CALCULO DE ARMADURA DE RESERVORIO
DATOSPROYECTO :AGUA POTABLE PAGO CARABAYA ACERO MUROS EXPEDIENTE : ACERO VERTICAL = 1/2 Pulg.ZONAL : DIAMETRO = 1.270 Cms.EVALUADOR :CARLOS L AREA = 1.267 Cms2.FECHA : 3-Aug-15 PESO = 0.994 Kg/ml
ACERO HORIZONTAL = 3/8 Pulg.DIAMETRO = 0.953 Cms.
CARACTERISTICAS GEOMETRICAS AREA = 0.713 Cms2.VOLUMEN RESERVORIO = 10.00 m3 PESO = 0.560 Kg/ml
ALTURA UTIL RESERVORI = 1.35 mts.LADO UTIL RESERVORIO = 2.75 mts. ACERO LOSA DE TECHO
ESPECIFICACIONES ACERO HORIZONTAL = 3/8 Pulg.CONCRETO f'c = 210 Kg/cm2 DIAMETRO = 0.953 Cms.SOBRECARGA EN LOSA = 150 Kg/m2 AREA = 0.713 Cms2.ACERO fy = 4,200 Kg/cm2 PESO = 0.560 Kg/mlRESISTENCIA DEL SUELO = 1.50 Kg/cm2 ACERO LOSA DE FONDOCOEF. SISMICO = 0.12 ACERO HORIZONTAL = 3/8 Pulg.RECUBRIMIENTO r = = 4.00 Cm DIAMETRO = 0.953 Cms.fs = 2,100 Kg/cm2 AREA = 0.713 Cms2.fc = 94.5 Kg/cm2 PESO = 0.560 Kg/ml
0.20 0.15 1.38
1.73
1.73
Sc WcSL 0.10
A' B'0.30
WL NIVEL DE AGUA
S1
1.35Ea
1.95 1.90 W1 0.45
1.03 Wa
A B
S2 0.20
0.10
C D
W2
0.28
0.87
1.04
-
CALCULOS
W1= Pc x V1 594.00 KgW2 = Pc x V2 830.40 KgWa = Pa x Va 1863.00 KgWL = Pc x VL 367.20 KgWs = Sc x A 229.50 KgS1 = 0,12 x W1 106.92 KgS2 = 0,12 x W2 149.47 KgSL = 0,12 x WL 66.10 KgSs = 0,12 x Ws 49.57 KgEa = 1,12 x 0,5 x Pa x H12 1530.90 Kg
VERIFICACION DEL ESFUERZO CORTANTE EN LA BASE AB
V = Fh / A 1.17 Kg/cm2
Vc = 0,29 ( f'c )^1/2 4.20 Kg/cm2
V= 1.17 Kg/cm2 < Vc = 4.20 Kg/cmBIEN !!
CALCULO DE LA ARMADURA
ACERO VERTICAL CARA B'-B
MOMENTO MAXIMO EN LA BASE A-B
Mu 976.23 Kg-mts.d = t1 - r - D/2 10.37 Cms.
AREA DE ACEROAs1 = 85.54 Cms2As2 = 2.57 Cms2 SE ASUME : 2.57 Cms2
CUANTIA = As / t1 x b 0.0017
CUANTIA MINIMA POR FLEXION 0.0012 < 0.0017 BIEN!!
USAR : 1 1/2 @ 0.30 mts.
ACERO HORIZONTAL B'B
ASUMIR CUANTIA MINIMA PARA EL ACERO HORIZONTAL, CONSIDERANDO P = 0,0018
As = P x b x t1 2.70 Cms2
USAR : 1 3/8 @ 0.26 mts.
ACERO EN LA ZAPATA
ASUMIR EL AREA DE ACERO HALLADA PARA LA BASE DE MURO
USAR : 1 1/2 @ 0.30 mts.
ACERO EN LA LOSA DE FONDO
P1 3370.896P2 5452.92P3 4918.32P4 8619.55P5 15425.64
LUEGO: 4035.56270.00
4305.56
WuD :WuL :
Wu :
-
CALCULO DEL MOMENTO ULTIMO
2068.19 Kg--mtsd = t1 - r - D/2 15.52 Cms.AREA DE ACEROAs1 = 128.33 Cms2As2 = 3.62 Cms2 SE ASUME : 3.62 Cms2
CUANTIA = As / t1 x b 0.00181
CUANTIA MINIMA POR FLEXION 0.0012 < 0.0018 BIEN!!
USAR : 1 3/8 @ 0.20 mts.
ACERO EN LA LOSA DE TECHO
360WuL = SC * 1,8 270
Wu = 630
CALCULO DEL MOMENTO ULTIMO
229.88 Kg--mtsd = t1 - r - D/2 5.72 Cms.AREA DE ACEROAs1 = 47.53 Cms2As2 = 1.09 Cms2 SE ASUME : 1.09 Cms2
CUANTIA = As / t1 x b 0.00109
CUANTIA MINIMA POR FLEXION 0.0012 > 0.0011 MAL!! SE ASUME CUANTIA MINIMA P= 0.0012
As = P * t1 * b 1.20 Cms2
USAR : 1 3/8 @ 0.25 mts
Mu = 0,0513 * Wu * L2
WuD = 2400 * t1 * 1,5
Mu = 0,0479 * Wu * L2
-
3.45
0.15 0.30
0.20 0.15 TUB. FG 3/4"@ 0,30 Mts.
0.15
1.6 UNIONESELECTROSOLDADAS
0.10
2.75
ESCALINES FG
VER DETALLE DETALLE DE ESCALINES
BUZON 0,60 x 0,60 Mts.
TAPA SANITARIA METALICA
ESPECIFICACIONES TECNICAS
0.15 RESISTENCIA DEL CONCRETO f'c = 175 Kg/cm2
FLUENCIA DEL ACERO fy = 4200 Kg/cm2
0.20 TRASLAPE MINIMO DE VARILLAS = 30 cm
0.20 0.15 2.75 0.15 0.20
FONCODESRESERVORIO APOYADO 10 M3
PLANTAC. LOAYZA P. Aug-15
-
TAPA SANITARIA METALICA 3/8 @ 0.250,60 x 0,60 mts.
0.10
0.30
NIVEL DE AGUA
1/2 @ 0.30
3/8 @ 0.26 TARRAJEO C / IMPERMEABILIZANTE 1.65
1.35
1/2 @ 0.30
3/8 @ 0.20 PENDIENTE DE FONDO 1%
3/8 @ 0.30
0.20
0.075
0.92 SOLADO DE CONCRETO
0.20 0.15 2.75 0.15 0.20
FONCODESRESERVORIO APOYADO 10 M3
CORTE A-AC. LOAYZA P. Aug-15
TUBERIA DE VENTILACION FG 2"
-
3/8 @ 0.25
3.05
2 3/8
ESPECIFICACIONES TECNICAS
RESISTENCIA DEL CONCRETO f'c = 175 Kg/cm2
FLUENCIA DEL ACERO fy = 4200 Kg/cm2
TRASLAPE MINIMO DE VARILLAS = 30 cm
3.05 FONCODESRESERVORIO APOYADO 10 M3ARMADURA DE LOSA DE TECHO
C. LOAYZA P. Aug-15
-
PLANILLA DE ARMADURA RESERVORIO 10 M3
ARMADURA LOSA DE TECHO LONGITUD VECES PESO
2.99
0.07 3/8 3.13 26.4 46.27
2.99
3/8 2.99 4 6.70
ARMADURA LOSA DE FONDO LONGITUD VECES PESO
1.27
0.17 1/2 1.44 50.00 40.23
3.39
3/8 3.39 16.22 30.80
ARMADURA DE MURO LONGITUD VECES PESO
0.11
1.81 1/2 2.03 44.67 90.13
0.15 2.90 3/8 6.25 14.69 51.42
1.53
PESO TOTAL EN Kg 265.55
-
HOJA DE METRADOS DE RESERVORIO
CAPACIDAD : 10 M3
PROYEC.: AGUA POTABLE PAGO CARABAYA EVALUADOR: CARLOS LEXPED.: 0 FECHA: 8/3/2015
PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL TOTAL UNID.
6.00 RESERVORIO 10.00 M36.01 TRAZO Y REPLANTEO 1.00 3.45 3.45 11.90 11.90 m26.02 EXCAVACION MANUAL 1.00 3.45 3.45 0.80 9.52 9.52 m36.03 SOLADO DE CONCRETO E= 0.05 Mts. 1.00 3.45 3.45 11.90 11.90 m26.04 CONCRETO F'C= 175 KG/CM2 1.00 3.45 3.45 0.20 2.38 6.18 m3
2.00 3.05 0.15 1.65 1.51 m32.00 2.75 0.15 1.65 1.36 m31.00 3.05 3.05 0.10 0.93 m3
6.05 CONFOR. DE PENDIENTE DE FONDO C F'C= 175 K 1.00 2.75 2.75 7.56 7.56 m26.06 ENCOFRADO Y DESENCOFRADO 4.00 3.05 1.75 21.35 47.06 m2
4.00 2.75 1.65 18.15 m21.00 2.75 2.75 7.56 m2
6.07 ACERO FY= 4,200 KG/CM2 1.00 265.55 265.55 265.55 kg6.08 ESCALINES DE FIERRO GALVANIZADO 2.00 2.15 4.30 5.50 ml
4.00 0.30 1.20
6.09 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 4.00 2.75 1.65 18.15 25.71 m21.00 2.75 2.75 7.56 m2
6.10 TARRAJEO EXTERIOR MEZCLA 1:5 4.00 3.05 1.75 21.35 30.65 m21.00 3.05 3.05 9.30 m2
6.11 TAPA SANITARIA METALICA 0,60 x 0,60 Mts. 1.00 1.00 1.00 unid6.12 TUBERIA DE VENTILACION FG D= 2" 1.00 1.00 1.00 unid6.13 PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO 1.00 1.00 1.00 glb6.14 SUMINISTRO Y COLOCACION DE HIPOCLORADOR 1.00 1.00 1.00 unid6.15 PINTADO DE MUROS EXTERIORES 4.00 3.05 1.75 21.35 30.65 m2
1.00 3.05 3.05 9.30
TIEMPO DE EJECUCION DE OBRA
PARTIDA DESCRIPCION UNID METRADO RENDI. PERSONAL PERSONAL BASE TIEMPO
6.00 RESERVORIO 10.00 M36.01 TRAZO Y REPLANTEO m2 11.90 200.00 1.00 1.00 0.48 Hrs.6.02 EXCAVACION MANUAL m3 9.52 3.00 1.00 5.00 5.08 Hrs.6.03 SOLADO DE CONCRETO E= 0.05 Mts. m3 11.90 70.00 2.00 2.00 1.36 Hrs.6.04 CONCRETO F'C= 175 KG/CM2 m3 6.18 9.00 2.00 2.00 5.49 Hrs.6.05 CONFOR. DE PENDIENTE DE FONDO C F'C= 175 K m2 7.56 70.00 2.00 2.00 0.86 Hrs.6.06 ENCOFRADO Y DESENCOFRADO m2 47.06 10.00 1.00 5.00 7.53 Hrs.6.07 ACERO FY= 4,200 KG/CM2 kg 265.55 250.00 1.00 1.00 8.50 Hrs.6.08 ESCALINES DE FIERRO GALVANIZADO ml 5.50 15.00 1.00 1.00 2.93 Hrs.6.09 TARRAJEO INTERIOR CON IMPERMEABILIZANTE m2 25.71 6.00 1.00 2.00 17.14 Hrs.6.10 TARRAJEO EXTERIOR MEZCLA 1:5 m2 30.65 10.00 1.00 2.00 12.26 Hrs.6.11 TAPA SANITARIA METALICA 0,60 x 0,60 Mts. und 1.00 5.00 1.00 1.00 1.60 Hrs.6.12 TUBERIA DE VENTILACION FG D= 2" und 1.00 10.00 1.00 1.00 0.80 Hrs.6.13 PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO glb 1.00 10.00 1.00 1.00 0.80 Hrs.6.14 SUMINISTRO Y COLOCACION DE HIPOCLORADOR und 1.00 10.00 1.00 1.00 0.80 Hrs.6.15 PINTADO DE MUROS EXTERIORES m2 30.65 25.00 1.00 1.00 9.81 Hrs.
TIEMPO APROX. EJECUCION RESERVORIO. 9.43 Dias
-
VOLUMEN ALTURA LADO INTER VOLUMEN ASUMIDO3.00 1.25 1.55 10.00 M34.00 1.25 1.805.00 1.25 2.00 ALTURA LADO6.00 1.25 2.20 1.35 2.757.00 1.25 2.408.00 1.30 2.509.00 1.30 2.6510.00 1.35 2.7511.00 1.40 2.8512.00 1.45 2.9013.00 1.50 2.9514.00 1.55 3.0515.00 1.55 3.1516.00 1.60 3.2017.00 1.65 3.2518.00 1.65 3.3519.00 1.70 3.3520.00 1.70 3.4521.00 1.75 3.5022.00 1.75 3.5523.00 1.80 3.6024.00 1.85 3.6525.00 1.85 3.7026.00 1.85 3.7527.00 1.90 3.8028.00 1.90 3.8529.00 1.95 3.9030.00 1.95 3.9531.00 2.00 3.9532.00 2.00 4.0033.00 2.05 4.0534.00 2.05 4.1035.00 2.05 4.1536.00 2.10 4.1537.00 2.10 4.2038.00 2.15 4.2539.00 2.15 4.3040.00 2.15 4.3541.00 2.20 4.3542.00 2.20 4.4043.00 2.20 4.4544.00 2.25 4.4545.00 2.25 4.5046.00 2.25 4.5547.00 2.30 4.5548.00 2.30 4.6049.00 2.30 4.6550.00 2.35 4.6551.00 2.35 4.7052.00 2.45 4.6553.00 2.40 4.7054.00 2.40 4.7555.00 2.40 4.8056.00 2.40 4.8557.00 2.45 4.8558.00 2.45 4.9059.00 2.55 4.85
-
60.00 2.45 4.95
CALCULOSPLANTACORTE A-AARMADO LOSA TECHOPLANILLA ARMADURAMETRADOSCUADROS