INFORME DE TRANSICIÓN
2017-2020
OFICINA DEL SECRETARIO
Departamento de Recursos Naturales y Ambientales
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario Humanos
ÍNDICE
Introducción ..................................................................................................................... 3
Base Legal ...................................................................................................................... 3
Misión y Visión ................................................................................................................ 5
Organigrama ................................................................................................................... 6
Proyectos y Logros.......................................................................................................... 9
Proyectos de Asistencia Pública de FEMA .................................................................. 16
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 3
Introducción
El Departamento de Recursos Naturales y Ambientales (DRNA), conforme a la Ley Núm. 23 de 20 de junio de 1972, según enmendada, está bajo la dirección y supervisión de su Secretario(a). A tenor con el Plan de Reorganización 1-1993, está adscrita a la Oficina del (de la) Secretario(a) la Autoridad de Desperdicios Sólidos en Puerto Rico, la Administración de Recursos Naturales, las Oficinas Asesoras y las Secretarías Auxiliares. El(la) Secretario(a) del DRNA es miembro del Consejo Consultivo del Gobernador(a), como parte del Gabinete Constitucional.
La Oficina del Secretario esta a cargo de la implantación y formulación de la política pública ambiental y de la protección y conservación de los recursos naturales y ambientales, regula los temas de contaminación ambiental, aire, agua, terrenos, contaminación por ruido y lumínica. Además, es responsable de la administración y la operación de los parques nacionales, balnearios y centros vacacionales. También administra los bienes de dominio público marítimo terrestre y de la protección de la biodiversidad, los bosques, la vida silvestre, los arrecifes de coral y la suma de especies de flora y fauna de nuestra Isla. Asimismo, administra las áreas naturales protegidas y es la Agencia reguladora en temas de contaminación ambiental de aire, aguas, suelos y la contaminación por ruido. De igual forma, tiene el deber ministerial de establecer y ejecutar la política pública concerniente al manejo de desperdicios sólidos y, por otra parte, también es responsable de administrar y operar los parques nacionales, centros vacacionales y balnearios públicos.
Base Legal
La Ley Núm. 23 de 20 de junio de 1972, según enmendada, conocida como Ley Orgánica
del Departamento de Recursos Naturales y Ambientales, establece que el DRNA será
responsable de implementar la política pública del Gobierno, contenida en la sección 19
del Artículo VI de la Constitución de Puerto Rico. Esta dispone que será política pública
del Gobierno de Puerto Rico la más eficaz conservación de sus recursos naturales, así
como el mayor desarrollo y aprovechamiento de los mismos para el beneficio general de
la comunidad.
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 4
Por otra parte, la Ley 171-2018, conocida como Plan de Reorganización del
Departamento de Recursos Naturales y Ambientales de 2018, consolidó en el DRNA las
funciones y operaciones de la Junta de Calidad Ambiental (JCA), la Autoridad de
Desperdicios Sólidos (ADS), y el Programa de Parques Nacionales (PPN).
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 5
Misión y Visión
Misión
Proteger, conservar y administrar los recursos ambientales del país de forma
balanceada para garantizar a las próximas generaciones su disfrute y estimular
una mejor calidad de vida.
Visión
Propiciar un ambiente sano y saludable a través de la promoción del uso sostenible de los recursos naturales, la ordenación de la gestión ambiental y la transformación de la cultura ambiental de los puertorriqueños hacia una conservación, con la participación de todos los sectores con la sociedad para mejorar la calidad de vida.
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 6
Organigrama
Comité de Expertos y Asesores sobre Cambio Climático
Ley 33-2019
Oficina del (la) Secretario (a)001
Ayudante Especial I011 ocupado003 ocupado014108 ocupado 014119 ocupado014148 ocupado014692 ocupado014693 ocupado014690 vacante008 vacante016 vacante017 vacante398 vacante1860 vacante18459 vacante 184003 vacante184079 vacante
Ayudante Especial II004 ocupado005 vacante006 vacante007 vacante009 vacante1803 vacante 184020 vacante184025 vacante 184030 vacante
Director en Relaciones Laborales (C)
014349 vacante
Chofer Confidencial015 Vacante014006 Vacante18407 Vacante
SubSecretario002 vacante
Secretaria Ejecutiva Confidencial III
014003 vacante
Secretaria Ejecutiva Confidencial II010 ocupado014146 vacante014133 vacante184004 vacante
Secretaria Ejecutiva Confidencial I1852 vacante184012 vacante184005 vacante
Administradora Sistemas de Oficina I086 vacante6308 ocupado
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 7
Oficina de Auditoría Interna
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 8
Organigrama funcional no cuenta con la aprobación de OGP.
Junta de Subastas
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 9
Proyectos y Logros
Sembrando Futuro
El proyecto Sembrando Futuro, es un esfuerzo gubernamental cuya meta es sembrar 500 mil árboles nativos y endémicos en todo Puerto Rico durante los próximos cinco años. El programa está enfocado en la reforestación de las 134 cuencas hidrográficas de la Isla.
Los impactos de los huracanes Irma y María impactaron severamente nuestros bosques; específicamente, María causó una defoliación masiva en toda la Isla, lo que provocó la pérdida de la cobertura vegetal. Conociendo la importancia de la conservación de los bosques, la protección de los cuerpos de agua y las futuras generaciones, se asignado el nombre Sembrando Futuro para este proyecto.
Aunque somos conscientes de que los fenómenos atmosféricos como sequías y disturbios tropicales son propios de la zona geográfica en que se encuentra nuestra Isla, estos fenómenos se hacen cada vez más frecuentes e intensos. Ante esta realidad, reconocemos la necesidad de recibir el insumo de los expertos para tomar las medidas correctas.
El proyecto comenzó con la siembra, liderada por el DRNA, junto a líderes de la comunidad y representantes de las organizaciones sin fines de lucro, de 200 árboles comunes de las áreas costeras en el Bosque Estatal de Piñones en Loíza.
Los árboles sembrados fueron mangle botón, emajagüilla, icacos, uva de playa y corazón cimarrón.
Como parte del esfuerzo, personal técnico y especializado en las regiones del DRNA realizaron siembras mensuales para alcanzar la meta. Estos trabajos estuvieron a cargo de los directores regionales y biólogos del Negociado de Manejo de Áreas Naturales Protegidas y Servicios Forestales.
Hasta la fecha se han sembrado más de 145,875 mil árboles.
Además, la agencia comenzó un programa de charlas y orientaciones a estudiantes de escuelas públicas en Loíza, donde ubica parte de la cuenca hidrográfica del Río Grande. Por medio del programa, los alumnos reciben educación enfocada en el ciclo de agua, así como la importancia de los ríos y árboles.
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 10
Las recientes proyecciones realizadas para Puerto Rico muestran que el calentamiento en la Isla será mucho más alto que el promedio mundial, lo que provocará periodos de sequía más prolongados y efectos negativos sobre la disponibilidad de agua, la agricultura, la salud humana, la flora y la fauna.
Puerto Rico is Open for Green Business
El foro Puerto Rico is Open for Green Business fue realizado para atraer empresas interesadas en invertir en negocios que estén en armonía con el ambiente La protección de la naturaleza ante el calentamiento global se ha convertido en una prioridad para el gobierno de Puerto Rico, mientras la Isla igualmente necesita de un nuevo impulso para su desarrollo económico Ante ambas necesidades, el gobierno de Puerto Rico creó una iniciativa progresiva para crear, como nunca se había hecho, el clima propicio que permita el surgimiento y desarrollo de empresas relacionadas con el área de “negocios verdes”, auspiciando el foro Puerto Rico is Open for Green Business. El foro se llevó a cabo el martes, 30 de abril en el Centro de Convenciones de Puerto Rico. El evento contó con la participación de la Compañía de Turismo de Puerto Rico, Discover Puerto Rico, Rones de Puerto Rico y el Departamento de la Vivienda y compañías del sector privado. El propósito del foro fue darle un nuevo giro a la manera tradicional en que se hace negocios en Puerto Rico, al presentar las oportunidades de insertarnos e n el “Green Economy”, y posicionar a Puerto Rico como un centro de excelencia e innovación en materia de resiliencia, mitigación y adaptación al cambio climático a través de la economía verde. Promover las grandes oportunidades para hacer negocios exitosos con poco o ningún impacto ambiental o de protección de los recursos naturales, resultará necesariamente en la creación de una sociedad resiliente y ecológicamente consciente, objetivos propuesto en el Comité Asesor de Cambio Climático.
Esta es una iniciativa inter-gubernamental que busca promover a Puerto Rico como un mercado de oportunidades para el desarrollo de actividades económicas eco-sustentables, las cuales potenciarán la creación de empleos, a la vez que nos ayuda a conservar y proteger la naturaleza amenazada por el cambio climático. Trabajando cuatro grandes temas: energía renovable, turismo verde, infraestructura verde y reciclaje
Puerto Rico tiene los atributos y la biodiversidad para el desarrollo de todos estos mercados socialmente responsables, sostenibles y beneficiosos para la naturaleza. Es hora de cambiar la forma de hacer negocios en Puerto Rico y las industrias verdes son una de las alternativas más prometedoras.
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 11
Comité Asesor de Cambio Climático La Ley de Mitigación, Adaptación y Resiliencia al Cambio Climático de Puerto Rico, establece una política pública clara con metas, métricas y fechas de cumplimiento para atender la variación global del clima de la Tierra a causa de la actividad humana. Con el fin de alcanzar la política general del Gobierno aquí establecida y la dirección estratégica en torno al cambio climático en Puerto Rico, se crea el Comité de Expertos y Asesores sobre Cambio Climático, adscrito al Departamento de Recursos Naturales y Ambientales, y cuyo presidente es el Secretario de Recursos Naturales y Ambientales, con total autonomía e independencia para atender los asuntos sustantivos, cuyo deber es asesorar y preparar el Plan de Mitigación, Adaptación y Resiliencia al Cambio Climático a evaluarse por la Comisión Conjunta sobre Mitigación, Adaptación y Resiliencia al Cambio Climático.
Entre las funciones del Comité de Expertos y Asesores sobre Cambio Climático se encuentran:
Presentar el Plan de Mitigación, Adaptación y Resiliencia al Cambio Climático, según establecido en los Artículos 8 y 9 de esta Ley, a la Comisión Conjunta sobre Mitigación, Adaptación y Resiliencia al Cambio Climático de la Asamblea Legislativa. El mismo debe ser uno viable para alcanzar los objetivos de reducción en las emisiones de gases de efecto de invernadero y de los contaminantes del aire para los períodos considerados, así como una propuesta de las medidas necesarias, incluyendo aquellos incentivos ambientales, para alcanzarlos de forma planificada y estableciendo indicadores cuantitativos anuales del impacto de las acciones.
Coordinar con la Rama Ejecutiva, Rama Legislativa, las agencias públicas, sectores industriales, grupos empresariales y organizaciones ambientales aquellas medidas necesarias para alcanzar las métricas establecidas en esta Ley.
Solicitar a las organizaciones de los sectores social y privado, así como a la sociedad en general, a colaborar con propuestas en cuanto al Plan de Mitigación, Adaptación y Resiliencia al Cambio Climático.
Establecer las prioridades de actuación, atendiendo a la disponibilidad económica, la planificación sectorial y el análisis costo eficiente.
Monitorear y evaluar el seguimiento e implementación de las políticas climáticas y de los planes de acción sectoriales con relación a los aspectos relevantes para alcanzar las finalidades de la presente Ley. Se le autoriza y faculta a expedir multas contra cualquier agencia gubernamental, entidad gubernamental y corporación pública que incumpla reiteradamente con las disposiciones de esta Ley y la implementación de las políticas climáticas. Para esto se presentará ante la Comisión Conjunta Sobre Mitigación, Adaptación y Resiliencia al Cambio Climático creada al amparo del Artículo 16 de esta Ley un reglamento
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 12
para la imposición de estas multas. La Comisión Conjunta Sobre Mitigación, Adaptación y Resiliencia al Cambio Climático deberá aprobar el reglamento. Los dineros que se reciban por concepto de multas estarán destinados a favor del Fondo de Cambio Climático.
Preparar y presentar a la Oficina del Gobernador, la Secretaría de la Cámara y del Senado de Puerto Rico un informe sobre contribuciones determinadas por sector económico.
Difundir sus finanzas, incluyendo ingresos y gastos, trabajos y resultados, así como publicar un informe anual de actividades y contribuciones por sector económico en Puerto Rico de la cantidad de emisiones anuales en el turismo, agricultura, transportación, farmacéutica, construcción, manufactura, sector energético y el Gobierno.
Realizar talleres públicos para educar en torno al cambio climático, sus efectos y repercusiones, y las medidas que pueden implementarse para reducir las emisiones de gases con efecto de invernadero.
El Comité de Expertos y Asesores sobre Cambio Climático de Puerto Rico comenzó a reunirse a
principios de 2020. Durante este tiempo se han realizado las siguientes gestiones:
1. El Reglamento de procedimientos internos CEACC. 2. Petición de presupuesto a OGP. 3. Bosquejo del Plan de Mitigación, Adaptación y Resiliencia al Cambio Climático. 4. Someter enmiendas a la Ley 33-2019. 5. Reunión con la Lcda. Margarita Varela del Comité de Recursos Naturales de la Cámara de
Representantes de Estados Unidos. 6. Discusión de comentarios al Reglamento Conjunto de la Junta de Planificación. 7. Orientar a la Administración de Servicios Generales (entidad que compra los vehículos del
gobierno central) sobre disposición de la Ley # 33 que requiere compra de vehículos de motor que no usen combustibles fósiles.
Los miembros del comité son los siguientes:
Lcdo. Rafael A. Machargo Maldonado Secretario de Departamento de Recursos Naturales
Jorge Haddock Presidente Universidad de Puerto Rico
Manuel Laboy Secretario de Desarrollo Económico
Rafael Méndez Tejada
Ada Monzón
Maritza Barreto
Roy Torbert
Carl Axel Soderberg
Pablo Méndez
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 13
FEMA – Programa de Asistencia Pública
El Programa de Asistencia Pública (PA, por sus siglas en inglés) de la Agencia Federal para el Manejo de Emergencias (FEMA, por sus siglas en inglés) otorga subvenciones a agencias estatales, municipios y organizaciones privadas sin fines de lucro (PNP, por sus siglas en inglés) para que las comunidades puedan responder rápidamente y recuperarse de desastres mayores. El Programa es financiado por FEMA y administrado por el Gobierno de Puerto Rico, a través de la Oficina Central de Recuperación, Reconstrucción y Resiliencia (COR3, por sus siglas en inglés). FEMA asigna fondos para estos proyectos directamente para Puerto Rico. El programa de PA consiste de las siguientes etapas: Solicitud de Asistencia Pública (RPA, por sus siglas en inglés), Formulación del Proyecto, Revisión de la Subvención, Solicitud de Reembolso (RFR, por sus siglas en inglés) y el Cierre de Proyecto. La Formulación del proyecto es el proceso de identificar el ámbito de trabajo elegible y estimar los costos asociados con ese alcance de trabajo para cada uno de los proyectos del Subreceptor (DRNA). COR3 y FEMA colaboran con el Solicitante para formular daños relacionados con incidentes en proyectos basados en agrupaciones lógicas del daño y alcance del trabajo. En esta etapa, se crea la Hoja de Trabajo del Proyecto (PW, por sus siglas en inglés). Aunque el Solicitante es responsable de identificar los daños y de proveer la documentación para respaldar la solicitud de financiamiento, este proceso es un esfuerzo colaborativo que comienza con el Inventario de Daños y concluye con el Cálculo del Costo Fijo. Para facilitar el procesamiento de los fondos de Asistencia Pública, FEMA separa el Trabajo de Emergencia en 2 categorías (A-B), y la Obra Permanente en 5 categorías (C-G), según los tipos generales de instalaciones, y la categoría Z para los Costos de Administración Estatal y los Costos Administrativos Directos (DAC, por sus siglas en inglés). A continuación, se enumeran todas las categorías: Trabajo de Emergencia
• Categoría A - Recogido de escombros
• Categoría B - Medidas de protección en emergencias Obra Permanente
• Categoría C - Carreteras y Puentes
• Categoría D - Instalaciones de control de agua
• Categoría E - Edificios y equipo
• Categoría F - Servicios Públicos
• Categoría G - Parques, instalaciones recreativas y otros Costos Administrativos
• Categoría Z - Costos Administrativos del Estado (DAC, por sus siglas en inglés)
• Categoría Z - Costos Administrativos Directos Proceso de la Formulación del Proyecto La siguiente figura explica los pasos en el proceso de la Formulación del Proyecto:
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 14
Paso 1: Identificación de Daños Para comenzar el proceso, las agencias gubernamentales, los municipios y las organizaciones sin fines de lucro son responsables de identificar todas las instalaciones dañadas por los huracanes Irma y María. Paso 2: Visita al Sitio La inspección inicial del sitio se realiza para validar los daños del desastre y obtener toda la información necesaria para preparar una descripción detallada de los daños. Paso 3: Descripciones de Daños y Dimensiones (DDD) El PW debe contener una descripción detallada de los daños que incluya las dimensiones y la causa del daño. La descripción del daño y las dimensiones son los elementos más críticos del PW. COR3, FEMA y el Solicitante deben coincidir en la descripción del daño y las dimensiones, preferiblemente antes de iniciar el desarrollo del alcance del trabajo. Paso 4: Alcance del Trabajo & Estimado de Costos (SOW & CE) Una vez se formula el DDD, se inicia el proceso del SOW & CE. El borrador inicial del SOW y CE será preparado por FEMA y se presentará a COR3 y al Subreceptor (DRNA) para su revisión y cualquier colaboración necesaria hasta que las tres partes involucradas lleguen a un acuerdo. Paso 5: Estimado de Costo Fijo (FCE) FEMA enviará la estimación al Panel de expertos para su validación cuando la estimación del costo total del proyecto sea de $5 millones o más o cuando hay un desacuerdo entre cualquiera de dos partes. Proceso 428 Hasta marzo de 2020, FEMA está utilizando el Programa de Procedimientos Alternativos 428 en Puerto Rico. Bajo los Procedimientos Alternativos, FEMA financiará todos los Proyectos grandes de trabajo permanente sobre la base de estimaciones fijas. Este procedimiento varía de lo descrito en 44 CFR §206.203 (c) (1), que proporciona fondos para el costo real de completar el alcance de trabajo elegible. Para el trabajo elegible que ya se ha completado, la cantidad fija se basará en el costo real. Si el trabajo elegible ya ha comenzado, pero la restauración no se ha completado, el costo fijo puede basarse en los costos reales y / o estimados según corresponda. FEMA usa la Hoja de Trabajo del Proyecto (PW) como la solicitud de subsidio. El PW documenta los detalles del proyecto del Solicitante, incluida una descripción detallada de los daños y dimensiones relacionados con el desastre y el Alcance del Trabajo (SOW, por sus siglas en inglés) asociado y los costos. Hoja de Trabajo de Proyecto La Hoja de Trabajo del Proyecto (PW, por sus siglas en inglés) es el mecanismo de concesión a través del cual se brinda asistencia federal de recuperación en caso de desastre a los destinatarios elegibles. Es la forma principal que se utiliza para documentar proyectos de Asistencia Pública e incluye la ubicación, la descripción y dimensiones de los daños, el alcance del trabajo y el costo. Los PW son preparados por FEMA, revisados y comentados por COR3 y los solicitantes. Solo los proyectos incluidos en un PW serán financiados por FEMA. El PW contiene la información necesaria para que el personal
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 15
autorizado revise y apruebe el SOW y los costos. Si se aprueba, FEMA obliga a la parte federal de los costos del proyecto elegibles. Una vez que un PW ha sido obligado, los fondos están disponibles para los procedimientos de reducción.
Revisión de PW Una vez que se presenta la descripción y las dimensiones del daño del proyecto, el alcance del trabajo (SOW) y el costo, el proyecto pasa por las siguientes revisiones:
Bajo las declaraciones de desastres firmadas por el Presidente en septiembre de 2017 para el huracán Irma (EM-3384 y DR-4336) y el huracán María (DR-4339), todos los 78 municipios de Puerto Rico han sido designados como elegibles para recibir asistencia de FEMA. El DRNA firmó el inventario de daños en mayo de 2020 y se encuentra trabajando en la formulación de proyectos. De acuerdo a la Figura 1 el proceso de formulación de proyectos inicia con las visitas de inspección, con la información recopilada FEMA elabora los DDDs (Damages, Description and Dimensions); basado en los DDDs se confecciona el Alcance de Trabajo SOW (Scope of Work) y se arriba a un estimado de costos. Cada etapa es dependiente de la anterior, y no se puede proceder hasta tanto no finalice y se apruebe la etapa anterior. Para la mayoría de las localidades del DRNA no se han realizado visitas de inspección, y por lo tanto, los proyectos están en la etapa inicial de desarrollo y recopilación de información. Para la declaración de desastre firmada por el Presidente para los terremotos (DR-4473) comprende el periodo de incidente comenzando el 28 de diciembre de 2019, hasta el 31 de julio de 2020 e incluye a los siguientes municipios:
· Adjuntas · Guánica · Guayanilla · Jayuya · Juana Díaz · Lajas · Las Marías · Mayagüez · Peñuelas · Ponce · Sabana Grande · San Germán · Utuado · Yauco
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 16
Ley del Comité Asesor de Reciclaje El 4 de agosto de 2017 se aprobó la Ley 66 titulada “Ley del Comité Asesor de Reciclaje” El Comité asistirá al Departamento de Recursos Naturales y Ambientales con recomendaciones sobre la política pública relacionada con la industria de reciclaje, evaluará y recomendará legislación relacionada con la prohibición, cargos por uso, impuesto o sobrecargos relacionados con reciclaje. Además, proveerá apoyo institucional a la industria de reciclaje y recomendará medidas necesarias para la promoción del reciclaje. A estos efectos el comité se ha reunido en varias ocasiones y está evaluando los posibles proyectos de ley que ayuden al desarrollo de programas para el manejo de residuos orgánicos de alimentos. Además, está evaluando legislación que promueva la reducción de los residuos a ser generados. La creación del Comité ayuda a obtener insumo de todos los sectores impactados por los programas de reciclaje (público, privado y gubernamental).
Programa de Desperdicios Sólidos No Peligrosos El Secretario ha estado trabajando directamente en reenfocar el Programa de Desperdicios Sólidos No Peligrosos para asegurarse que el Departamento de Recursos Naturales y Ambientales mantenga su prerrogativa para establecer la política pública sobre el manejo de los desperdicios sólidos no peligrosos en Puerto Rico. La Agencia Federal de Protección Ambiental (EPA, por sus siglas en inglés) en la década de los 90 delegó en el Gobierno de Puerto Rico este Programa. Por los pasados 10 años, la facultad de establecer la política pública para el manejo de los desperdicios sólidos en Puerto Rico había sido abandonada y este vacío lo estaba llenando la EPA, por lo que es vital retomar esta importante facultad.
Proyectos de Asistencia Pública de FEMA A continuación, se presenta una descripción general del estado y la situación de todos los proyectos presentados a la Agencia Federal para el Manejo de Emergencias (FEMA): Tabla 1. Listado de proyectos sometidos para Asistencia Pública de la Agencia para el Manejo de Emergencias (FEMA, por sus siglas en inglés) del Departamento de Recursos Naturales y Ambientales (DRNA) para los huracanes Irma (EM-3384 y DR-4336) y María (DR-4339). Incluye proyectos del Programa de Parques Nacionales, bajo la sombrilla del DRNA en virtud de la Ley Núm. 171 del 2 de agosto de 2018. El 6 de marzo de 2020, el DRNA se acogió al Programa Tradicional de Asistencia Pública (Sección 406 de la Ley Stafford) para trabajar los proyectos grandes de mejoras permanentes para servicios no críticos1. El programa Asistencia Pública otorga fondos para reparación y puede asignar una partida para hacer las facilidades más resistentes e implementar medidas de mitigación de riesgos que las protejan de daños futuros.
Event Project
# Category Title Type
Process Step
3384EM-PR (3384EM) 51169
B - Emergency Protective Measures
EMERGENCY PROTECTVE MEASURES
Work Completed / Fully Documented
Pending Initial Project Development
4336DR-PR (4336DR) 51170
B - Emergency Protective Measures
DRNA-01PW CATA expidited balance
Work Completed / Fully Documented
Applicant Signed Project
4336DR-PR 51171 B - Emergency DRNA01-CATB- Work Completed / Pending
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 17
Event Project
# Category Title Type
Process Step
(4336DR) Protective Measures DEPT OF NATURAL AND ENVIRONMENTAL RESOURCES (3)
Fully Documented Formulation Completion
4339DR-PR (4339DR) 51175
B - Emergency Protective Measures
MDNE009 -Emergency Protective Measures
Work Completed / Fully Documented
Applicant Signed Project
4339DR-PR (4339DR) 51182
B - Emergency Protective Measures
MDNE013 - EPM Generators
Work Completed / Fully Documented
Applicant Signed Project
4339DR-PR (4339DR) 74109
B - Emergency Protective Measures
MDNE022 Cerrillos Dam Low Flow Gate Standard
Applicant Signed Project
4339DR-PR (4339DR) 107744
B - Emergency Protective Measures
MDNE014 Emergency Protective Measures
Work Completed / Fully Documented
Applicant Signed Project
4339DR-PR (4339DR) 51172
B - Emergency Protective Measures
CAT-B Dept. of Natural and Environmental Resources
Work Completed / Fully Documented Obligated
4339DR-PR (4339DR) 51173
B - Emergency Protective Measures
MDNE007 - Emergency Protective Measures
Work Completed / Fully Documented Obligated
4339DR-PR (4339DR) 51174
B - Emergency Protective Measures
MDNE008 Emergency Protective Measures
Work Completed / Fully Documented Obligated
4339DR-PR (4339DR) 51176
B - Emergency Protective Measures
MDNE010 - Emergency Protective Measures
Work Completed / Fully Documented Obligated
4339DR-PR (4339DR) 51177
B - Emergency Protective Measures
MDNE011 - Emergency Protective Measures
Work Completed / Fully Documented Obligated
4339DR-PR (4339DR) 51178
B - Emergency Protective Measures
MDNE012 - Emergency Protective Measures
Work Completed / Fully Documented Obligated
4339DR-PR (4339DR) 51179
B - Emergency Protective Measures
MDNE017 -Emergency Protective Measures
Work Completed / Fully Documented Obligated
4339DR-PR (4339DR) 51180
B - Emergency Protective Measures
MDNE020-EMERGENCY PROTECTIVE
Work Completed / Fully Documented Obligated
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 18
Event Project
# Category Title Type
Process Step
MEASURES
4339DR-PR (4339DR) 51181
B - Emergency Protective Measures
MDNE006 Emergency Protective Measures
Work Completed / Fully Documented Obligated
4339DR-PR (4339DR) 65424
B - Emergency Protective Measures
MNDE021-Construction Temporary Electrical Subst Standard Obligated
4339DR-PR (4339DR) 77128
B - Emergency Protective Measures
MDNE023 - Emergency Measures for Flood Control Pump Stations – Bypass Pumps Specialized Obligated
4339DR-PR (4339DR) 134461
B - Emergency Protective Measures
Contracted Security Hours for FCPS
Work Completed / Fully Documented Obligated
4339DR-PR (4339DR) 91699
D - Water Control Facilities
El Parque Flood Control Pump Station Discharge Pipe Specialized
Pending Applicant DDD Approval
4339DR-PR (4339DR) 120066
E - Buildings and Equipment
Mona West Sardinera - Ranger Detachment Facilities Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123241
G - Parks, Recreational Facilities, and Other Items
Boqueron Ranger Unit Pier Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123243
G - Parks, Recreational Facilities, and Other Items
Cano Tiburones Pier Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123247
G - Parks, Recreational Facilities, and Other Items Culebra Pier Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123248
G - Parks, Recreational Facilities, and Other Items
Guayanilla Boat Ramp Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123254
G - Parks, Recreational Facilities, and Other Items
Mona East - Pajaros Pier Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123310
E - Buildings and Equipment
Refugio Vida Silvestre Embalse Cerrillos Standard
Pending Applicant DDD
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 19
Event Project
# Category Title Type
Process Step
Observation Tower Approval
4339DR-PR (4339DR) 123321
G - Parks, Recreational Facilities, and Other Items
Reserva Natural La Parguera Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123338
E - Buildings and Equipment
Bosque Estatal de Boqueron Office Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123390
D - Water Control Facilities
Balneario La Monserrate Pump System Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123392
D - Water Control Facilities
Parque Nacional Balneario Seven Seas Pump System Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123395
G - Parks, Recreational Facilities, and Other Items
Parque Acuático Punta Santiago Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123399
D - Water Control Facilities
Balneario Caña Gorda Pipe Line Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123457
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin A Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123458
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin B Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123459
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin C Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123460
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin D Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123461
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin E Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123462
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin F Standard
Pending Applicant DDD Approval
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 20
Event Project
# Category Title Type
Process Step
4339DR-PR (4339DR) 123463
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin G Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123477
E - Buildings and Equipment
Centro Vacacional de Boqueron Villa 1 CC Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123478
E - Buildings and Equipment
Centro Vacacional de Boqueron Villa 1 DD Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123480
E - Buildings and Equipment
Centro Vacacional de Boqueron Villa 2 Algas Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123481
E - Buildings and Equipment
Centro Vacacional de Boqueron Villa 2 Ballenas Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123482
E - Buildings and Equipment
Centro Vacacional de Boqueron Villa 2 Coral Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123483
E - Buildings and Equipment
Centro Vacacional de Boqueron Villa 2 Delfin Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123484
E - Buildings and Equipment
Centro Vacacional de Boqueron Villa 2 Erizo Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123485
E - Buildings and Equipment
Centro Vacacional de Boqueron Villa 2 Faro Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123486
E - Buildings and Equipment
Centro Vacacional de Boqueron Villa 2 Gaviota Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123487
E - Buildings and Equipment
Centro Vacacional de Boqueron Villa 2 Hicaco Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123488
E - Buildings and Equipment
Centro Vacacional de Boqueron Villa 2 Islote Standard
Pending Applicant DDD Approval
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 21
Event Project
# Category Title Type
Process Step
4339DR-PR (4339DR) 123489
E - Buildings and Equipment
Centro Vacacional de Boqueron Villa 2 Juey Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123496
E - Buildings and Equipment
Centro Vacacional Punta Santiago Cabin D Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123512
G - Parks, Recreational Facilities, and Other Items
Centro Vacacional Punta Santiago Recreational Facilities and Utilities Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 144027
D - Water Control Facilities
Southern Flood Contol Pump Stations Specialized
Pending Applicant DDD Approval
4339DR-PR (4339DR) 144028
D - Water Control Facilities
Baldorioty/De Diego/Parada 18 Flood Control Pump Stations Specialized
Pending Applicant DDD Approval
4339DR-PR (4339DR) 144029
D - Water Control Facilities
Catano/Guaynabo Flood Control Pump Stations Specialized
Pending Applicant DDD Approval
4339DR-PR (4339DR) 123396
D - Water Control Facilities
Parque Acuático Punta Santiago Pump Station Standard
Pending Applicant Project Review
4339DR-PR (4339DR) 123444
D - Water Control Facilities
Centro Vacacional Punta Santiago Pump System Standard
Pending Applicant Project Review
4339DR-PR (4339DR) 123246
G - Parks, Recreational Facilities, and Other Items
Ceiba Ranger Station Pier Standard
Pending CRC Project Development
4339DR-PR (4339DR) 123249
G - Parks, Recreational Facilities, and Other Items
Humacao Punta Santiago Pier Standard
Pending CRC Project Development
4339DR-PR (4339DR) 123250
G - Parks, Recreational Facilities, and Other Items
Humacao Reserve Dock System Standard
Pending CRC Project Development
4339DR-PR (4339DR) 123499
E - Buildings and Equipment
Centro Vacacional Punta Santiago Cabin F Standard
Pending CRC Project Development
4339DR-PR 123500 E - Buildings and Centro Vacacional Standard Pending CRC
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 22
Event Project
# Category Title Type
Process Step
(4339DR) Equipment Punta Santiago Cabin G
Project Development
4339DR-PR (4339DR) 123509
E - Buildings and Equipment
Centro Vacacional Punta Santiago Villa 7 Standard
Pending CRC Project Development
4339DR-PR (4339DR) 123514
D - Water Control Facilities Cerrillos Dam1 Specialized
Pending CRC Project Development
4339DR-PR (4339DR) 123464
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin H Standard
Pending DDD Completion
4339DR-PR (4339DR) 85288
G - Parks, Recreational Facilities, and Other Items
Zoologico de Puerto Rico Parkwide Damages Standard
Pending EHP Review
4339DR-PR (4339DR) 123239
G - Parks, Recreational Facilities, and Other Items
Boqueron Boat Ramp Standard
Pending EHP Review
4339DR-PR (4339DR) 123501
E - Buildings and Equipment
Centro Vacacional Punta Santiago Cabin H Standard
Pending EMMIE Submission
4339DR-PR (4339DR) 89462
G - Parks, Recreational Facilities, and Other Items
Parque las Cavernas del Rio Camuy External Parkwide Damages Standard
Pending FEMA 406 HMP Completion
4339DR-PR (4339DR) 123245
G - Parks, Recreational Facilities, and Other Items Cayo Ratones Pier Standard
Pending FEMA 406 HMP Completion
4339DR-PR (4339DR) 123252
G - Parks, Recreational Facilities, and Other Items
La Parguera Boat Ramp Standard
Pending FEMA 406 HMP Completion
4339DR-PR (4339DR) 123253
G - Parks, Recreational Facilities, and Other Items
Mona West - Sardinera Pier Standard
Pending FEMA 406 HMP Completion
4339DR-PR (4339DR) 123256
G - Parks, Recreational Facilities, and Other Items
Playita Rosada Pier Standard
Pending FEMA 406 HMP Completion
1 El proyecto 123514 sobre mejoras permanentes a la represa Cerrillos es el único proyecto del DRNA que será bajo la Sección 428 de la Ley Stafford y los Procedimientos Alternos de Asistencia Pública, que establece un Estimado de Costo Fijo para los proyectos. La fecha límite establecida por FEMA para arribar a los Estimados de Costo Fijo es el 31 de diciembre de 2020.
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 23
Event Project
# Category Title Type
Process Step
4339DR-PR (4339DR) 123362
E - Buildings and Equipment
Cabo Rojo Fish Lab Structures Standard
Pending FEMA 406 HMP Completion
4339DR-PR (4339DR) 123505
E - Buildings and Equipment
Centro Vacacional Punta Santiago Villa 3 Standard
Pending FEMA 406 HMP Completion
4339DR-PR (4339DR) 123506
E - Buildings and Equipment
Centro Vacacional Punta Santiago Villa 4 Standard
Pending FEMA 406 HMP Completion
4339DR-PR (4339DR) 123329
G - Parks, Recreational Facilities, and Other Items
Jose Luis Vivaldi Aviary Standard
Pending Formulation Completion
4339DR-PR (4339DR) 128915
Z - Management Costs
DNER Management Costs Management Costs
Pending Formulation Completion
4339DR-PR (4339DR) 154915
E - Buildings and Equipment
Additional DNER Contents Standard
Pending Formulation Completion
4339DR-PR (4339DR) 87465 A - Debris Removal
Island WIde Debris Removal Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123294
E - Buildings and Equipment
Moorings and Critical Habitats Buoys Island Wide Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123295
G - Parks, Recreational Facilities, and Other Items
Seagrass Restoration Island Wide Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123296
G - Parks, Recreational Facilities, and Other Items
Artificial Reefs Island Wide Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123297
E - Buildings and Equipment
Fish Aggregate Devices (FADs) Island Wide Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123298
G - Parks, Recreational Facilities, and Other Items
Manatee Signs Island Wide Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123299
G - Parks, Recreational Facilities, and Other
Coral Reefs Damage Island Wide Specialized
Pending Initial Project Development
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 24
Event Project
# Category Title Type
Process Step
Items
4339DR-PR (4339DR) 123300
G - Parks, Recreational Facilities, and Other Items
Dunes Damage Island Wide Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123301
G - Parks, Recreational Facilities, and Other Items
Seagrass Damage Island Wide Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123303
G - Parks, Recreational Facilities, and Other Items
Wetlands Damage Island Wide Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123306
G - Parks, Recreational Facilities, and Other Items
Camuy Caves Clara Cave System Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123307
G - Parks, Recreational Facilities, and Other Items
Camuy Caves Espiral Cave System Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123308
G - Parks, Recreational Facilities, and Other Items
Camuy Caves Catedral Cave System Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123311
E - Buildings and Equipment
Refugio Vida Silvestre Embalse Guajataca Admin Building Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123312
G - Parks, Recreational Facilities, and Other Items
Refugio Vida Silvestre Embalse La Plata Facilities Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123315
G - Parks, Recreational Facilities, and Other Items
Reserva Nacional de Investigación Estuarina de Bahía de Jobos Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123316
C - Roads and Bridges
Reserva Natural Corredor Ecológico del Noreste Roads Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123322
G - Parks, Recreational Facilities, and Other Items
Reserva Natural Laguna Tortuguero Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123323
G - Parks, Recreational Facilities, and Other Items
Reserva Natural Efraín Archilla Diez Humacao Standard
Pending Initial Project Development
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 25
Event Project
# Category Title Type
Process Step
4339DR-PR (4339DR) 123324
G - Parks, Recreational Facilities, and Other Items
Reserva Natural Punta Tuna Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123325
G - Parks, Recreational Facilities, and Other Items
Reserva Natural Caño Tiburones Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123326
D - Water Control Facilities
Reserva Natural Caño Tiburones Dike Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123327
E - Buildings and Equipment Finca Gabia Office Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123330
G - Parks, Recreational Facilities, and Other Items
Vivero de Plantas de Cambalache Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123331
G - Parks, Recreational Facilities, and Other Items
Vivero de Peces Maricao Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123332
D - Water Control Facilities
Vivero de Peces Maricao Water Structures Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123333
D - Water Control Facilities
Vivero de Peces Maricao Dam Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123334
D - Water Control Facilities
Vivero de Peces Maricao Holding Tank System Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123337
G - Parks, Recreational Facilities, and Other Items
Bosque Estatal de Aguirre Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123339
G - Parks, Recreational Facilities, and Other Items
Bosque Estatal de Cambalache Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123340
G - Parks, Recreational Facilities, and Other Items
Destacamento Cambalache Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123342
G - Parks, Recreational Facilities, and Other Items
Bosque Estatal de Carite Standard
Pending Initial Project Development
4339DR-PR 123343 G - Parks, Bosque Estatal de Standard Pending
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 26
Event Project
# Category Title Type
Process Step
(4339DR) Recreational Facilities, and Other Items
Guajataca Initial Project Development
4339DR-PR (4339DR) 123344
E - Buildings and Equipment
Negociado de Servicio Forestal Building Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123346
G - Parks, Recreational Facilities, and Other Items
Bosque Estatal de Maricao Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123347
G - Parks, Recreational Facilities, and Other Items
Bosque Estatal de Monte Guilarte Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123348
G - Parks, Recreational Facilities, and Other Items
Bosque Estatal de Piñones Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123349
G - Parks, Recreational Facilities, and Other Items
Bosque Estatal de Rio Abajo Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123350
G - Parks, Recreational Facilities, and Other Items
Bosque Estatal de Susua Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123351
G - Parks, Recreational Facilities, and Other Items
Bosque Urbano de San Patricio Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123353
G - Parks, Recreational Facilities, and Other Items
Bosque Estatal de Toro Negro Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123354
G - Parks, Recreational Facilities, and Other Items
Bosque Estatal de Vega Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123355
G - Parks, Recreational Facilities, and Other Items
Base 11 Region Metropolitana Unidad Terrestre Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123356
G - Parks, Recreational Facilities, and Other Items
Base 61 Región Guayama Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123357
E - Buildings and Equipment
Destacamento de Guanica Standard
Pending Initial Project
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 27
Event Project
# Category Title Type
Process Step
Development
4339DR-PR (4339DR) 123358
E - Buildings and Equipment
Hangar DRNA Isla Grande Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123359
E - Buildings and Equipment
Cayo Ratones Structures Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123360
G - Parks, Recreational Facilities, and Other Items
Cayo Aurora Structures Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123361
G - Parks, Recreational Facilities, and Other Items
Area Recreativa Isla de Cabras Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123363
G - Parks, Recreational Facilities, and Other Items
Reserva Natural de Humacao Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123365
G - Parks, Recreational Facilities, and Other Items
Unidad Maritima Cuerpo de Vigilantes de Ceiba Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123366
G - Parks, Recreational Facilities, and Other Items
Unidad Marítima Cuerpo de Vigilantes Arecibo Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123367
E - Buildings and Equipment
Unidad Maritima de Guayama Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123368
E - Buildings and Equipment
Unidad Maritima de Boqueron Contents Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123369
E - Buildings and Equipment
Unidad Maritima de Aguadilla Contents Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123370
E - Buildings and Equipment
Oficina Comisionado de Navegacion de Fajardo contents Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123371
E - Buildings and Equipment
Base 21 Región Arecibo contents Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123372
E - Buildings and Equipment
Base 41 Region Mayaguez contents Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123373
E - Buildings and Equipment
Base 51 Region Ponce contents Standard
Pending Initial Project
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 28
Event Project
# Category Title Type
Process Step
Development
4339DR-PR (4339DR) 123374
E - Buildings and Equipment
Base 71 Region Humacao contents Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123377
G - Parks, Recreational Facilities, and Other Items
Parque Las Nereidas Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123378
G - Parks, Recreational Facilities, and Other Items
Parque Luis Muñoz Rivera Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123380
G - Parks, Recreational Facilities, and Other Items
Parque Lineal Marti Coll Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123383
B - Emergency Protective Measures
Equipment Rental for Debris Removal Island Wide
Work Completed / Fully Documented
Pending Initial Project Development
4339DR-PR (4339DR) 123384 A - Debris Removal
Natural and Protected Areas and Forests Debris Removal
Work Completed / Fully Documented
Pending Initial Project Development
4339DR-PR (4339DR) 123385
B - Emergency Protective Measures
Force Account Labor for Flood Control Pump Stations and Dams
Work Completed / Fully Documented
Pending Initial Project Development
4339DR-PR (4339DR) 123388
G - Parks, Recreational Facilities, and Other Items
Parque Julio Enrique Monagas Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123389
G - Parks, Recreational Facilities, and Other Items
Balneario La Monserrate Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123391
G - Parks, Recreational Facilities, and Other Items
Parque Nacional Balneario Seven Seas Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123393
G - Parks, Recreational Facilities, and Other Items
Balneario Sun Bay, Vieques Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123394
D - Water Control Facilities
Balneario Sun Bay, Vieques Pump Station Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123398
G - Parks, Recreational
Balneario Caña Gorda Standard
Pending Initial Project
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 29
Event Project
# Category Title Type
Process Step
Facilities, and Other Items
Development
4339DR-PR (4339DR) 123400
G - Parks, Recreational Facilities, and Other Items
Centro Vacacional Villas de Añasco Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123401
G - Parks, Recreational Facilities, and Other Items
Balneario Tres Hermanos Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123402
D - Water Control Facilities
Balneario Tres Hermanos Pumping Station Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123403
G - Parks, Recreational Facilities, and Other Items
Centro Vacacional Monte del Estado Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123404
G - Parks, Recreational Facilities, and Other Items
Centro Vacacional Villas del Lago Caonillas Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123405
G - Parks, Recreational Facilities, and Other Items
Balneario Cerro Gordo Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123406
G - Parks, Recreational Facilities, and Other Items
Manuel Nolo Morales Balneario de Dorado Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123407
G - Parks, Recreational Facilities, and Other Items
Balneario de Punta Salinas Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123446
D - Water Control Facilities
Centro Vacacional de Boqueron Pumping Stations 1-3 Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123465
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin I Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123466
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin J Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123467
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin K Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123468
E - Buildings and Equipment
Centro Vacacional de Boqueron Standard
Pending Initial Project
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 30
Event Project
# Category Title Type
Process Step
Cabin L Development
4339DR-PR (4339DR) 123469
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin M Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123471
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin N Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123472
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin O Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123473
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin P Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123474
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin Q Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123475
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabin R Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123476
E - Buildings and Equipment
Centro Vacacional de Boqueron Villa 1 BB Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123479
E - Buildings and Equipment
Centro Vacacional de Boqueron Villa 1 EE Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123490
G - Parks, Recreational Facilities, and Other Items
Centro Vacacional de Boqueron Villa 2 Parks and Rec Facilities and Utilities Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123492
G - Parks, Recreational Facilities, and Other Items
Centro Vacacional de Boqueron Parks, Recreation, and Storage Facilities Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123493 F - Utilities
Centro Vacacional de Boqueron Waste Water Treatment Plants 1 and 2 Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123494 F - Utilities
Centro Vacacional de Boqueron Electrical Substation Standard
Pending Initial Project Development
4339DR-PR (4339DR) 123513
D - Water Control Facilities Portugues Dam Specialized
Pending Initial Project Development
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 31
Event Project
# Category Title Type
Process Step
4339DR-PR (4339DR) 123515
D - Water Control Facilities Ajies Dam Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123516
D - Water Control Facilities Daguey Dam Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123517
D - Water Control Facilities
Rio Anton Ruiz en Humacao Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123518
D - Water Control Facilities
Rio Humacao Canal Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123519
D - Water Control Facilities
Portugues West Levee System Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123520
D - Water Control Facilities
Portugues and Bucana Levee System Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123521
D - Water Control Facilities
Bayagan North Levee System Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123522
D - Water Control Facilities
Bucana East Levee System Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123523
D - Water Control Facilities
Portugues North Tieback Levee System Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123524
D - Water Control Facilities
Portugues East Waterway Levee Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123525
D - Water Control Facilities Rio Chiquito Levee Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123526
D - Water Control Facilities
Upper Bucana Debris Basin Levee System Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123527
D - Water Control Facilities
Rio Grande de Manati Levee (Barceloneta Pueblo) Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123528
D - Water Control Facilities
Quebrada Rosa Sanchez Yabucoa Canal Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123529
D - Water Control Facilities
Dique Canal Santiago Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123530
D - Water Control Facilities Dique Las Gramas Specialized
Pending Initial Project Development
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 32
Event Project
# Category Title Type
Process Step
4339DR-PR (4339DR) 123531
D - Water Control Facilities
Dique Canal Tanama Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123532
D - Water Control Facilities
Canal Rio Santiago Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123533
D - Water Control Facilities
Villa Nueva Creek Dam Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123534
D - Water Control Facilities
Cantera Creek Debris Basin Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123535
D - Water Control Facilities
Cumba Creek Debris Basin Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123536
D - Water Control Facilities
Eugenia Creek Debris Basin Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123537
D - Water Control Facilities
Duende Creek Debris Basin Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123538
D - Water Control Facilities
Sin Nombre Creek Debris Basin Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123539
D - Water Control Facilities
Laya Creek Debris Basin Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123540
D - Water Control Facilities
Villa Nueva Creek Debris Basin Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123541
D - Water Control Facilities
Rio Bayamon Erosion Control Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123542
D - Water Control Facilities
Rio Turabo en Villa del Rey Caguas Flood Control Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123543
D - Water Control Facilities
Rio Grande de Loiza Contratos A/C Levee Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123544
D - Water Control Facilities
Rio Grande de Loiza Contrato D Waterway Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123545
D - Water Control Facilities
Quebrada Mendoza- Cabo Rojo Waterway Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123546
D - Water Control Facilities
Rio La Plata de Dorado (Fase 1A) Dike Specialized
Pending Initial Project Development
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 33
Event Project
# Category Title Type
Process Step
4339DR-PR (4339DR) 123547
D - Water Control Facilities
Rio Guanajibo (San German) Channel Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123548
D - Water Control Facilities
Rio Puerto Nuevo Bechara Mid Section and 90 Sewer Line Waterway Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123550
D - Water Control Facilities
Rio Puerto Nuevo Bechara Contrato II AA Waterway Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123551
D - Water Control Facilities
Rio Puerto Nuevo contrato II AR- Margarita Channel Structure Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123552
D - Water Control Facilities
Rio Fajardo (dique Punta Fajardo) Dike Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123553
D - Water Control Facilities
Rio Fajardo (dique Santa Isidra) Dike Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123554
D - Water Control Facilities
Proyecto Control de Erosion Rio Pitahaya Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123555
D - Water Control Facilities
Rio Guayanilla (Guayanilla) Flood Control Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123556
D - Water Control Facilities
Rio Guanajibo (Hormigueros) Waterway Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123557
D - Water Control Facilities
Rio Yaguez Waterway Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123558
D - Water Control Facilities
Rio Guanajibo (Sabana Grande) Flood Control Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123560
D - Water Control Facilities Rio Cibuco Dike Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123562
D - Water Control Facilities
Rio Luchetti Flood Control Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 127388
E - Buildings and Equipment
Reserva Nacional de Investigación Estuarina de Bahía de Jobos Old Train Station Standard
Pending Initial Project Development
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 34
Event Project
# Category Title Type
Process Step
4339DR-PR (4339DR) 127389
G - Parks, Recreational Facilities, and Other Items
Reserva Natural Caño Tiburones Dock Standard
Pending Initial Project Development
4339DR-PR (4339DR) 129592
D - Water Control Facilities Dique Expreso Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 129839 F - Utilities
Zoologico de Puerto Rico Phone Lines and Fiber Optic Networks Standard
Pending Initial Project Development
4339DR-PR (4339DR) 132452
G - Parks, Recreational Facilities, and Other Items
Coral Reef Restoration for Culebra Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 133836
E - Buildings and Equipment
Centro Vacacional Punta Santiago Cabins Contents Standard
Pending Initial Project Development
4339DR-PR (4339DR) 133838
E - Buildings and Equipment
Centro Vocacional Punta Santiago Villas Contents Standard
Pending Initial Project Development
4339DR-PR (4339DR) 133850
E - Buildings and Equipment
Centro Vacacional de Boqueron Cabins Contents Standard
Pending Initial Project Development
4339DR-PR (4339DR) 135604 F - Utilities
Punta Santiago Vacacional Center Transformers Standard
Pending Initial Project Development
4339DR-PR (4339DR) 136996
E - Buildings and Equipment
Cabo Rojo Fish Lab Contents Standard
Pending Initial Project Development
4339DR-PR (4339DR) 144031
D - Water Control Facilities
De Diego Flood Control Pump Station Outfall Pipeline Specialized
Pending Initial Project Development
4339DR-PR (4339DR) 123504
E - Buildings and Equipment
Centro Vacacional Punta Santiago Villa 2 Standard
Pending Insurance Completion
4339DR-PR (4339DR) 123507
E - Buildings and Equipment
Centro Vacacional Punta Santiago Villa 5 Standard
Pending Insurance Completion
4339DR-PR (4339DR) 123511
E - Buildings and Equipment
Centro Vacacional Punta Santiago Villa 9 Standard
Pending Insurance Peer Review
4339DR-PR (4339DR) 123039
G - Parks, Recreational Facilities, and Other Items
Isla Caja de Muerto Pier Specialized
Pending PDMG Scope & Cost Routing
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 35
Event Project
# Category Title Type
Process Step
4339DR-PR (4339DR) 123508
E - Buildings and Equipment
Centro Vacacional Punta Santiago Villa 6 Standard
Pending PDMG Scope & Cost Routing
4339DR-PR (4339DR) 123238
G - Parks, Recreational Facilities, and Other Items
Bay View Catano Boat Ramp Standard
Pending Peer Review
4339DR-PR (4339DR) 86151
G - Parks, Recreational Facilities, and Other Items
Refugio de Vida Silvestre Iris Alameda Standard
Pending Recipient Final Review
4339DR-PR (4339DR) 122176
G - Parks, Recreational Facilities, and Other Items
Reserva Natural Caja de Muertos- Facilities Standard
Pending Recipient Final Review
4339DR-PR (4339DR) 123242
G - Parks, Recreational Facilities, and Other Items
Cabo Rojo Fish Lab Pier Standard
Pending Recipient Final Review
4339DR-PR (4339DR) 123251
G - Parks, Recreational Facilities, and Other Items
Isla de Cabras Boat Ramp Standard
Pending Recipient Final Review
4339DR-PR (4339DR) 123255
G - Parks, Recreational Facilities, and Other Items
Pinones Ranger Station Pier Standard
Pending Recipient Final Review
4339DR-PR (4339DR) 123498
E - Buildings and Equipment
Centro Vacacional Punta Santiago Cabin E Standard
Pending Recipient Final Review
4339DR-PR (4339DR) 123502
E - Buildings and Equipment
Centro Vacacional Punta Santiago Cabin K Standard
Pending Recipient Final Review
4339DR-PR (4339DR) 123503
E - Buildings and Equipment
Centro Vacacional Punta Santiago Villa 1 Standard
Pending Recipient Final Review
4339DR-PR (4339DR) 123510
E - Buildings and Equipment
Centro Vacacional Punta Santiago Villa 8 Standard
Pending Recipient Final Review
4339DR-PR (4339DR) 80241
G - Parks, Recreational Facilities, and Other Items
MDNE037-Zoologico de Puerto Rico, Mayaguez Standard
Process Discontinued
4339DR-PR (4339DR) 83765
G - Parks, Recreational Facilities, and Other Items
MDNE038-Centro Vacacional de Boqueron Standard
Process Discontinued
4339DR-PR 84241 G - Parks, MDNE050 Parque Standard Process
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 36
Event Project
# Category Title Type
Process Step
(4339DR) Recreational Facilities, and Other Items
las Cavernas del Rio Camuy
Discontinued
4339DR-PR (4339DR) 84745
D - Water Control Facilities
MDNE024 - Baldorioty de Castro Pump Station Specialized
Process Discontinued
4339DR-PR (4339DR) 84748
D - Water Control Facilities
MDNE025 - De Diego Pump Station Specialized
Process Discontinued
4339DR-PR (4339DR) 84750
D - Water Control Facilities
MDNE026 - Parada 18 Pump Station Specialized
Process Discontinued
4339DR-PR (4339DR) 84751
D - Water Control Facilities
MDNE027 - Sabana Pump Station Specialized
Process Discontinued
4339DR-PR (4339DR) 84752
D - Water Control Facilities
MDNE028 - San Fernando Pump Station Specialized
Process Discontinued
4339DR-PR (4339DR) 84753
D - Water Control Facilities
MDNE029 - Juana Matos Pump Station Specialized
Process Discontinued
4339DR-PR (4339DR) 84754
D - Water Control Facilities
MDNE030 - Malaria Pump Station Specialized
Process Discontinued
4339DR-PR (4339DR) 84755
D - Water Control Facilities
MDNE031 - Bay View Pump Station Specialized
Process Discontinued
4339DR-PR (4339DR) 84756
D - Water Control Facilities
MDNE032 - Pichingo Pump Station Specialized
Process Discontinued
4339DR-PR (4339DR) 84758
D - Water Control Facilities
MDNE033 - El Guapo Pump Station Specialized
Process Discontinued
4339DR-PR (4339DR) 84759
D - Water Control Facilities
MDNE034 - El Parque Pump Station Specialized
Process Discontinued
4339DR-PR (4339DR) 84760
D - Water Control Facilities
MDNE035 - Las 80 Pump Station Specialized
Process Discontinued
4339DR-PR (4339DR) 84762
D - Water Control Facilities
MDNE036 - Pastillo Pump Station Specialized
Process Discontinued
4339DR-PR (4339DR) 86091
G - Parks, Recreational Facilities, and Other Items
Refugio de Vida Silvestre Iris Alameda Standard
Process Discontinued
4339DR-PR (4339DR) 87277
C - Roads and Bridges
MDNE039-Consolidated DI- Cat C Standard
Process Discontinued
4339DR-PR 87282 D - Water Control MDNE040- Standard Process
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 37
Event Project
# Category Title Type
Process Step
(4339DR) Facilities Consolidated DI -CAT D
Discontinued
4339DR-PR (4339DR) 87284
D - Water Control Facilities
MDNE041-Consolisated- Cat D2 Standard
Process Discontinued
4339DR-PR (4339DR) 87288
E - Buildings and Equipment
MDNE042-Consolidated- Cat E Standard
Process Discontinued
4339DR-PR (4339DR) 87291
E - Buildings and Equipment
MDNE043-Consolidated- Cat E2 Standard
Process Discontinued
4339DR-PR (4339DR) 87295
G - Parks, Recreational Facilities, and Other Items
MDNE045-Consolidated-Cat G Standard
Process Discontinued
4339DR-PR (4339DR) 87296 F - Utilities
MDNE044-Consolidated- Cat F Standard
Process Discontinued
4339DR-PR (4339DR) 87299
G - Parks, Recreational Facilities, and Other Items
MDNE046-Consolidated-Cat G2 Standard
Process Discontinued
4339DR-PR (4339DR) 87309
G - Parks, Recreational Facilities, and Other Items
MDNE047-Consolidated-Cat G3 Standard
Process Discontinued
4339DR-PR (4339DR) 88319
Z - Management Costs DNER DAC cost Management Costs
Process Discontinued
4339DR-PR (4339DR) 89302
D - Water Control Facilities
MDNE052-El Parque Pump Station Discharge Pipe Standard
Process Discontinued
4339DR-PR (4339DR) 89303
G - Parks, Recreational Facilities, and Other Items
Bay View Catano Boat Ramp Standard
Process Discontinued
4339DR-PR (4339DR) 90001
G - Parks, Recreational Facilities, and Other Items
MDNE038-Centro Vacacional de Boqueron Standard
Process Discontinued
4339DR-PR (4339DR) 91581 A - Debris Removal Zoo Debris
Work Completed / Fully Documented
Process Discontinued
4339DR-PR (4339DR) 108622
Z - Direct Administrative Costs
MDNE015 PAAP DAC - SubRecipients
Direct Administrative Costs and SMC
Process Discontinued
4339DR-PR (4339DR) 123309
G - Parks, Recreational Facilities, and Other Items
Refugio Vida Silvestre Iris Alameda Facilities Standard
Process Discontinued
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 38
Event Project
# Category Title Type
Process Step
4339DR-PR (4339DR) 123445
D - Water Control Facilities
Centro Vocacional Punta Santiago Tank Water Heater Standard
Process Discontinued
Tabla 2. Listado de proyectos sometidos para el Programa de Asistencia Pública de la Agencia para el Manejo de Emergencias (FEMA, por sus siglas en inglés) del Departamento de Recursos Naturales y Ambientales (DRNA) para los daños causados por los terremotos. Los proyectos serán bajo la Sección 428 de la Ley Stafford y los Procedimientos Alternos de Asistencia Pública, que establece un Estimado de Costo Fijo para los proyectos. La fecha límite establecida por FEMA para arribar a los Estimados de Costo Fijo es el 16 de julio de 2021.
Event Project
# Category Title Type Process Step
4473DR-PR (4473DR) 151410
B - Emergency Protective Measures
Caja de Muertos Island Nature Reserve Temporary Dock Standard
Pending Formulation Completion
4473DR-PR (4473DR) 151411
B - Emergency Protective Measures
Caja de Muertos Island Nature Reserve Temporary Facility Standard
Pending Formulation Completion
4473DR-PR (4473DR) 151393
A - Debris Removal
Declaration Wide Debris Removal Standard
Pending Initial Project Development
4473DR-PR (4473DR) 151394
B - Emergency Protective Measures
Emergency Protective Measures Declaration Wide
Work Completed / Fully Documented
Pending Initial Project Development
4473DR-PR (4473DR) 151396
G - Parks, Recreational Facilities, and Other Items
Balneario Caña Gorda Facilities Standard
Pending Initial Project Development
4473DR-PR (4473DR) 151398
E - Buildings and Equipment
Centro Vacacional Villas del Lago Caonillas Standard
Pending Initial Project Development
4473DR-PR (4473DR) 151400
E - Buildings and Equipment
Caja de Muerto Island Nature Reserve Lighthouse Standard
Pending Initial Project Development
4473DR-PR (4473DR) 151402
E - Buildings and Equipment
Guanica State Forest Facilities Standard
Pending Initial Project Development
4473DR-PR (4473DR) 151403
E - Buildings and Equipment
Guanica State Forest Historic Facilities Standard
Pending Initial Project Development
4473DR-PR (4473DR) 151405
C - Roads and Bridges
Susua State Forest- Acces Road Standard
Pending Initial Project Development
4473DR-PR (4473DR) 151406
E - Buildings and Equipment
La Parguera Natural Reserve - Restroom Standard
Pending Initial Project
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 39
Faclitiy Development
4473DR-PR (4473DR) 151407
E - Buildings and Equipment
Lucchetti Reservoir Wildlife Refuge - Admin Offices Standard
Pending Initial Project Development
4473DR-PR (4473DR) 151408
E - Buildings and Equipment
Punta Las Cucharas Nature Reserve- Lighthouse Standard
Pending Initial Project Development
4473DR-PR (4473DR) 151409
E - Buildings and Equipment
Ranger Corps Cerrillos Building Standard
Pending Initial Project Development
4473DR-PR (4473DR) 155807 F - Utilities
Balneario Caña Gorda Treatment Plant and Tanks Standard
Pending Initial Project Development
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 40
Tabla 3. Listado de proyectos sometidos para el Programa de Asistencia Pública de la Agencia para el Manejo de Emergencias (FEMA, por sus siglas en inglés) de la Autoridad de Desperdicios Sólidos (ADS) para los huracanes Irma y María. Los proyectos de la ADS serán bajo la Sección 428 de la Ley Stafford y los Procedimientos Alternos de Asistencia Pública, que establece un Estimado de Costo Fijo para los proyectos. La fecha límite establecida por FEMA para arribar a los Estimados de Costo Fijo es el 31 de diciembre de 2020.
Event Project
# Category Title Type
Process Step
3384EM-PR (3384EM) 99620
B - Emergency Protective Measures
ESWA002 EPM - Sub-Station
Work Completed / Fully Documented Obligated
3384EM-PR (3384EM) 99344
Z - Direct Administrative Costs
ESWA003 PAAP DAC - SubRecipients
Direct Administrative Costs and SMC
Pending Initial Project Development
3384EM-PR (3384EM) 71356
Z - Direct Administrative Costs
DR-3384 ESWA003 - DAC PAAP
Direct Administrative Costs and SMC
Process Discontinued
3384EM-PR (3384EM) 99379
A - Debris Removal
ESWA001 Debris - Caguas-Toa Baja-Arecibo (PAAP)
Work Completed / Fully Documented
Process Discontinued
4336DR-PR (4336DR) 49139
A - Debris Removal
ISWA001V1- PAAP DEBRIS-Caguas-Toa Baja-Arecibo
Work Completed / Fully Documented Obligated
4336DR-PR (4336DR) 49140
B - Emergency Protective Measures
ISWA002V1 EMERGENCCY PROTECTIVE MEASURES
Work Completed / Fully Documented Obligated
4336DR-PR (4336DR) 100597
Z - Direct Administrative Costs
ISWA003 PAAP DAC - SubRecipients
Direct Administrative Costs and SMC
Pending PDMG Project Review
4339DR-PR (4339DR) 49135
B - Emergency Protective Measures
84E2 EMERGENCY PROTECTIVE MEASURES
Work Completed / Fully Documented
Applicant Signed Project
4339DR-PR (4339DR) 49134
A - Debris Removal
189E1 SWA001A- Debris Alternative Procedures (PAAP) V1
Work Completed / Fully Documented Obligated
4339DR-PR (4339DR) 49136
B - Emergency Protective Measures
MSWA003 - EPM - Generators
Work Completed / Fully Documented Obligated
4339DR-PR (4339DR) 95360
E - Buildings and Equipment
MSWA006 Transfer Station of San Juan: (Structural , electrical, site poles and PVC Fence) Standard
Pending Applicant DDD Approval
4339DR-PR (4339DR) 95366
E - Buildings and Equipment
MSWA012 BUILDING AND CONTENTS 1. METAL FENCE Standard
Pending Formulation Completion
4339DR-PR (4339DR) 95367
E - Buildings and Equipment
MSWA013 BUILDING AND Standard
Pending Formulation
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 41
Event Project
# Category Title Type
Process Step
CONTENTS 1, ROOF DAMAGE 2. EXTERIOR PAINTING
Completion
4339DR-PR (4339DR) 49137
E - Buildings and Equipment
Buildings and Equipment (4) Standard
Pending Initial Project Development
4339DR-PR (4339DR) 49138
E - Buildings and Equipment Utilities (5) Standard
Pending Initial Project Development
4339DR-PR (4339DR) 95359
E - Buildings and Equipment
MSWA005 BUILDING AND CONTENTS: (Galvalume Roof and insulation) Standard
Pending Initial Project Development
4339DR-PR (4339DR) 95361
E - Buildings and Equipment
MSWA007 BUILDING AND CONTENTS: (Acoustical ceiling, doors and A/C duct system) Standard
Pending Initial Project Development
4339DR-PR (4339DR) 95362
E - Buildings and Equipment
MSWA008 BUILDING AND CONTENTS: (electrical failures, metal windows, louvers and roll up doors) Standard
Pending Initial Project Development
4339DR-PR (4339DR) 95363
E - Buildings and Equipment
MSWA009 BUILDING AND CONTENTS - 1. ALUMINUM WINDOWS 2. ROOF AND FENCE DAMAGE Standard
Pending Initial Project Development
4339DR-PR (4339DR) 95364
E - Buildings and Equipment
MSWA010 BUILDING AND CONTENTS- (Ceiling tiles damage, galvalume sheet repair) Standard
Pending Initial Project Development
4339DR-PR (4339DR) 95365
E - Buildings and Equipment
MSWA011 BUILDING AND CONTENTS - 1. ALUMINUM WINDOWS 2. ROOF AND FENCE DAMAGE Standard
Pending Initial Project Development
4339DR-PR (4339DR) 68273
Z - Direct Administrative Costs ESWA003 - DAC
Direct Administrative Costs and SMC
Process Discontinued
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 42
Event Project
# Category Title Type
Process Step
4339DR-PR (4339DR) 95368
Z - Direct Administrative Costs
CAT Z - Direct Administrative Costs
Direct Administrative Costs and SMC
Process Discontinued
INFORME DE TRANSICIÓN 2017-2020
Oficina del Secretario
Página 43
Tabla 4. Listado de proyectos sometidos para el Programa de Asistencia Pública de la Agencia para el Manejo de Emergencias (FEMA, por sus siglas en inglés) de la Junta de Calidad Ambiental (JCA) para el huracán y María. Los proyectos de la JCA serán bajo la Sección 428 de la Ley Stafford y los Procedimientos Alternos de Asistencia Pública, que establece un Estimado de Costo Fijo para los proyectos. La fecha límite establecida por FEMA para arribar a los Estimados de Costo Fijo es el 31 de diciembre de 2020.
Event Project
# Category Title Type
Process Step
4339DR-PR (4339DR) 50761
B - Emergency Protective Measures
MEQD001- EMERGENCY PROTECTIVE MEASURES
Work Completed / Fully Documented Obligated
4339DR-PR (4339DR) 50762
E - Buildings and Equipment
MEQD002- Building Contents-Antigua Penitenciaria Standard Obligated
4339DR-PR (4339DR) 73254
E - Buildings and Equipment
MEQB010- EQB Telecommunications System
Work Completed / Fully Documented Obligated
4339DR-PR (4339DR) 115025
Z - Management Costs
EQB- Management Costs
Management Costs Obligated
4339DR-PR (4339DR) 129864
B - Emergency Protective Measures
Vehicle Repairs for Emergency Work
Work Completed / Fully Documented
Pending Initial Project Development
4339DR-PR (4339DR) 66925
E - Buildings and Equipment
MEQB010- EQB TELECOM. SYSTEM Standard
Process Discontinued
4339DR-PR (4339DR) 72549
E - Buildings and Equipment
MEQB010- EQB TELECOMMUNICATION SYSTEM Standard
Process Discontinued
4339DR-PR (4339DR) 87457
E - Buildings and Equipment
MEQD002 - Building Contents Standard
Process Discontinued