25 2.17 0.25 5/8" 1 2 2.67 5.34

1.70 3/8" 1 56 1.70 95.20

V-113A, V-213A, V-114A, V-214A

0.25 14.5 0.25 3/4" 2 2 15.00 60.00

3.00 3/4" 2 3 3.00

Page 16: METRADOS EDIFICACIONES

Página 16 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

0.25 14.5 0.25 3/4" 2 2 15.00 60.00

3.00 3/4" 2 3 3.00

1.70 3/8" 2 52 1.70 176.80

V-313A, V-314A, V-315A, V-316A

0.25 14.5 0.25 5/8" 1 2 15.00 30.00

3.00 5/8" 1 3 3.00

0.25 14.5 0.25 5/8" 1 2 15.00 30.00

3.00 5/8" 1 3 3.00

1.70 3/8" 1 52 1.70 88.40

V-303e

0.25 3.54 0.25 1/2" 1 3 4.04 12.12

3.00 8mm 1 2 3.00 6.00

0.25 3.54 0.25 1/2" 1 3 4.04 12.12

1.70 3/8" 1 24 1.70 40.80

V-304e

0.25 3.54 0.25 1/2" 1 3 4.04 12.12

Page 17: METRADOS EDIFICACIONES

Página 17 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

3.00 8mm 1 2 3.00 6.00

0.25 3.54 0.25 1/2" 1 3 4.04 12.12

1.70 3/8" 1 23 1.70 39.10

V-104e, V-204e

0.25 3.54 0.25 1/2" 2 1 4.04 8.08

0.25 3.54 0.25 5/8" 2 2 4.04 16.16

3.00 8mm 2 2 3.00 12.00

0.25 3.54 0.25 1/2" 2 3 4.04 24.24

1.70 3/8" 2 24 1.70 81.60

V-104e, V-204e, V-101e, V-301e

0.25 3.54 0.25 1/2" 3 1 4.04 12.12

0.25 3.54 0.25 5/8" 3 2 4.04 24.24

3.00 8mm 3 2 3.00 18.00

0.25 3.54 0.25 1/2" 3 3 4.04 36.36

1.70 3/8" 3 24 1.70 122.40

Page 18: METRADOS EDIFICACIONES

Página 18 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

Peso en Kilogramos por metro 0.25 0.20 0.40 0.56 0.99 1.55 2.24 3.97 TOTAL

Longitud Total por Ø en metros 0.00 0.00 211.10 1768.20 294.03 249.96 418.25 0.00 EN KG

Total en Kilogramos por Ø 0.00 0.00 84.44 990.19 291.09 387.44 936.88 0.00 2,690.04

05.07.03. COLUMNETAS

PRIMER NIVEL

C-A1 0.25

3.80 1/2" 28 2 4.30 240.80

0.25

0.74 1/4" 28 19 0.74 393.68

C-A2 0.15

3.80 3/8" 2 2 3.95 15.80

0.25

0.74 6mm 2 15 0.74 22.79

SEGUNDO NIVEL

C-A1 0.25

2.65 1/2" 22 4 3.15 277.20

0.25

0.74 1/4" 22 19 0.74 309.32

Page 19: METRADOS EDIFICACIONES

Página 19 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

TERCER NIVEL

C-A1 0.25

2.65 1/2" 22 4 3.15 277.20

0.25

0.74 1/4" 22 19 0.74 309.32

SOBRE EL TERCER TECHO

C-A1 0.25

0.65 1/2" 16 4 1.15 73.60

0.25

0.74 1/4" 16 19 0.74 224.96

Peso en Kilogramos por metro 0.25 0.20 0.40 0.56 0.99 1.55 2.24 3.97 TOTAL

Longitud Total por Ø en metros 1237.28 22.79 0.00 15.80 868.80 0.00 0.00 0.00 EN KG

Total en Kilogramos por Ø 309.32 4.56 0.00 8.85 860.11 0.00 0.00 0.00 1,182.84

05.08.03. VIGAS DE CONFINAMIENTO

PRIMER NIVEL

Eje 20

0.10 1.70 0.10 3/8" 3 4 1.90 22.80

Estribos 0.61 1/4" 3 14 0.61 25.62

Page 20: METRADOS EDIFICACIONES

Página 20 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

0.10 2.70 0.10 3/8" 1 4 2.90 11.60

Estribos 0.61 1/4" 1 24 0.61 14.64

Eje 21

0.10 1.70 0.10 3/8" 4 4 1.90 30.40

Estribos 0.61 1/4" 4 14 0.61 34.16

Entre eje 20 - 21

0.10 3.00 0.10 3/8" 1 4 3.20 12.80

Estribos 0.61 1/4" 1 21 0.61 12.81

Eje B

0.10 2.50 0.10 3/8" 1 4 2.70 10.80

Estribos 0.61 1/4" 1 24 0.61 14.64

0.10 3.30 0.10 3/8" 1 4 3.50 14.00

Estribos 0.43 1/4" 1 24 0.43 10.32

Entre eje B - C

0.10 2.60 0.10 3/8" 1 4 2.80 11.20

Estribos 0.61 1/4" 1 21 0.61 12.81

Entre eje C - D

0.10 2.30 0.10 3/8" 1 4 2.50 10.00

Estribos 0.61 1/4" 1 21 0.61 12.81

Entre eje C - D

0.10 2.70 0.10 3/8" 1 4 2.90 11.60

Page 21: METRADOS EDIFICACIONES

Página 21 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

Estribos 0.61 1/4" 1 21 0.61 12.81

0.10 3.70 0.10 3/8" 1 4 3.90 15.60

Estribos 0.61 1/4" 1 21 0.61 12.81

0.10 1.14 0.10 3/8" 1 4 1.34 5.36

Estribos 0.61 1/4" 1 21 0.61 12.81

Eje B

0.10 6.70 0.10 3/8" 1 4 6.90 27.60

Estribos 0.61 1/4" 1 50 0.61 30.50

SEGUNDO NIVEL

Eje 20

0.10 1.70 0.10 3/8" 3 4 1.90 22.80

Estribos 0.61 1/4" 3 14 0.61 25.62

0.10 2.70 0.10 3/8" 1 4 2.90 11.60

Estribos 0.61 1/4" 1 24 0.61 14.64

Eje 21

0.10 1.70 0.10 3/8" 4 4 1.90 30.40

Estribos 0.61 1/4" 4 14 0.61 34.16

TERCER NIVEL

Eje 20

Page 22: METRADOS EDIFICACIONES

Página 22 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

0.10 1.70 0.10 3/8" 3 4 1.90 22.80

Estribos 0.61 1/4" 3 14 0.61 25.62

0.10 2.70 0.10 3/8" 1 4 2.90 11.60

Estribos 0.61 1/4" 1 24 0.61 14.64

Eje 21

0.10 1.70 0.10 3/8" 4 4 1.90 30.40

Estribos 0.61 1/4" 4 14 0.61 34.16

PARAPERO SOBRE TERCER NIVEL

Eje A

0.10 7.44 0.10 3/8" 1 4 7.64 30.56

Estribos 0.61 1/4" 1 38 0.61 23.18

Eje B

0.10 2.14 0.10 3/8" 1 4 2.34 9.36

Estribos 0.61 1/4" 1 16 0.61 9.76

Eje F

0.10 9.39 0.10 3/8" 1 4 9.59 38.36

Estribos 0.61 1/4" 1 48 0.61 29.28

Eje G

0.10 8.25 0.10 3/8" 1 4 8.45 33.80

Estribos 0.61 1/4" 1 55 0.61 33.55

Eje H

Page 23: METRADOS EDIFICACIONES

Página 23 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

0.10 8.25 0.10 3/8" 1 4 8.45 33.80

Estribos 0.61 1/4" 1 55 0.61 33.55

Eje 18

0.10 3.59 0.10 3/8" 1 4 3.79 15.16

Estribos 0.61 1/4" 1 15 0.61 9.15

Eje 21

0.10 14.70 0.10 3/8" 1 4 14.90 59.60

Estribos 0.61 1/4" 1 80 0.61 48.80

Eje 20

0.10 3.77 0.10 3/8" 1 4 3.97 15.88

Estribos 0.61 1/4" 1 20 0.61 12.20

Entre eje 20 - 21

0.10 3.59 0.10 3/8" 1 4 3.79 15.16

Estribos 0.61 1/4" 1 15 0.61 9.15

PARAPETO BALCON

0.10 11.02 0.10 3/8" 1 4 11.22 44.88

Estribos 0.61 1/4" 1 60 0.61 36.60

Peso en Kilogramos por metro 0.25 0.20 0.40 0.56 0.99 1.55 2.24 3.97 TOTAL

Longitud Total por Ø en metros 600.80 0.00 0.00 609.92 0.00 0.00 0.00 0.00 EN KG

Total en Kilogramos por Ø 150.20 0.00 0.00 341.56 0.00 0.00 0.00 0.00 491.76

Page 24: METRADOS EDIFICACIONES

Página 24 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

05.10.03 LOSA ALIGERADA

PRIMER TECHO

Paño A 0.15 1.08 3/8" 1 9 1.23 11.07

1.08 0.15 1 9 1.23 11.07

0.15 0.15

3.55 1/2" 2 9 3.85 69.30

Paño A2

0.15 1.08 3/8" 1 5 1.23 6.15

1.08 0.15 1 5 1.23 6.15

2.55 1/2" 1 10 2.55 25.50

0.15 4.20 1/2" 1 5 4.35 21.75

4.22 0.15 1/2" 1 5 4.37 21.85

Paño A1

0.15 1.08 3/8" 1 18 1.23 22.14

1.08 0.15 1 18 1.23 22.14

2.55 1/2" 1 54 2.55 137.70

0.15 7.82 3/8" 1 18 7.97 143.46

4.22 0.15 1 18 4.37 78.66

3/8"

3/8"

3/8"

3/8"

Page 25: METRADOS EDIFICACIONES

Página 25 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

Acero de T°

4.00 1/4" 1 13 4.00 52.00

1.98 1/4" 1 42 1.98 83.16

7.42 1/4" 1 56 7.42 415.52

SEGUNDO TECHO

Paño A 0.15 1.08 3/8" 1 9 1.23 11.07

1.08 0.15 1 9 1.23 11.07

0.15 0.15

3.55 1/2" 2 9 3.85 69.30

Paño B

0.15 1.08 3/8" 1 5 1.23 6.15

1.08 0.15 1 5 1.23 6.15

2.55 1/2" 1 10 2.55 25.50

0.15 4.20 1/2" 1 5 4.35 21.75

4.22 0.15 1/2" 1 5 4.37 21.85

Paño A

0.15 1.08 3/8" 1 18 1.23 22.14

1.08 0.15 1 18 1.23 22.14

2.55 1/2" 1 54 2.55 137.70

3/8"

3/8"

3/8"

Page 26: METRADOS EDIFICACIONES

Página 26 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

0.15 7.82 3/8" 1 18 7.97 143.46

4.22 0.15 1 18 4.37 78.66

Acero de T°

4.00 1/4" 1 13 4.00 52.00

1.98 1/4" 1 42 1.98 83.16

7.42 1/4" 1 56 7.42 415.52

TERCER TECHO

Paño A 0.15 1.08 3/8" 1 19 1.23 23.37

1.08 0.15 1 19 1.23 23.37

0.15 0.15

3.55 1/2" 2 19 3.85 146.30

Paño A2

0.15 1.08 3/8" 1 5 1.23 6.15

1.08 0.15 1 5 1.23 6.15

2.55 3/8" 1 10 2.55 25.50

0.15 4.20 3/8" 1 5 4.35 21.75

4.22 0.15 1/2" 1 5 4.37 21.85

Paño A1

3/8"

3/8"

3/8"

Page 27: METRADOS EDIFICACIONES

Página 27 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

0.15 1.08 3/8" 1 18 1.23 22.14

1.08 0.15 1 18 1.23 22.14

2.55 1 54 2.55 137.70

0.15 7.82 3/8" 1 18 7.97 143.46

4.22 0.15 1 18 4.37 78.66

Acero de T°

4.00 1/4" 1 13 4.00 52.00

1.98 1/4" 1 42 1.98 83.16

7.42 1/4" 1 56 7.42 415.52

3/8"

3/8"

3/8"

Page 28: METRADOS EDIFICACIONES

Página 28 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

Peso en Kilogramos por metro 0.25 0.20 0.40 0.56 0.99 1.55 2.24 3.97 TOTAL

Longitud Total por Ø en metros 1652.04 0.00 0.00 1112.07 720.35 0.00 0.00 0.00 EN KG

Total en Kilogramos por Ø 413.01 0.00 0.00 622.76 713.15 0.00 0.00 0.00 1,748.92

05.11.03 ESCALERAS

TRAMO 1

As. Longitudinal

4.55 1/2" 1 8 4.55 36.40

1.79 1/2" 1 8 1.79 14.32

2.28 1/2" 1 8 2.28 18.24

2.07 1/2" 1 8 2.07 16.56

As. Transversal

pasos 1.55 3/8" 1 5 1.55 7.75

1.55 1/2" 1 24 1.55 37.20

TRAMO 2 y 4

Page 29: METRADOS EDIFICACIONES

Página 29 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

As. Longitudinal 5.66 1/2" 2 8 5.66 90.56

1.20 1/2" 2 8 1.20 19.20

2.22 1/2" 2 8 2.22 35.52

1.48 1/2" 2 8 1.48 23.68

1.43 1/2" 2 8 1.43 22.88

As. Transversal

pasos 1.55 3/8" 2 5 1.55 15.50

1.55 1/2" 2 29 1.55 89.90

TRAMO 3

As. Longitudinal 4.70 1/2" 1 8 4.70 37.60

1.79 1/2" 1 8 1.79 14.32

Page 30: METRADOS EDIFICACIONES

Página 30 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

1.87 1/2" 1 8 1.87 14.96

2.13 1/2" 1 8 2.13 17.04

As. Transversal

pasos 1.55 3/8" 1 6 1.55 9.30

1.55 1/2" 1 29 1.55 44.95

Peso en Kilogramos por metro 0.25 0.20 0.40 0.56 0.99 1.55 2.24 3.97 TOTAL

Longitud Total por Ø en metros 0.00 0.00 0.00 32.55 533.33 0.00 0.00 0.00 EN KG

Total en Kilogramos por Ø 0.00 0.00 0.00 18.23 528.00 0.00 0.00 0.00 546.22

06.03.00. MUROS

PRIMER NIVEL

0.65 1/4" 2 142 0.65 184.60

1.20 1/4" 2 35 1.20 84.00

SEGUNDO NIVEL

0.65 1/4" 2 131 0.65 170.30

1.20 1/4" 2 16 1.20 38.40

TERCER NIVEL

0.65 1/4" 2 131 0.65 170.30

1.20 1/4" 2 16 1.20 38.40

Page 31: METRADOS EDIFICACIONES

Página 31 de 50

DESCRIPCION DISEÑO DEL FIERRO Ø CANT LONG. LONGITUD POR Ø (en m.)

1/4" 6mm 8mm 3/8" 1/2" 5/8" 3/4" 1"N°

ELEM.

SOBRE EL TERCER TECHO

0.65 1/4" 2 5 0.65 6.50

1.20 1/4" 2 8 1.20 19.20

Peso en Kilogramos por metro li 0.25 0.20 0.40 0.56 0.99 1.55 2.24 3.97 TOTAL

Longitud Total por Ø en metros 711.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 EN KG

Total en Kilogramos por Ø 177.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 177.93

Page 32: METRADOS EDIFICACIONES

Página 32 de 50

ITEM DESCRIPCION UND CANT.MEDIDAS

LARGO ANCHO

Page 33: METRADOS EDIFICACIONES

Página 33 de 50

MEDIDASSUB TOTAL TOTAL

ALTURA

Page 34: METRADOS EDIFICACIONES

Página 34 de 50

ITEM DESCRIPCION UND PARCIAL SUB TOTAL TOTAL

METRADO INSTALACIONES ELECTRICAS

01 OBRAS PRELIMINARES

1.01 EXCAVACION DE ZANJAS PARA CONDUCTORES ELECTRICOS ml 213.97 213.97

1.02 BUZON PARA CABLES UND 1.00 1.00

1.03 ELIMINACION DE MATERIAL EXCEDENTE m3 20.54 20.54

02 INSTALACIONES ELECTRICAS

02.01 SALIDA DE TECHO (CENTRO DE LUZ) 6.00

ARCHIVO pto 1.00PASADIZO pto 4.00Cocina pto 1.00

02.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE 6.00

ARCHIVO pto 2.00PASADIZO pto 2.00Cocina pto 2.00

03 CAJAS DE PASE

03.01 CAJA DE PASE OCTOGANAL 3.00

TOPICO u 1.00

Secretaría y sala de espera u 1.00

SALA DE PROFESORES u 1.00

04.00.00 TABLEROS

04.01 TABLERO GENERAL TG 1.00

BLOQUE A u 1.00

04.02 TABLERO DE DISTTRIBUCION TD-1 1.00

BLOQUE A (ESCALERA) u 1.00

04.03 TABLERO DE DISTTRIBUCION TD-2 1.00

BLOQUE D (ESCALERA) u 1.00

05 CONEXION A RED EXTERNA Y MEDIDORES 78.65

05.01 ALIMENTADOR TG ml 15.70 15.70

05.02 ALIMENTADOR TD-01 ml 16.80 16.80

05.03 ALIMENTADOR TD-02 ml 46.15 46.15

06 ILUMINACIÓN

06.01 LUMINARIA FLUORESCENTE 2 X40W 10.00

SALA DE PROFESORES pza 2.00AULA 03 pza 4.00AULA 04 pza 4.00

Page 35: METRADOS EDIFICACIONES

Página 35 de 50

ITEM DESCRIPCION UND PARCIAL SUB TOTAL TOTAL

METRADO DE INSTALACIONES SANITARIAS

01 SISTEMA DE AGUA FRIA

01.02 TUBERIA DE 2" PVC-SAP 73.50

Planta Bloque C m 6.75

Alimentador a bloques m 66.75

01.03 TUBERIA DE 1 1/2" PVC-SAP 16.95

Planta Bloque C m 3.25

Alimentador a bloques m 13.70

01.04 TUBERIA DE 1 1/4" PVC-SAP 21.16

Planta Bloque C m 5.80

Planta de Bloque G m 2.45

Planta General m 12.91

01.05 TUBERIA DE 1" PVC-SAP 86.25

Planta de Bloque C m 9.60

Planta de Bloque F m 7.01

Planta de Bloque G m 21.82

Planta General m 47.82

01.06 TUBERIA DE 3/4" PVC-SAP 96.11

Planta Bloque A m 9.10

Planta Bloque C m 32.60

Planta Bloque E m 2.57

Planta Bloque F m 2.70

Planta Bloque G m 24.18

Planta General m 24.96

01.07 TUBERIA DE 1/2" PVC-SAP 125.00

Planta Bloque A m 6.36

Planta Bloque C m 31.25

Planta Bloque E m 7.30

Planta Bloque F m 24.43

Planta Bloque G m 17.52

Plano General m 38.14

01.08 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" 39.00

SH pto 4.00Cuarto de Limpieza pto 1.00SS.HH. Discapacitados pto 2.00SS.HH. Prof. pto 2.00Duchas y vestidores mujeres pto 2.00Duchas y vestidores hombres pto 2.00SS.HH. HOMBRES pto 4.00SS.HH. Mujeres pto 4.00Cocina pto 1.00SS.HH pto 3.00Laboratorio de fisica química pto 4.00SH Hombres pto 4.00SH Mujeres pto 3.00Planta General pto 3.00

01.09 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 3/4" 16.00

SS.HH. HOMBRES pto 4.00SS.HH. Mujeres pto 2.00SH Hombres pto 3.00SH Mujeres pto 5.00Planta General pto 2.00

01.10 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1" 8.00

SH Varones pto 5.00Planta General pto 3.00

01.11 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" 5.00

Tópico pto 1.00Cuarto de Limpieza pto 1.00

Page 36: METRADOS EDIFICACIONES

Página 36 de 50

ITEM DESCRIPCION UND PARCIAL SUB TOTAL TOTAL

Cocina pto 1.00En planta general pza 2.00

01.12 VALVULAS DE COMPUERTA DE BRONCE DE 3/4" 8.00

SH pza 1.00SS.HH. Discapacitados pza 1.00SS.HH. Prof. pza 1.00Duchas y vestidores mujeres pza 1.00Duchas y vestidores hombres pza 1.00SS.HH pza 1.00En planta general pza 2.00

01.13 VALVULAS DE COMPUERTA DE BRONCE DE 1" 7.00

SS.HH. HOMBRES pza 1.00SS.HH. Mujeres pza 1.00Laboratorio de fisica quimica pza 1.00SS.HH. Damas pza 1.00En planta general pza 3.00

01.14 VALVULAS DE COMPUERTA DE BRONCE DE 1 1/4" 1.00

SH Hombres pza 1.00

01.15 LLAVE DE RIEGO CON GRIFO DE 1/2" 2.00

Planta General pza 2.00

01.16 LLAVE DE RIEGO CON GRIFO DE 3/4" 2.00

Planta General pza 2.00

01.17 LLAVE DE RIEGO CON GRIFO DE 1" 3.00

Planta General pza 3.00

01.18 CAJA PARA VALVULAS 21.00

Tópico pza 1.00SH pza 1.00Cuarto de Limpieza pza 1.00SS.HH. Discapacitados pza 1.00SS.HH. Prof. pza 1.00Duchas y vestidores mujeres pza 1.00Duchas y vestidores hombres pza 1.00SS.HH. HOMBRES pza 1.00SS.HH. Mujeres pza 1.00Cocina pza 1.00SS.HH pza 1.00Laboratorio de física química pza 1.00SH Hombres pza 1.00SH Mujeres pza 1.00Planta General pza 7.00

01.19 NICHO PARA VALVULAS 1.00

En planta general exterior pza 1.00

02 SISTEMA DE DESAGUE

02.01 SALIDAS DE PVC SAL PARA DESAGUE DE 2" 50.00

SH pto 2.00Tópico pto 2.00Cuarto de Limpieza pto 3.00SS.HH. Discapacitados pto 1.00SS.HH. Prof. pto 2.00Duchas y vestidores mujeres pto 3.00Duchas y vestidores hombres pto 3.00SS.HH. Varones pto 6.00SS.HH Damas pto 3.00Cocina pto 2.00SS.HH pto 2.00Laboratorio de fisica quimica pto 9.00SH Varones pto 8.00SH Damas pto 4.00

Page 37: METRADOS EDIFICACIONES

Página 37 de 50

ITEM DESCRIPCION UND PARCIAL SUB TOTAL TOTAL

02.02 SALIDAS DE PVC SAL PARA DESAGUE DE 4" 48.00

SH pto 3.00Tópico pto 1.00SS.HH. Discapacitados pto 3.00SS.HH. Prof. pto 2.00SS.HH. Varones pto 8.00SS.HH. Damas pto 8.00Cocina pto 1.00SS.HH pto 3.00SH Varones pto 9.00SH Damas pto 10.00

02.03 SALIDAS DE PVC SAL PARA VENTILACION DE 2" 11.00

SH pto 1.00Tópico pto 1.00SS.HH. Discapacitados pto 1.00Duchas y vestidores pto 2.00SS.HH. Varones pto 1.00SS.HH. Damas pto 1.00Cocina pto 1.00Laboratorio de fisica quimica pto 1.00SH Varones pto 1.00SH Dmas pto 1.00

02.04 SALIDAS DE PVC SAL PARA VENTILACION DE 3" 5.00

Bloque C

S.H. Prof. pto 1.00SS.HH. Damas pto 2.00SS.HH. Varones pto 1.00Bloque E

S.H pto 1.00

02.05 TUBERIA PVC SAL DE 6" 45.95

En planta general exterior ml 45.95

02.06 TUBERIA PVC SAL DE 4" 179.87

SH ml 5.20Tópico ml 2.70S.H. Minusvalido ml 7.77S.H. Prof. ml 3.25Duchas ml 4.45SS.HH. Varones ml 11.76SS.HH. Damas ml 8.98S.H ml 4.50SS.H.H Varones ml 13.41SS.H.H Damas ml 13.75En planta general exterior ml 104.10

02.07 TUBERIA PVC SAL DE 3" 53.31

S.H. Prof. ml 5.46SS.HH. Varones ml 10.75SS.HH. Damas ml 11.45S.H ml 6.80SS.H.H Varones y Damas ml 18.85

02.08 TUBERIA PVC SAL DE 2" 197.51

Bloque A

SS.HH. ml 13.25Tópico ml 14.07Bloque C

Page 38: METRADOS EDIFICACIONES

Página 38 de 50

ITEM DESCRIPCION UND PARCIAL SUB TOTAL TOTAL

Cuarto de Limpieza ml 9.96S.H. Prof. ml 5.65SS.HH. Minusvalidos ml 2.42Duchas ml 22.13SS.HH. Varones y Damas ml 30.73Bloque E

Cocina ml 14.72S.H ml 1.57Bloque F

Laboratorio de Física y Química ml 35.96Bloque G

SS.H.H Varones y Damas ml 47.05

02.09 REGISTROS DE BRONCE CROMADO 4" 23.00

Bloque A

SH pza 1.00Tópico pza 1.00Bloque C

SS.HH. Discapacitados pza 1.00SS.HH. Prof. pza 1.00SS.HH. Varones pza 4.00SS.HH. Damas pza 4.00Bloque E

Cocina pza 1.00SS.HH pza 1.00Bloque G

SH Varones pza 4.00SH Damas pza 5.00

02.10 REGISTROS DE BRONCE CROMADO 2" 4.00

Bloque C

Cuarto de Limpieza pza 1.00Duchas y vestidores mujeres pza 1.00Duchas y vestidores hombres pza 1.00Bloque F

Laboratorio de fisica quimica pza 1.00

02.11 CAJA DE REGISTRO DE DESAGUE 45 X 60cm 3.00

Obras exteriores

Planta General pza 3.00

02.12 CAJA DE REGISTRO DE DESAGUE 30 X 60cm 4.00

Obras exteriores

Planta General pza 4.00

02.13 CAJA DE REGISTRO DE DESAGUE 25 X 50cm 7.00

Obras exteriores

Planta General pza 7.00

02.14 BUZON DE CONCRETO f'c= 175kg/cm2 (H=1.20 - 1.70) 61.10

Obras exteriores

Planta General pza 5.00

03 CISTERNA Y TANQUE ELEVADO

03.01 TUBERIA PVC SAL D=2.0" - PARA REBOSE m 11.90

03.02 CAJA RECEPTORA (INCLUY. TRAMPA) pza 1.00

03.03 REJILLA DE Fº8"X12" u 1.00

03.04 ROMPEAGUA u 1.00

03.05 TUBERIA DE SUCCIÓN DE PVC D=2 1/2" m 7.40

03.06 TUBERIA DE IMPULSION DE FºGº D=2" m 13.80

03.07 VALVULAS DE COMPUERTA DE BRONCE DE 2" pza 2.00

03.08 VALVULAS CHECK DE ACERO DE 2" pza 2.00

03.09 VALVULAS FLOTADOR DE 1 1/2" pza 1.00

03.10 VALVULAS DE PIE pza 2.00

Page 39: METRADOS EDIFICACIONES

Página 39 de 50

ITEM DESCRIPCION UND PARCIAL SUB TOTAL TOTAL

03.11 EQUIPO DE BOMBEO-ELECTROBOMBA DE 1.9 HP u 2.00

03.12 TAPA DE CISTERNA Y TANQUE ELEVADO (INCL. ACCESORIOS u 2.00

03.13 ABRAZADERA DE FIJACION DE TUBERIA u 8.00

03.14 CONTROL DE NIVELES u 1.00

04 APARATOS Y ACCESORIOS SANITARIOS

04.01 INODORO TANQUE BAJO C/GRIFERIA DE BRONCE 10.00

Bloque A

SH pza 1.00Bloque C

SS.HH. Discapacitados pza 1.00SS.HH. Prof. pza 1.00SS.HH. Varones pza 3.00SS.HH. Damas pza 3.00Bloque E

SH. pza 1.00

04.02 INODORO BABY TANQUE BAJO C/GRIFERIA DE BRONCE 8.00

Bloque G

SS.HH. Varones pza 4.00SS.HH. Damas pza 4.00

04.03 URINARIO DE LOSA BLANCO 7.00

Bloque C

SS.HH. Varones pza 3.00Bloque G

SS.HH. Varones pza 4.00

04.04 DUCHAS CROMADA DE CABEZA GIRATORIA 6.00

Bloque A

SH pza 1.00Bloque C

Duchas pza 4.00Bloque E

SH. pza 1.00

04.05 SUMIDERO D=2" 16.00

Bloque A

SH pza 1.00Tópico pza 1.00Bloque C

Cuarto de Limpieza pza 1.00S.H. Prof. pza 1.00Duchas pza 6.00Bloque E

Cocina pza 1.00SH. pza 1.00Bloque F

Laboratorio Física Química pza 4.00

04.06 SUMIDERO D=4" 7.00

Bloque A

SH pza 1.00Bloque C

SS.HH. Discapacitados pza 1.00SS.HH. Damas pza 1.00SS.HH. Varones pza 1.00Bloque E

SH. pza 1.00Bloque G

SS.HH. Varones pza 1.00

Page 40: METRADOS EDIFICACIONES

Página 40 de 50

ITEM DESCRIPCION UND PARCIAL SUB TOTAL TOTAL

SS.HH. Damas pza 1.00

04.07 LAVATORIO VITRIFICADO BLANCO 3.00

Bloque A

SH pza 1.00Bloque C

SS.HH. Prof. pza 1.00Bloque E

SH. pza 1.00

04.08 LAVATORIO OVALIN 15.00

Bloque C

SS.HH. Discapacitados pza 1.00SS.HH. Varones pza 3.00SS.HH. Damas pza 3.00Bloque G

SS.HH. Varones pza 4.00SS.HH. Damas pza 4.00

04.09 LAVADERO DE LOSA 7.00

Bloque C

Cuarto de Limpieza pza 1.00Bloque E

Cocina pza 2.00Bloque F

Laboratorio Física Química pza 4.00

04.10 LAVADERO DE ACERO INOXIDABLE 6.00

Bloque A

Tópico pza 1.00Bloque E

Cocina pza 1.00Bloque F

Laboratorio pza 4.00

04.11 DISPENSADOR DE PAPEL 18.00

Bloque A

SH pza 1.00Bloque C

SS.HH. Discapacitados pza 1.00SS.HH. Prof. pza 1.00SS.HH. Varones pza 3.00SS.HH. Damas pza 3.00Bloque E

SH. pza 1.00Bloque G

SS.HH. Varones pza 4.00SS.HH. Damas pza 4.00

04.12 DISPENSADOR DE JABON LIQUIDO 6.00

Bloque A

SH pza 1.00Bloque C

Duchas pza 4.00Bloque E

SH. pza 1.00

04.13 TOALLERA CON SOPORTE DE LOSA Y BARRA PLASTICA COLOR BLANCO 6.00

Bloque A

SH pza 1.00Bloque C

Page 41: METRADOS EDIFICACIONES

Página 41 de 50

ITEM DESCRIPCION UND PARCIAL SUB TOTAL TOTAL

Duchas pza 4.00Bloque E

SH. pza 1.00

04.14 ESPEJOS 8.00

Bloque A

SH pza 1.00Bloque C

SS.HH. Discapacitados pza 1.00SS.HH. Prof. pza 1.00SS.HH. Varones pza 1.00SS.HH..Damas pza 1.00Bloque E

SH. pza 1.00Bloque G

SS.HH. Varones pza 1.00SS.HH. Damas pza 1.00

05 SISTEMA DE EVACUACION PLUVIAL

05.01 REJILLA PARA CANAL DE EVACUACION 139.33

Patios ml 139.33

05.02 CANAL PLUVIAL 261.55

En Patio ml 261.55

05.03 CANALETA DE EVACUACION PLUVIAL 271.85

En Techos de ultimos niveles de BloquesBloque A ml 43.30Escalera entre Bloque A y B ml 6.70Bloque B ml 46.90Bloque C ml 16.25Bloque D ml 46.90Escalera entre Bloque D y E ml 6.70Bloque E ml 20.15Bloque F ml 33.00Escalera entre Bloque F y G ml 6.85Bloque G ml 45.10

05.04 TUBERIA DE PVC SAP 8" P/EVACUACION PLUVIAL 44.29

En union de canal de evacuación planta general ml 44.29

Page 42: METRADOS EDIFICACIONES

METRADO ACERO

Proyecto : MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA ESCUELA DE POST GRADO DE LA UNIVERSIDAD

NACIONAL DE TUMBES

SUBPRESUPUESTO: ESTRUCTURAS

CLIENTE: UNIVERSIDAD NACIONAL DE TUMBES

LUGAR: TUMBES-TUMBES-TUMBES

05.01.02 ZAPATAS.- ACERO Fy=4200 kg/cm2

Datos Dimensiones

item descripción n descripción ACEROØ #

ZAPATAS Z-1 12.00 1/2 16

05.03.03 COLUMNAS.- ACERO Fy=4200 kg/cm2

Datos Dimensiones

item descripción n descripción ACEROØ #

1° PISO C-1 12.00 5/8 6 C-2 4.00 1/2 4

ESTRIBOS LONG. DEL ESTRIBO 1° PISO

C-1 12.00 3/8 18 C-2 4.00 3/8 18

05.06 VIGAS

Page 43: METRADOS EDIFICACIONES

05.06.02.03 VIGAS DE AMARRE: V-A, V-A1 y V-A2 - ACERO Fy=4200 kg/cm2

Datos Dimensiones

item descripción n descripción ACEROØ #

VIGAS VA, VA1, VA2 1° PISO

EJE A-A 1.00 V-A (0.30x0.25) 1/2 4 ESTRIBOS 1.00 3/8 94 EJE C-C 1.00 V-A (0.30x0.25) 1/2 4 ESTRIBOS 1.00 3/8 84 EJE 6-6/ EJE A-B 1.00 V-A (0.30x0.25) 1/2 4 ESTRIBOS 1.00 3/8 21 1-1/2-2/3-3/4-4/5-5 5.00 V-A1 (0.15x0.25) 1/2 4 ESTRIBOS 5.00 3/8 42

05.14.03 COLUMNETA- ACERO Fy=4200 kg/cm2

Datos Dimensiones

item descripción n descripción ACEROØ #

COLUMNETAS

1° PISO C-a EJE A-A Y EJE C-C 12.00 3/8 4 ESTRIBOS 12.00 1/4 16 ENTRE LAS REJAS TIP 1.00 3/8 4 ESTRIBOS 1.00 1/4 17

05.12.03 ALAMBRE N°8, REFUERZO HORIZONTAL EN MUROS

Datos Dimensiones

item descripción H FACTOR ACERO n Ø #

EJE 1-1/ EJE A-C 2.75 0.32 4.00 1/4 8

Page 44: METRADOS EDIFICACIONES

EJE 2-2/EJE A-C 2.75 0.32 4.00 1/4 8

EJE 3-3/EJE A-C 2.75 0.32 4.00 1/4 8 EJE 4-4/EJE A-C 2.75 0.32 4.00 1/4 8EJE 5-5/EJE B-C 2.75 0.32 4.00 1/4 8EJE 6-6/EJE A-B 2.75 0.32 2.00 1/4 8EJE A-A/ EJE 1-2 2.75 0.32 2.00 1/4 8EJE A-A/EJE 2-3 2.75 0.32 2.00 1/4 8EJE A-A/EJE 3-4 2.75 0.32 2.00 1/4 8EJE A-A/ EJE 4-5 2.75 0.32 3.00 1/4 8EJE A-A/ EJE 5-6 2.75 0.32 2.00 1/4 8EJE B-B/ EJE 4-6 2.75 0.32 4.00 1/4 8EJE C-C/ EJE 1-2 2.75 0.32 2.00 1/4 8EJE C-C/ EJE 2-3,EJE3 2.75 0.32 4.00 1/4 8EJE C-C/ EJE 4-5 2.75 0.32 3.00 1/4 8

Page 45: METRADOS EDIFICACIONES

METRADO ACERO

MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS EN LA ESCUELA DE POST GRADO DE LA UNIVERSIDAD

0.55 0.40 0.45 0.60 0.800.25 0.56 0.99 1.55 2.24

Dimensiones RESULTADOS longitud longitud # 1/4 3/8 1/2 5/8 3/4 s/emp TOTAL emp. ML ML ML ML ML

1.05 201.60 22.00 0.00 0.00 211.50 0.00 0.00 - - 0.00 0.00 0.00 0.00 0.00

- - 211.50 - -

- - 23.50 - -

- - 210.25 - -

0.55 0.40 0.45 0.60 0.800.25 0.56 0.99 1.55 2.24

Dimensiones RESULTADOS longitud longitud # 1/4 3/8 1/2 5/8 3/4 s/emp TOTAL emp. ML ML ML ML ML

3.82 275.04 30.00 0.00 0.00 0.00 293.04 0.00 3.82 61.12 6.00 0.00 0.00 63.82 0.00 0.00

1.15 248.40 27.00 0.00 259.20 0.00 0.00 0.00 0.65 46.80 5.00 0.00 48.80 0.00 0.00 0.00

- 308.00 63.82 293.04 - 34.22 7.09 32.56 -

- 172.33 63.44 454.86 -

Page 46: METRADOS EDIFICACIONES

VIGAS DE AMARRE: V-A, V-A1 y V-A2 - ACERO Fy=4200 kg/cm2 0.55 0.40 0.45 0.60 0.800.25 0.56 0.99 1.55 2.24

Dimensiones RESULTADOS longitud longitud # 1/4 3/8 1/2 5/8 3/4 s/emp TOTAL emp. ML ML ML ML ML

18.60 74.40 8.00 0.00 0.00 78.00 0.00 0.00 1.05 98.70 10.00 0.00 102.70 0.00 0.00 0.00 17.10 68.40 7.00 0.00 0.00 71.55 0.00 0.00 1.05 88.20 9.00 0.00 91.80 0.00 0.00 0.00 4.60 18.40 2.00 0.00 0.00 19.30 0.00 0.00 1.05 22.05 2.00 0.00 22.85 0.00 0.00 0.00 8.82 176.40 19.00 0.00 0.00 184.95 0.00 0.00 0.75 157.50 17.00 0.00 164.30 0.00 0.00 0.00

- 381.65 353.80 - - - 42.41 39.31 - - - 213.53 351.71 - -

0.55 0.40 0.45 0.60 0.800.25 0.56 0.99 1.55 2.24

RESULTADOS 1/4 3/8 1/2 5/8 3/4ML ML ML ML ML

0.55 0.40 0.45 0.60 0.800.25 0.56 0.99 1.55 2.24

Dimensiones RESULTADOS longitud longitud # 1/4 3/8 1/2 5/8 3/4 s/emp TOTAL emp. ML ML ML ML ML

2.67 128.16 14.00 0.00 133.76 0.00 0.00 0.00 0.55 105.60 11.00 111.65 0.00 0.00 0.00 0.00 2.92 11.68 1.00 0.00 12.08 0.00 0.00 0.00 0.55 9.35 1.00 9.90 0.00 0.00 0.00 0.00

121.55 145.84 0.00 0.00 0.0013.51 16.20 0.00 0.00 0.0030.39 81.60 0.00 0.00 0.00

0.55 0.40 0.45 0.60 0.800.25 0.56 0.99 1.55 2.24

Dimensiones RESULTADOS longitud longitud # 1/4 3/8 1/2 5/8 3/4 s/emp TOTAL emp. ML ML ML ML ML

0.70 22.40 2.00 23.50 0.00 0.00 0.00 0.00

Page 47: METRADOS EDIFICACIONES

0.70 22.40 2.00 23.50 0.00 0.00 0.00 0.00

0.70 22.40 2.00 23.50 0.00 0.00 0.00 0.00 0.70 22.40 2.00 23.50 0.00 0.00 0.00 0.00 0.70 22.40 2.00 23.50 0.00 0.00 0.00 0.00 0.70 11.20 1.00 11.75 0.00 0.00 0.00 0.00 0.70 11.20 1.00 11.75 0.00 0.00 0.00 0.00 0.70 11.20 1.00 11.75 0.00 0.00 0.00 0.00 0.70 11.20 1.00 11.75 0.00 0.00 0.00 0.00 0.70 16.80 1.00 17.35 0.00 0.00 0.00 0.00 0.70 11.20 1.00 11.75 0.00 0.00 0.00 0.00 0.70 22.40 2.00 23.50 0.00 0.00 0.00 0.00 0.70 11.20 1.00 11.75 0.00 0.00 0.00 0.00 0.70 22.40 2.00 23.50 0.00 0.00 0.00 0.00 0.70 16.80 1.00 17.35 0.00 0.00 0.00 0.00

269.70 0.00 0.00 0.00 0.0029.97 0.00 0.00 0.00 0.0067.43 0.00 0.00 0.00 0.00

Page 48: METRADOS EDIFICACIONES

METRADO ACERO

1.203.97

1 ML

0.000.00

-

-

-

210.25

1.203.97

1 ML

0.000.00

0.000.00

- - - 725.16 17494.81 16,769.65

Page 49: METRADOS EDIFICACIONES

1.203.97

1 ML

0.000.000.000.000.000.000.000.00

- - - 593.51

1.203.97

1 ML

1.203.97

1 ML

0.000.000.000.000.000.000.00

117.58 1881.4

1.203.97

1 ML

0.00

Page 50: METRADOS EDIFICACIONES

0.00

0.000.000.000.000.000.000.000.000.000.000.000.000.00

0.000.000.00

70.80