  • 8/2/2019 IAS Taj Presentation

    1/39

    Problems before Mahavitaran

    Action Plan, Achievements & Future Plans Towards Reforms

  • 8/2/2019 IAS Taj Presentation

    2/39

    Slide 2

    Problems before Mahavitaran (June 05)

    1. Shortage of Power and Load Shedding of more than 4000 MW

    (500MW Chandrapur under long Outage)

    2. High Distribution Losses (31.14% in 04-05)

    3. Large Amount of Outstanding Arrears (Rs. 8130.61 Cr.)

    4. Highly Deteriorated Distribution Infrastructure

    5. Large Pending Applications for Ag Connections (1.7 Lakhs Paid App)

    6. Poor Response to Consumers

    7. Employee Motivation

    8. Financial Losses

  • 8/2/2019 IAS Taj Presentation

    3/39

    Slide 3

    Action Plan to Resolve the Issues

    MSEDCLs Mission Statement

    10 Point Action Plan

    Communication Plan

    Organizational Changes

  • 8/2/2019 IAS Taj Presentation

    4/39

    Slide 4

    1. Shortage of Power and Load Shedding of more than 4000MW

    A) Load Management

    Single Phasing : 7800 villages completed Load Relief : 960 MW

    Gaothan feeder Separation : 90 feeders completed- Load Relief : 104 MW

    Akshay Prakash Yojana : 4611 Villages, 960 MW

    Energy Conservation : 4.5 Lakhs CFLs, 9 MW

    Pune Zero Load Shedding Model

    Total Load Managed: 2122 MW

    Action Plan and Achievements in 2005-06

    LOAD MANAGEMENT CAPACITY ADDITION PLAN

    Load Curve for APY & Single Phasing

  • 8/2/2019 IAS Taj Presentation

    5/39

    Slide 5

    Shortage of Power and Load Shedding of more than 4000MW Contd

    B) Capacity Addition Availability Plan Up to FY 12 Plan of 19000 MW to meet deficit of 10000 MW in 5 years

    MahaGenco 6178Central Sector 2753Interstate 591

    RGPPL - 1768IPP 3973Ultra Mega PP 3840

    2006-07 (MW):

    Mahagenco 364, Tarapur - 158, NTPC (Vchal, Sipat, Kgaon) 316,Ghatghar 200, RGPPL 650: Total 1688 MW

    Power Purchase at High Cost

    Total: 19103 MW

  • 8/2/2019 IAS Taj Presentation

    6/39

    Slide 6

    Future Plans (Load Management) Single Phasing Phase II - 4515 villages with expenditure of Rs. 270Cr. by March 2008

    Gaothan Feeder Separation-2500 villages by 06-07 and balance by 2007-08

    Energy Conservation-

    CFL Launch in entire Maharashtra ( 3 Crores of CFLs to be distributed in entire

    Maharashtra within next 1 year)

    Capacitors-

    LTLMS on 62666 DTCs, Fixed capacitors on 19900 DTCs

    Total No. of villages 40687

    Single Phasing Villages 14315

    Feeder Separation Villages 10232

    Askhay Prakash Villages 3757

    Villages exempted from Load Shedding

    for various reasons 12383

    Abstract:

    Shortage of Power and Load Shedding of more than 4000MW Contd

  • 8/2/2019 IAS Taj Presentation

    7/39Slide 7

    2. High Distribution Losses (31.14% in 04-05)

    Action Plan & Achievements

    Energy accounting and fixing of responsibility at all levels

    - 80% Feeders EA Completed, 50,000 DTCs Metered & EA Completed

    Theft reduction drive including abetment & action against employees:

    - FIR Against 22 Employees

    - Disciplinary Action Against 389 Employees

    - 110 Flying Squads Deployed- 26572 Thefts detected

    Outsourcing of Meter Reading, Bill Distribution and Collection

    Bhiwandi Franchisee Finalized

    HVDS

    Centre of Excellence - DRUM Project at Aurangabad : Tenders Invited

    Commercial Intelligence Wing Set Up

    LOSSES REDUCED BY 3.15% TO 27.9% IN 2005-06

  • 8/2/2019 IAS Taj Presentation

    8/39Slide 8

    High Distribution Losses (contd)

    Future Plans

    Distribution Losses to be reduced to 19 % by 2008-09. [with 3% reduction each year]

    Energy Audit of the remaining 2830 feeders to be completed during this year

    Metering of 1.5 Lakh DTCs to be completed by March 2007

    6 police stations to be set up

    Bhiwandi to be handed over to Franchisee

    High Loss feeders (Losses above 50%) to be franchised out (Feeder Franchisee Scheme)

    High Loss DTCs to be franchised out (Micro Franchisee Scheme)

    16.65 Lakh Ag connections to be metered by the year 2007-08.

    20,000 HT consumers will get AMR

    Ludhiana Pattern to be introduced on large scale.

  • 8/2/2019 IAS Taj Presentation

    9/39Slide 9

    3. Low collection efficiency

    Action Plan & Achievements

    After Company formation Monthly repatriation has increased from Rs. 932 Cr. to Rs.

    1426 Cr.

    Collection Efficiency has reached 95.32% in 2005-06.

    Elimination of average billing: Normal Billing Increased to 84.2% in 2005-06 from

    77.44% in 2004-05.

    100 % disconnection of consumers with arrears above Rs 5000/-

    Reduction of arrears: RCI Arrears reduced from Rs.1466 Cr. In FY 05 to Rs.1360 Cr in FY 06

    E-billing (all Bills), Spot billing (20 Cities), ATM Cash Collection Centres (50), Drop Boxes, E-

    payment Introduced.

    Special PD Arrears Recovery Team Set Up: Rs. 8.28 Crs Recovered.

  • 8/2/2019 IAS Taj Presentation

    10/39Slide 10

    Low collection efficiency (contd..)

    Future Plans

    Spot Billing and ATMs at all circles

    Mobile Collection Centres

    Increasing the scope of e-payment

    Collection Efficiency to be increased by 2% every year

  • 8/2/2019 IAS Taj Presentation

    11/39

    Slide 11

    4. Deteriorated Distribution Infrastructure

    Action Plan & Achievements(Infrastructure Development Plan)

    3 years Load Profile at SDO Level: Prepared for 580 Sub-

    Divisions (Growth of 8870 MW)

    3 years Infrastructure Plan to cater to the load:

    DPR Prepared for 580 Subdivisions of Rs. 14524 Crores Plan includes 590 Sub Stn, 35 Switching Stn, 68751 DTC, 84531 KM HT

    Lines, 23229 KM LT Lines

    Project Management Consultants Appointed

    Quality Control Department Set Up

    Material Management Cell set Up

    Rs. 5000 Cr. MOUs Signed with REC/ PFC, (15 projects approved by REC

    worth Rs.2256 Cr

    Received In-Principle Go-Ahead from MERC

    Objectives

  • 8/2/2019 IAS Taj Presentation

    12/39

    Slide 12

    Details of Proposed Major Works

    Year

    Sub-Station (Nos.) Switching Station

    (Nos.)

    DTC (Nos.)

    Related

    HT Lines(Km)

    Related

    HT Lines(Km)

    RelatedLT Lines

    (Km)33/11 KV 22/11 KV

    11 / 0.4KV

    22 / 0.4KV

    22 KV 11 KV

    06-07 57 4 3 6,562 553 569 8,180 2,404

    07-08 250 16 16 28,532 2,406 2,474 35,565 10,453

    08-09 248 15 16 28,311 2,387 2,455 35,288 10,372

    Total 555 35 35 63,405 5,346 5,498 79,033 23,229

    Year

    HVDS Transformer

    (Nos.)

    Distribution Special Project

    25 KVA 16 KVAHT Line(GFSS)

    (Km)

    LT Line(GFSS)

    (Km)

    DTC (Nos.)

    63 kVA 100 kVA

    06-07 4,313 2,728

    24,000 4,0006,000

    4,00007-08 18,753 11,862

    08-09 18,608 11,769

    Total 41,674 26,359 24,000 4,000 6,000 4,000

    Deteriorated Distribution Infrastructure(Contd..)

  • 8/2/2019 IAS Taj Presentation

    13/39

    Slide 13

    Financial Plan for 3 years - (FY 06-07 to FY 08-09)

    Year Wise Outlay:

    Year Capital Works R&M Works Total

    FY06-07 774 1,027 1,801

    FY07-08 4,343 2,000 6,343

    FY08-09 4,343 2,037 6,380

    Total 9,460 5,064 14,524

    Rs. Cr.

    Deteriorated Distribution Infrastructure(Contd..)

  • 8/2/2019 IAS Taj Presentation

    14/39

    Slide 14

    5. Pending Applications for Ag connections

    Achievements

    Future Plan

    Bring down the Ag. pending connections to one month in 3 years

    Status of Pending Ag Pump Applications as on 31-03-2006

    Total Applns Recd - 3,76,385Paid Pending Applns - 1,98,837Test Reports Received - 1,03,601

    04-05 05-06 06-07

    Connectionsreleased

    Conn Released TargetConn Released (till

    May 06)

    81,294 79,466 1,11,927 12,095

    Circle Wise Break Up

  • 8/2/2019 IAS Taj Presentation

    15/39

    Slide 15

    6. Poor Response to Consumer

    Action Plan & Achievements Implementation of MIS:

    MIS Phase I Computers and CMS/FEMS software provided to 345 S/Dns.

    Module for Store, EA, Finance, Consumer Systems etc.

    MIS Phase II TCS Appointed, 15 Modules (including Asset Mgt,

    GAD, HRMS, Training .etc.) envisaged

    Communication Backbone with BSNL & Data Centre Started

    Training to employees: Mandays Trained in 2005-06 increased to 36757 in comparison to 28226

    in FY 2004-05.

    Customer Facilitation Centres: 5 CFCs Set Up

    Call Centres: 9 at Pune, Bhandup, Nagpur, Akola, Amravati, Kalyan, Ahmednagar, Nasik,

    Kolhapur Set Up

    SCADA: Being Implemented in 10 Cities (Amravati, Aurangabad, Kolhapur, Malegaon, Nagpur,

    Nanded, Nashik, Pimpri-chinchwad, Sangli, Pune)

    E-billing , Online payment , SEVAK ATM (50 Achieved in 2005-06), Bill junction / Bill desk

    9 Consumer Grievance Redressal Forums Set Up

  • 8/2/2019 IAS Taj Presentation

    16/39

    Slide 16

    Poor Consumer Response (contd..)

    Future Plan

    50 CFCs to be completed by August 06

    12 Call centres to be set up at Municipal Corporations by March 07

    67 more SEVAK ATMs to be installed by October 06

    MIS Phase I Computers and CMS/FEMS software will be provided to additional220 S/Dns by March 2007

    Integration of 6 modules of MIS Phase I will be completed by October 06

    GIS Network Mapping

    MIS Phase-II will be Completed in 1 Year.

  • 8/2/2019 IAS Taj Presentation

    17/39

    Slide 17

    7. Employee Motivation

    Communication Plan & Motivational Work Shop

    Reward for Good Performance of all Employees

    Performance Scorecard of All Officers on KPIs on Internet

    Increasing Officers Exposure to Best Practices

    Voluntary Uniform, Flag & Anthem

    4 Mobile MDs Representatives

    De-centralization & Regional Executive Directors Simplification of Procedures and Transparency

    Quality Consciousness

    Drive Against Corruption

    Action Plan & Achievements

  • 8/2/2019 IAS Taj Presentation

    18/39

    Summary of Major Achievements

    Monthly repatriation increased from average Rs. 932 Crores to maximum Rs. 1426 Crores

    Distribution Losses reduced by 3.14 % (31.14 % in 2004-05 to 28 % in 2005-06)

    50,000 Urban DTCs metered and Energy Accounting started

    5 years load Profile and Infrastructure Work Plan prepared for 580 Subdivisions of Rs.

    14524 Crores for a three year period

  • 8/2/2019 IAS Taj Presentation

    19/39

    Summary of Major Achievements Contd

    Effective Load Management through Akshay Prakash Yojana, Single Phasing,

    GFSS,use of CFLs, capacitor installation on DTCs and at sub-stations being

    implemented successfully for greater consumer satisfaction

    Bhiwandi Franchisee Finalised

    Employee motivation through training

    Communication Plan implemented for Goodwill building up

    Enhanced Consumer Response through CFCs, Call Centres, ATMs, E-billing etc.

    Pune Zero Load Shedding Model

  • 8/2/2019 IAS Taj Presentation

    20/39

    Summary of Future Plans

    3 years Infrastructure Plan to cater to the future load growth

    Distribution Losses to be reduced to 19 % within 3 years

    Energy Audit to be started on the remaining 1.5 Lakh DTCsand 2830 feeders by March 2007

    Collection Efficiency to be increased to 100% within 3 years

    Normal Billing Percentage to be 100% in one year

  • 8/2/2019 IAS Taj Presentation

    21/39

    Summary of Future Plans (Contd..)

    Load Management and Capacity Addition so as to have zero

    Load Shedding by 2009-10

    Micro franchisee and Feeder Franchisee Schemes

    Use of SCADA, Call Centres, CFCs etc. in all Municipal

    Corporation Areas

    16.5 Lakh Ag Consumers to be metered by 2007-08

    Bring down the Ag pending Connections to 1 month in 3 years

    I i h G f M h h

  • 8/2/2019 IAS Taj Presentation

    22/39

    Slide 22

    Issues with Govt. of Maharashtra

    Promised Conversion of Govt. Debt of Rs. 2742 Cr. Not Cleared.

    Experience of Other States

    Appointment of Director (Finance), Director (HRD)

    Valuation/ New Balance Sheet/ New P&L Account

    Establishing dedicated police stations and special courts-Appointments of SPs ondeputation

    M/s. Mula Pravara Electric Co-op Society recovery of arrears and other pending

    issues

    Payment of Arrears of State Govt. Dept.

  • 8/2/2019 IAS Taj Presentation

    23/39

    Slide 23

    Major Performance Indicators

    Description 2004-05 2005-06Revenues (Rs. Cr.) 14,930 14,058 #

    Power Purchase Cost (Rs. Cr.) 12,942 11,787 #

    Surplus/ Deficit [Accrual], (Rs. Cr.) -1137 -599 * #Distribution Losses (%) 31.14 27.98

    AT&C Losses (%) Mahavitaran

    [Effect of Free Power]

    26.93 26.53

    Average Collection Per Month (Rs. Cr.) 999.36 1113.93

    RCI Arrears (Rs. Cr.) 31st Mar 1466 1360

    DTC Failure Rate (%) 18.52 16.14

    Capital Investment (Rs. Cr.) 511.27 1277.43Cash Losses (Rs. Cr.) 998 150 (Projected)

    SCADA Progress Nil 10 Cities

    Call Centers 2 3 Operational

    Franchisee Nil 1 (Bhiwandi)FinalizedSpot Billing Nil 20 Cities

    No. of Theft Cases Detected 16337 26572

    FY 2005-06: Genco: Profit Rs. 256 Cr, Transco: Profit Rs. 330 Cr. Net -13 Cr

    # Values for period 05/06/2005 to 31/03/2006

    Previous Years

  • 8/2/2019 IAS Taj Presentation

    24/39

    Slide 24

    Further Ideas . . . . . . . . . . . . . . . .

    ?

  • 8/2/2019 IAS Taj Presentation

    25/39

    Thank You

  • 8/2/2019 IAS Taj Presentation

    26/39

    Slide 26

    (Rs. Crore)

    ARR & Tariff Petition Summary

    Total Revenue Expenditure

    S.no. Particulars

    Previous

    Year (FY2004-05)

    Current

    Year (FY2005-06)

    % Inc. overFY 2004-05 Ensuing Year(FY 2006-07) % Inc over FY2005-06

    1 Power Purchase Expenses 10706.91 12878.41 20.28% 16335.13 27%

    2 Operation & Maintenance Expenses 1747.64 1865.48 6.74% 2045.66 10%

    2.1 Employee Expenses 1360.53 1456.35 7.04% 1564.64 7%

    2.2 Administration & General Expenses 121.03 127.00 4.94% 133.35 5%

    2.3 Repair & Maintenance Expenses 266.08 282.12 6.03% 347.66 23%

    3

    Depreciation, including advance against depreciation

    511.43 540.72 5.73% 599.18

    11%

    4 Interest on Long-term Loan Capital 348.97 180.88 -48.17% 278.65 54%

    5

    Other Interest & Finance Charges incl. Interest on working

    capital & consumer security deposits123.69 260.72 110.79% 348.39

    34%

    6 Bad Debts Written off 209.88 219.95 4.80% 238.08 8%

    7 Other Expenses (details given separately) 130.20 122.70 -5.76% 137.40 12%

    8 Income Tax 0.00 108.50 160.89 48%

    9 Transmission Charges paid to Transmission Licensee 1533.89 1715.66 11.85% 1868.34 9%

    10 Contribution to contingency reserves 44.83 49.65 11%

    11 Total Revenue Expenditure 15312.60 17937.84 17.14% 22061.38 23%

    MSEDCL ARR & R G

  • 8/2/2019 IAS Taj Presentation

    27/39

    Slide 27

    MSEDCL - ARR & Revenue Gap

    Rs. Cr.

    S.No Particulars FY 2004-05 FY 2005-06 FY 2006-07 Total

    1 Aggregate Rev. Reqmt. 14505 16910 22490 53905

    2 Revenue with Existing Tariff 13992 15509 18942 484433 Revenue Gap 513 1401 3548 5462

    P d T iff

  • 8/2/2019 IAS Taj Presentation

    28/39

    Slide 28

    Proposed Tariffs

    Category

    ExistingFixed

    Charges

    (Rs)

    ExistingEnergy

    Charges(Rs/ Unit)

    ProposedFixed

    Charges

    (Rs)

    ProposedEnergy

    Charges(Rs/ Unit)

    % Increase

    Domestic

    (0-30 Units)20 221 25 265 28.8%

    Domestic(31-300 Units)

    40 386 60 480 28.8%

    Industrial LT

    (0-1000 Units)60 376 100 480 28.8%

    Commercial

    (0-100 Units)100 386 100 500 28.8%

    Agriculture (Per Hp) 213 213 0%

    Others 28.8%

    N d f t iff i

  • 8/2/2019 IAS Taj Presentation

    29/39

    Slide 29

    Need for tariff increase

    Power Purchase Cost has increased from Rs 10707 Crore in FY 04

    to Rs 16335 Crore in FY 07

    The average cost of supply (ACOS) has increased from Rs. 3.07

    per kWh to Rs. 4.22 per kWh.

    The average increase in tariff works out to 28.8%

    Ci l i Di t ib ti l Y Y C i

  • 8/2/2019 IAS Taj Presentation

    30/39

    Slide 30

    Circle wise Distribution loss YoY Comparison

    Circle 2004-05 2005-06

    Wardha 14.0% 11.06%

    Bhandara 38.0% 34.79%

    Chandrapur 13.0% 12.09%

    Gadchiroli 38.9% 34.67%

    Ahmadnagar 37.7% 36.39%

    Nashik ( R ) 39.4% 38.75%

    Nashik ( U ) 22.5% 17.18%

    Dhule 44.3% 42.18%

    Jalgaon 48.6% 38.76%

    Parbhani 57.3% 52.47%

    Aurangabad [R] 42.5% 37.88%

    Jalana 36.1% 32.97%

    Aurangabad [U] 35.3% 31.13%

    Buldhana 34.7% 30.42%Akola 39.9% 37.39%

    Amrawati 39.6% 34.85%

    Yeotmal 43.0% 42.41%

    Solapur 36.2% 39.93%

    Kolhapur 17.9% 14.92%

    Sangli 21.7% 17.79%

    Circle 2004-05 2005-06

    Satara 19.3% 20.09%

    Pen 10.2% 9.5%

    Kalyan (U) 34.7% 25.09%

    Kalyan 31.6% 31.5%

    Vasai 19.2% 17.51%

    Osmanabad 52.5% 48.14%

    Nanded 59.7% 55.8%

    Beed 60.4% 59.07%

    Latur 53.7% 46.74%

    Ratnagiri 15.9% 16.92%

    Sindhudurga 27.4% 29.46%

    Ganeshkhind 15.2% 12.68%

    Rastapeth 17.6% 17.14%

    Pune [R] 30.9% 27.51%

    Nagpur [U] 33.8% 31.14%

    Nagpur (R) 20.4% 18.98%

    Washi 12.4% 7.89%

    Bhandup 21.2% 21.17%

    Bhiwandi 37.9% 44.53%

    Major Performance Indicators

  • 8/2/2019 IAS Taj Presentation

    31/39

    Slide 31

    Major Performance Indicators

    Description 2004-05 2005-06Distribution Losses (%) 31.14 27.98

    Average Collection Per Month(Rs. Cr.)

    999.36 1113.93

    RCI Arrears (Rs. Cr.) 31st Mar 1466 1360

    DTC Failure Rate (%) 18.52 16.14Capital Investment onDistribution Infrastructure

    511.27 1277.43

    Cash Losses (Rs. Cr.) 537 900 (Projected)

    SCADA Progress Nil 10 Cities

    Call Centers 2 3 OperationalFranchisee Nil 1 (Bhiwandi) Finalized

    Spot Billing Nil 20 Cities

    Theft Cases Detected 16337 Cases 26572 Cases

    Demand Supply Gap (In MW)

  • 8/2/2019 IAS Taj Presentation

    32/39

    Slide 32

    Demand Supply Gap (In MW)Instances of Peak Demand

    Financial Year 2004-05 2005-06

    Date 28th March 28th December

    Demand (MW) 12749 14061

    Total Availability (MW) 9704 9756

    1. MahaGenco (MW) 6899 7238

    2. Central Sector Share (MW) 2317 2096

    3. Traders (MW) 377 443

    4. Tata Power (MW) 111 79

    Gap (MW) 3045 4205

    L d M t

  • 8/2/2019 IAS Taj Presentation

    33/39

    Slide 33

    Load Management

    Description 2005-06

    No. of APY villages4611 Villages

    960 MW

    Special Gaothan feeder separation 90 Feeders

    104 MW

    Single Phasing Scheme7800Villages

    960 MW

    DSM/ Energy Conservation4.5 Lakh

    9 MW

    Total Load Managed 2122 MW

    P P h t Hi h C t M thl 2005 06

  • 8/2/2019 IAS Taj Presentation

    34/39

    Slide 34

    Power Purchase at High Cost Monthly 2005-06

    UTILITY UNITS Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar FY 05-06

    TRADERS

    MUs 219.6 378.2 196.8 213.1 198.2 223.8 298.1 208.2 345.2 446.3 243.5 323.0 3294.0

    CostRs.Cr

    67.3 122.1 64.4 66.6 61.6 68.9 106.5 72.6 127.6 163.4 94.6 112.4 1128.2

    KAWASLIQUID

    MUs 207.1 152.5 24.8 0.3 0.0 0.0 0.0 0.0 77.7 142.3 243.2 129.9 977.8

    Cost

    Rs.Cr 135.9 93.8 14.8 0.2 0.0 0.0 0.0 0.0 56.2 101.4 179.4 94.8 676.3

    TPC

    MUs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 108.3 41.0 7.7 0.0 156.9

    CostRs.Cr

    0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 47.3 17.9 3.3 0.0 68.6

    CPP

    MUs 13.5 11.9 8.3 6.5 14.8 18.0 18.0 19.0 22.0 31.0 34.0 35.0 232.1

    CostRs.Cr 3.5 3.1 2.2 1.7 3.9 4.7 5.8 5.9 6.0 8.9 11.3 12.0 68.8

    TOTAL

    MUs 440.2 542.7 229.9 220.0 213.0 241.8 316.1 227.2 553.2 660.6 528.3 487.8 4660.8

    CostRs.Cr

    206.7 219.0 81.3 68.5 65.5 73.6 112.3 78.5 237.1 291.7 288.5 219.3 1941.9

    MUS, Average Cost, Total Cost

    Communication Plan

  • 8/2/2019 IAS Taj Presentation

    35/39

    Slide 61

    Communication Plan

    Communication Strategy

    Communication Focused towards internal EmployeesCommunication of reforms to consumers

    Means of CommunicationWorkshops with field staff and with unions

    Workshops conducted by Unions for members

    Staff Meetings at Division/Circle LevelHouse Journal (E-magazine)Maha Vitaran Veej Varta

    Video message on Ten Point Program

    Articles in Newspapers

    Officers KKPI

  • 8/2/2019 IAS Taj Presentation

    36/39

    Slide 62

    Officers KKPI

    S N KKPI Weightage HOD

    1 Percentage DTC having lossesBelow 15% ( U ) 05

    CE (IR)Below 25% ( R )

    2 Percentage Feeders having losses Below 15% ( U ) 05 CE (IR)Below 25% ( R )

    3 Sub-division / Division / Circle/Zone losses 05 CE (IR)

    4 Repatriation against target 10 CE (Comm)

    5 Commercial efficiency : Rs. collected/ input units 10 CE (Comm)

    6 Normal billing percentage 05 CE (Comm)

    7 FIR lodged/Compounding cases 10 CE (Comm)

    8 Arrears in Days:

    RCI Live 03 CE (Comm)

    Others Live 02

    RCI PD 05

    9 Percentage DTC failure against target 05 CE (LM)

    10 SAIFI / SAIDI 05 CE (LM)

    11 Reduction in Accidents 05 CE (LM)

    12 Pending RCI connections beyond SOP 05 CE (Dist)

    13 Annual plan progressPhysical 05 CE (IS)

    Financial 05

    14 Capacitors: MVAR in service out of MVAR installed 05 CE (Dist)

    15 Training (mandays) 05 CE (IR)

    Total : 100

    Dri e Against Corr ption

  • 8/2/2019 IAS Taj Presentation

    37/39

    Slide 63

    Drive Against Corruption

    Drive including abetment & action against employees:

    - FIR Against 22 Employees

    - Disciplinary Action Against 389 Employees

    P L d Sh ddi M d l

  • 8/2/2019 IAS Taj Presentation

    38/39

    Slide 69

    Pune Load Shedding Model

    Total Load Required for Pune Urban Circles: 751 MW

    Non Sheddable Load : 393 MW

    Sheddable Load : 358 MW

    CPP Generation : 90 MW (From 28 Consumers)CPP Generators to run : 4 to 6 Hrs. / Day

    Loading on Consumer : 42 Ps. / Unit

    except (0 to 300 Units Consumption)

    Major Performance Indicators (Previous Years)

  • 8/2/2019 IAS Taj Presentation

    39/39

    Major Performance Indicators (Previous Years)

    Description 2002-03 2003-04 2004-05 2005-06

    Revenues (Rs. Cr.) 12,437 13,225 14,930 14,058 #

    Power Purchase Cost (Rs. Cr.) 12,942 11,787 #

    Surplus/ Deficit [Accrual], (Rs. Cr.) -1137 -599 #

    Distribution Losses (%) 33.24 33.12 31.14 27.98

    AT&C Losses (%) Mahavitan 44.25 38.95 26.93 26.53

    Average Collection Per Month (Rs. Cr.) 999.36 1113.93

    RCI Arrears (Rs. Cr.) 31st

    Mar 1666 1845 1466 1360DTC Failure Rate (%) 18.52 16.14

    Capital Investment (Rs. Cr.) 511.27 1277.43Cash Losses (Rs. Cr.) 998 150

    (Projected)SCADA Progress Nil Nil Nil 10 CitiesCall Centers Nil Nil 2 3 Operational

    Franchisee Nil Nil Nil 1 (Bhiwandi)Finalized

    Spot Billing Nil Nil Nil 20 Cities

    No. of Theft Cases Detected 16337 26572

    # Values for period 05/06/2005 to 31/03/2006