ksb service presentation (3)

14
Worldwide Spark Erosion Service KSB SERVICE 1 KSB SERVICE UNITED KINGDOM P ECCLES 2015

Upload: ksb-glasgow-spark-erosion

Post on 19-Feb-2017

189 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: KSB Service PRESENTATION (3)

Worldwide Spark Erosion Service

KSB SERVICE

1KSB SERVICE UNITED KINGDOM P ECCLES 2015

Page 2: KSB Service PRESENTATION (3)

Contact Details:

Paul Eccles52 Nasmyth Rd SouthHillingtonGlasgow G53 4REScotland

Phone: 0044 (0)7803 389 193 0044 141 883 0732

Email: [email protected]

Ireland

Arbroath

Loughborough

Caldicot

2KSB SERVICE UNITED KINGDOM P ECCLES 2015

KSB SERVICE

Page 3: KSB Service PRESENTATION (3)

Company History

• 2001 Separate operating division set up within Motherwell Bridge.

• 2004 Management buy out from Motherwell Bridge – Metal Disintegration Services Limited was formed.

• Acquired by KSB group in march 2008 and integrated into UK Service operation of KSB Service..

3KSB SERVICE UNITED KINGDOM P ECCLES 2015

Page 4: KSB Service PRESENTATION (3)

Services

• Stud & bolt removal

• Dowel and pin removal

• Broken taps

• Specialised metal removal including carbide

• Marine engine repairs

4KSB SERVICE UNITED KINGDOM P ECCLES 2015

Page 5: KSB Service PRESENTATION (3)

How spark erosion actually works

• No force or heat is transferred to the parent part when material is being eroded.

The Spark Erosion Process

• Very low risk of damage to threads.

• Leaves tapped hole ready for a replacement stud to be inserted.

• Works on the principle of a vibrating spindle with electrical power supply creating a series of arcs occurring 120 times per second.

• Cutting takes place at the tip of the graphite electrode with 4 bar water pressure running through the centre cooling and flushing as the material is being eroded.

5KSB SERVICE UNITED KINGDOM P ECCLES 2015

Page 6: KSB Service PRESENTATION (3)

KSB Service utilize the most powerful and reliable 20KVA

Super Structure

Power Unit

Machines used by KSB Service

• Capable of continuously disintegrating on a 100% duty cycle

• virtually cuts in any angle or direction.

• minimum preparation time required to set up.

• Cuts through the hardest of materials quickly and efficiently.

6KSB SERVICE UNITED KINGDOM P ECCLES 2015

Page 7: KSB Service PRESENTATION (3)

Workshop & faculties

• Our Workshop is used for making graphite electrodes & special tooling for customers unique needs (24 hour turnaround)

• A Strategic stock holding of graphite electrodes is held at our workshop, covering a range of sizes & shapes, facilitating fast reaction.

• We also carry out all maintenance work on our spark erosion equipment here to ensure that we supply you the customer with the most effective and reliable service possible.

• The workshop is also available for any in house spark erosion on small parts that are more manageable to transport for repair.

7KSB SERVICE UNITED KINGDOM P ECCLES 2015

Page 8: KSB Service PRESENTATION (3)

Benefits of using spark erosion

Gas turbine removal of blind radial bolts

• Spark Erosion is a fast and effective way of removing the blind radial bolts on any gas turbine and has been proven to be up to 5 times faster to conventional drilling.

• Minimum preparation & set up time

• Casing will be ready for lifting quicker

• Allows the customer faster access to the inside of the turbine keeping them on schedule with there outage plan.

• 24 hr response & cover available on every job

• Minimum damage to threads leaving hole ready for replacement stud

8KSB SERVICE UNITED KINGDOM P ECCLES 2015

Page 9: KSB Service PRESENTATION (3)

Some pictures of spark erosion on a GE 9E gas turbine & boiler feed pumpRemoval of the coupling bolts on a 9E gas turbine

Removal of 31/4 unc studs from boiler feed pump end cover

9KSB SERVICE UNITED KINGDOM P ECCLES 2015

Page 10: KSB Service PRESENTATION (3)

GE workshop Dartford England (Case Study)

• Tie rods cut ready for spark erosion in order to release the seized compressor wheels.

• 4 techs with 2 machines worked on each shift day/night to complete this job resulting in GE refurbishing this rotor and returning it to the customer within the scheduled timescale they were given.

• Delighted customer

10KSB SERVICE UNITED KINGDOM P ECCLES 2015

Page 11: KSB Service PRESENTATION (3)

Uk power station 2012 (Case Study)• Boiler feed pump in-situ overhaul, during annual routine maintenance shut down, the BFP was the critical path item to returning the station on-line

• 16 off end cover studs seized

• Removed by MDS using spark erosion in only 4 days

• Conventional removal methods (drilling) estimated at 14 days

• Result BFP completed ahead of schedule

• Station operator benefitted from increased generation earnings due to early station on-line return.

11KSB SERVICE UNITED KINGDOM P ECCLES 2015

Page 12: KSB Service PRESENTATION (3)

KSB Service 24hr response

• KSB Service have teams available 24hrs a day 365 days of the year

• Have specialised equipment based around the globe minimising response times and costs

• KSB Service are world market leaders in the spark erosion business and have been supplying our services to a wide variety of sectors inclusive of the oil & gas , energy and the marine industry

12KSB SERVICE UNITED KINGDOM P ECCLES 2015

Page 13: KSB Service PRESENTATION (3)

Service Portfolio• On Site Spark Erosion

• Gas & Steam Turbine Seized Stud Removal

• River hawk Repair & Servicing

• Broken Taps

• Dowel & Pin Removal

• Total 53 Employees at 3 UK facilities

• Pump and valve Field & Workshop services

Markets• Energy

• Water & Waste Water

• Oil & Gas

• Marine

• Steel

• Offshore

13KSB SERVICE UNITED KINGDOM P ECCLES 2015

Page 14: KSB Service PRESENTATION (3)

Paul EcclesSales ManagerTel: +44 141 883 0732 (work)Mob:+44 7803 389 193 Email:[email protected]

KSB Service52 Nasmyth road SouthGlasgow G52 4REScotland

24 hrs 365 days

14KSB SERVICE UNITED KINGDOM P ECCLES 2015

Contacts:

KSB Limited2 cotton way, LoughboroughLeicestershire LE11 5TFTel:01509231872Www.ksb.com