Sheet1S10Pgina :1Precios y cantidades de recursos requeridos
por tipoObra1002026CONSTRUCCION DE AREA RECREATIVA DEL I.E. NIO
JESUS DE PRADOSubpresupuesto001CONSTRUCCION DE AREA RECREATIVA DEL
I.E. NIO JESUS DE PRADOFecha05/09/2014Lugar110207ICA - CHINCHA -
PUEBLO NUEVOCdigoRecursoUnidadCantidadPrecio S/.Parcial S/.MANO DE
OBRA0101010002CAPATAZhh32.152921.15680.030101010004OFICIALhh110.202615.311,687.2001010100060002OPERADOR
DE EQUIPO
LIVIANOhh13.600817.57238.970101010003OPERARIOhh300.738318.285,497.500101010005PEONhh361.979713.774,984.4613,088.16MATERIALES0201010002ACEITE
GRADO 30gal0.440660.0026.440204030001ACERO CORRUGADO fy = 4200
kg/cm2 GRADO
60kg944.67482.982,815.130204240031AFIRMADOm331.490040.001,259.600207070001AGUA
PUESTA EN OBRAm30.440015.006.6002040100010002ALAMBRE NEGRO RECOCIDO
N 16kg55.03153.81209.6702040100010001ALAMBRE NEGRO RECOCIDO N
8kg32.31243.81123.110207020001ARENA
FINAm32.803040.00112.1202070200010002ARENA
GRUESAm36.095040.00243.800213010001CEMENTO PORTLAND TIPO I (42.5
kg)bol243.710718.264,450.1602041200010006CLAVOS PARA MADERA CON
CABEZA DE 3
1/2"kg16.15505.6090.470201030002GASOLINAgal5.288813.6071.930201020014GRASA
MULTIPLElbs0.882512.0010.590207030001HORMIGONm324.835435.00869.240231010001MADERA
TORNILLOp2317.41406.702,126.670201040001PETROLEO
D-2gal5.385913.8074.3302070100010002PIEDRA CHANCADA
1/2"m39.752040.00390.080207010012PIEDRA GRANDE DE
6"m316.374845.00736.870207010005PIEDRA
MEDIANAm30.148235.005.1913,622.00EQUIPOS03012200040002CAMION
VOLQUETE DE 10 m3hm8.3280120.00999.360301160001CARGADOR
FRONTALhm1.3741180.00247.340301100007COMPACTADORA DE
PLANCHAhm15.216715.00228.250301010006HERRAMIENTAS
MANUALES%mo633.0903012900030001MEZCLADORA DE CONCRETO 11 P3 (23
HP)hm15.448835.00540.7103010600020001REGLA DE ALUMINIO 1" X 4" X
8"und3.114475.00233.5803011700020002RETROEXCAVADORA SOBRE ORUGAS
115 - 165 HPhm2.6424250.00660.6003012900010002VIBRADOR DE CONCRETO
4 HP 1.25"hm1.848010.0018.483,561.41TotalS/.30,271.57Fecha
:12/09/2014" "06\:59\:20 PM