Page 1: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN

2017-2020

OFICINA DEL SECRETARIO

Departamento de Recursos Naturales y Ambientales

Page 2: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario Humanos

ÍNDICE

Introducción ..................................................................................................................... 3

Base Legal ...................................................................................................................... 3

Misión y Visión ................................................................................................................ 5

Organigrama ................................................................................................................... 6

Proyectos y Logros.......................................................................................................... 9

Proyectos de Asistencia Pública de FEMA .................................................................. 16

Page 3: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 3

Introducción

El Departamento de Recursos Naturales y Ambientales (DRNA), conforme a la Ley Núm. 23 de 20 de junio de 1972, según enmendada, está bajo la dirección y supervisión de su Secretario(a). A tenor con el Plan de Reorganización 1-1993, está adscrita a la Oficina del (de la) Secretario(a) la Autoridad de Desperdicios Sólidos en Puerto Rico, la Administración de Recursos Naturales, las Oficinas Asesoras y las Secretarías Auxiliares. El(la) Secretario(a) del DRNA es miembro del Consejo Consultivo del Gobernador(a), como parte del Gabinete Constitucional.

La Oficina del Secretario esta a cargo de la implantación y formulación de la política pública ambiental y de la protección y conservación de los recursos naturales y ambientales, regula los temas de contaminación ambiental, aire, agua, terrenos, contaminación por ruido y lumínica. Además, es responsable de la administración y la operación de los parques nacionales, balnearios y centros vacacionales. También administra los bienes de dominio público marítimo terrestre y de la protección de la biodiversidad, los bosques, la vida silvestre, los arrecifes de coral y la suma de especies de flora y fauna de nuestra Isla. Asimismo, administra las áreas naturales protegidas y es la Agencia reguladora en temas de contaminación ambiental de aire, aguas, suelos y la contaminación por ruido. De igual forma, tiene el deber ministerial de establecer y ejecutar la política pública concerniente al manejo de desperdicios sólidos y, por otra parte, también es responsable de administrar y operar los parques nacionales, centros vacacionales y balnearios públicos.

Base Legal

La Ley Núm. 23 de 20 de junio de 1972, según enmendada, conocida como Ley Orgánica

del Departamento de Recursos Naturales y Ambientales, establece que el DRNA será

responsable de implementar la política pública del Gobierno, contenida en la sección 19

del Artículo VI de la Constitución de Puerto Rico. Esta dispone que será política pública

del Gobierno de Puerto Rico la más eficaz conservación de sus recursos naturales, así

como el mayor desarrollo y aprovechamiento de los mismos para el beneficio general de

la comunidad.

Page 4: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 4

Por otra parte, la Ley 171-2018, conocida como Plan de Reorganización del

Departamento de Recursos Naturales y Ambientales de 2018, consolidó en el DRNA las

funciones y operaciones de la Junta de Calidad Ambiental (JCA), la Autoridad de

Desperdicios Sólidos (ADS), y el Programa de Parques Nacionales (PPN).

Page 5: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 5

Misión y Visión

Misión

Proteger, conservar y administrar los recursos ambientales del país de forma

balanceada para garantizar a las próximas generaciones su disfrute y estimular

una mejor calidad de vida.

Visión

Propiciar un ambiente sano y saludable a través de la promoción del uso sostenible de los recursos naturales, la ordenación de la gestión ambiental y la transformación de la cultura ambiental de los puertorriqueños hacia una conservación, con la participación de todos los sectores con la sociedad para mejorar la calidad de vida.

Page 6: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 6

Organigrama

Comité de Expertos y Asesores sobre Cambio Climático

Ley 33-2019

Oficina del (la) Secretario (a)001

Ayudante Especial I011 ocupado003 ocupado014108 ocupado 014119 ocupado014148 ocupado014692 ocupado014693 ocupado014690 vacante008 vacante016 vacante017 vacante398 vacante1860 vacante18459 vacante 184003 vacante184079 vacante

Ayudante Especial II004 ocupado005 vacante006 vacante007 vacante009 vacante1803 vacante 184020 vacante184025 vacante 184030 vacante

Director en Relaciones Laborales (C)

014349 vacante

Chofer Confidencial015 Vacante014006 Vacante18407 Vacante

SubSecretario002 vacante

Secretaria Ejecutiva Confidencial III

014003 vacante

Secretaria Ejecutiva Confidencial II010 ocupado014146 vacante014133 vacante184004 vacante

Secretaria Ejecutiva Confidencial I1852 vacante184012 vacante184005 vacante

Administradora Sistemas de Oficina I086 vacante6308 ocupado

Page 7: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 7

Oficina de Auditoría Interna

Page 8: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 8

Organigrama funcional no cuenta con la aprobación de OGP.

Junta de Subastas

Page 9: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 9

Proyectos y Logros

Sembrando Futuro

El proyecto Sembrando Futuro, es un esfuerzo gubernamental cuya meta es sembrar 500 mil árboles nativos y endémicos en todo Puerto Rico durante los próximos cinco años. El programa está enfocado en la reforestación de las 134 cuencas hidrográficas de la Isla.

Los impactos de los huracanes Irma y María impactaron severamente nuestros bosques; específicamente, María causó una defoliación masiva en toda la Isla, lo que provocó la pérdida de la cobertura vegetal. Conociendo la importancia de la conservación de los bosques, la protección de los cuerpos de agua y las futuras generaciones, se asignado el nombre Sembrando Futuro para este proyecto.

Aunque somos conscientes de que los fenómenos atmosféricos como sequías y disturbios tropicales son propios de la zona geográfica en que se encuentra nuestra Isla, estos fenómenos se hacen cada vez más frecuentes e intensos. Ante esta realidad, reconocemos la necesidad de recibir el insumo de los expertos para tomar las medidas correctas.

El proyecto comenzó con la siembra, liderada por el DRNA, junto a líderes de la comunidad y representantes de las organizaciones sin fines de lucro, de 200 árboles comunes de las áreas costeras en el Bosque Estatal de Piñones en Loíza.

Los árboles sembrados fueron mangle botón, emajagüilla, icacos, uva de playa y corazón cimarrón.

Como parte del esfuerzo, personal técnico y especializado en las regiones del DRNA realizaron siembras mensuales para alcanzar la meta. Estos trabajos estuvieron a cargo de los directores regionales y biólogos del Negociado de Manejo de Áreas Naturales Protegidas y Servicios Forestales.

Hasta la fecha se han sembrado más de 145,875 mil árboles.

Además, la agencia comenzó un programa de charlas y orientaciones a estudiantes de escuelas públicas en Loíza, donde ubica parte de la cuenca hidrográfica del Río Grande. Por medio del programa, los alumnos reciben educación enfocada en el ciclo de agua, así como la importancia de los ríos y árboles.

Page 10: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 10

Las recientes proyecciones realizadas para Puerto Rico muestran que el calentamiento en la Isla será mucho más alto que el promedio mundial, lo que provocará periodos de sequía más prolongados y efectos negativos sobre la disponibilidad de agua, la agricultura, la salud humana, la flora y la fauna.

Puerto Rico is Open for Green Business

El foro Puerto Rico is Open for Green Business fue realizado para atraer empresas interesadas en invertir en negocios que estén en armonía con el ambiente La protección de la naturaleza ante el calentamiento global se ha convertido en una prioridad para el gobierno de Puerto Rico, mientras la Isla igualmente necesita de un nuevo impulso para su desarrollo económico Ante ambas necesidades, el gobierno de Puerto Rico creó una iniciativa progresiva para crear, como nunca se había hecho, el clima propicio que permita el surgimiento y desarrollo de empresas relacionadas con el área de “negocios verdes”, auspiciando el foro Puerto Rico is Open for Green Business. El foro se llevó a cabo el martes, 30 de abril en el Centro de Convenciones de Puerto Rico. El evento contó con la participación de la Compañía de Turismo de Puerto Rico, Discover Puerto Rico, Rones de Puerto Rico y el Departamento de la Vivienda y compañías del sector privado. El propósito del foro fue darle un nuevo giro a la manera tradicional en que se hace negocios en Puerto Rico, al presentar las oportunidades de insertarnos e n el “Green Economy”, y posicionar a Puerto Rico como un centro de excelencia e innovación en materia de resiliencia, mitigación y adaptación al cambio climático a través de la economía verde. Promover las grandes oportunidades para hacer negocios exitosos con poco o ningún impacto ambiental o de protección de los recursos naturales, resultará necesariamente en la creación de una sociedad resiliente y ecológicamente consciente, objetivos propuesto en el Comité Asesor de Cambio Climático.

Esta es una iniciativa inter-gubernamental que busca promover a Puerto Rico como un mercado de oportunidades para el desarrollo de actividades económicas eco-sustentables, las cuales potenciarán la creación de empleos, a la vez que nos ayuda a conservar y proteger la naturaleza amenazada por el cambio climático. Trabajando cuatro grandes temas: energía renovable, turismo verde, infraestructura verde y reciclaje

Puerto Rico tiene los atributos y la biodiversidad para el desarrollo de todos estos mercados socialmente responsables, sostenibles y beneficiosos para la naturaleza. Es hora de cambiar la forma de hacer negocios en Puerto Rico y las industrias verdes son una de las alternativas más prometedoras.

Page 11: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 11

Comité Asesor de Cambio Climático La Ley de Mitigación, Adaptación y Resiliencia al Cambio Climático de Puerto Rico, establece una política pública clara con metas, métricas y fechas de cumplimiento para atender la variación global del clima de la Tierra a causa de la actividad humana. Con el fin de alcanzar la política general del Gobierno aquí establecida y la dirección estratégica en torno al cambio climático en Puerto Rico, se crea el Comité de Expertos y Asesores sobre Cambio Climático, adscrito al Departamento de Recursos Naturales y Ambientales, y cuyo presidente es el Secretario de Recursos Naturales y Ambientales, con total autonomía e independencia para atender los asuntos sustantivos, cuyo deber es asesorar y preparar el Plan de Mitigación, Adaptación y Resiliencia al Cambio Climático a evaluarse por la Comisión Conjunta sobre Mitigación, Adaptación y Resiliencia al Cambio Climático.

Entre las funciones del Comité de Expertos y Asesores sobre Cambio Climático se encuentran:

Presentar el Plan de Mitigación, Adaptación y Resiliencia al Cambio Climático, según establecido en los Artículos 8 y 9 de esta Ley, a la Comisión Conjunta sobre Mitigación, Adaptación y Resiliencia al Cambio Climático de la Asamblea Legislativa. El mismo debe ser uno viable para alcanzar los objetivos de reducción en las emisiones de gases de efecto de invernadero y de los contaminantes del aire para los períodos considerados, así como una propuesta de las medidas necesarias, incluyendo aquellos incentivos ambientales, para alcanzarlos de forma planificada y estableciendo indicadores cuantitativos anuales del impacto de las acciones.

Coordinar con la Rama Ejecutiva, Rama Legislativa, las agencias públicas, sectores industriales, grupos empresariales y organizaciones ambientales aquellas medidas necesarias para alcanzar las métricas establecidas en esta Ley.

Solicitar a las organizaciones de los sectores social y privado, así como a la sociedad en general, a colaborar con propuestas en cuanto al Plan de Mitigación, Adaptación y Resiliencia al Cambio Climático.

Establecer las prioridades de actuación, atendiendo a la disponibilidad económica, la planificación sectorial y el análisis costo eficiente.

Monitorear y evaluar el seguimiento e implementación de las políticas climáticas y de los planes de acción sectoriales con relación a los aspectos relevantes para alcanzar las finalidades de la presente Ley. Se le autoriza y faculta a expedir multas contra cualquier agencia gubernamental, entidad gubernamental y corporación pública que incumpla reiteradamente con las disposiciones de esta Ley y la implementación de las políticas climáticas. Para esto se presentará ante la Comisión Conjunta Sobre Mitigación, Adaptación y Resiliencia al Cambio Climático creada al amparo del Artículo 16 de esta Ley un reglamento

Page 12: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 12

para la imposición de estas multas. La Comisión Conjunta Sobre Mitigación, Adaptación y Resiliencia al Cambio Climático deberá aprobar el reglamento. Los dineros que se reciban por concepto de multas estarán destinados a favor del Fondo de Cambio Climático.

Preparar y presentar a la Oficina del Gobernador, la Secretaría de la Cámara y del Senado de Puerto Rico un informe sobre contribuciones determinadas por sector económico.

Difundir sus finanzas, incluyendo ingresos y gastos, trabajos y resultados, así como publicar un informe anual de actividades y contribuciones por sector económico en Puerto Rico de la cantidad de emisiones anuales en el turismo, agricultura, transportación, farmacéutica, construcción, manufactura, sector energético y el Gobierno.

Realizar talleres públicos para educar en torno al cambio climático, sus efectos y repercusiones, y las medidas que pueden implementarse para reducir las emisiones de gases con efecto de invernadero.

El Comité de Expertos y Asesores sobre Cambio Climático de Puerto Rico comenzó a reunirse a

principios de 2020. Durante este tiempo se han realizado las siguientes gestiones:

1. El Reglamento de procedimientos internos CEACC. 2. Petición de presupuesto a OGP. 3. Bosquejo del Plan de Mitigación, Adaptación y Resiliencia al Cambio Climático. 4. Someter enmiendas a la Ley 33-2019. 5. Reunión con la Lcda. Margarita Varela del Comité de Recursos Naturales de la Cámara de

Representantes de Estados Unidos. 6. Discusión de comentarios al Reglamento Conjunto de la Junta de Planificación. 7. Orientar a la Administración de Servicios Generales (entidad que compra los vehículos del

gobierno central) sobre disposición de la Ley # 33 que requiere compra de vehículos de motor que no usen combustibles fósiles.

Los miembros del comité son los siguientes:

Lcdo. Rafael A. Machargo Maldonado Secretario de Departamento de Recursos Naturales

Jorge Haddock Presidente Universidad de Puerto Rico

Manuel Laboy Secretario de Desarrollo Económico

Rafael Méndez Tejada

Ada Monzón

Maritza Barreto

Roy Torbert

Carl Axel Soderberg

Pablo Méndez

Page 13: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 13

FEMA – Programa de Asistencia Pública

El Programa de Asistencia Pública (PA, por sus siglas en inglés) de la Agencia Federal para el Manejo de Emergencias (FEMA, por sus siglas en inglés) otorga subvenciones a agencias estatales, municipios y organizaciones privadas sin fines de lucro (PNP, por sus siglas en inglés) para que las comunidades puedan responder rápidamente y recuperarse de desastres mayores. El Programa es financiado por FEMA y administrado por el Gobierno de Puerto Rico, a través de la Oficina Central de Recuperación, Reconstrucción y Resiliencia (COR3, por sus siglas en inglés). FEMA asigna fondos para estos proyectos directamente para Puerto Rico. El programa de PA consiste de las siguientes etapas: Solicitud de Asistencia Pública (RPA, por sus siglas en inglés), Formulación del Proyecto, Revisión de la Subvención, Solicitud de Reembolso (RFR, por sus siglas en inglés) y el Cierre de Proyecto. La Formulación del proyecto es el proceso de identificar el ámbito de trabajo elegible y estimar los costos asociados con ese alcance de trabajo para cada uno de los proyectos del Subreceptor (DRNA). COR3 y FEMA colaboran con el Solicitante para formular daños relacionados con incidentes en proyectos basados en agrupaciones lógicas del daño y alcance del trabajo. En esta etapa, se crea la Hoja de Trabajo del Proyecto (PW, por sus siglas en inglés). Aunque el Solicitante es responsable de identificar los daños y de proveer la documentación para respaldar la solicitud de financiamiento, este proceso es un esfuerzo colaborativo que comienza con el Inventario de Daños y concluye con el Cálculo del Costo Fijo. Para facilitar el procesamiento de los fondos de Asistencia Pública, FEMA separa el Trabajo de Emergencia en 2 categorías (A-B), y la Obra Permanente en 5 categorías (C-G), según los tipos generales de instalaciones, y la categoría Z para los Costos de Administración Estatal y los Costos Administrativos Directos (DAC, por sus siglas en inglés). A continuación, se enumeran todas las categorías: Trabajo de Emergencia

• Categoría A - Recogido de escombros

• Categoría B - Medidas de protección en emergencias Obra Permanente

• Categoría C - Carreteras y Puentes

• Categoría D - Instalaciones de control de agua

• Categoría E - Edificios y equipo

• Categoría F - Servicios Públicos

• Categoría G - Parques, instalaciones recreativas y otros Costos Administrativos

• Categoría Z - Costos Administrativos del Estado (DAC, por sus siglas en inglés)

• Categoría Z - Costos Administrativos Directos Proceso de la Formulación del Proyecto La siguiente figura explica los pasos en el proceso de la Formulación del Proyecto:

Page 14: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 14

Paso 1: Identificación de Daños Para comenzar el proceso, las agencias gubernamentales, los municipios y las organizaciones sin fines de lucro son responsables de identificar todas las instalaciones dañadas por los huracanes Irma y María. Paso 2: Visita al Sitio La inspección inicial del sitio se realiza para validar los daños del desastre y obtener toda la información necesaria para preparar una descripción detallada de los daños. Paso 3: Descripciones de Daños y Dimensiones (DDD) El PW debe contener una descripción detallada de los daños que incluya las dimensiones y la causa del daño. La descripción del daño y las dimensiones son los elementos más críticos del PW. COR3, FEMA y el Solicitante deben coincidir en la descripción del daño y las dimensiones, preferiblemente antes de iniciar el desarrollo del alcance del trabajo. Paso 4: Alcance del Trabajo & Estimado de Costos (SOW & CE) Una vez se formula el DDD, se inicia el proceso del SOW & CE. El borrador inicial del SOW y CE será preparado por FEMA y se presentará a COR3 y al Subreceptor (DRNA) para su revisión y cualquier colaboración necesaria hasta que las tres partes involucradas lleguen a un acuerdo. Paso 5: Estimado de Costo Fijo (FCE) FEMA enviará la estimación al Panel de expertos para su validación cuando la estimación del costo total del proyecto sea de $5 millones o más o cuando hay un desacuerdo entre cualquiera de dos partes. Proceso 428 Hasta marzo de 2020, FEMA está utilizando el Programa de Procedimientos Alternativos 428 en Puerto Rico. Bajo los Procedimientos Alternativos, FEMA financiará todos los Proyectos grandes de trabajo permanente sobre la base de estimaciones fijas. Este procedimiento varía de lo descrito en 44 CFR §206.203 (c) (1), que proporciona fondos para el costo real de completar el alcance de trabajo elegible. Para el trabajo elegible que ya se ha completado, la cantidad fija se basará en el costo real. Si el trabajo elegible ya ha comenzado, pero la restauración no se ha completado, el costo fijo puede basarse en los costos reales y / o estimados según corresponda. FEMA usa la Hoja de Trabajo del Proyecto (PW) como la solicitud de subsidio. El PW documenta los detalles del proyecto del Solicitante, incluida una descripción detallada de los daños y dimensiones relacionados con el desastre y el Alcance del Trabajo (SOW, por sus siglas en inglés) asociado y los costos. Hoja de Trabajo de Proyecto La Hoja de Trabajo del Proyecto (PW, por sus siglas en inglés) es el mecanismo de concesión a través del cual se brinda asistencia federal de recuperación en caso de desastre a los destinatarios elegibles. Es la forma principal que se utiliza para documentar proyectos de Asistencia Pública e incluye la ubicación, la descripción y dimensiones de los daños, el alcance del trabajo y el costo. Los PW son preparados por FEMA, revisados y comentados por COR3 y los solicitantes. Solo los proyectos incluidos en un PW serán financiados por FEMA. El PW contiene la información necesaria para que el personal

Page 15: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 15

autorizado revise y apruebe el SOW y los costos. Si se aprueba, FEMA obliga a la parte federal de los costos del proyecto elegibles. Una vez que un PW ha sido obligado, los fondos están disponibles para los procedimientos de reducción.

Revisión de PW Una vez que se presenta la descripción y las dimensiones del daño del proyecto, el alcance del trabajo (SOW) y el costo, el proyecto pasa por las siguientes revisiones:

Bajo las declaraciones de desastres firmadas por el Presidente en septiembre de 2017 para el huracán Irma (EM-3384 y DR-4336) y el huracán María (DR-4339), todos los 78 municipios de Puerto Rico han sido designados como elegibles para recibir asistencia de FEMA. El DRNA firmó el inventario de daños en mayo de 2020 y se encuentra trabajando en la formulación de proyectos. De acuerdo a la Figura 1 el proceso de formulación de proyectos inicia con las visitas de inspección, con la información recopilada FEMA elabora los DDDs (Damages, Description and Dimensions); basado en los DDDs se confecciona el Alcance de Trabajo SOW (Scope of Work) y se arriba a un estimado de costos. Cada etapa es dependiente de la anterior, y no se puede proceder hasta tanto no finalice y se apruebe la etapa anterior. Para la mayoría de las localidades del DRNA no se han realizado visitas de inspección, y por lo tanto, los proyectos están en la etapa inicial de desarrollo y recopilación de información. Para la declaración de desastre firmada por el Presidente para los terremotos (DR-4473) comprende el periodo de incidente comenzando el 28 de diciembre de 2019, hasta el 31 de julio de 2020 e incluye a los siguientes municipios:

· Adjuntas · Guánica · Guayanilla · Jayuya · Juana Díaz · Lajas · Las Marías · Mayagüez · Peñuelas · Ponce · Sabana Grande · San Germán · Utuado · Yauco

Page 16: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 16

Ley del Comité Asesor de Reciclaje El 4 de agosto de 2017 se aprobó la Ley 66 titulada “Ley del Comité Asesor de Reciclaje” El Comité asistirá al Departamento de Recursos Naturales y Ambientales con recomendaciones sobre la política pública relacionada con la industria de reciclaje, evaluará y recomendará legislación relacionada con la prohibición, cargos por uso, impuesto o sobrecargos relacionados con reciclaje. Además, proveerá apoyo institucional a la industria de reciclaje y recomendará medidas necesarias para la promoción del reciclaje. A estos efectos el comité se ha reunido en varias ocasiones y está evaluando los posibles proyectos de ley que ayuden al desarrollo de programas para el manejo de residuos orgánicos de alimentos. Además, está evaluando legislación que promueva la reducción de los residuos a ser generados. La creación del Comité ayuda a obtener insumo de todos los sectores impactados por los programas de reciclaje (público, privado y gubernamental).

Programa de Desperdicios Sólidos No Peligrosos El Secretario ha estado trabajando directamente en reenfocar el Programa de Desperdicios Sólidos No Peligrosos para asegurarse que el Departamento de Recursos Naturales y Ambientales mantenga su prerrogativa para establecer la política pública sobre el manejo de los desperdicios sólidos no peligrosos en Puerto Rico. La Agencia Federal de Protección Ambiental (EPA, por sus siglas en inglés) en la década de los 90 delegó en el Gobierno de Puerto Rico este Programa. Por los pasados 10 años, la facultad de establecer la política pública para el manejo de los desperdicios sólidos en Puerto Rico había sido abandonada y este vacío lo estaba llenando la EPA, por lo que es vital retomar esta importante facultad.

Proyectos de Asistencia Pública de FEMA A continuación, se presenta una descripción general del estado y la situación de todos los proyectos presentados a la Agencia Federal para el Manejo de Emergencias (FEMA): Tabla 1. Listado de proyectos sometidos para Asistencia Pública de la Agencia para el Manejo de Emergencias (FEMA, por sus siglas en inglés) del Departamento de Recursos Naturales y Ambientales (DRNA) para los huracanes Irma (EM-3384 y DR-4336) y María (DR-4339). Incluye proyectos del Programa de Parques Nacionales, bajo la sombrilla del DRNA en virtud de la Ley Núm. 171 del 2 de agosto de 2018. El 6 de marzo de 2020, el DRNA se acogió al Programa Tradicional de Asistencia Pública (Sección 406 de la Ley Stafford) para trabajar los proyectos grandes de mejoras permanentes para servicios no críticos1. El programa Asistencia Pública otorga fondos para reparación y puede asignar una partida para hacer las facilidades más resistentes e implementar medidas de mitigación de riesgos que las protejan de daños futuros.

Event Project

# Category Title Type

Process Step

3384EM-PR (3384EM) 51169

B - Emergency Protective Measures

EMERGENCY PROTECTVE MEASURES

Work Completed / Fully Documented

Pending Initial Project Development

4336DR-PR (4336DR) 51170

B - Emergency Protective Measures

DRNA-01PW CATA expidited balance

Work Completed / Fully Documented

Applicant Signed Project

4336DR-PR 51171 B - Emergency DRNA01-CATB- Work Completed / Pending

Page 17: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 17

Event Project

# Category Title Type

Process Step

(4336DR) Protective Measures DEPT OF NATURAL AND ENVIRONMENTAL RESOURCES (3)

Fully Documented Formulation Completion

4339DR-PR (4339DR) 51175

B - Emergency Protective Measures

MDNE009 -Emergency Protective Measures

Work Completed / Fully Documented

Applicant Signed Project

4339DR-PR (4339DR) 51182

B - Emergency Protective Measures

MDNE013 - EPM Generators

Work Completed / Fully Documented

Applicant Signed Project

4339DR-PR (4339DR) 74109

B - Emergency Protective Measures

MDNE022 Cerrillos Dam Low Flow Gate Standard

Applicant Signed Project

4339DR-PR (4339DR) 107744

B - Emergency Protective Measures

MDNE014 Emergency Protective Measures

Work Completed / Fully Documented

Applicant Signed Project

4339DR-PR (4339DR) 51172

B - Emergency Protective Measures

CAT-B Dept. of Natural and Environmental Resources

Work Completed / Fully Documented Obligated

4339DR-PR (4339DR) 51173

B - Emergency Protective Measures

MDNE007 - Emergency Protective Measures

Work Completed / Fully Documented Obligated

4339DR-PR (4339DR) 51174

B - Emergency Protective Measures

MDNE008 Emergency Protective Measures

Work Completed / Fully Documented Obligated

4339DR-PR (4339DR) 51176

B - Emergency Protective Measures

MDNE010 - Emergency Protective Measures

Work Completed / Fully Documented Obligated

4339DR-PR (4339DR) 51177

B - Emergency Protective Measures

MDNE011 - Emergency Protective Measures

Work Completed / Fully Documented Obligated

4339DR-PR (4339DR) 51178

B - Emergency Protective Measures

MDNE012 - Emergency Protective Measures

Work Completed / Fully Documented Obligated

4339DR-PR (4339DR) 51179

B - Emergency Protective Measures

MDNE017 -Emergency Protective Measures

Work Completed / Fully Documented Obligated

4339DR-PR (4339DR) 51180

B - Emergency Protective Measures

MDNE020-EMERGENCY PROTECTIVE

Work Completed / Fully Documented Obligated

Page 18: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 18

Event Project

# Category Title Type

Process Step

MEASURES

4339DR-PR (4339DR) 51181

B - Emergency Protective Measures

MDNE006 Emergency Protective Measures

Work Completed / Fully Documented Obligated

4339DR-PR (4339DR) 65424

B - Emergency Protective Measures

MNDE021-Construction Temporary Electrical Subst Standard Obligated

4339DR-PR (4339DR) 77128

B - Emergency Protective Measures

MDNE023 - Emergency Measures for Flood Control Pump Stations – Bypass Pumps Specialized Obligated

4339DR-PR (4339DR) 134461

B - Emergency Protective Measures

Contracted Security Hours for FCPS

Work Completed / Fully Documented Obligated

4339DR-PR (4339DR) 91699

D - Water Control Facilities

El Parque Flood Control Pump Station Discharge Pipe Specialized

Pending Applicant DDD Approval

4339DR-PR (4339DR) 120066

E - Buildings and Equipment

Mona West Sardinera - Ranger Detachment Facilities Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123241

G - Parks, Recreational Facilities, and Other Items

Boqueron Ranger Unit Pier Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123243

G - Parks, Recreational Facilities, and Other Items

Cano Tiburones Pier Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123247

G - Parks, Recreational Facilities, and Other Items Culebra Pier Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123248

G - Parks, Recreational Facilities, and Other Items

Guayanilla Boat Ramp Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123254

G - Parks, Recreational Facilities, and Other Items

Mona East - Pajaros Pier Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123310

E - Buildings and Equipment

Refugio Vida Silvestre Embalse Cerrillos Standard

Pending Applicant DDD

Page 19: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 19

Event Project

# Category Title Type

Process Step

Observation Tower Approval

4339DR-PR (4339DR) 123321

G - Parks, Recreational Facilities, and Other Items

Reserva Natural La Parguera Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123338

E - Buildings and Equipment

Bosque Estatal de Boqueron Office Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123390

D - Water Control Facilities

Balneario La Monserrate Pump System Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123392

D - Water Control Facilities

Parque Nacional Balneario Seven Seas Pump System Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123395

G - Parks, Recreational Facilities, and Other Items

Parque Acuático Punta Santiago Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123399

D - Water Control Facilities

Balneario Caña Gorda Pipe Line Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123457

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin A Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123458

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin B Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123459

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin C Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123460

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin D Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123461

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin E Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123462

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin F Standard

Pending Applicant DDD Approval

Page 20: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 20

Event Project

# Category Title Type

Process Step

4339DR-PR (4339DR) 123463

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin G Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123477

E - Buildings and Equipment

Centro Vacacional de Boqueron Villa 1 CC Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123478

E - Buildings and Equipment

Centro Vacacional de Boqueron Villa 1 DD Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123480

E - Buildings and Equipment

Centro Vacacional de Boqueron Villa 2 Algas Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123481

E - Buildings and Equipment

Centro Vacacional de Boqueron Villa 2 Ballenas Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123482

E - Buildings and Equipment

Centro Vacacional de Boqueron Villa 2 Coral Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123483

E - Buildings and Equipment

Centro Vacacional de Boqueron Villa 2 Delfin Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123484

E - Buildings and Equipment

Centro Vacacional de Boqueron Villa 2 Erizo Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123485

E - Buildings and Equipment

Centro Vacacional de Boqueron Villa 2 Faro Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123486

E - Buildings and Equipment

Centro Vacacional de Boqueron Villa 2 Gaviota Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123487

E - Buildings and Equipment

Centro Vacacional de Boqueron Villa 2 Hicaco Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123488

E - Buildings and Equipment

Centro Vacacional de Boqueron Villa 2 Islote Standard

Pending Applicant DDD Approval

Page 21: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 21

Event Project

# Category Title Type

Process Step

4339DR-PR (4339DR) 123489

E - Buildings and Equipment

Centro Vacacional de Boqueron Villa 2 Juey Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123496

E - Buildings and Equipment

Centro Vacacional Punta Santiago Cabin D Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123512

G - Parks, Recreational Facilities, and Other Items

Centro Vacacional Punta Santiago Recreational Facilities and Utilities Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 144027

D - Water Control Facilities

Southern Flood Contol Pump Stations Specialized

Pending Applicant DDD Approval

4339DR-PR (4339DR) 144028

D - Water Control Facilities

Baldorioty/De Diego/Parada 18 Flood Control Pump Stations Specialized

Pending Applicant DDD Approval

4339DR-PR (4339DR) 144029

D - Water Control Facilities

Catano/Guaynabo Flood Control Pump Stations Specialized

Pending Applicant DDD Approval

4339DR-PR (4339DR) 123396

D - Water Control Facilities

Parque Acuático Punta Santiago Pump Station Standard

Pending Applicant Project Review

4339DR-PR (4339DR) 123444

D - Water Control Facilities

Centro Vacacional Punta Santiago Pump System Standard

Pending Applicant Project Review

4339DR-PR (4339DR) 123246

G - Parks, Recreational Facilities, and Other Items

Ceiba Ranger Station Pier Standard

Pending CRC Project Development

4339DR-PR (4339DR) 123249

G - Parks, Recreational Facilities, and Other Items

Humacao Punta Santiago Pier Standard

Pending CRC Project Development

4339DR-PR (4339DR) 123250

G - Parks, Recreational Facilities, and Other Items

Humacao Reserve Dock System Standard

Pending CRC Project Development

4339DR-PR (4339DR) 123499

E - Buildings and Equipment

Centro Vacacional Punta Santiago Cabin F Standard

Pending CRC Project Development

4339DR-PR 123500 E - Buildings and Centro Vacacional Standard Pending CRC

Page 22: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 22

Event Project

# Category Title Type

Process Step

(4339DR) Equipment Punta Santiago Cabin G

Project Development

4339DR-PR (4339DR) 123509

E - Buildings and Equipment

Centro Vacacional Punta Santiago Villa 7 Standard

Pending CRC Project Development

4339DR-PR (4339DR) 123514

D - Water Control Facilities Cerrillos Dam1 Specialized

Pending CRC Project Development

4339DR-PR (4339DR) 123464

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin H Standard

Pending DDD Completion

4339DR-PR (4339DR) 85288

G - Parks, Recreational Facilities, and Other Items

Zoologico de Puerto Rico Parkwide Damages Standard

Pending EHP Review

4339DR-PR (4339DR) 123239

G - Parks, Recreational Facilities, and Other Items

Boqueron Boat Ramp Standard

Pending EHP Review

4339DR-PR (4339DR) 123501

E - Buildings and Equipment

Centro Vacacional Punta Santiago Cabin H Standard

Pending EMMIE Submission

4339DR-PR (4339DR) 89462

G - Parks, Recreational Facilities, and Other Items

Parque las Cavernas del Rio Camuy External Parkwide Damages Standard

Pending FEMA 406 HMP Completion

4339DR-PR (4339DR) 123245

G - Parks, Recreational Facilities, and Other Items Cayo Ratones Pier Standard

Pending FEMA 406 HMP Completion

4339DR-PR (4339DR) 123252

G - Parks, Recreational Facilities, and Other Items

La Parguera Boat Ramp Standard

Pending FEMA 406 HMP Completion

4339DR-PR (4339DR) 123253

G - Parks, Recreational Facilities, and Other Items

Mona West - Sardinera Pier Standard

Pending FEMA 406 HMP Completion

4339DR-PR (4339DR) 123256

G - Parks, Recreational Facilities, and Other Items

Playita Rosada Pier Standard

Pending FEMA 406 HMP Completion

1 El proyecto 123514 sobre mejoras permanentes a la represa Cerrillos es el único proyecto del DRNA que será bajo la Sección 428 de la Ley Stafford y los Procedimientos Alternos de Asistencia Pública, que establece un Estimado de Costo Fijo para los proyectos. La fecha límite establecida por FEMA para arribar a los Estimados de Costo Fijo es el 31 de diciembre de 2020.

Page 23: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 23

Event Project

# Category Title Type

Process Step

4339DR-PR (4339DR) 123362

E - Buildings and Equipment

Cabo Rojo Fish Lab Structures Standard

Pending FEMA 406 HMP Completion

4339DR-PR (4339DR) 123505

E - Buildings and Equipment

Centro Vacacional Punta Santiago Villa 3 Standard

Pending FEMA 406 HMP Completion

4339DR-PR (4339DR) 123506

E - Buildings and Equipment

Centro Vacacional Punta Santiago Villa 4 Standard

Pending FEMA 406 HMP Completion

4339DR-PR (4339DR) 123329

G - Parks, Recreational Facilities, and Other Items

Jose Luis Vivaldi Aviary Standard

Pending Formulation Completion

4339DR-PR (4339DR) 128915

Z - Management Costs

DNER Management Costs Management Costs

Pending Formulation Completion

4339DR-PR (4339DR) 154915

E - Buildings and Equipment

Additional DNER Contents Standard

Pending Formulation Completion

4339DR-PR (4339DR) 87465 A - Debris Removal

Island WIde Debris Removal Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123294

E - Buildings and Equipment

Moorings and Critical Habitats Buoys Island Wide Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123295

G - Parks, Recreational Facilities, and Other Items

Seagrass Restoration Island Wide Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123296

G - Parks, Recreational Facilities, and Other Items

Artificial Reefs Island Wide Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123297

E - Buildings and Equipment

Fish Aggregate Devices (FADs) Island Wide Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123298

G - Parks, Recreational Facilities, and Other Items

Manatee Signs Island Wide Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123299

G - Parks, Recreational Facilities, and Other

Coral Reefs Damage Island Wide Specialized

Pending Initial Project Development

Page 24: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 24

Event Project

# Category Title Type

Process Step

Items

4339DR-PR (4339DR) 123300

G - Parks, Recreational Facilities, and Other Items

Dunes Damage Island Wide Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123301

G - Parks, Recreational Facilities, and Other Items

Seagrass Damage Island Wide Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123303

G - Parks, Recreational Facilities, and Other Items

Wetlands Damage Island Wide Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123306

G - Parks, Recreational Facilities, and Other Items

Camuy Caves Clara Cave System Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123307

G - Parks, Recreational Facilities, and Other Items

Camuy Caves Espiral Cave System Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123308

G - Parks, Recreational Facilities, and Other Items

Camuy Caves Catedral Cave System Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123311

E - Buildings and Equipment

Refugio Vida Silvestre Embalse Guajataca Admin Building Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123312

G - Parks, Recreational Facilities, and Other Items

Refugio Vida Silvestre Embalse La Plata Facilities Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123315

G - Parks, Recreational Facilities, and Other Items

Reserva Nacional de Investigación Estuarina de Bahía de Jobos Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123316

C - Roads and Bridges

Reserva Natural Corredor Ecológico del Noreste Roads Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123322

G - Parks, Recreational Facilities, and Other Items

Reserva Natural Laguna Tortuguero Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123323

G - Parks, Recreational Facilities, and Other Items

Reserva Natural Efraín Archilla Diez Humacao Standard

Pending Initial Project Development

Page 25: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 25

Event Project

# Category Title Type

Process Step

4339DR-PR (4339DR) 123324

G - Parks, Recreational Facilities, and Other Items

Reserva Natural Punta Tuna Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123325

G - Parks, Recreational Facilities, and Other Items

Reserva Natural Caño Tiburones Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123326

D - Water Control Facilities

Reserva Natural Caño Tiburones Dike Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123327

E - Buildings and Equipment Finca Gabia Office Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123330

G - Parks, Recreational Facilities, and Other Items

Vivero de Plantas de Cambalache Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123331

G - Parks, Recreational Facilities, and Other Items

Vivero de Peces Maricao Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123332

D - Water Control Facilities

Vivero de Peces Maricao Water Structures Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123333

D - Water Control Facilities

Vivero de Peces Maricao Dam Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123334

D - Water Control Facilities

Vivero de Peces Maricao Holding Tank System Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123337

G - Parks, Recreational Facilities, and Other Items

Bosque Estatal de Aguirre Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123339

G - Parks, Recreational Facilities, and Other Items

Bosque Estatal de Cambalache Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123340

G - Parks, Recreational Facilities, and Other Items

Destacamento Cambalache Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123342

G - Parks, Recreational Facilities, and Other Items

Bosque Estatal de Carite Standard

Pending Initial Project Development

4339DR-PR 123343 G - Parks, Bosque Estatal de Standard Pending

Page 26: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 26

Event Project

# Category Title Type

Process Step

(4339DR) Recreational Facilities, and Other Items

Guajataca Initial Project Development

4339DR-PR (4339DR) 123344

E - Buildings and Equipment

Negociado de Servicio Forestal Building Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123346

G - Parks, Recreational Facilities, and Other Items

Bosque Estatal de Maricao Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123347

G - Parks, Recreational Facilities, and Other Items

Bosque Estatal de Monte Guilarte Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123348

G - Parks, Recreational Facilities, and Other Items

Bosque Estatal de Piñones Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123349

G - Parks, Recreational Facilities, and Other Items

Bosque Estatal de Rio Abajo Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123350

G - Parks, Recreational Facilities, and Other Items

Bosque Estatal de Susua Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123351

G - Parks, Recreational Facilities, and Other Items

Bosque Urbano de San Patricio Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123353

G - Parks, Recreational Facilities, and Other Items

Bosque Estatal de Toro Negro Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123354

G - Parks, Recreational Facilities, and Other Items

Bosque Estatal de Vega Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123355

G - Parks, Recreational Facilities, and Other Items

Base 11 Region Metropolitana Unidad Terrestre Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123356

G - Parks, Recreational Facilities, and Other Items

Base 61 Región Guayama Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123357

E - Buildings and Equipment

Destacamento de Guanica Standard

Pending Initial Project

Page 27: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 27

Event Project

# Category Title Type

Process Step

Development

4339DR-PR (4339DR) 123358

E - Buildings and Equipment

Hangar DRNA Isla Grande Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123359

E - Buildings and Equipment

Cayo Ratones Structures Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123360

G - Parks, Recreational Facilities, and Other Items

Cayo Aurora Structures Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123361

G - Parks, Recreational Facilities, and Other Items

Area Recreativa Isla de Cabras Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123363

G - Parks, Recreational Facilities, and Other Items

Reserva Natural de Humacao Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123365

G - Parks, Recreational Facilities, and Other Items

Unidad Maritima Cuerpo de Vigilantes de Ceiba Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123366

G - Parks, Recreational Facilities, and Other Items

Unidad Marítima Cuerpo de Vigilantes Arecibo Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123367

E - Buildings and Equipment

Unidad Maritima de Guayama Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123368

E - Buildings and Equipment

Unidad Maritima de Boqueron Contents Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123369

E - Buildings and Equipment

Unidad Maritima de Aguadilla Contents Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123370

E - Buildings and Equipment

Oficina Comisionado de Navegacion de Fajardo contents Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123371

E - Buildings and Equipment

Base 21 Región Arecibo contents Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123372

E - Buildings and Equipment

Base 41 Region Mayaguez contents Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123373

E - Buildings and Equipment

Base 51 Region Ponce contents Standard

Pending Initial Project

Page 28: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 28

Event Project

# Category Title Type

Process Step

Development

4339DR-PR (4339DR) 123374

E - Buildings and Equipment

Base 71 Region Humacao contents Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123377

G - Parks, Recreational Facilities, and Other Items

Parque Las Nereidas Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123378

G - Parks, Recreational Facilities, and Other Items

Parque Luis Muñoz Rivera Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123380

G - Parks, Recreational Facilities, and Other Items

Parque Lineal Marti Coll Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123383

B - Emergency Protective Measures

Equipment Rental for Debris Removal Island Wide

Work Completed / Fully Documented

Pending Initial Project Development

4339DR-PR (4339DR) 123384 A - Debris Removal

Natural and Protected Areas and Forests Debris Removal

Work Completed / Fully Documented

Pending Initial Project Development

4339DR-PR (4339DR) 123385

B - Emergency Protective Measures

Force Account Labor for Flood Control Pump Stations and Dams

Work Completed / Fully Documented

Pending Initial Project Development

4339DR-PR (4339DR) 123388

G - Parks, Recreational Facilities, and Other Items

Parque Julio Enrique Monagas Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123389

G - Parks, Recreational Facilities, and Other Items

Balneario La Monserrate Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123391

G - Parks, Recreational Facilities, and Other Items

Parque Nacional Balneario Seven Seas Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123393

G - Parks, Recreational Facilities, and Other Items

Balneario Sun Bay, Vieques Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123394

D - Water Control Facilities

Balneario Sun Bay, Vieques Pump Station Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123398

G - Parks, Recreational

Balneario Caña Gorda Standard

Pending Initial Project

Page 29: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 29

Event Project

# Category Title Type

Process Step

Facilities, and Other Items

Development

4339DR-PR (4339DR) 123400

G - Parks, Recreational Facilities, and Other Items

Centro Vacacional Villas de Añasco Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123401

G - Parks, Recreational Facilities, and Other Items

Balneario Tres Hermanos Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123402

D - Water Control Facilities

Balneario Tres Hermanos Pumping Station Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123403

G - Parks, Recreational Facilities, and Other Items

Centro Vacacional Monte del Estado Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123404

G - Parks, Recreational Facilities, and Other Items

Centro Vacacional Villas del Lago Caonillas Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123405

G - Parks, Recreational Facilities, and Other Items

Balneario Cerro Gordo Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123406

G - Parks, Recreational Facilities, and Other Items

Manuel Nolo Morales Balneario de Dorado Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123407

G - Parks, Recreational Facilities, and Other Items

Balneario de Punta Salinas Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123446

D - Water Control Facilities

Centro Vacacional de Boqueron Pumping Stations 1-3 Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123465

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin I Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123466

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin J Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123467

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin K Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123468

E - Buildings and Equipment

Centro Vacacional de Boqueron Standard

Pending Initial Project

Page 30: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 30

Event Project

# Category Title Type

Process Step

Cabin L Development

4339DR-PR (4339DR) 123469

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin M Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123471

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin N Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123472

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin O Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123473

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin P Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123474

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin Q Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123475

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabin R Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123476

E - Buildings and Equipment

Centro Vacacional de Boqueron Villa 1 BB Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123479

E - Buildings and Equipment

Centro Vacacional de Boqueron Villa 1 EE Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123490

G - Parks, Recreational Facilities, and Other Items

Centro Vacacional de Boqueron Villa 2 Parks and Rec Facilities and Utilities Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123492

G - Parks, Recreational Facilities, and Other Items

Centro Vacacional de Boqueron Parks, Recreation, and Storage Facilities Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123493 F - Utilities

Centro Vacacional de Boqueron Waste Water Treatment Plants 1 and 2 Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123494 F - Utilities

Centro Vacacional de Boqueron Electrical Substation Standard

Pending Initial Project Development

4339DR-PR (4339DR) 123513

D - Water Control Facilities Portugues Dam Specialized

Pending Initial Project Development

Page 31: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 31

Event Project

# Category Title Type

Process Step

4339DR-PR (4339DR) 123515

D - Water Control Facilities Ajies Dam Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123516

D - Water Control Facilities Daguey Dam Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123517

D - Water Control Facilities

Rio Anton Ruiz en Humacao Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123518

D - Water Control Facilities

Rio Humacao Canal Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123519

D - Water Control Facilities

Portugues West Levee System Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123520

D - Water Control Facilities

Portugues and Bucana Levee System Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123521

D - Water Control Facilities

Bayagan North Levee System Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123522

D - Water Control Facilities

Bucana East Levee System Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123523

D - Water Control Facilities

Portugues North Tieback Levee System Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123524

D - Water Control Facilities

Portugues East Waterway Levee Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123525

D - Water Control Facilities Rio Chiquito Levee Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123526

D - Water Control Facilities

Upper Bucana Debris Basin Levee System Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123527

D - Water Control Facilities

Rio Grande de Manati Levee (Barceloneta Pueblo) Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123528

D - Water Control Facilities

Quebrada Rosa Sanchez Yabucoa Canal Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123529

D - Water Control Facilities

Dique Canal Santiago Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123530

D - Water Control Facilities Dique Las Gramas Specialized

Pending Initial Project Development

Page 32: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 32

Event Project

# Category Title Type

Process Step

4339DR-PR (4339DR) 123531

D - Water Control Facilities

Dique Canal Tanama Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123532

D - Water Control Facilities

Canal Rio Santiago Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123533

D - Water Control Facilities

Villa Nueva Creek Dam Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123534

D - Water Control Facilities

Cantera Creek Debris Basin Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123535

D - Water Control Facilities

Cumba Creek Debris Basin Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123536

D - Water Control Facilities

Eugenia Creek Debris Basin Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123537

D - Water Control Facilities

Duende Creek Debris Basin Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123538

D - Water Control Facilities

Sin Nombre Creek Debris Basin Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123539

D - Water Control Facilities

Laya Creek Debris Basin Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123540

D - Water Control Facilities

Villa Nueva Creek Debris Basin Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123541

D - Water Control Facilities

Rio Bayamon Erosion Control Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123542

D - Water Control Facilities

Rio Turabo en Villa del Rey Caguas Flood Control Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123543

D - Water Control Facilities

Rio Grande de Loiza Contratos A/C Levee Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123544

D - Water Control Facilities

Rio Grande de Loiza Contrato D Waterway Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123545

D - Water Control Facilities

Quebrada Mendoza- Cabo Rojo Waterway Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123546

D - Water Control Facilities

Rio La Plata de Dorado (Fase 1A) Dike Specialized

Pending Initial Project Development

Page 33: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 33

Event Project

# Category Title Type

Process Step

4339DR-PR (4339DR) 123547

D - Water Control Facilities

Rio Guanajibo (San German) Channel Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123548

D - Water Control Facilities

Rio Puerto Nuevo Bechara Mid Section and 90 Sewer Line Waterway Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123550

D - Water Control Facilities

Rio Puerto Nuevo Bechara Contrato II AA Waterway Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123551

D - Water Control Facilities

Rio Puerto Nuevo contrato II AR- Margarita Channel Structure Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123552

D - Water Control Facilities

Rio Fajardo (dique Punta Fajardo) Dike Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123553

D - Water Control Facilities

Rio Fajardo (dique Santa Isidra) Dike Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123554

D - Water Control Facilities

Proyecto Control de Erosion Rio Pitahaya Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123555

D - Water Control Facilities

Rio Guayanilla (Guayanilla) Flood Control Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123556

D - Water Control Facilities

Rio Guanajibo (Hormigueros) Waterway Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123557

D - Water Control Facilities

Rio Yaguez Waterway Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123558

D - Water Control Facilities

Rio Guanajibo (Sabana Grande) Flood Control Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123560

D - Water Control Facilities Rio Cibuco Dike Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123562

D - Water Control Facilities

Rio Luchetti Flood Control Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 127388

E - Buildings and Equipment

Reserva Nacional de Investigación Estuarina de Bahía de Jobos Old Train Station Standard

Pending Initial Project Development

Page 34: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 34

Event Project

# Category Title Type

Process Step

4339DR-PR (4339DR) 127389

G - Parks, Recreational Facilities, and Other Items

Reserva Natural Caño Tiburones Dock Standard

Pending Initial Project Development

4339DR-PR (4339DR) 129592

D - Water Control Facilities Dique Expreso Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 129839 F - Utilities

Zoologico de Puerto Rico Phone Lines and Fiber Optic Networks Standard

Pending Initial Project Development

4339DR-PR (4339DR) 132452

G - Parks, Recreational Facilities, and Other Items

Coral Reef Restoration for Culebra Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 133836

E - Buildings and Equipment

Centro Vacacional Punta Santiago Cabins Contents Standard

Pending Initial Project Development

4339DR-PR (4339DR) 133838

E - Buildings and Equipment

Centro Vocacional Punta Santiago Villas Contents Standard

Pending Initial Project Development

4339DR-PR (4339DR) 133850

E - Buildings and Equipment

Centro Vacacional de Boqueron Cabins Contents Standard

Pending Initial Project Development

4339DR-PR (4339DR) 135604 F - Utilities

Punta Santiago Vacacional Center Transformers Standard

Pending Initial Project Development

4339DR-PR (4339DR) 136996

E - Buildings and Equipment

Cabo Rojo Fish Lab Contents Standard

Pending Initial Project Development

4339DR-PR (4339DR) 144031

D - Water Control Facilities

De Diego Flood Control Pump Station Outfall Pipeline Specialized

Pending Initial Project Development

4339DR-PR (4339DR) 123504

E - Buildings and Equipment

Centro Vacacional Punta Santiago Villa 2 Standard

Pending Insurance Completion

4339DR-PR (4339DR) 123507

E - Buildings and Equipment

Centro Vacacional Punta Santiago Villa 5 Standard

Pending Insurance Completion

4339DR-PR (4339DR) 123511

E - Buildings and Equipment

Centro Vacacional Punta Santiago Villa 9 Standard

Pending Insurance Peer Review

4339DR-PR (4339DR) 123039

G - Parks, Recreational Facilities, and Other Items

Isla Caja de Muerto Pier Specialized

Pending PDMG Scope & Cost Routing

Page 35: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 35

Event Project

# Category Title Type

Process Step

4339DR-PR (4339DR) 123508

E - Buildings and Equipment

Centro Vacacional Punta Santiago Villa 6 Standard

Pending PDMG Scope & Cost Routing

4339DR-PR (4339DR) 123238

G - Parks, Recreational Facilities, and Other Items

Bay View Catano Boat Ramp Standard

Pending Peer Review

4339DR-PR (4339DR) 86151

G - Parks, Recreational Facilities, and Other Items

Refugio de Vida Silvestre Iris Alameda Standard

Pending Recipient Final Review

4339DR-PR (4339DR) 122176

G - Parks, Recreational Facilities, and Other Items

Reserva Natural Caja de Muertos- Facilities Standard

Pending Recipient Final Review

4339DR-PR (4339DR) 123242

G - Parks, Recreational Facilities, and Other Items

Cabo Rojo Fish Lab Pier Standard

Pending Recipient Final Review

4339DR-PR (4339DR) 123251

G - Parks, Recreational Facilities, and Other Items

Isla de Cabras Boat Ramp Standard

Pending Recipient Final Review

4339DR-PR (4339DR) 123255

G - Parks, Recreational Facilities, and Other Items

Pinones Ranger Station Pier Standard

Pending Recipient Final Review

4339DR-PR (4339DR) 123498

E - Buildings and Equipment

Centro Vacacional Punta Santiago Cabin E Standard

Pending Recipient Final Review

4339DR-PR (4339DR) 123502

E - Buildings and Equipment

Centro Vacacional Punta Santiago Cabin K Standard

Pending Recipient Final Review

4339DR-PR (4339DR) 123503

E - Buildings and Equipment

Centro Vacacional Punta Santiago Villa 1 Standard

Pending Recipient Final Review

4339DR-PR (4339DR) 123510

E - Buildings and Equipment

Centro Vacacional Punta Santiago Villa 8 Standard

Pending Recipient Final Review

4339DR-PR (4339DR) 80241

G - Parks, Recreational Facilities, and Other Items

MDNE037-Zoologico de Puerto Rico, Mayaguez Standard

Process Discontinued

4339DR-PR (4339DR) 83765

G - Parks, Recreational Facilities, and Other Items

MDNE038-Centro Vacacional de Boqueron Standard

Process Discontinued

4339DR-PR 84241 G - Parks, MDNE050 Parque Standard Process

Page 36: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 36

Event Project

# Category Title Type

Process Step

(4339DR) Recreational Facilities, and Other Items

las Cavernas del Rio Camuy

Discontinued

4339DR-PR (4339DR) 84745

D - Water Control Facilities

MDNE024 - Baldorioty de Castro Pump Station Specialized

Process Discontinued

4339DR-PR (4339DR) 84748

D - Water Control Facilities

MDNE025 - De Diego Pump Station Specialized

Process Discontinued

4339DR-PR (4339DR) 84750

D - Water Control Facilities

MDNE026 - Parada 18 Pump Station Specialized

Process Discontinued

4339DR-PR (4339DR) 84751

D - Water Control Facilities

MDNE027 - Sabana Pump Station Specialized

Process Discontinued

4339DR-PR (4339DR) 84752

D - Water Control Facilities

MDNE028 - San Fernando Pump Station Specialized

Process Discontinued

4339DR-PR (4339DR) 84753

D - Water Control Facilities

MDNE029 - Juana Matos Pump Station Specialized

Process Discontinued

4339DR-PR (4339DR) 84754

D - Water Control Facilities

MDNE030 - Malaria Pump Station Specialized

Process Discontinued

4339DR-PR (4339DR) 84755

D - Water Control Facilities

MDNE031 - Bay View Pump Station Specialized

Process Discontinued

4339DR-PR (4339DR) 84756

D - Water Control Facilities

MDNE032 - Pichingo Pump Station Specialized

Process Discontinued

4339DR-PR (4339DR) 84758

D - Water Control Facilities

MDNE033 - El Guapo Pump Station Specialized

Process Discontinued

4339DR-PR (4339DR) 84759

D - Water Control Facilities

MDNE034 - El Parque Pump Station Specialized

Process Discontinued

4339DR-PR (4339DR) 84760

D - Water Control Facilities

MDNE035 - Las 80 Pump Station Specialized

Process Discontinued

4339DR-PR (4339DR) 84762

D - Water Control Facilities

MDNE036 - Pastillo Pump Station Specialized

Process Discontinued

4339DR-PR (4339DR) 86091

G - Parks, Recreational Facilities, and Other Items

Refugio de Vida Silvestre Iris Alameda Standard

Process Discontinued

4339DR-PR (4339DR) 87277

C - Roads and Bridges

MDNE039-Consolidated DI- Cat C Standard

Process Discontinued

4339DR-PR 87282 D - Water Control MDNE040- Standard Process

Page 37: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 37

Event Project

# Category Title Type

Process Step

(4339DR) Facilities Consolidated DI -CAT D

Discontinued

4339DR-PR (4339DR) 87284

D - Water Control Facilities

MDNE041-Consolisated- Cat D2 Standard

Process Discontinued

4339DR-PR (4339DR) 87288

E - Buildings and Equipment

MDNE042-Consolidated- Cat E Standard

Process Discontinued

4339DR-PR (4339DR) 87291

E - Buildings and Equipment

MDNE043-Consolidated- Cat E2 Standard

Process Discontinued

4339DR-PR (4339DR) 87295

G - Parks, Recreational Facilities, and Other Items

MDNE045-Consolidated-Cat G Standard

Process Discontinued

4339DR-PR (4339DR) 87296 F - Utilities

MDNE044-Consolidated- Cat F Standard

Process Discontinued

4339DR-PR (4339DR) 87299

G - Parks, Recreational Facilities, and Other Items

MDNE046-Consolidated-Cat G2 Standard

Process Discontinued

4339DR-PR (4339DR) 87309

G - Parks, Recreational Facilities, and Other Items

MDNE047-Consolidated-Cat G3 Standard

Process Discontinued

4339DR-PR (4339DR) 88319

Z - Management Costs DNER DAC cost Management Costs

Process Discontinued

4339DR-PR (4339DR) 89302

D - Water Control Facilities

MDNE052-El Parque Pump Station Discharge Pipe Standard

Process Discontinued

4339DR-PR (4339DR) 89303

G - Parks, Recreational Facilities, and Other Items

Bay View Catano Boat Ramp Standard

Process Discontinued

4339DR-PR (4339DR) 90001

G - Parks, Recreational Facilities, and Other Items

MDNE038-Centro Vacacional de Boqueron Standard

Process Discontinued

4339DR-PR (4339DR) 91581 A - Debris Removal Zoo Debris

Work Completed / Fully Documented

Process Discontinued

4339DR-PR (4339DR) 108622

Z - Direct Administrative Costs

MDNE015 PAAP DAC - SubRecipients

Direct Administrative Costs and SMC

Process Discontinued

4339DR-PR (4339DR) 123309

G - Parks, Recreational Facilities, and Other Items

Refugio Vida Silvestre Iris Alameda Facilities Standard

Process Discontinued

Page 38: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 38

Event Project

# Category Title Type

Process Step

4339DR-PR (4339DR) 123445

D - Water Control Facilities

Centro Vocacional Punta Santiago Tank Water Heater Standard

Process Discontinued

Tabla 2. Listado de proyectos sometidos para el Programa de Asistencia Pública de la Agencia para el Manejo de Emergencias (FEMA, por sus siglas en inglés) del Departamento de Recursos Naturales y Ambientales (DRNA) para los daños causados por los terremotos. Los proyectos serán bajo la Sección 428 de la Ley Stafford y los Procedimientos Alternos de Asistencia Pública, que establece un Estimado de Costo Fijo para los proyectos. La fecha límite establecida por FEMA para arribar a los Estimados de Costo Fijo es el 16 de julio de 2021.

Event Project

# Category Title Type Process Step

4473DR-PR (4473DR) 151410

B - Emergency Protective Measures

Caja de Muertos Island Nature Reserve Temporary Dock Standard

Pending Formulation Completion

4473DR-PR (4473DR) 151411

B - Emergency Protective Measures

Caja de Muertos Island Nature Reserve Temporary Facility Standard

Pending Formulation Completion

4473DR-PR (4473DR) 151393

A - Debris Removal

Declaration Wide Debris Removal Standard

Pending Initial Project Development

4473DR-PR (4473DR) 151394

B - Emergency Protective Measures

Emergency Protective Measures Declaration Wide

Work Completed / Fully Documented

Pending Initial Project Development

4473DR-PR (4473DR) 151396

G - Parks, Recreational Facilities, and Other Items

Balneario Caña Gorda Facilities Standard

Pending Initial Project Development

4473DR-PR (4473DR) 151398

E - Buildings and Equipment

Centro Vacacional Villas del Lago Caonillas Standard

Pending Initial Project Development

4473DR-PR (4473DR) 151400

E - Buildings and Equipment

Caja de Muerto Island Nature Reserve Lighthouse Standard

Pending Initial Project Development

4473DR-PR (4473DR) 151402

E - Buildings and Equipment

Guanica State Forest Facilities Standard

Pending Initial Project Development

4473DR-PR (4473DR) 151403

E - Buildings and Equipment

Guanica State Forest Historic Facilities Standard

Pending Initial Project Development

4473DR-PR (4473DR) 151405

C - Roads and Bridges

Susua State Forest- Acces Road Standard

Pending Initial Project Development

4473DR-PR (4473DR) 151406

E - Buildings and Equipment

La Parguera Natural Reserve - Restroom Standard

Pending Initial Project

Page 39: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 39

Faclitiy Development

4473DR-PR (4473DR) 151407

E - Buildings and Equipment

Lucchetti Reservoir Wildlife Refuge - Admin Offices Standard

Pending Initial Project Development

4473DR-PR (4473DR) 151408

E - Buildings and Equipment

Punta Las Cucharas Nature Reserve- Lighthouse Standard

Pending Initial Project Development

4473DR-PR (4473DR) 151409

E - Buildings and Equipment

Ranger Corps Cerrillos Building Standard

Pending Initial Project Development

4473DR-PR (4473DR) 155807 F - Utilities

Balneario Caña Gorda Treatment Plant and Tanks Standard

Pending Initial Project Development

Page 40: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 40

Tabla 3. Listado de proyectos sometidos para el Programa de Asistencia Pública de la Agencia para el Manejo de Emergencias (FEMA, por sus siglas en inglés) de la Autoridad de Desperdicios Sólidos (ADS) para los huracanes Irma y María. Los proyectos de la ADS serán bajo la Sección 428 de la Ley Stafford y los Procedimientos Alternos de Asistencia Pública, que establece un Estimado de Costo Fijo para los proyectos. La fecha límite establecida por FEMA para arribar a los Estimados de Costo Fijo es el 31 de diciembre de 2020.

Event Project

# Category Title Type

Process Step

3384EM-PR (3384EM) 99620

B - Emergency Protective Measures

ESWA002 EPM - Sub-Station

Work Completed / Fully Documented Obligated

3384EM-PR (3384EM) 99344

Z - Direct Administrative Costs

ESWA003 PAAP DAC - SubRecipients

Direct Administrative Costs and SMC

Pending Initial Project Development

3384EM-PR (3384EM) 71356

Z - Direct Administrative Costs

DR-3384 ESWA003 - DAC PAAP

Direct Administrative Costs and SMC

Process Discontinued

3384EM-PR (3384EM) 99379

A - Debris Removal

ESWA001 Debris - Caguas-Toa Baja-Arecibo (PAAP)

Work Completed / Fully Documented

Process Discontinued

4336DR-PR (4336DR) 49139

A - Debris Removal

ISWA001V1- PAAP DEBRIS-Caguas-Toa Baja-Arecibo

Work Completed / Fully Documented Obligated

4336DR-PR (4336DR) 49140

B - Emergency Protective Measures

ISWA002V1 EMERGENCCY PROTECTIVE MEASURES

Work Completed / Fully Documented Obligated

4336DR-PR (4336DR) 100597

Z - Direct Administrative Costs

ISWA003 PAAP DAC - SubRecipients

Direct Administrative Costs and SMC

Pending PDMG Project Review

4339DR-PR (4339DR) 49135

B - Emergency Protective Measures

84E2 EMERGENCY PROTECTIVE MEASURES

Work Completed / Fully Documented

Applicant Signed Project

4339DR-PR (4339DR) 49134

A - Debris Removal

189E1 SWA001A- Debris Alternative Procedures (PAAP) V1

Work Completed / Fully Documented Obligated

4339DR-PR (4339DR) 49136

B - Emergency Protective Measures

MSWA003 - EPM - Generators

Work Completed / Fully Documented Obligated

4339DR-PR (4339DR) 95360

E - Buildings and Equipment

MSWA006 Transfer Station of San Juan: (Structural , electrical, site poles and PVC Fence) Standard

Pending Applicant DDD Approval

4339DR-PR (4339DR) 95366

E - Buildings and Equipment

MSWA012 BUILDING AND CONTENTS 1. METAL FENCE Standard

Pending Formulation Completion

4339DR-PR (4339DR) 95367

E - Buildings and Equipment

MSWA013 BUILDING AND Standard

Pending Formulation

Page 41: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 41

Event Project

# Category Title Type

Process Step

CONTENTS 1, ROOF DAMAGE 2. EXTERIOR PAINTING

Completion

4339DR-PR (4339DR) 49137

E - Buildings and Equipment

Buildings and Equipment (4) Standard

Pending Initial Project Development

4339DR-PR (4339DR) 49138

E - Buildings and Equipment Utilities (5) Standard

Pending Initial Project Development

4339DR-PR (4339DR) 95359

E - Buildings and Equipment

MSWA005 BUILDING AND CONTENTS: (Galvalume Roof and insulation) Standard

Pending Initial Project Development

4339DR-PR (4339DR) 95361

E - Buildings and Equipment

MSWA007 BUILDING AND CONTENTS: (Acoustical ceiling, doors and A/C duct system) Standard

Pending Initial Project Development

4339DR-PR (4339DR) 95362

E - Buildings and Equipment

MSWA008 BUILDING AND CONTENTS: (electrical failures, metal windows, louvers and roll up doors) Standard

Pending Initial Project Development

4339DR-PR (4339DR) 95363

E - Buildings and Equipment

MSWA009 BUILDING AND CONTENTS - 1. ALUMINUM WINDOWS 2. ROOF AND FENCE DAMAGE Standard

Pending Initial Project Development

4339DR-PR (4339DR) 95364

E - Buildings and Equipment

MSWA010 BUILDING AND CONTENTS- (Ceiling tiles damage, galvalume sheet repair) Standard

Pending Initial Project Development

4339DR-PR (4339DR) 95365

E - Buildings and Equipment

MSWA011 BUILDING AND CONTENTS - 1. ALUMINUM WINDOWS 2. ROOF AND FENCE DAMAGE Standard

Pending Initial Project Development

4339DR-PR (4339DR) 68273

Z - Direct Administrative Costs ESWA003 - DAC

Direct Administrative Costs and SMC

Process Discontinued

Page 42: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 42

Event Project

# Category Title Type

Process Step

4339DR-PR (4339DR) 95368

Z - Direct Administrative Costs

CAT Z - Direct Administrative Costs

Direct Administrative Costs and SMC

Process Discontinued

Page 43: INFORME DE TRANSICIÓN 2017-2020 OFICINA DEL SECRETARIO

INFORME DE TRANSICIÓN 2017-2020

Oficina del Secretario

Página 43

Tabla 4. Listado de proyectos sometidos para el Programa de Asistencia Pública de la Agencia para el Manejo de Emergencias (FEMA, por sus siglas en inglés) de la Junta de Calidad Ambiental (JCA) para el huracán y María. Los proyectos de la JCA serán bajo la Sección 428 de la Ley Stafford y los Procedimientos Alternos de Asistencia Pública, que establece un Estimado de Costo Fijo para los proyectos. La fecha límite establecida por FEMA para arribar a los Estimados de Costo Fijo es el 31 de diciembre de 2020.

Event Project

# Category Title Type

Process Step

4339DR-PR (4339DR) 50761

B - Emergency Protective Measures

MEQD001- EMERGENCY PROTECTIVE MEASURES

Work Completed / Fully Documented Obligated

4339DR-PR (4339DR) 50762

E - Buildings and Equipment

MEQD002- Building Contents-Antigua Penitenciaria Standard Obligated

4339DR-PR (4339DR) 73254

E - Buildings and Equipment

MEQB010- EQB Telecommunications System

Work Completed / Fully Documented Obligated

4339DR-PR (4339DR) 115025

Z - Management Costs

EQB- Management Costs

Management Costs Obligated

4339DR-PR (4339DR) 129864

B - Emergency Protective Measures

Vehicle Repairs for Emergency Work

Work Completed / Fully Documented

Pending Initial Project Development

4339DR-PR (4339DR) 66925

E - Buildings and Equipment

MEQB010- EQB TELECOM. SYSTEM Standard

Process Discontinued

4339DR-PR (4339DR) 72549

E - Buildings and Equipment

MEQB010- EQB TELECOMMUNICATION SYSTEM Standard

Process Discontinued

4339DR-PR (4339DR) 87457

E - Buildings and Equipment

MEQD002 - Building Contents Standard

Process Discontinued