A WARM WELCOMEA WARM WELCOMEFORFOR
SHAPOORJI PALLONJI ENGINEERS CONSTRUCTION
EVERY DROP COUNTS
A PRESENTATION ON A PRESENTATION ON SEWAGE TREATMENT PROCESSSEWAGE TREATMENT PROCESS
![Page 2: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/2.jpg)
• Compact Plants - Occupy Compact Plants - Occupy Minimum Space.Minimum Space.
• Less O&M CostLess O&M Cost• Less Manpower Less Manpower
requirementrequirement• No Odour Nuisance.No Odour Nuisance.• Flexibility for future Flexibility for future
ExpansionExpansion• Minimal Sludge Minimal Sludge
Handling.Handling.• Easy To Use & Operate.Easy To Use & Operate.
![Page 3: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/3.jpg)
WASTE WATER WASTE WATER CONTAININGCONTAINING
CONTAMINANTSCONTAMINANTSBACTERIA HARMLESS END HARMLESS END
PRODUCTSPRODUCTS
CO2 + H2O + NEW BACTERIA
CH4 + H2O + NEW BACTERIA
PRESENCE OF O2
ABSENCE OF O2
AEROBIC
ANAEROBIC
THE PROCESS
![Page 4: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/4.jpg)
• Most Ideal Solution• Large Land Requirement
However
• Routing pipelines through congested areas of the city. • Digging up of roads for laying of pipelines. • Construction of bridges for conveying pipelines across the river, if any• Setting up Sewage pumping stations
Massive Investment Required for
![Page 5: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/5.jpg)
![Page 6: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/6.jpg)
• Investment for laying of pipelines avoided.
• Investment in setting up pumping stations minimized.
• Reduced cost of operations due to absence of pumping.
• Treatment as close as possible to source of generation.
• Better flexibility to cater to future expansions.
![Page 7: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/7.jpg)
• pHpH
• O & GO & G
• B.O.D.B.O.D.
• C.O.D.C.O.D.
• T.S.S.T.S.S.
• : 6 - 9: 6 - 9
• : 50 mg/l: 50 mg/l
• : 200-275 mg / l: 200-275 mg / l
• : 550-600: 550-600 mg / l mg / l
• : 350-450 mg / l: 350-450 mg / l
![Page 8: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/8.jpg)
• PhPh
• O & G (mg / l )O & G (mg / l )
• B.O.D. (mg / l)B.O.D. (mg / l)
• C.O.D. (mg / l)C.O.D. (mg / l)
• T.S.S. (mg / l)T.S.S. (mg / l)
6-96-9
< 10< 10
< 30< 30
< 100 < 100
< 50 < 50
6.5 - 8.56.5 - 8.5
< 5< 5
< 10< 10
< 100< 100
< 10 < 10
PARAMETER NORMS FORDISPOSAL
FOR RECYCLE
For Disposal ToOn Land Water
Bodies
Gardening.
![Page 9: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/9.jpg)
Operational Requirements of a Operational Requirements of a Wastewater Management SystemWastewater Management System
Meet CPCB / SPCB / WHO Norms Meet CPCB / SPCB / WHO Norms
Meet Coliform Count after TreatmentMeet Coliform Count after Treatment
Low Foot Print AreaLow Foot Print Area
Flexible in operation : Should accept varying Flexible in operation : Should accept varying loadsloads
Easy to Operate & Maintain Easy to Operate & Maintain
No smell / odourNo smell / odour
![Page 10: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/10.jpg)
SEWAGE
TERTIARYTREATMENT
RECYCLE
DISPOSAL
For Removal OfSS, Oil etc.
For Reduction OfBOD, COD etc.
PRIMARYTREATMENT
Physical TreatmentScreening, Oil & Grease Removal
SEC.TREATMENT
Biological Treatment
Polishing UnitsDual Media Filter
Activated Carbon Filter
![Page 11: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/11.jpg)
EVOLUTION OF TECHNOLOGYEVOLUTION OF TECHNOLOGY• Oxidation PondsOxidation Ponds
• Anaerobic Systems (UASB/AF etc.)Anaerobic Systems (UASB/AF etc.)
• Aerobic ProcessesAerobic Processes– Suspended Growth : (ASP & Variants) Suspended Growth : (ASP & Variants) – Attached Growth Processes Attached Growth Processes
• S A F FS A F F
- - FLUIDISED BED REACTORFLUIDISED BED REACTOR (MBBR) (MBBR)
![Page 12: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/12.jpg)
• Natural Mode Of Treatment.Natural Mode Of Treatment.• Large area requirement.Large area requirement.• Odour Nuisance Likely.Odour Nuisance Likely.• Consumes Power For Pumping Sewage Consumes Power For Pumping Sewage
Out Of The City.Out Of The City.• Complete Treatment Cannot Be Complete Treatment Cannot Be
Guaranteed.Guaranteed.• Expected Project Schedule - 1 - 2 YearsExpected Project Schedule - 1 - 2 Years
![Page 13: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/13.jpg)
INFLUENT
EQUALISATIONTANK
AERATIONLAGOON
TREATED EFFLUENT
UASB - I
UASB - II
SLUDGE DRYINGBED
![Page 14: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/14.jpg)
• Up flow Anaerobic Sludge Blanket Up flow Anaerobic Sludge Blanket Reactor.Reactor.
• No Aeration Device Required.No Aeration Device Required.• Odour nuisanceOdour nuisance• Sensitive To Fluctuations / Shock Loads.Sensitive To Fluctuations / Shock Loads.• Calls For Adequate Post Aeration To Calls For Adequate Post Aeration To
Meet The Norms.Meet The Norms.• Regular Skilled Monitoring - Essentiality.Regular Skilled Monitoring - Essentiality.• Long Start Up Time : 3 - 4 MonthsLong Start Up Time : 3 - 4 Months• Restart Time : Minimum 1 MonthRestart Time : Minimum 1 Month
![Page 15: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/15.jpg)
INFLUENT
EQUALISATIONTANK
TREATEDEFFLUENT
+
+
+
+
SLUDGE DRYINGBEDS
AERATION TANK
SEC. CLARIFIER
SLUDGE RECYCLE
SURFACE AERATOR
![Page 16: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/16.jpg)
ACTIVATED SLUDGE PROCESSACTIVATED SLUDGE PROCESS
RECYCLED SLUDGE
SETTLINGTANK
AERATION TANK
AERATORS
TREATEDEFFLUENT
AFTERPRIMARY
TMT.
SLUDGE FOR TREATMENT / DISPOSAL
F / M ? M . L . S . S . ?
DISSOLVED OXYGEN ?
PUMPING COSTRECYCLED SLUDGE % ?
F / M : FOOD TO MICRO-ORGANISM RATIOM.L.S.S. : MIXED LIQUOR SUSPENDED SOLIDS
![Page 17: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/17.jpg)
INHERENT PROBLEMS
• HIGH OPERATING COSTS
• COMPLEX MECHANICAL EQUIPMENTS
• SKILLED PROCESS OPERATIONS
• LARGE QUANTITY OF DIFFICULT TO HANDLE SLUDGE PRODUCED
• SUSCEPTIBLE TO SHOCK LOADS
• CONTINUOUS POWER SUPPLY REQUIRED
![Page 18: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/18.jpg)
SCRENNING & EQUALISATION
RAWSEWAGE
V V V V V V V V V V V V V V V V V
M
M
SAFF REACTOR
AIR BLOWERS
AIRDIFFUSERS
FIXED MEDIA
SAFF TREATMENT SYSTEM
SLUDGEDRYING
BEDS
SLUDGE
(OPTIONAL)
FILTER PRESS
CHLORINATION
TREATEDSEWAGE
TUBESETTLER
![Page 19: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/19.jpg)
BASED ON PRINCIPAL OF MOVING BED ATTACHED GROWTH
![Page 20: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/20.jpg)
FBR ……….FBR ……….
• has media which supports the has media which supports the biomass.biomass.
• The media is in suspension, since The media is in suspension, since the specific gravity of the media the specific gravity of the media is less than that of water.is less than that of water.
• The fluidization of the media The fluidization of the media takes place by current set by takes place by current set by aeration.aeration.
![Page 21: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/21.jpg)
V V V V V V V V V V V V
M
M
REACTOR - I REACTOR - II
AIR BLOWERS
AIRDIFFUSERS
FLOATING MEDIA
FBR TREATMENT SYSTEM
SLUDGEDRYING
BEDS
SLUDGE
(OPTIONAL)
FILTER PRESS
CHLORINATION
TREATEDSEWAGE
TUBESETTLER
TERTIARY TREATMENT
Oil &
Grease trap
Equalization
Cum
Collection
Tank
SCREEN
V V V V V V
![Page 22: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/22.jpg)
A) EQUALISATION TANK
THE OBJECTIVE
• Dampen / absorb the effluent flow rate variations.
• Keep the effluent in mixed condition to obtain homogenous characteristics.
TO ENSURE
Desired treatment efficiency of the down line system.
![Page 23: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/23.jpg)
A) EQUALISATION TANK
V V V V V V V
RAW SEWAGE
BAR SCREENCHAMBER
AIR GRID
EQUALISATION TANK
AIR BLOWER
M
M
FEEDPUMPS
![Page 24: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/24.jpg)
FLUIDISEDFLUIDISEDBEDBED
REACTOR REACTOR (MBBR)(MBBR)
![Page 25: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/25.jpg)
FEATURESFEATURESFROM
PRIMARY
FBREACTOR-I
A) TWO REACTORS IN SERIES
FBREACTOR-II
![Page 26: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/26.jpg)
FEATURESFEATURESSEWAGE
INLET
SEWAGEOUTLET
B) NO SHORT CIRCUITING
![Page 27: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/27.jpg)
FEATURESFEATURESSEWAGE
INLET
C) COUNTER CURRENT FLOW
AIR DISTRIBUTION GRID
V V V V
SEWAGE
AIR
![Page 28: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/28.jpg)
FEATURESFEATURES
D) ENHANCED OXYGEN TRANSFER
V V V V V V V V
REACTOR WITHOUT CARRIER ELEMENTS
REACTOR WITH CARRIER ELEMENTS
AIRBUBBLES
![Page 29: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/29.jpg)
FEATURESFEATURES
F) NO SLUDGE RECYCLING
FBREACTOR-I
FBREACTOR-II
![Page 30: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/30.jpg)
AEROBIC / ANAEROBIC &FACULTATIVE LAGOONS
FB REACTOR
OXIDATION DITCH
COMPARATIVE AREA REQUIREMENTS
ASP
SAFF REACTOR
FB REACTOR
![Page 31: MBBR PRESENTATION](https://reader035.vdocumento.com/reader035/viewer/2022081416/58773ac81a28ab342e8b5791/html5/thumbnails/31.jpg)
Specific Advantages of FBR over Specific Advantages of FBR over other processesother processes
• Very low area requirement : Approx. Very low area requirement : Approx. 1/10th That Of Conventional Processes1/10th That Of Conventional Processes
• High treatment efficiency.High treatment efficiency.• Digested Sludge - No Sludge Treatment Digested Sludge - No Sludge Treatment
Reqd.Reqd.• Ease Of Operation & Maintenance - Ease Of Operation & Maintenance -
Minimum Manpower.Minimum Manpower.• Quick re-start after prolonged shut-downsQuick re-start after prolonged shut-downs
– typically after 1 week shut down, re-start time typically after 1 week shut down, re-start time is only 12 hours.is only 12 hours.